HomeMy WebLinkAbout14070074 State Release ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA at http:/lwww.in.povldhs/2650.htm.
This on•Iine flling Is through a secure site,you can usa It to submit your proJect information,pay the fees and upload your proJect plans.
Use Internet Browser to Vlew thls report,ofAer browsers are not compatible to view this report
Project number Release date
`"` ��'°4 CONSTRUCTION DESIGN RELEASE
a ��"w� State Form 4N91 (R9I5-98) 372376 07/08/14
��¢�_� �." �1� � Constructiontype OccupancyclassiTication
-. ., /� ReporlPnntetl on:July 8,2014 II-B, SPK B, REM
� �e'�e� Scope of release
Indlana Department of Homeland Secudty �NDIANA OQ ARCH ELEC MECH
DIVISION OF FIRE 8 BUILDING SAFETY � �`Q S o000
PLAN REVIEW DIVISION F%�� Type of release
402 W.Washington SL,Room E245 %P� Standard
Indianapolis,IN 46204 tI0051ER 54iEiY
Avalleble At Your Loul Lic�nc�ea�cn p�aject name
To:Owner I Nchitect I Engineer SUPPORT XOOSIER SAFE7Y Dr Nunery's Office
Schott Design
KevinHugh Boyle AR10700017 streetaadress
7128 Waldemar Drive 207 N Pennsylvania Parkway
Indianapolis IN 46268 suite 225
City County
ax 8 etnall: 3173871770,studiob@schottdesign.com Indianapolis HAMILTON
The plans;specifications and application�submitted for the�above referencetl projed�have been reviewed for compliance with the applicable rules of
the Fire Prevenlion antl Building Safety Commission.The project is released for conslruciion subjecl lo,but not necessarily limited to,the conditions
listed below.THIS IS NO7 A BUILDING PERMIT.All required local permitsand licenses must be obtained�prior lo,beginning construction work.All
conswction work must be in full compliance wifh all applicable`State'rules.��Any changes in the�released plans and/or specifcations'must be filed with
and released by this Offce before any work is altered��7his'�release may�be suspended oi:revoked if it is detertninedto be issued in error,in violation
ot any rules o�the Commission or if it is baseA on�incovecCOr insuffcieot infortnation�.This�releasa shall expire byJimitatioq.and become null and
voitl,if the work authorized is.no4commenced within one(1)year irom the above date.
CONDITIONS:
Note:(AtA&A7 B): In accordance:with the affitlavit swom under penalties of perjury in lhe appliwtion for construction design release the plans
and specifications fled in conjuncUOn��with this project shall�comply with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission.Providing false information constitutes an act of peijury,which is a�Class D felony punishable.by a prison term and a fine up to$10,000.
In accordance with Section 19 of the General Administretive Rules(675 IAC 72-6-19)a complete�set of plans and specifications ihat confortn
exaclly to the design thal was released by lhe oRice of the�slate builtling commissioner shall be maintained on the construction jobsite as well as a
copy of the tlesign release. -
4G0411A Any;building lawfully in existence at the time of the adoption of any rule of the Commission for new
construction may have its existing use or occupancy continued without having to be altered to
compiy with such a rule in accordance with 675 IAC 12-4-11(a).
4G0412AC. No addition or alteration shall cause an existing building, structure, or any part of the permanent
heating, ventilating, air conditioning, electrical, plumbing, sanitary, emergency detection, emergency
communication, o� fire or explosion suppression systems to become unsafe or overloaded under
the provisions of the rules of the Commission for new construction in accordance with 675 IAC 12-4-
12(c).
4G0603AF Detailed plans and specifications for the revised fire suppression system shall be filed with the
required application and appropriate fees in accordance with 675 IAC 12-6- 3(a), 675 IAC 12-6-
7(g)(17), and 675 IAC 13-1-8. (N.F.P.A. 13)
Please be advised that iLan administrative review of ltiis action is tlesiretl,a written pelition for review musl be filed al the above address with Ihe
Fire Preven�ion and Builtling Safery Commission identiFyingthe matter for which a review is 5ought no later�han eighteen(18)days from ihe above-
stated date,unless the eighteenth day falls on'a Saturday,a Sunday,a legal holiday under State statute,or a day in which the Depariment of Fire
and Builtling Services is closetl during nortnal business hours.In the latter case,ihe fling deadline will be tM1e first working day thereafler.lf you
choose to petition,and ihe before-mentioned procedures are tollowed,your petition for review will be granted,and an administrative proceeding will
be conducted by an administretive law judge of the Fire Prevenlion and Building Safety Commission. It a petition for review is not fled,ihis Order will
be final,and you must comply with its requirements.
Page 1/2