HomeMy WebLinkAboutSchutt - Lookabill/ENG/$8,403.52/CO 1/Monon Bridge over Carmel DriveCITY OF CARMEL
APPROVED AS TO FORM BY
L-to\-1,
TO: Mike McBride CONTRACT CHANGE ORDER NC 1
Dick Hill DATE: 7/29/2008
PROJECT NAME: Monon Bridge over W. Carmel Dr.
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
Additional Catch Basins and various sizes of PVC pipe required to tie in unforeseen existing draintiles. Addition
of www.mononbridge.com information signs and additional pedestrian information signage.
SCHEDULED ADJUSTMENT
ITEM AMOUNT ( +) OR ( - ) DAYS
#72 Catch Basin E -7
#97 Construction Sign, C
#98 Pipe, PVC, 8 in.
499 Pipe, PVC, 4 in.
$2,828.60
$3,249.92
$1,200.00
$1,125.00
0
0
0
0
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $3,246,858.18
Contract Price will be increased/decreased by this Change Order $8,403.52
New Contract Price including this Change Order $3,255,261.70
Contract Time prior to this Change Order Days 11/15/2009 Completion Date
Net increased/decreased resulting from this Change Order 0 Days
Current Contract Time including this Change Order Days 11/15/2009 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
ENGINEER
4
auresss
1625 N. Post Rd.
City /State /Zip
Indi s/IN/46229
By Sian
Phone: 117.:95.2585
Date: 7.29.2008
The Above Changes Are
Accepted
CONTRACTOR
c jmL.6. //
Address
4050 Rockville Rd
City /State /Zip
Indian .poli ' /462 2
Bye .- <. „/ A 'l
Phone: 317- 484 -1500
Date: 7.29.2008
Johnson,
Clerk for
D' a Co ra �j1 rk- Treasure
�lM'rly
Michael Mc nde,
Engineer
' tit/ 23/ AIM 10:51 3175691695 SCXIUTT LCOCABILL
PAGE 01/04
Contract No:B -27185 Change Order No.: 001
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Page: 1
Contract Information Contract No.: B -27185 Letting Date:05/14/2008
District:GREENFIELD DISTRICT AE:Goldner, Rob PE/S:Mlller, Christopher Status:Pending
Change Order Information
Change Ordor No.: 001 EWA: Y or Foroo Acct: N
Date Generated: 07/15/2008 Date Approved: 00/00/0000
Reason Code: SCOPE CHANGES, Local Agency Request
Description: Addtlonal Structures and Addtional Detour Route Signage
Original Contract Amount $ 3,240,858.18
Current Change Order Amount $ 8,403.52
Total Previous Approved Changes $ 0.00
Total Change To -Date $ 8,403.52
Modified Contract Amount $ 3,285,281.70
Time Extension Information
Date Initiated 00/00 /0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
Percent: 0.259 %
Percent: 0.000 %
Percent: 0.259 %
Date Completed 00 /00 /0000
SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0
SP Date 00/00 /0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
SS Days 0 SP Days 0 SP Days Value $ 0.00
SS Days by AE: DCE: SCE: DDCM:
S5 Days SP Days Value $
SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00 /0000 or SP Days 0
as..f0.J11 LuvNwnl LL
Contract No:B -27185 Change Order No.: 001
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority AE: DCE: SCE: DDCM:
($ per Change Order) (- LE $ 250K-) (- LE $ 750K - ) ( — LE $ 2 M — ) ( — GT $ 2 M — )
(Days per Contract) (50 55 days ) ( 100 55 days ) ( 200 55 Days ) (G 1' 200 SS days)
Verbal Approval Required? Y / N If Y by Date Issued
Total Change To- pate >5 %7 Y / N If Y , Copy to Program Budget Manager
Scope /Design Recommendation Y / N If Y, Referred to Project Manager(PM)
Required?
Page: 2
•
Date to PM Date Returned
Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date
If N,Resolution: Approved Disapproved
Resolved by Date
LPA Signatures Required? Y / N If Y, Date to LPA Date Returned
FHWA Signatures Required? Y / N Y, Date to PHWA Date Returned
• Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
07/23/2008 10:51 3175691695 SO-UTT LOOKABILL
Contract No:B -27185
INDIANA
Change Order No:001 Department of Transportation
CartrarA:
Project
Change Order Nbr:
Change Order Description: Addtlonal Structures end AddBonal Detour Route Signege
Reason Code: SCOPE CHANGES, Local Agency Rcqucat
:.u,w.e,e,e.
