Loading...
HomeMy WebLinkAbout551.00 Sewer/Water Permit/s SEWER PERMIT / RECEIPT pECEIPT No: SO1.7V.00 CITY OF CARMEL permit Na.: 2000.0796.SW Permit Issue Date: Ap�24, 2000 �ssue oa�e: Ap�24� 2000 Receivedirom : RYLAND HOMES 7he sum ot : Two Thousanil One Hundred Five On Account of: Lat: 63 Subdivision : PLUM CREEK FARMS Strcet address: 12620 STANWICH FL ,a�'���.�ca'�'�o�`�s�uJt�c�sY p�,�u��; Fr7u �'qat��u5S�uN'ru Coi�i��tt(:f�rur: . . . .IIUII.UING:\'P:1UUItl?SS.I.IS'f4;D:\ItCI\'li: Wa[er Connection g609 �$ �,310.00 F.xcavator i BUTTZ EXCAVATING � - - - - � ' - - - - - - - � R'a�er.4vailabilih• #610 PO Box: S(reet Address: 12484 E 156TH ST Sewer Inspec[ion #65l $ 20.00 City;State,7.ip: NOBLESVILLE,IN 46060 Sewer Connection #659 $ ��5.00 Bond Cxpirev : Mar 19,2001 Sewer AvailabilitV #660 �..,_.__._ ��� � 'Potal $ $2,105.00 �% �' � '`� �/ Total Paid $ $2�105.00 i '% l/thorized Signatu e Receipt Issued ey: VAD Naymen[ 'I'ype : CheCk p 4530 Tlie building sewer shall be pvc sewer pipe meeting ASTM.specifcations 3034 SDR 35 of latest revision; or vitrified clay pipe„meeting ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are hereby permitted in w�i4ing: The sewer shall be installed in accordance with ASTM'G17for extra strength clay pipe and ASTM 2321 for pvc,pipe and the Uniform Plumbing Code for the State of Indiana. All installations shall be in strict compliance with pertinent City of'Carmel ordinances. All building sewers shall be 6" diameter. All installations shall be "open lrench".inspected and approved bythe Carmel Sewer Department before any backfiliing is done. Non-compliance mayresult in digging up the sewer insiallation and/or denial of future sewer permits andlo� denial of water connections. No footing or foundation drains or othersources of ground water orstorm watershall be permitted to enter the public sewer. Sewer inspections shoultl be requested at (317)571-2645 one to tour hours in advance. No inspections orinstallations will�be made on Saturday or Sunday or holidays unlessarrangements are made at least 24 hours in advance. All plumbers-or contractors installing sewer(or water)lines shall have a plumbers bond posted with the GTY ENGINEER'S OFFICE. If any street must be.cut,a�separate streebcut permit shall be obtained. 1 have read the�conditions to which I nmst adhere,and-agree�to accept the responsibility tor all work done under this permit. ��,����� � -�---- s��„�a: , �