Loading...
HomeMy WebLinkAbout14060055 Correspondence (3) City of Ca� el Fire Department Headquarters 2 CNIC SQUARE CARMEL, INDIANA 46032 Voice (317) 571-2600 Fax (317) 571-2615 Fire Prevention Bureau CRG Seasons, LLC 805 City Center Drive, Ste. 160 � Carmel, IN 46032 �� Attn: Joseph A. Langebartels ��� RE: Seasons of Carmel Apartment Complex �� 9815 N. Westfield Blvd � Carmel, IN 46032 Plan Review Comments The undersigned has reviewed the proposed plans for the above listed project and is forwarding the following comments for your review. All comments are requirements of the Indiana Fire Code 2008 Edition 675 IAC 22-2.4 or the 2008 Indiana Building Code unless noted. 1. 907.2.10.1.2 Single-or multiple-station smoke alarms shall be installed in Groups R-2 R-3, R-4 and I-1 regardless of occupant load at all of the following locations: 1. On the ceiling or wall outside of each separate sleeping area in the immediate vicinity of bedrooms. 2. In each room used for sleeping purposes. 3. In each story within a dwelling unit, including basements but not including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level. ( 9072.10.1.2 Groups R-2, R-3, R-4 and I-1. ) Additionally, all smoke alarms shall receive their primary power from the buildings power source, shall be equipped with a battery backup, and be interconnected in such a manner that the activation on one alarm will activate all the alarms within the individual unit. All apartment units shall have single station smoke detectors installed and shall comply with this section. 2. Provide full fire alarm system plans for each building for review. 3. Full automatic fire sprinkler system plans shall be provided for review for each building. 4. 905.3.1 Building height. Class I standpipe systems sFiall be installed throughout buildings where the floor level of the highest story is located more than 30 feet(9144 mm) above the lowest level of the fire department vehicle access, or where the floor level of the lowest story is located more than 30 feet(9144 mm) below the highest level of fire department vehicle access. A full standpipe system shall be installed in building A. The installation shall comply with the 2008 Indiana Fire Code and NFPA 14. 5. 1208.2 Attic spaces: An opening not less than twenty (20) inches by forty (40)inches (five hundred eight (508) mm by one thousand sixteen (1,016) mm shall be provided to any attic area having a clear height of over thirty (30) inches (seven hundred sixty-two (762) mm). A thirty (30) inch (seven hundred sixty-two(762) mm) minimum clear headroom in the attic space shall be provided at or above the access opening. When the access opening penetrates fire-resistive construction, the access opening closure shall provide the fre- resistive construction as required forthe fire-resistive construction that is penetrated for the opening, and may be manufactured or field assembled, and shall be tight fitting. 6. 1024.6 Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way. Sidewalks shall be provided from each required exit to a public way. ` 7. 1410.1 Required access. Approved vehicle access for firefighting shall be provided to all construction or demolition sites. Prior to construction beginning above grade and the arrival of combustible materials on site, Emergency Vehicle access shall be provided by roads with at least an asphalt binder surface capable of supporting vehicle loading under all weather conditions. Vehicle access shall be maintained unobstructed at all times. 8. 1412 WATER SUPPLY FOR FIRE PROTECTION. An approved water supply for fire protection, either temporary or permanent, shall be made available as soon as combustible material arrives on the site. Fire Hydrants shall be fully tested/inspected, accessible, and placed in service prior to combustible material arriving on site. 9. 506.1. Key Boxes When Required.Whenever the servicing fire department has instituted a key box emergency access system, a key box compatible with that system shall be installed in an accessible location if: (1)the building is protected with an automatic sprinkler system equipped with a local or transmitted water- flow alarm, or (2) the building is provided with any fire alarm system equipped with an outside audible/visual signaling device, or (3) the building is provided with any fire alarm system where the alarm is transmitted to an off-site location, or to the fire alarm center for the servicing fire department. Each individual building shall be provided with its own Knox Box at an approved location. 10. 912.3.1 Locking fire department connection caps. Provide approved locking caps on fire department connections for water-based fire protection systems where the responding fire department carries appropriate key wrenches for removal. Knox locking caps shall be provided for each fire department connection. Please respond to the above noted condition(s) in writing and forward this to my attention. Be advised that a full building permit will not be approved for release by this o�ce until the requested response is received. If you have any questions I can be contacted directly at 317-571-2621. Date: 07116114 By: Chris Ellison, Deputy Fire Marshal Carmel Fire Department Mishler, Nicholas F From: Carol Schleif[schleif@indy.rr.com] Sent: Thursday, July 17, 2014 11:14 AM To: Mishler, Nicholas F Subject: 7-17-14 toNick Demo @ 620 2nd Ave NE This one is a contributing building on the new survey. I forvvarded it to Landmarks. Carol From: Mishler, Nicholas F [mailto:nmishlerCalcarmel.in.gov] Sent: Thursday, ]uly 17, 2014 10:09 AM To: Schleif, Carol Subject: Demo @ 620 2nd Ave NE Good morning Carol,I jus[received a demo application for 620 2"d Ave.NE. This will be a demo of the house only. If you have any questions, let me know. Thanks, Nick Mishler Administrative Assistant Building&Cade Servites (317�571-2489 p,-aj Please mnsider the environment betore printing this email No virus found in this message. Checked by AVG - www.avg.com Version: 2014.0.4716 /Virus Database: 3986/7865 - Release Date: 07/16/14 No virus found in this message. Checked by AVG - �vww.avg.com Version: 2014.0.4716 / Virus Database: 3986/7869 - Release Date: 07/17/14 i � � c� z ;, � G J � m H # N F z ° J J J J J J J J J J J J J J W W W W W W W ,W W W W W W W � � � � � � � � � � � � � � 2' d' �0..' d' 2 � � 2' d' � � � �.' a' Q Q Q Q Q Q Q Q Q Q Q Q Q Q U U U U U U U U U U U U U U LL LL LL LL. LL LL lL LL LL LL LL IL LL LL Q � � � � 0 � � � � � � � Q � N � � � � � � � � � � � � Z Z Z Z Z Z Z Z Z Z Z Z Z Z O O O O O O O O O O O O O O � � � N � N � � � � � � � � > w W ug w w w w u� w w ug ug w' w 3 � � � � � � � � � � � � � � -° ui w w w w w w w w w w w w w v"; x x x = x x x x x = = x = x � F- �- F- � F- f- F- F- r f- H � H .a W o �o 0 0 0 0 0 0 0 0 0 0 0 0 � m m m ao m ro m m ao m ro m ao m = N N N N N N N N N N N N N N N v v v v v v v v v v v v v v U " � z z z z z z z z z z z z z z � �., - - - - - - - - - - - - - - � ' �� f/1 N VI N N (/1 N N VI f/1 f� f/1 IA f/1 � � O O O O O O O O O O O O O O O o_ n n n o. n n n n a a a a a m m m m m m m m m m m m m m � c c c �c c c c c c c c c c c r � v m m m m �a m m m m m m m m m � v� y �o �o �o v � �o v v `o 'v �o �o 'v v U C C C C C C C C C C C C C C W � � W � �" j F" � y _ �c j U y � � � � � � � � � � � � � � � � � r`� U � � � � � � � ❑ � o � ❑ 0 0 F- I- F F- H F- F- H H F H H F- � (� (� (� Q 2 � � �' � � � .