PAGE 03/84
Date:07/22/2008
Page: 3
B •27185
0300059 - Slate:9929036
001
CNN PCN PLN tom Cede IAdt UniPdoe CO City
0072 0200080 0000 120045225 EACH 1.414.200 2.000
Wen Deeablka: CATCH BASIN. E7
Supplemental Demalptionl:
WIPIreenevel Desenpeort:
Commend
Amount Change
Amami 2,026.60
97 0300060 103 80143290 EACH 405.240 8.000 C Amounts 3,249,92
gem Desa$rlen: CONSTRIICfON SIGN. C
appandn6l Oacc ptlall: Inlamallon 81Ore and Work Zone Penally Sgns
atgflada D/aubaant:
98 0300059 104 71542417 LFT 46.000 25.000 C Anwurtf 1,200.00
nets Dosaplon: PIPE, PVC, $
Daoapion1: Omen*
supplemental C
60 0300069 106 715.93037 LFT 46.000 25.000 C Amounts 1,125.00
Item DesehIaliem PIPE, PVC, 4 IN,
Suppemerdal DoayAanl: Oneida
Supplemental DeoalP6ont
Total Value for Dome Order 001 • $ 8 ,403.62
Whereas, die Standerd Spod6osSwR for ads centred provides for such work to Oa porfonns4 We PoSowIn9 theme N recommence.
Derr& pi mend..d aIw gs Oreer Caplanaian
Addvotdd Type C signs were added to comply Mth to Work Zone safety Sipmge required for all projects Type C signs were eteo requested bY
err kcN LPA to provide eddr5ard krbrnawon to the eareenp public. These Include 0n www.n aronbldge.mn egne as wee so Tni open to
COY Center se Makes sign Addeornl Type 6.7 kdob wee nesdod Its order to drain the Aunt parking Id. 3 adawoe . meet pleas wan
discovered cuing deeming end placement otdie 2C Awn Punk Iho. AddecnpI pipe menu re needed is well end Include r end 4- PVC
*ahem The editing d..LS watts direct, Into the new 6T wun smc
Cbange Order Egrtandlon for Sped9e tiro born
t iv the Intend of the pieties dad Ws dirge order I full and compete cementation for the worn Meaux ebotro,
Neeno. den end mew m It time emir 1. hereby actrrowtedped.
Contras , .... 04441tc
J vcY 23. 2 cog
Dab:
NOTE Other required Stele and FHWA sgnaSdss will be obalrad eloarm^ .p y vnigh do 91mi4arager Wins-
u u micuvo .U:Ol 31/5b71btl0
Contract No:8 -27185
S121U1.I L.LLRABILL rMat bo /bq
INDIANA
Change Order No:001 Department or Transportation
Date:07/22/2008
Page: 4
,kza„iti
(SIGNATURE)
(SIGNATURE)
APPROVED FOR LOCAL PUBLIC AGENCY
pp ATY i t/ a 9
(TITLE)
( TITLE)
SUBMITTED FOR CONSIDERATION
744)/2658
O
(DATE)
APPROU® FOR DONNA DEPARTMENT OF TRANSPORATION
Approval Level NarnB Approver
Area Engineer Goldner, Rob
00/00/0000
Status
Action Pending
Contract No:B -27185 Change Order No.: 001
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Contract Information
Contract No.: B -27185 Letting Date:05/14/2008
Page: 1
District:GREENFIELD DISTRICT AE:Goldner, Rob PE /S:Miller, Christopher Status:Approved
Change Order Information Change Order No.: 001 EWA: Y or Force Acct: N
Date Generated: 07/15/2008 Date Approved: 09/04/2009
Reason Code: SCOPE CHANGES, Local Agency Request
Description: Addtional Structures and Addtional Detour Route Signage
Original Contract Amount
Current Change Order Amount
Total Previous Approved Changes
Total Change To -Date
Modified Contract Amount
Time Extension Information
Date Initiated 00 /00 /0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
$ 3,246,858.18
$ 8.403.52
$ 45,409.02
$ 53,812.54
S 3,300,670.72
Percent: 0.259
Percent: 1399
Percent: 1.658 %
Date Completed 00 /00 /0000
SS Completion Date 00 /00 /0000 or SS Calendar /Work Days 0
SP Date 00 /00 /0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
SS Days 0 SP Days 0
SS Days by AE:_ DCE: SCE:
SS Days
SP Days Value $ 0.00
SP Days Value S
DDCM:
SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0
SS Date 00 /00 /0000 or SP Days 0
