HomeMy WebLinkAbout64-87 ADLS Phase 8 Meridian Technology Center Erosion Contol Planz
S7 r. /S/° /O
(CC-XB byt-6 )
T� - 48. /-7
/NV. - 4S, 34
x
a�5
i
CSTRAW BALES
EROSION CONTROL
• LAND ALTERATIONS WHICH STRIP THE LAND OF
VEGETATION, INCLUDING REGRADING, SHALL BE
DONE IN AWAY THAT WILL MINIMIZE EROSION.
WHENEVER FEASIBLE, NATURAL VEGETATION
SHALL BE RETAINED, PROTECTED AND SUPPLE-
MENT. .
• THE DURATION OF TIME WHICH AN AREA REMAINS
EXPOSED SHALL BE KEPT TO A PRACTICAL
MINIMUM. THE AREA SHALL BE STABILIZED AS
QUICKLY AS PRACTICAL.
• TEMPORARY VEGETATION OR MULCHING SHALL
BE USED TO PROTECT EXPOSED AREAS DURING
DEVELOPMENT.
• PERMANENT AND FINAL VEGETATION OR STRUCTURAL
EROSION CONTROL DEVICES SHALL BE INSTALLED
AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES.
• SEDIMENT IN RUN -OFF WATER SHALL BE
TRAPPED BY THE USE OF SUCH METHODS AS
DEBRIS BASINS, AND SILT TRAPS UNTIL THE
DISTURBED AREA IS STABILIZED.
5 7`iz.
/V-2 /// /
�C�EE ///L,E /iVLET> S7.P A/S //O L
%G - ¢S. 00 C, iAVED /9,eSA 1416 ET,
/NV,- 39.6905) Tc -44.42
//vv. - - 3'7. 4 105-E)
/Nv• - 39. S/ (N)
4783¢s 46.
�,:..
7,43 � �
1 -5 fi' IVE //1:9
6
46./4
3Z .4 /z
a 'Y
9.0 �,-4Ars i�" D. 30 i>< �.(6 - --f
+ 9s.6 x,40 CG
�.
4L.90 `�
r 46, 90 46.15 >
�a
47.7
y,
Sr
S7ir. A19 /04
oo
N
I I
P
n 46.70
.� Fin. Fl. Elev
x
--N ( 847.50)
I I�
�b
Is ° -/03
R6
Og k ' STj
q
�W'ST RAw
Q
0
BA1LES 4z2
(nA5-s.T)p0,i 8�o
S7-R. /1/s /OZ
-- a°
(Cue's Im.at
re- -45.9z og
I /NV, - 4z. 54 (5 --)
I /,vv. - ¢-2.74 CNw)
/370
STRAW
..BALES - -
�.Q S fe. N- /0 / /
6BEEN /VE BILE -)
C T -46,Go
/M V, - ¢2.33 (,')
/,v,. - 4 2. 4 2. (NUi)
I W
I -
I►
I
l
�I
�I
.I
W W
1, 1 MR
47.Z0
/0//7
(CuR,e /NLE-/
% - 45.24
I11vv. -42.7¢ C4
C
CONGRESSIONAL
J
Wheat or Rye
Oats
Annual Ryegrass
Non - Irrigated*
Irrigated
Dormant
Seeding **
Temporary Seeding Dates
Jan
Feb
Mar
Apr May
Jun Jul
Aug
Sep Oct
s7',R N ° /Os
CCV" /NLE f,
Dec
------------------------------------
---
---
---------------
rc_ 49.17
-�
��
77 ---------------
\
//yv. - 4s7< Z 4
-
\ 1
��
LLI
---------
- ---
--
- - --
-- --
- - --
U
0
U
Permanent
Seeding
W
1/2' deep
II
0Wyy
Spring -Oats
--------
3lbs_3
2_ - - _-- ___-
- --
LL
Annual Ryegrass
- -- -1 - - --
40 lbs.
- - - --
U I
N
OD
�\
Q
s N/ °r� /o¢ I
X
6 -jgva P ,4&A /NLE 79
rc - 46.02
a
43. 3-0 CS )
4-3. 5-2 CND
=o
z
Q
Cr
0
o
W
Q
°
�
z
C7
0!S
Q
_2
y 2
cr
ap
_z
W
Cn
U)
X
z
w
Z
aN_
2J
O
^W
I..L
z
-57�? A/2 /o 3
��EE•NiVE �,yLE:�%
R2
Cr
z
4Z.
43.0000 1
i
x
a�5
i
CSTRAW BALES
EROSION CONTROL
• LAND ALTERATIONS WHICH STRIP THE LAND OF
VEGETATION, INCLUDING REGRADING, SHALL BE
DONE IN AWAY THAT WILL MINIMIZE EROSION.
