HomeMy WebLinkAbout340.02 Sewer/Water Permit/s SEWER PERMIT /RECEIPT qECEIPT No: S0004.02
CITY OF CARMEL Permit No. : Z002.0084:SW
t����nac�: Mar 20� 2002 Penni�Issue Uatc: Mel 20�2002
Received from : CENTEX .
7 ne sum ut : Two Thousand One Hundred Five'
On Account oT: Lot: 3� Snbdi�ision : SETTLER'S RIDGE AT HAVERSTICK
Street address : 13986 SAND CHERRY CT
APVLICATION IS�HERGtSY MAUIi.FON PERRiftiS10NT0 COI�`��I'sC'f'PHE
I3UILD[NG AT ADDRESS LISTtiD AI-0OVF:1 .
Sewer Notes
Wate�Connectlon #609 $ 1,310.00
Excavator: HELLYER EXCAVATION � �-�---.
— -- WarerAvailability #610
PO Box:
Street AdJress; 8500 KEYSTONE XING STE�160 Sewer Inspec[ion #651 $ 20.00
....... .. ...... � 775.00
Cit ,S[ate,Zi -��-- Sewer Connec[ion #65I $
Y P � �INDIANAPOLIS,IN 46240 , . .
Bond Expirey : May 05,2002 Sewer�Availability #660
Total $ $2�105.00
�� �'�.�p� Total Paid $ $Z�105.00
An[hon J Signahve Receipt IssueJ By: �B Payment Type : ChBCk p 59232
The building sewer shall be pvc sewerpipe meeting ASTM specifications 3034 SDR 35 of latest revision; or vitrified
clay pipe,-meeting ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are
here6ype�mitted in writing. The sewer shall be installed in accordance with ASTM C-12 for extra strength clay pipe
and ASTM 2321 for pvc pipe and the Uniform Plumtiing Codefior the State of lndiana. All installations shall be in strict
compliance with pertinent City of'Carmel ordinances. All building sewers shall be 6"diameter.
All installations shall be "open'trencfi"inspected and approved bythe Carmel Sewer Department.before any backfilling
is�Non-comp iance may resu t in igging up the sewer instaffation an . or enial o uture sewer permits an �
denial;of water'connections.
No footing orfoundation drains or other sources of ground water or storm wate�shall be permitted to enter the public
sewer:
Sewer inspections:should be requested at(317)5712648+one to four hours in advance.
No:inspectionsor installations will bemade�on Saturday.or Sunday o�holidays,unless zrrangements�are made at least 24 hours in
advance. All plumtieis.or coritractors�installing�.sewer(orwater).linesslial6have�a plumbers bond posted with the CITY ENGINEER'S ,
OFFICE. If�any street must be cut,a separate stFeeCcut permifshall`be`obtained.
1 have�read3he�condi[ions to wGich 1 must.adliere,and:;agreeto accept:tl�e respbnsibili[y foi'all�wurk done.under this�permit.
- - -���� ��� ��
Sig�/�
Aqproved by State Board of Accounts.for City of 6armel, 2001