Contract No:B -27185
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Contract Information Contract No.: B -27185
District:GREENFIELD DISTRICT AE:Goldner, Rob
Change Order Information Change Order No.: 002
Date Generated: 04/22/2009 Date Approved: 06/10/2009
Reason Code: ERRORS & OMISSIONS, Contract Related
Description: Ornamental Steel
Original Contract Amount $ 3.246,858.18
Current Change Order Amount $ 23,177.76
Total Previous Approved Changes $ 30,634.78
Total Change To -Date $ 53,812.54
Modified Contract Amount $ 3,300,670.72
Time Extension Information
Date Initiated 00 /00 /0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
Change Order No.: 002
Page: 1
Letting Date:05 /14/2008
PE /S:Miller, Christopher Status:Approved
EWA: Y or Force Acct: N
Percent: 0.714 %
Percent: 0.944
Percent: 1.658
Date Completed 00 /00 /0000
SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0
SP Date 00 /00 /0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
SS Days 0 SP Days 0 SP Days Value $ 0.00
SS Days by AE: DCE: SCE: _ DDCM:
SS Days SP Days Value $
SS Completion Date 00 /00 /0000 or SS Calendar /Work Days 0
SS Date 00 /00 /0000 or SP Days 0
Contract No:B -27185
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Contract Information Contract No.: B -27185
District:GREENFIELD DISTRICT AE:Goldner, Rob
Change Order Information Change Order No.: 003
Date Generated: 05/14/2009 Date Approved: 09/04/2009
Reason Code: CHANGED COND, Environmental Related
Description: Landscaping - Ground Cover and Topsoil
Original Contract Amount
Current Change Order Amount
Total Previous Approved Changes
Total Change To -Date
Modified Contract Amount
Time Extension information
Date Initiated 00 /00 /0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
$ 3.246,858.18
$ 15,051.10
$ 38,761.44
$ 53,812.54
$ 3,300,670.72
Change Order No.: 003
Page: 1
Letting Date:05/14/2008
PE /S:Miller, Christopher Status:Approved
EWA: Y or Force Acct: N
Percent: 0.464 %
Percent: 1.194 %
Percent: 1.658
Date Completed 00/00 /0000
SS Completion Date 00 /00 /0000 or SS Calendar /Work Days 0
SP Date 00 /00 /0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
SS Days 0 SP Days 0 SP Days Value $ 0.00
SS Days by AE: DCE: SCE: DDCM:
SS Days SP Days Value $
SS Completion Date 00 /00 /0000 or SS Calendar /Work Days 0
SS Date 00 /00 /0000 or SP Days 0
Contract No:B -27185 Change Order No.: 004
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Contract Information Contract No.: B -27185
District:GREENFIELD DISTRICT AE:Goldner, Rob
Change Order Information Change Order No.: 004
Date Generated: 00 /00 /0000 Date Approved: 01/14/2010
Reason Code: SCOPE CHANGES, Local Agency Request
Description: Failed Pipe and Sink Hole Repair
Original Contract Amount $ 3,246,858.18
Current Change Order Amount S 7,180.16
Total Previous Approved Changes S 46,632.38
Total Change To -Date S 53,812.54
Modified Contract Amount $ 3,300,670.72
Time Extension Information
Date Initiated 00 /00 /0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
Date Completed 00 /00 /0000
Page: 1
Letting Date:05 /14 /2008
PE /S:Miller, Christopher Status:Approved
EWA: Y or Force Acct: N
Percent: 0.221 %
Percent: 1.436 %
Percent: 1.657 %
SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0
SP Date 00 /00 /0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
SS Days 0 SP Days 0 SP Days Value $ 0.00
SS Days by AE: DCE: SCE: DDCM:_
SS Days SP Days Value $
SS Completion Date 00 /00 /0000 or SS Calendar /Work Days 0
SS Date 00 /00 /0000 or SP Days 0