� �� W Q Q Q O O O O O O O O O O � w w w z z z z z �n <n <n cn <n � � �n �n �n cn �n �n m cn cn �n �n v� �n v� Z z z z z z z z z z z z z z. z O O O O O O O O O O O O O O ii (n (n (n ln (an ln ln (n fn (/J � ln (n (Qn i W W W W LLI W W W W W W W W W �' � � � � � � � � � � � � � � � y o Q N b N V' � aD (O N t") I� tA Ol O t`� a0 � O (D � °' � 3 oJ O N O � M m 00 Q] (h d' j � OJ I� CO N N N N N N N �O � �. m O� Q� N N N N N N N N N N m >, a 3 �7 C � CO � � � � N M V N (O I� � � N � � - s = .—� � S -d O ��^ � T' � W W A tl O V � � � z w ; � � C7 F � 4' -" d � d , -� �` — r ti - � �, '° � � a v� E"'i !n J M p,.� � ,.7.� � W J �. .� U o-.� G O ►r d x y o C/� r.l � O � CO _ � z Z v O � � O E � � � � O � Q � �, � .. � o z � H � � � � � � � Z J � � F' u p� # O a ° ° a E"n Q N"� � V W J O o � a� � � Si � "" d' rn � rn a E ., U z : `n �a' O a a � a � � � v _ � � 0 Z W 2 �i a o �'' o Z' a fO >. v a a W Q ni @ ni o v� IL � �o a G� a .� � � � � � ` c � c '� Y - � ¢ :.� > > rn G o� _ �° �o v w u ►w � O�.y �� ,r�+ 'C C C N C C O �/ U � ` C V C �� � � v 'p�� N �I � � �v m � m ''' c . ,� � W V, � d Q d Q � J Q W d' VI U � °' L � � N M � 'y w � V U N N N N N OO L � I� I� ^ I� ^ � V �' � � �' � � 0 ' 0 > � � R+ -d (~j > o 'ol c ° p U z w .—� � � ° m = ' � _ _ � � v � E vv Q� U y U � ��E '° t v'.'�i Cd o u c � (c`p _ C � Q U "O � � � � v W U. � 0 3 � � � � Ym � � �° � � o := ?' � ? � • h Z a� � � L 'c v� v � � 'o c �ai � y c s � a+ c o u c ai � � > � � Z' �n � a � c !� u m !a y (o E �v !� - �o v� � � a a � Qa m � a 07 '0 � a � C7Q � � � � 3 V V U U � ` U � Z � � v o � w o N v o � v o N v - O � W � _ �' E _ �' � _ �' � _ '- E °' � _ W m ai �- m .� �- m ai �- io N " ra � ai g�`.,e 6� F OC V' c� E � u � � uE � c� E3 c� wE _ Q � 2 a p a o � E o � E o � E o � E o c � : � i:«:i � a rr Z� � � ,� o � �' a�i o �' aai o � a�i o � aai o � °c' a°"i � ° � x �i` tJ ° a � uou uov i� oc� 'uoc� � wa � y��ov� - •. n w Q ' � � p O p � O O O a a � z r, ' � a � o � � � � o � O ❑ � = -- < o v, x x = = x o � ncnm � cn ?� n omc� omn 3 t0 � (D C C SU ' SU !D N (D fD C _. —� � (D � (D J � � � n � z � � � a 3 ��.� � a� T� m �7 � � -� � � � - � � ro m � rr � rr �' ,_. � o � � � o � o O o � m � � c�o � _ p m m � � � � � � � � N � a � a a oni � �. �i r3o �� w _ � � "' n on � n g � �° m � > > > > � � u; m o rn o o, o a ,�� .�� ' � � 'c � ? � ? � j v��, .a Q r��o � m � r�n � m � � .� r�o ? 3-'� ? g `° m � � — — — - m .. T a � � a ��,amp � m � inm �n vLl av� p� amr O � Dv a0��`� � � Cl aDp .: in � _ �� � � �� a �� '� �.d m `Da < i < °1 v .'^.a � N °i c ' ? �Dto ? � aa � gs L� • � � � t� �' P -'� � � > x vi � � n � vi c vi �. t�o � � � la�i m � � f=D � � t=o < n .� = np rn � ^ � [a p� K 2 n d C o�� � � m f=D �. p7 o�i 3 � ���< c� P � � o m � r o � 'm < < _. n = _ < < s io � s � a � m °' °' � x n � c, T._ "' ^ d � o, .o _ :o �o � n � F � � � °' ro � °' � °�' °' r° n � � � � � :'� y m � a °..' � � � � � �o � � � ro � �. T o, . 3 3 � o v, .,o � p � � � � �p _ �p R � _ � � � ? - � . 3�. 3 3 ,� a ro � � � � $ � o o — flm � - � a � � � v ' �p� ^ ^ p b � � �n n -. � . N to ro � - .r°'os � � co ' > >� � � - � � > >� „ �n 3 ��n ? n � < o O1 r� n (D Vi C C C pj t. � O = . . p = .-r N v+ tn T O < O O � � N u �` � V V V N � N tn U'I ln � V tO v V v � V V V V V �-` � ^ � Oi W 01 � r, r, F+ t+ F+ O� O W CO t0 Ul O� V N N N N N � 3 � W N r � O � � W W O � ��-' Z m z ,n Z m v p rt-p Cl � cn T 1n cn � D � cn cn v ?i O� w m (n ln (n fD �p fD o� fD �p fD ip O � (D o (D' N d �'[D (D p� ' O O � O O O � n � �n � n °' m � c _�° ° � � m a ��.� f � ro w � in � q � y � q � � r�n r. T .� � a ro ro m � m r� m p v a °--�� � � � m � m a m ^ :: � n °�` m v.� v c a �. v,v� ro r'o o � m f F � ? — � a � �? � fD � o � ro a ro ? °- � ro ro � �. < �. �. v a a r"n < m � m � o v a a " � � 3 -'� � `° � 3 � � � c � m � c� � (D N N '� N � d �D � � T � fY � �'f T C � 6 O (D 3 d � Q� N � � ry 3 D = > c — c c 6 :: -• cD v+ — � .�., 3 a -'� � 3 ^ `�' o ° o " r�°n � Pt T � � N � T � � � � � � � � �3 � '� � r�r _ � � � z 3 O � '� N O — � _ � � a � ` G G o tl �1 /� � Q p � � Z i� .� e. a� � � � � � � � � i � ~\ N � � Mishler, Nicholas F From: Barnes, David R Sent: Tuesday, July 29, 2014 8:50 AM To: Lux, Pamela K; Mishler, Nicholas F Subject: SEASOIVS The Seasons project has been satisfied for release by the Dept. of Engineering and Utilities Department. Dave Barnes 1 Mishler, Nicholas F From: Duncan, Gary R Sent: Thursday, July24,'2014 5:47 PM To: Mishle�, Nicholas F; Thomas, John G; Barnes, David R; Jordan, Alex Subject: RE: Seasons of Carmel We are now waiYing on just a few more bonds. G From: Mishler, Nicholas F ��{m _ __ _,________ _ Sent: Monday, July 21,Z014 11:50 AM To: Duncan, Gary R; Thomas, John G; Barnes, David R; Jordan, Alex Subject: RE: Seasons of Carmel Is this approved? The builder just called andYOld'me you guys have approved it,but 1 don't have anything that says-that. Thanks, Nick Mishler Administrative Assistant euilding&Code Services (3ll)571-2489 �,-�j Please coiulder the envlronment Lafore prfnting th is einsil From: Dunca�, Gary R � ^ � Sent: Monday, ]une 23, 2014 3:05 PM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Thomas, John G; Barnes, David R; 'Larry Beard'.; Lux, Pameia K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Carmel We still need to review the latest submittal. �_______� ____�._._.._. _____ __.. ...__ -------...__w_ .__. _ __�. From: Mishler, Nicholas F Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V;.Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Cisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, ]oslyn; Jordan, Alex Cc: 'jmaloy@c�gresidential.com' Subject: Seasons of Carmel Goodafternoon- I have received plans�for the new.Seasons of Carmel apartments. This will be a 14 building,256�unit apartment complex bcated at approximately 98`�&Westfield Bivd. I have attached a few:of the building plans. Please let me know what your department will require prior to the issuance of a building permit. I have CC'd 1. Maloywith CRG Residential on this email. Please copy him on�your reply. Have a great weekend!! . 2 Mishler;,Nieholas F From: Bernida Egging [begging@spectrumretirement.com] Sent Tuesday; July 22, 2014 120 PM Fo: Mishler, Nicholas F Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E;Robert Terral; Joyce Terral; Ron Bokinskie; Erik Bentley Subject: Re: Carmel Senior Living: UniYNumbering & Emergency Access for Vertical Construction Hello Nick, You are correct and we are aware of this requicement. [ have copied our contractor on this email so he is also in the loop on this conespondence. You should be hearing from then directly when they are ready for you to come out and inspect. Thank you, Bemida Egging Vice President of Construction Spectrum 200 Spruce St., Suite 200 Denver, CO 80230 ph:303360.8812 fax: 303.360.8814 be�(�a,spectrumretirementcom On Jul 22, 2014, at 12:08 PM, "Mishler, Nicholas F" <nmishler(ce�carmel.in.�ov> wrote: Bernida, this project is currently foundation only, and we will just need to verify that the roads, hydrants, etc are complet8 prior to allowing any materials on site. I haven't been contacted by any contractors in the last month or so. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 4 P Please consider the environment before printing this email From: Bernida Egging [mailto:beeQin�(c��ectrumretiremenkcom] Sent: Tuesday, July 22, 2014 1:02 PM To: Mishler, Nicholas F Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E Subject: Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction Hi Nick, Due to the very wet spring/summer, we still have not completed our slab pours or the asphalt paving. We are hoping to make some headway and should hopefully be complete by the end of this month. Just for my knowledge, has the contractor not been in touch with you or your department? Thank you, Bernida Egging Vice President of Construction Spectrum 200 Spruce St., Suite 200 Denver; CO 80230 ph: 303.360.8812 fax; 303.360.8814 beggi�(c�spectrumretirement.com On Jul 22, 2014, at ll:54 AM, "Mishler, Nicholas F" <nmishler(�a carmel.in.gov> wrote: Hi Bernida, I just wanted to see if you had any updates on this? s Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 P Please consider the environment before printing this email From: Bemida Egging [mailto:begQ%_(c�soectrumretirement.com] Sent: Friday, June l3, 2014 12:18 PM To: Mishler, Nicholas F Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction Ftello Nick, Do to the weather, we have not completed thc slab pours or the asphalt drive yet. Once we do, we will have our contractor contact CFD for "inspection" and approval to start going vertical. Thank you, Bernida,Egging Vice President of Construction <image001.gif> 200 Spruce St., Suite 200 Denver, CO 80230 6 ph: 303.360.8812 fax: 303.360.8814 be�ginQ(cr�soectrumretirement.com Check out our digital lifestvle magazine! From: Mishler, Nicholas F [mailto:nmishler(�Jcarmel.in.�ov] Sent: Thursday, June 12, 2014 L2:09 PM To: Bernida Egging Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction Hi Bernida- The GC for this job was in our office today asking about the status of this project. I I�ad told him the last update I had was from March 31 that we were still waiting on CFD access and fire hydrants before we can give a full release to bring materials on site. Do you have any further updates on this? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 P Please consider the environment before printing this email From: Mishler, Nicholas F Sent: Monday, March 31, 2014 11:55 AM To: 'Bernida Egging' Ce: Knott, Bruce; Ellison, Christopher M � Subject: RE: Carmel Senior Living: Unit-Numbering & Emergency Access for Vertical Construction Hi Bernida- I will be out of�the office nexYweek so I'm trying to get an idea of where all of the current projects stand so [ can let Pam know. Do you have any updates on the Fire Department access, as well as installation of the fire hydrants? Thanks, Nick Mishler Administrative Assistant Building &Code Services (3 l7)�571-2489 P Please consider the environment before printing this email From: Bemida Egging [mailto:beg i�n�(�spectrumretirement.coin] Sent: Tuesday, February l8, 2014 12:52 PM To: Mishler, Nicholas F Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction Hi Nick, I am just touching base with you to see if you and Bruce were able to meet regarding the unit numbering at Carmel Senior Living last week. Please advise if there are any questions or concerns that I may answer. e Thank you, Bernida Egging Vice President of ConsYruction <image001.gifl 200 Spruce St., Suite 200 Denver, CO 80230 ph: 303.360.8812 fax: 303360.8314 be��i n�(c�spectrumretirement.com � Check out our di�ital lifestyle ma�azine! From: Knott, Bruce [mailto:BKnotYncarmel.in.govJ Sent: Monday, February 10, 2014 8:45 AM To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M Cc: Knott, Bruce Subject: RE: Carmel Senior Living: Unit Numberina & Emergency Access for Vertical Construction Bernida, Nick Mishler and [ are meeting this week to look over the addressing. As far as the access to Che site goes, there was a TAC meeting on Sept. 17`� 2013 in which the access need was stated as paved/binder all around the loop of the building and all hydrants to be in place and working prior to vertical construction and wood on the site. Part of the issue with this site is that: #l. there isonly one access point,from a public road. #2. The proposed access loop has very liinited parking which will have to constantly be monitored. Emergency apparatus will need to have access 24/7 . Having access to only half or less of the building (prosed highlighted access) will make it impossible to quickly deal with an emergency. 9 � #3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the access road. #4. Required hydrants on the East side of the site would not be accessible if the complete access were not provided. #5. The limited parldng and ext_ra space on this site is going to make it difficult for construction equipment (and vehicles) to allow for 24/7 emergency access without altering the loop road binder, and our experience shows that dirt and or gravel has not held up in the past and does not support the emergency equipment. Thank you, Bruce Knott Fire Marshal Carmel Fire Dept. From: Bernida Egging [mailto:be��in a,spectrumretirement.com] Sent: Friday, February 0?;2014 4:57 PM To: Mishler,Nicho(as F; Knott, Bruce; Ellison, Christopher M Subjech Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction Hello Nick, Bruce and Chris, I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit numbering as well as the required paved surface for our construction project prior to going vertical. L Unit Numbering a. [ have attached two possible solutions for our unit numbering. [ believe these options address your concerns from our meeting.and hope we can come to an agreerrient on how to proceed. 2. Paved Surface for Going Vertical a: Please see the attached pdf named "Carmel — FD Required Paved Surface.pdP'. I would like to propose that we definitely install the yellow io highlighted azea for fire department paved access, but would like to confirm acceptance of using [llinois Street and W. 136`�' Street as part of our required "paved surfaces" due to their proximity to our jobsite. Can you please confirm acceptance ofthis? Feel free to contact me with any questions or concerns. Thank you, Bernida Egging Vice President of Construction <image001.gif> 200 Spruce St., Suite 200 Denver, CO 80230 ph: 303360.8812 fax: 303360.8814 be��ic spectrumretirementcom Check out our digital lifestyle mas:azine! ii Mishler, Nicholas F From: Hunter, Shirley A [Shirley.Hunter@duke-energy.com] Sent: Tuesday, July 22, 2014 11:15 AM To: Mishler, Nicholas F Subject: RE: Seasons of Carmel Good to go ----...__._..._...__..___ ___. ----._ _ ___� _ From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, July 22, 2014 Y1:15 AM To: Hunter, Shirley A Subject: RE: Seasons of Carmel Shirley,are you OK with this one? Thanks, Nick Mishler Administrative Assistant Buiiding&Code Services (317�571-2489 � ��`j Please considzr tfre envimnme;u 6eFor�printing this 2m�il From: Hunter, Shirley A [mailto:Shirley.HunterCa�duke-energy.com] �^^� Sent: Friday, June 06, 2014 3:24 PM To: Mishler, Nicholas F Subject: RE: Seasons of Carmel Please slow down! O From: Mishler, Nicholas F [mailto:nmishlerColcarmel.in.qov] W�LL�µ _. _ .� Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-WOId, Alezia K; Mindham, Daren; Hunter, Shirley A; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas; John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel `�' This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email. *'"' Goodakernoon- I have received plans for the new:5easons of Carmel apartments. This will be a 14 building,256 unitapartment mmplex located at approximately 9S`h&Westfield Blvd. I have attached a few of ihe building plans. Please let me know what your department will require prior to the issuance of a building permit. I have CC'd 1. Maloy with CRGResidential on this�email. Please mpy him on your reply. Have a great weekend!! Thanks, 12 Mishler, Nicholas F From: Ryan Hartman [Ryan.Hartman@CTRWD.ORG] Sent: Monday, July 21, 2014 1038 AM To: Mishle�, Nicholas F Subject: RE: Seasoris of Carmel Nick, We have been satisfied and are ready to hold a precon whenever the contractor call us to schedule. Thank you. Ryan Hartman, District,Engineer • r Clay Township Regional Waste District ��I� � 10701 N, College Avenue, Suite A Indianapolis, Indiana 46280 Phone - 317-844-92Q0 Mobile - Website - www.ctrwd.org Email - ryan.hartman@ctnvd.org 2013 Public Education Award Recipient 2013 Governor's Award Recipient Vda#er Er�vironmeM: Fecierati�rr ase�c�+r 't,. Public Education Category Outreach/Education Category From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] � mm Sent: Tuesday, July 15, 2014 10:14 AM To: Ryan Hartman Subject: RE: Seasons of Carmel Ryan, do you have what you need for this? Thanks, Nick Mishler Administrative Assistant Building & Code Services (31�7) 571-2489 P Please consider the environment before printing this email 14 From: Ryan Hartman [mailto:Ryan.Hartman n CTRWD.ORG] Sent: Thursday, June 12, 2014 4:33 PM To: Mishler, Nicholas F Cc: 'jmaloy@crgresidential.com; Fetahagic, Alen (Afetahagic a structurepoint.com) Subject: RE: Seasons of Carmel Nick, Plans are pretty close to being finalized. CTRWD is okay with allowing for conditional building pennits with the understanding that sanitary sewer plans need to be finalized, the IDEM permit approval need to be received, a CTRWD pre-con still needs to beheld, and payment need to be made to CTRWD before any sanitary sewer work is to commence. Ryan Hartman, District Engineer �'����' Clay Township Regional Waste District 10701 N. College Avenue, Suite�A Indianapolis, Indiana 46280 Phone - 317-844-9200 Mobile - Website - www.ctrwd.org Email - ryan.hartman ct ctrwd.org 2013 Public Education Award 2013 Governor's Award Recipient Reeipient �s't��l':EtiY1tQ19tt1�'t1� �2tf�t'�3tI41'i' �`�. �tmvr�tercR�3typ�a6a, "".� " Public Education Category Outreach/Education Category From: Ryan HaRman Sent: Friday, June 06, 2014 4:30 PM To: 'MisHler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter,ShirleyA'; 'Greg R Hoyes; 'jdark@vectren.com; Duffy, John M; Kempa, Lisa L; 'David Lucas; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons ofCarmel Nick, Plans for this project are still under review. Thank you. is Ryan Hartman,,District Engineer ������� (CI'ay Township�Regioual Waste District 10701 N. College.Avenue, Suite A Indianapolis, [ndiana 46280 Phone - 317-844-9200 Mobile - Website - www.ctrwd.ore Email - ryan.hartman(c`cctrwd.org 2013 Public Education Award 2013 Govemor's Award Recipient Recipient Wa#�r Environmen# Feder�tiorT ��. ���,�• Public Education Category Outreach/Education Category From: Mishler, Nicholas F [mailtosnmishler�carmel.in.aov] Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A; 'Greg R. Hoyes; jclark@vectren.com; Ryan Hartman; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes; David R; 'Lany Beard; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- I have received plans for the new Seasons of Carmel apartments. This will be a 14 building, 256 unit apartment complex located at approximately 98`h & Westfield Blvd. I have attached a few of the building plans. Please let me know what your department will�i-equire prior to the issuance of a building permit. I have CC'd J. Maloy with CRG ResidenYial on this email. Please copy him on your reply. Have a great weekend!! Thanks, 16 Mishler, Nicholas F From: Ellison, Christopher M Sent: Wednesday, July 16, 2014 7:28 AM Ta 'jlangebartels@crgresidential.com'; 'Ibass@crgresidential.com' Cc: Mishler, Nicholas F; Knott, Bruce Subject: Seasons of Carmel Apts Plan Review Letter Attachments: Seasons of Carmel Plan Letter.doc See the attached plan review letter for the proposed seasons of Carmel Apartment project. Be advised this project has been cleared for foundation permitting only at this time by the Carmel Fire Dept. Please review the attached letter and provide a response to each item desc�ibing how compliance with the required code will be achieved. Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Department 2 Civic Square, Carmel IN 46032 317-571-2600 Headquarters 317-571-2674 Fax cellison @ca rmel.in.gov s� y * CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain information which is confidential, attorney work-product and/or subject to the attorney-client privilege, and is intended solely for the receipient(s) named above. If you are nota named recipient, any interception, copying, distribution, disdosure or use of this transmission or any information contained in iYis strictly prohibited, and may be subject to criminal and civil penalties under State or Federal law. ff you have received this transmission in error, please immediately call us at (317) 571-2600, delete the transmission from all forms of electronic or otlier storage, and destroy all hard copies. DO NOT forward this transmission. Any error in addressing or sending this e-mail is not a waiver of confidentiality or privilege and does not waive consentto copying or distribution of tHis e-mail or attachments.Thank You. 1s Mishler, Nicholas F From: Daviii E. Lucas [David.Lucas@hamiltoncounty.in.gov] Sent: Tuesday, July 15, 2014 3:54 PM To: Mishler, Nicholas F Subject: RE Seasons of Carmel Nick, No issues with this. Thanks From: Mishler, Nicholas F [mailto:nmishler(alcarmel.in.qov] � � � Sent: Tuesday, July 15, 2014 10:16 AM To: David E. Lucas Subject: Seasons of Carmel David,do you have any issues with these.permits being released? Address is approx 9815 N.Westfield Bivd. Thanks, Nick Mishler Adminisirative Assistant Building&Code Services (317)571-2489 �sj Please mr,sider'Ehe�nvi:onmeni 6eforn priniing tF{s 2mail 19 MiShler, Nicholas F From: Ellison, Christopher M Sent: Tuesday; July 15, 2014 7:50 AM To: Mishler, Nicholas F; Lux, Pamela K; Kass, Joslyn Cc: LaFollette, Sally L; 'jlangebartels@crgresidetial.com' Subject: Seasons of Carmel The seasons of Carmel project and permits are cleared for foundation permitting only at this time. I still need to complete an architectural reviewand issue a plan review letter. Additionally, they must still build roads and install fire hydrants prior to combustibles arriving on site and building above grade. Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Department 2 Civic Square, Carmel IN 46032 317-571-2600 Headquarters 317-571-2674 Fax cellison@ca rmel.in.