WHENEVER FEASIBLE, NATURAL VEGETATION
SHALL BE RETAINED, PROTECTED AND SUPPLE-
MENT. .
• THE DURATION OF TIME WHICH AN AREA REMAINS
EXPOSED SHALL BE KEPT TO A PRACTICAL
MINIMUM. THE AREA SHALL BE STABILIZED AS
QUICKLY AS PRACTICAL.
• TEMPORARY VEGETATION OR MULCHING SHALL
BE USED TO PROTECT EXPOSED AREAS DURING
DEVELOPMENT.
• PERMANENT AND FINAL VEGETATION OR STRUCTURAL
EROSION CONTROL DEVICES SHALL BE INSTALLED
AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES.
• SEDIMENT IN RUN -OFF WATER SHALL BE
TRAPPED BY THE USE OF SUCH METHODS AS
DEBRIS BASINS, AND SILT TRAPS UNTIL THE
DISTURBED AREA IS STABILIZED.
5 7`iz.
/V-2 /// /
�C�EE ///L,E /iVLET> S7.P A/S //O L
%G - ¢S. 00 C, iAVED /9,eSA 1416 ET,
/NV,- 39.6905) Tc -44.42
//vv. - - 3'7. 4 105-E)
/Nv• - 39. S/ (N)
4783¢s 46.
�,:..
7,43 � �
1 -5 fi' IVE //1:9
6
46./4
3Z .4 /z
a 'Y
9.0 �,-4Ars i�" D. 30 i>< �.(6 - --f
+ 9s.6 x,40 CG
�.
4L.90 `�
r 46, 90 46.15 >
�a
47.7
y,
Sr
S7ir. A19 /04
oo
N
I I
P
n 46.70
.� Fin. Fl. Elev
x
--N ( 847.50)
I I�
�b
Is ° -/03
R6
Og k ' STj
q
�W'ST RAw
Q
0
BA1LES 4z2
(nA5-s.T)p0,i 8�o
S7-R. /1/s /OZ
-- a°
(Cue's Im.at
re- -45.9z og
I /NV, - 4z. 54 (5 --)
I /,vv. - ¢-2.74 CNw)
/370
STRAW
..BALES - -
�.Q S fe. N- /0 / /
6BEEN /VE BILE -)
C T -46,Go
/M V, - ¢2.33 (,')
/,v,. - 4 2. 4 2. (NUi)
I W
I -
I►
I
l
�I
�I
.I
W W
1, 1 MR
47.Z0
/0//7
(CuR,e /NLE-/
% - 45.24
I11vv. -42.7¢ C4
C
CONGRESSIONAL
J
Wheat or Rye
Oats
Annual Ryegrass
Non - Irrigated*
Irrigated
Dormant
Seeding **
Temporary Seeding Dates
Jan
Feb
Mar
Apr May
Jun Jul
Aug
Sep Oct
Nov
Dec
------------------------------------
---
---
---------------
- - --
- - --
-�
��
77 ---------------
\
Remarks
-
\ 1
��
` --
---
- - -- --
- - -- - - --
---------
- ---
--
- - --
-- --
- - --
Cover seed I' to
0
U
Permanent
Seeding
Dates
1/2' deep
l
Spring -Oats
--------
3lbs_3
2_ - - _-- ___-
- --
- --
Annual Ryegrass
- -- -1 - - --
40 lbs.
- - - --
---------
N
OD
�\
------------------
X
c
Irrigation needed during this period. To control
erosion at times other than in the shaded areas,
use mulch.
* Late summer spedinq dates may be extended 5 days
if mulch is applied.
** Increase seeding application by 50%•
NOTE:
SHADED AREA DENOTES AREA TO
, BE SEEDED AND STRAW MULCHED.
V1
W
Q
* Not necessary where mulch is applied.
s 4,e ni° /D 8
(f'0 v6d A e s A AV, r. T)
%G- -43.76
IN V. - 38-so(/Yw %s E,
30';t?�.P
'C-Ass 36 V.
ASSUMED NORTH
SCALE: I =40
GENERAL NOTES:
I. IT SHALL BE THE RESPONSIBILITY OF EACH
SUBCONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND
CONDITIONS PERTAINING TO HIS PHASE OF WORK. IT SHALL
ALSO BE THE SUBCONTRACTORS RESPONSIBILITY TO
CONTACT THE OWNERS OF THE VARIOUS UTILITIES FOR
PROPER STAKE LOCATION OF EACH UTILITY BEFORE WORK
IS STARTED. THE SUBCONTRACTOR SHALL NOTIFY IN
WRITING THE OWNER OR THE ENGINEER OF ANY CHANGES
OMISSIONS, OR ERRORS FOUND ON THESE PLANS OR IN
FIELD BEFORE WORK IS STARTED OR RESUMED.