�ov � 41� �� ♦ ' 1 f CONFIDENTIALITY NOTICE:This transmission (including any attachments) may contain information which is confidential, attorney work-product and/or subject to the attorney-client privilege, and is intended solely for the receipient(s) named above. If you are not a named recipient, any interception, copying, distribution, disclosure or use of this transmission or any information contained in it is strictly prohibited, and may be subject to criminal and civil penalties under State or Federal law. If you have received this transmission in error, please immediately call us at (317) 571-2600, delete the transmission from all forms of electronic or other storage, and destroy all hard copies. DO NOT forward this transmission. Any error in add�essing or sending this e-mail is not a waiver of confidentiality or privilege and does not waive consent to copying,or distribution of this e-mail or attachments. Thank You. zo Mishler, Nicholas F From: Barnes, David R Sent: Tuesday, July 15, 2014 7:14 AM To: Mishler, Nicliolas F; Duncan, Gary R; Thomas, John G; Jordan, Alex Subject: RE: Seasons of Carmel Nick, I haven't received any bonding for this yet. ___ ____ ____ __— --__ _�_..__-- From: Mishler, Nicholas F Sent: Monday, July 14, 2014 4:38 PM To: Duncan, Gary R; Thomas, ]ohn G; Jordan, Alex; Barnes, David R Subject: RE: Seasons of Carmel Any updates on this project? Thanks, Nick Mishler� Administrative Assistant Building&{ode Services (317�571-2489 y,-�j?�ea,e ccnsider t'he em�lronmen*before printing.hls�mall —M'_._T __'_'__..�.. _....__.'__ �_..�__�..._...,.._______-___�_..�_... From: Duncan, Gary R Sent: Monday, June 23, 2014 3:05 PM To: Mishler, Nicholas F; Conn, Angelina.V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Carmel We still need to review the latest submittal. ___V___.�___ ---_� _-------- From: Mishler, Nicholas F ______ _..______ _ `____._.___ Sent: Friday, June 06, 2014 3:05 PM To: Conn; Angelina V; Littlejohn, David W; Donahue-WOId, Alexia K; Mindham, Daren; 'HUnter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa; Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, ]ohn G; Barnes, David R; 'Larry`Bea�tl'; lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- I have received plans forthe newSeasons of Carmel apartments. This will be a 14 building,256vnit apartment complex located at approximately 98'h&Westfield Blvd. I have attached a few of the 6uilding plans. Please let me�knowwhat your department will require prior to the issuance ofa 6uilding�permit. I have CC'd 1.Maloy with�CRG Resitlential on this email. Please copy him on your.reply. Have a great weekend!! Thanks, 21 Mishler, Nicholas F From: Duffy, John M Sent: Monday, July 14, 2014 8:08 PM To: Kempa, Lisa L Cc: Spearman, Ted A; Cook, Steve L; Hollander, Greg H; Smith, Jerry G; Luper, Michaef E; Barnes, David R; Mishler, Nicholas F Subject: Re: Seasons Thanks lisa Sent f'rom my Ueri�ori Y�ireless 4G GTE DROID "Kempa, Lisa L" <LKempa@carmel.in.�> wrote: WE have received water availability and conriection fees for the Seasons Availability 43,349:20 Connection 495,743.82 Inspection Fees 714.00 Review Fee 300.00 Total $540,107.02 Check No. 312350 �isa /�e,wfia Carmel Utilities 30 West Main Ste 200 Carmel, IN 46032 317/571-2267 23 Mishler, Nicholas F From: Thomas, Jofin G Sent: Monday, July 14, 2014 4;43 PM To: Mishler, Nicholas F; Duncan, Gary R; Jordan, Alex; Barnes, David R Subject: RE: Seasons of Carmel IYs still in review, but we`are trying to get things wrapped up this week. I'li copy you on the storm water permiYwhen it gets issued. Sincerely, John Thomas, CPESC, CMS4S Storm Water Adminrstrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Mishler, Nicholas F� � � � � � Sent: Monday, July 14, 2014 4:38 PM To: Duncan, Gary R; Thomas,John G; Jordan, Alex; Barnes, David R Subject: RE: Seasons of Carmel Any upda[es on this project? Thanks, Nick Mishler Administrative Assistant Building&Code Services (3ll)5712489 y-�j Please�c¢nsider the environ�r.eni 6efor�pnr,Ung tl:is eniai; From: Duncan, Gary R __ ---_-__ ,�__ _ _____�� __._,___ Sent: Monday, June 23, 2014 3:05 PM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren:com'; 'Ryan Fiartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Thomas, John G; Bames, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject:REi Seasons of Carmel We still need to review thelatest submittal. �_ _ _._ __�___ ____._._.�..-----_ From: Mishler; Nicholas F Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R, Hoyes; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, ]oslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good aftemoon- 24 I have received plans for the new5easons of Carmel apartments. This will be a 14 building,256 unit apartment complex located at approximately 98`h&Westfield Blvd. I have attached�a few of the building plans. Please letme know what your department will requireprior to the issuance of a building permit. I have CC'd 1.Maloy with CRG Residential on this email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administrative Assistant Building&Code Services (3ll)�571-2489 �j plea;e cunsider the environment before printing fhis�mail 25 Mishler, Nicholas F From: Kempa, Lisa L Sent: Monday, July 14, 2014 4;12 PM To: Duffy, John M; Spearman, Ted A; Cook, Steve L; Hollander, Greg H; Smith, Jerry G, Luper, Michael E; Barnes, David R; Mishler, Nicholas F Subject: Seasons WE have received water availability and connection fees for the Seasons Availability 43,349.20 Connection 495,743.82 Inspection Fees 714.00 Review Fee 300.00 Total $540,107.02 Check No. 312350 G"sa �e�pa Carmel Utilities 30 West Main Ste 200 Carmel, IN 46032 317/571-2267 26 Mishler, Nicholas F From: Joe Langebartels [jlangebartels@crgresidential.com] Sent: Friday, June 27, 2014 2:33 PM To: Mishler, Nicholas F Subject: RE: Seasons of Carmel How do i find out what the fees are from the other depertments? Jmseph A. Langebarteis Vice Fresicienf � �� f2 ES 1 CtEi�d"fl d.i i_ 8Q5 City Center Drive, Suite 16D Carmel,7n-06D32 Direct: 317.666.5278 Main: 317.575.9400 Fax: 317:575.9399 muw.CRGResidential.com .. _ -----_ _....._.�__ — _ From: Mishler, Nicholas F [mailto:nmishleri�carmel.in.qov] Sent: Friday, ]une 27, 2014 2:26 PM To: Joe Langebartels Subject: RE: Seasons of Carmel I gave someone a spreadsheet the other day with�the total building permit fees. I cadt rememberhis name,but I have attached what I gave him. PerJim B7anchard this will need to have Engineering approval and all other fees paid(Carmel Utilities,CTRWD)prior to issuance. Thanks, Nick Mishler Administrative Assistant Building&Code Services (317)571-2489 m,�Vleasecons�der the environment beho;e prinnng mis arna�l �.._.—. ��_._.. __� _�.. ..__.__.____ From: Joe Langebartels [mailto:jlancaebartels:o`cr residential.com] Sent: Friday, June 27, 2014 2:19 PM To; Mishler, Nicholas F Subject: Seasons of Carmel Nick, I wanted to check and see if you could give me and update on the Seasons of Carmei and where we stand on the ail the department reviews. Also is it you that will be providing us with the cost of the permits or someone else. Thanks for your help. Joseph A. langebartels Vice Presidenl z� Mishler, Nicholas F From: Joe Langebartels [jlangebartels@crgresidential.com] Sent: Friday, June 27, 2014 2:19 PM To: Mishler, Nicholas F Subject: Seasons of Ca�mel Nick, I wanted to check and see if you could give me and update on the Seasons of Carmel and where we stand on the aII the deparYmenk reviews. Also is if you that will be providing us with the cost of the permits orsomeone else. Thanks for your help. Joseph A. Langebartels Vice President F2�SIL3�Pd�'ll�s� 805 City Center Drive, Suita 18fl Garmel,Jn 46032 Oirect: 317.68Q.8278 Main: 317.575.9400 Fax: 317,575.9399 www.G RG ResidentiaLcom 29 Mishler, Nicholas F From: Duffy, John M Sent: Monday, June 23, 2014 423 PM To: Mishler, Nicholas F Cc: jmaly@crgresidential.com; Kempa, Lisa L Subject: RE: Seasons of Carmel Nick, Water availability and connection fees need to be paid. Other than that they are good to go. Thanks J Duffy From: Duncan, Gary R Sent: Monday, ]une 23, 2014 3:05 PM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Thomas, ]ohn G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; ]ordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Carmel We still need to review the latest submittal. From: Mishler, Nicholas F Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- I have received plans for the new Seasons of Carmel apartments. This will be a 14 building,256 unit apartment complex located at approximately 98ch&Westfield Blvd. I have attached a few of the building plans. Please let me know what your department will require prior to the issuance of a building permit. I have CC'd 1.Maloy wi[h CRG Residential on this email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administrative Assistant Building&Code Services (317)571-2489 `,�j Nlease consider the envVOnmen[before pnntfng thls emzll 30 Mishler, Nicholas F From: Duncan,•Gary R Sent: Monday, June 23, 2014 3:05 PM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham; Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Carmel We still need to review ihe latest submittal. From: Mishler, Nicholas F � � Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, ]oslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Goodafternoon- I have received plans for the new Seasons of Carmel apartments. This will he a 14 building, 256 unit apartment complex located at approximately 98`"&Westfield 81vd. I have attached a few of the building plans. Please let me know what your department will require prior to the issuance of a building permit. I have CCd 1,Maloy with CRG Residential on this email. Please copy him on your reply. .Have a great weekend!! Thanks, Nick Mishler Administrative Assistant Building&Code Services (317�571-2489 b,�j Ptease consider�[iie em�!ronmen'-beFme prir.ting tF.is�email 31 Mishler, Nicholas F From: Lux, Pamela K Sent: Wednesday, June 18, 2014 12:59 PM To: Amber Hawkins ; Anderson, Richard (Richard.Anderson@hamiltoncounty.in.gov); Campbell, Scott; Clark, Joanie; Conn, Angelina V; Daley, Penny J; Darren Wilson; Donahue-Wold, Alexia K; Duffy, John M; Ellison, Christopher M; Indiana Service Installation; Keesling, Rachel M; Kempa, Lisa L; 'Kirkman, Jason'; Knott, Bruce; Krueskamp, Theresa A; Stewart, Lisa M; McCoy, David W; Meri Seedorf; Mishler, Nicholas F; 'Owens, Cynthia'; 'Richardson, Mary A'; 'Schwemmin, Bonnie'; Shanayda, Kurt A; Spears, Jack J; Summers, Mindy; Valone, Susan Cc: 'Joe Langebartels' Subject: The Seasons of Carmel «AddressesReport.rtfl> Good aftemoon— Attached is ao address list for the Seasons of Carmel.This is located at just north of E 98th St on the east side oP Westfield Blvd. If you have any questions,please jus[let me know. Thank you. Pam Lux Building and Code Services City of Carmel 32 Mishler, Nicholas F From: Conn, Angelina V Sent: Tuesday, June 17, 2014 2:22 PM To: Misliler, Nicholas F; Motz, Lisa Cc: 'jmaloy@crgresidential.com'; Mishler, Nicholas F Subject: FW: Seasons of Carmel Apartments (PC docket no. 12120015 ADLS) Good ahernoon, Nick— The Planning/Zoning Dept. has now stamped/approved the exterior architectural building elevations for all buildings, and they are attached as PDF's. Please double check with the Engineering Dept. (Jeremy Kashman) to verify that he is okay with the curb cutting off the trash dumpster access from the rest of the site, though. Other than that minor issue, the Planning Dept. has also stamped/approved the site plan, which is also attached as a pdf. (Lisa—please add these pdf's to laser fiche. Thank you. J Thank you, Angie Conn, Planning Administretor City of Carmel Planning &Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 � Direct: 317-571-2281 � Fax: 317-571-2426 I E-mail: aconnCacarmel.in.qov � Web: www.carmeldocs.com Piease consider the environmenl be(ore prinfing this e-mail From: Nick Churchill [mailto:nick@pittmanpartners.com] Sent: Friday, June 13, 2014 3:59 PM To: Conn, Angelina V Cc: Steve Pittman; Alex Barrett Subject: RE: Seasons of Carmel Apartments Angie, Thank you for your time yesterday to review and address these items at your office. Please see our responses below and let me know if you need anything else from us. Have a great weekend and thank you again for your time. Nick Churchill, LEEDAP Pittman Partners 317.573.6692 direct 317.777.1811 mobile ni[k(�pittmdnpdfLnOfS.COm Mail: 70 Box SSG Carmel,IN 46082-0554 Otfice: 12521 E New Market Sc,Suite 100 Carmel,IN 46032 www.pittflldflpdit112f5.com From: Conn, Angelina V [mailto:Aconn(o�carmel.in.gov] Sent: Wednesday, June 11, 2014 4:14 PM To: 'Joe Langebartels'; Nick Churchill Cc: Steve Pittman; Rex Barrett - Barrett&Stokely (rmb�barrettandstokely.com); Chris Reid; Alex Barrett; Schrage, Brad; 33 Fetahagic, Alen; James Maloy; Mishler, Nicholas F Subject: RE: Seasons of Carmel Apartments Good aftemoon,Joe - The Planning Dept. has a few questions and comments regarding the Elevations and Site Plan. Please reply to each comment below, so we can proceed with review and approvals of the Elevations and Site Plan. Thank you. 1. Building C1 Front Elevation— please provide us with more details about the garage door materials, color, and design. (These look different than what the PC approved) Materials,color sample and cut sheet provided on 6/12/14 2. Building B Front Elevation—please provide us with more details about the garage door material, color, and design. (It looks different than what the PC approved) Materials,color sample and cut sheet provided on 6/12/14 3. Building C3 Rear Elevation—the timbers on the middle architectural feature need to be more massive/thicker, so that it matches what the PC approved. (see attached marked up elevation, pdf 12033A5.8.)The scale of the submitted plans for that particular building is unfortunately small. The wood columns/structure will actually be the same dimension as the similar columns and structures on the other buildings. It will be a 6"x 6"solid post, wrapped to an approximately 8" x 8" finished dimension. 4. Building C3 Front Elevation—please provide us with more details about the garage door materials, color, and design. (These look different than what the PC approved) Materials,color sample and cut sheet provided on 6/12/14 5. Building Q Front Elevation—please provide us with more details about the garage door materials, color, and design. (These look different than what the PC approved) Materials, color sample and cut sheet provided on 6/12J14 6. Building C2 Side Elevation—cannot find there this matches what the PC approved. ( Nick, is this one of the elevations that is changing, per the meeting you had with us a month or so ago?) This is one of the elevations that was changed and reviewed at that meeting.The arrow on the marked up elevations should Rave been duplicated and extended to the second floor to make those changes as apparent as those on the first floor. 