2. ALL GRADES AT BOUNDARY SHALL MEET EXISTING GRADES.
3. ANY PART OF THE STORM SEWER TRENCHES RUNNING
UNDER PAVED AREAS TO BE BACKFILLED WITH GRANULAR
MATERIAL.
EX /S'' 5 7-11 M /NLET
37. 376EX s s. -369
/ir v. - 3 7. 8'2 ('IV--14i /J!E. 3 o's A1,6
G�
3° x
STRAW
, , BALES
, ,
-4
BLVD.
NOTE:
See construction plans by
Triad Associates for
Y
U
W
z
U
W
H
0
m
O
z
Y
U
X
Uj
U
CC <
oo�
>m
m
0
c/) W, Z C1� c Q Q w
�
Temporary Seedings
0
Existing Storm Sewerw /Inlet
w
Rates
per:
---�- -• New Storm Sewer"tinlet
w
Kind of Seed
1000 Sq. Ft.
Acre
Remarks
Z
Wheat or Rye
3.5 lbs.
------------------------------
2 bu.
Cover seed I' to
0
U
oo. Al I Other Finished Elevations
=
W
1/2' deep
l
Spring -Oats
--------
3lbs_3
2_ - - _-- ___-
-bu.
_- - --------------------------
-1
Cover seed I' deep
Annual Ryegrass
1 lb.
40 lbs.
Cover seed 1/4 dee p *
* Not necessary where mulch is applied.
s 4,e ni° /D 8
(f'0 v6d A e s A AV, r. T)
%G- -43.76
IN V. - 38-so(/Yw %s E,
30';t?�.P
'C-Ass 36 V.
ASSUMED NORTH
SCALE: I =40
GENERAL NOTES:
I. IT SHALL BE THE RESPONSIBILITY OF EACH
SUBCONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND
CONDITIONS PERTAINING TO HIS PHASE OF WORK. IT SHALL
ALSO BE THE SUBCONTRACTORS RESPONSIBILITY TO
CONTACT THE OWNERS OF THE VARIOUS UTILITIES FOR
PROPER STAKE LOCATION OF EACH UTILITY BEFORE WORK
IS STARTED. THE SUBCONTRACTOR SHALL NOTIFY IN
WRITING THE OWNER OR THE ENGINEER OF ANY CHANGES
OMISSIONS, OR ERRORS FOUND ON THESE PLANS OR IN
FIELD BEFORE WORK IS STARTED OR RESUMED.
2. ALL GRADES AT BOUNDARY SHALL MEET EXISTING GRADES.
3. ANY PART OF THE STORM SEWER TRENCHES RUNNING
UNDER PAVED AREAS TO BE BACKFILLED WITH GRANULAR
MATERIAL.
EX /S'' 5 7-11 M /NLET
37. 376EX s s. -369
/ir v. - 3 7. 8'2 ('IV--14i /J!E. 3 o's A1,6
G�
3° x
STRAW
, , BALES
, ,
-4
BLVD.
NOTE:
See construction plans by
Triad Associates for
Y
U
W
z
U
W
H
0
m
O
z
Y
U
X
Uj
U
CC <
oo�
>m
m
0
c/) W, Z C1� c Q Q w
sewer 13
Wz
sanitary 0 .,
,4:
water line design, m 14- L()
0 z
- LEGEND -
�
0
Existing Storm Sewerw /Inlet
w
W
---�- -• New Storm Sewer"tinlet
w
?
U.
+40 Q° 9
Existin Grade Elevations
r
Z
o.00 Finished Pavement Elevations
F-
0
U
oo. Al I Other Finished Elevations
=
W
W
Drainage Flow Direction
w
?
U
rr OD
N
OD
X
a
� m
=o
i
Cr
o
°
C7
0!S
_2
y 2
cr
ap
W
Z
Z
aN_
2J
O
z
Q
" <
W
R2
Cr
z
W
W
Co
2
_
C CD
(3' 2�
� N
- -0
> C
U �
sewer 13
Wz
sanitary 0 .,
,4:
water line design, m 14- L()
0 z
- LEGEND -
�
Q
Existing Storm Sewerw /Inlet
w
o
---�- -• New Storm Sewer"tinlet
w
?
a'
+40 Q° 9
Existin Grade Elevations
r
Z
o.00 Finished Pavement Elevations
F-
0
U
oo. Al I Other Finished Elevations
=
W
z
Drainage Flow Direction
w
?
¢� O
ORIGINATING BENCHMARK a Wz w
MINE SPIKE IN NORTH SIDE OF P W Wo im
POWER POLE � 10 _ 106 -B g�;m
AT INTERSECTION OF 116TH STREET AND PENN ROAD. =MEET
(ELEVATION 846.64 ) OF S• I I
I I