7. Building A Rear Elevation—please provide us with more details about the garage door materials, color, and design. (These look different than wfiat the PC approved) Materials, color sample and cut sheet provided on 6/12J14 8. Building A side elevation—looks like a gable or roof plane is missing just below the clock. (see attached marked up plan, pdf 12033A5.2) The gable roof shown in the original elevations represents the main/primary gable in the center of the front elevation.This gable still exists on the building; unfortunately the CAD program used to create the plan drawings omits that gable from the side elevation view due to the distance between it and the end of the building. 9. Site Plan & dumpster access—the site plan does not match what the Plan Commission (PC) approved for the dumpsterarea and access. Please change back to the prior version so that the dumpster area can be accessed from within the site and not just from 98`h Street.This is nonnegotiable. (see attached marked up plan, pdf C100) You stated that this was a concern brought up by Jeremy in the Engineering Department.We met with him after our meeting yesterday and he had been made aware af the challenges presented by the grade elevation change in that area as well as the cover requirements for the existing subsurface water main that would prevent the changing of that grede. He indicated that as a result he was ok with this revision for those reasons and this should be evidenced by his approval of the plans in the coming days. 30. Site Plan and parking space locations - the site plan does not match what the Plan Commission approved for the location of several 'pods' of parking spaces; please explain why these changes were made. (see attached marked up plan)The parking in those areas was removed/relocated due to excessive parking being origi�ally planned, 34 relocating the spaces to more convenient areas in closer proximity to users and an effort to further reduce impervious surfaces on the site. Angie Conn, Planning Administrator City of Carmel Planning &Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 � Direct: 317-571-2281 � Fax: 3ll-571-2426 � E-mail: aconnCo�carmel.in.qov � Web: www.carmeldocs.com Please consider the environment be(o�e printing this e-mai( From: Joe Langebartels (mailto:jlanqebartels;acrgresidential.com] Sent: Tuesday, ]une 10, 2014 8:13 AM To: Conn, Angelina V Cc: Nick Churchill; steve,�a pittmanpartners.com; Rex Barrett - Barrett & Stokely (rmbCo�barrettandstokelv.com); Chris Reid; Alex Barrett; Schrage, Brad; Fetahagic, Alen; ]ames Maloy; Mishler, Nicholas F Subject: Seasons of Carmel Apartments Angie, As requested, attached are the elevations of all the buildings at Seasons of Carmel. Also attached is a site plan. Please let me know if you have any questions or need further information. Thanks Joseph A. Langebartels Vice President � 805 City Center Drive, Suite 160 Carmel,In 46032 Direct: 317.660.6278 Main: 317.575.9400 Fax: 317.575.9399 www.CRGResidential.com 35 Mishler, Nicholas F From: Hollibaugh, Mike P Sent: Monday, June 16, 2014 5:03 PM To: Mishler, Nicholas F Cc: Blanchard, Jim E; Keeling, Adrienne M Subject: RE: Seasons ofCarmel PRIF Hi Nick, The attached BPW resolution should besufficient to address the Park Impact Fee issue. Thisresolution allows for the enti�e PRIF amount to be placed in escrow, per 29.07.05 Credit in Lieu of Payment,to be used to construct public infrastructure as approved by, in this case, the BPW. Make sense? Mike from: Mishler, Nicholas F � ------° .--_..__.� _ . _ __...__.___.__ Sent: Monday, June 16, 2014 3:23 PM To: Hollibaugh, MikeP Cc: Blanchard, Jim E; Keeling, Adrienne M Subject: Seasonsof Carmel PRIF Mike,.l am trying to set up the Seasons�of Carme6so we can release the permit to�satisfy their lender's requiremeMS,and Jim mentioned that the PRIF will be paid at a later time. Is this something that they will be wiring directly to the Clerk-Treasurer's office as I believe has been done in the past? I'm just trying to figure out the best way to do this so they get the paperwork they need and we have everything documented: At 256 total units, I believe the�PRiF will be somewhere�in the$430k range. � Thanks, Nick Mishler Administrative Assistant , Building& Code Servires (317�571-2489 ��j?lease comider S6c en:�lronmant b�fore priating ti��ls en:ail 36 Mishler, Nicholas F From: Joe Langebartels [jlangebartels@crgresidential.com] Sent: Monday, June 16, 2014 4:51 PM To: Mishler; Nicholas F Cc: Larry Bass Subject: RE: Seasons of Carmel Nick, Larry Bass (in our office) and I talked to Jim and he stated that you would be providing an invoice for the fees that were due once all departments were finished with their review. It is my understanding thai impact fees are to be paid at a later date. Please forward the invoice to me once you have it prepared so we can arrange proper payment. Thanks for your help. Joseph A. �angebartels Vice President � 8d5 City Center Drive, Suite 160 Carmel, In 46432 Direct: 317.660.6278 Main: 317.575.9400 Fax: 317.575.9399 www.CRG Residentiai.com From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, ]une 16, 2014 2:38 PM To: )oe Langebartels Subject: RE: Seasons of Carmel Please contact lim Blanchard regarding this projecL I know this is supposed to have a conditional release at some point bu[I'm not sure if that can happen yet. lim's number is 571-2450. Thanks, Nick Mishler Administrative Assistant Building&Code Services (317�571-2489 �'j Pleusv ronsider the environment 6efor�e printin�this emoil From: ]oe Langebartels [mailto:jlangebarteisCo�agresidentiai.com] � Sent: Monday, )une 16, 2014 2:30 PM To: Mishler, Nicholas F Subject: Seasons of Carmel Nick, I wanted to follow up with you and get an update on the Seasons of Carmel Apartment complex. I also wanted to check and see if there is anything else you need from m. 37 Mishler, Nicholas F From: Joe Langeba�tels [jlangebartels@crgresidential.com] Sent: Monday, June 16, 2014 2:30 PM To: Mishler, Nicholas F Subject: Seasons of Carmel Nick, I wanted to follo�N up with you and get an update on the Seasons of Carmel Apartment complex. I also wanted to check and see if there is anything else you need from m. Thanks for your help. Joseph A. Langebartels Vice Presidenf J -- b05 City Center Qrive, Suite 160 Garmel,In 46032 Direct: 317.$60.6278 Main: 317.575.9400 Fax; 317.575.9399 www.GftG Residsn4ial.com 39 Mishler, Nicholas F From: Conn, Angelina V Sent: Friday, Jurie 13, 2014 4:05 PM To: 'Nick CfiuPChill' Cc: Steve Pittman;Alex Barrett; Mishler, Nicholas F Subject: RE: Seasons of Carmel Apartments Thank you, Nick. The Planning Dept. can send out the stamped/approved elevations and site plan early next week. Angie Conn, PlartnNg Administrator City of Carmel Planning &Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 3ll-571-24ll � Dired: 317-571-2281 � fax: 317-571-2426 � E-mail: aconnCalcarmel.in.aov � Web: www.carmeldocs:com Please consider the anvironmant be/ore printtng this a-mail From: Nick Churchill [mailto:nick@pittmanpartners.com] ~ �� Sent: Friday,June 13, 2014 3:59 PM To: Conn, Angelina V Cc: Steve Pittman; Alex Barrett Subject: RE: Seasons of Carmel Apartments Angie, Thank you for your time yesterday to review and address these items at your office. Please see our responses below and let me know if you need anything else from us. Have a great weekend and thank you again for your time. Nick Chu[chill, �eeoac Pittman Partners 317.573.6692 direct 317.777.1811 mobile nitk@ pittmanpartnerS.cOm Mail: PO 9ox 554 Carmel,IN 46082-0554 Office: 12821 E New Market St.,Sulie 100 CarmeI,IM46032 www.pittf11df1pditn2fs.[011t ____, ._'." ___�____....'_"___.�..—_ __'_�___ From: Conn, Angelina V [mailto:Aconn^acarmel.in:yov] Sent: Wednesday,June 11, 2014 4:14 PM To: 7oe Langebartels; Nick Churchill Cc: Steve Pittman; Rex'Barrett - Barrett &Stokely (rmbfabarrettandstokely.com); ChrisReid; Alex Barrett; Schrage, Brad; Fetahagic, Alen; James Maloy; Mishler, Nicholas F Subject: RE: Seasons of Carmel Apartments Good afternoon, Joe - The Planning Dept. has a few questions and comments regarding tfie Elevations and Site Plan. Please reply to each comment below, so we can proceed with review and approvals of the Elevations and Site Plan. Thank you. 1. Building C1 Front Elevation—please provide us with more details about the garage door materials, color, and design. (These look different than what the PC approved) Materials,color sample and cut sheet provided on 6/12/14 40 2. Building B Front Elevation—please provide us with more details about the garage door material, color, and design. Qt looks differenf than what the PC approved) Materiais;color sample and cut sheet provided on 6/12/14 3. Building C3 Rear E(evation—the,timbers on the middle architectural feature need to be more massive/th'rcker, so that it matches what the-PC approved. (see attached marked up elevation, pdf 12033A5.8.)The scale of the submitted plans for that particular building is unfortunately small.Tha wood columns/structure will actually be the same dimension as the similar columns and structures on the oiher buildings. It will be a 6" x 6" solid posi, wrapped to an approximata)y 8"x 8"finished dimension. 4. Building C3 Front Elevation— please provide us with more details about the garage door materials, color, and design. (These look different than wha[the PC approved) Materials,color sample and cut sheet provided on 6/12/14 5. Building C2 Front Elevation—please provide us with more details about the garage door materia(s, cofor, and design. (These look different than what the PC approved) Materiais, color sample and cut sheet provided on 6/12/14 6. Building C2 Side Elevation—cannot find there this matches what the PC approved. ( Nick, is this one of the elevations that is changing, per tfiemeeting you had with us a month or so ago?) This is one of the elevations that was changed and reviewed at that meeting.The arrow on the marked up elevations should have been duplicated and extended to the second floor to make those changes as apparent as those on the first floor. 7. Building A Rear Elevation—please provide us with more details about the garage door materials, color, and design. (These look different tHan what the PC approved) Materials,color sample and cut sheet provided on 6/12/14 8. Building A side elevation —looks like a gable or roof plane is missing just below the dock. (see attached marked up plan, pdf 12033A5.2)The gable roof shown in the original elevations represents the main/primary gable in the center of the front elevation.This gable still exists on the building; unfortunately the CAD program used to create the plan drawings omits that gabie from the side elevation view due to the distance between it and the end of the building. 9. Site Plan & dumpster access—the site plan does not match what [he PIan.Commission �PC) approved for ttie dumpster area and access. Please change back to the prior version so that the dumpster area can be accessed from within the site and not just from 98`"Street.This is nonnegotiable. (see attached marked up plan, pdf C100)You stated that this was a concern brought up by Jeremy in the Engineering Department. We met with him after our meeting yesterday and he had been made aware of the challenges presented by the grade elevation change in that area as weil as the cover requirements for the existing subsurface water main that would prevent the changing of that grade. He indicated that as a result he was ok with this revision for those reasons and tfiis should be evidenced by his approval ot Yhe plans in the coming days. 30. Site Plan and parking space locations-the site plan does not match what the Plan Commission approved for the location of several 'pods' of parking spaces; please explain why these changes were made. (see attached marked up plan)The parking in those areas was removed/relocated due to excessive parking being originally planned; relocating the spaces to more convenient areas in closer proximity to users and an effort to further reduce impervious surfaces on the site. Angie Conn, Pfanning Administrator City of Carmel Planning�&Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O�ce: 317-571-24ll � Direct: 317-571-2281 � Fax: 3ll-571-2426 � E-mail: aconn(�carmel.in.aov � Web: www.carmeldocs:com Please consider the environmerrt before printing this e-mait 41 _ ____ _.--- _�_..._ ___ _---- .__ ___ _. From: Joe Langebartels.[mailto:jianqebartels�crqresider�tiaLmm] Sent:Tuesday; June 10, 2014 8:13 AM To: Conn, Angelina V Cc: Nick Churchill; steve:n-pittman�artners.com; Rex Barrett - Barrett & Stokely (rmb��barrettandstokely.com); Chris Reid; Alex Barrett; Schrage, Brad; Fetahagic, Alen; James Maloy; Mishler, Nicholas F Subject: Seasons of Carmel Apartments Angie, As requested, attached are the elevations of all the buildings at Seasons of Carmel. Also attached is a site plan. Please let me know if you have any questions or need further information. Thanks Joseph A. langeba�tels Vica Presidenf % '_ 805 City Cen4er Drive, Suite 180 Carmel; !n A&032 Direct; 317,884.8278 PAain: 317.575,9440 Fax: 317.575.9383 wavw.GRGResidential.com 42 Mishler; Nicholas F From: Ryan Hartman [Ryan.Hartman@CTRWD.ORG] Sent: Thursday, June 12, 2014 4:33 PM To: Mishler, Nicholas F Cc: 'jmaloy@crgresidentiaLcom; Fetahagic, Alen (Afetahagic@structurepoint.com) Subject: RE: Seasons of Carmel Nick, Plans are pretty close to being finalized. CTRWD is okay with allowing for conditional building permits with the understanding thatsanitary sewer plans need to be finalized, the IDEM permif approval need to be received, a CTRWD pre-con still needs to be held, and payment need to be made to CTRWD before any sariitary sewer work is to commence. � Ryan Hartman, District Engineer Clay Township Regional Waste District 10701 N. Coilege Avenue, Suite A I�dianapolis, Indiana 46280 Phone - 317-844-9Z00 Mobile - Website - www.ctrwd.org Email - ryan:hartman@ctrwd.org 2013 PublicEducation Award Recipient z013 Govemor's Award Recipient � J Public Education Category Outreach/Education Category _ __w. _ �_____ __ __ � __._____m__ From: Ryan Hartman � � � Sent: Friday, June 06, 2014 4:30 PM To: 'Mishler, Nicholas F'; Conn, Angelina V; Littlejohn, David W; Donahue-Wold; Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Bames, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Carmel Nick, Plans for this project are still under review. Thank you. J Ryan Hartman, District Engineer Clay Township Regional Waste District 10701 N. College Avenue, Suite A Indianapolis, Indiana 46280 Phone - 317-844-9200 Mobile - Website - www.ctrwd.orq Email - ryan.hartmanCalctrwd.orq 2013 Public Education Award Recipient z013 Governor's Award Recipient !� J Public Education Category Outreach/Education Category 43 ._ ___ w_____._..m__ �� _ ____---�__.,_..�-----__ _ From: Mishler, Nicholas F [mailto:nmishlerCalcarmel.in.aov] Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R: Hoyes'; 'jclark@vectren.com'; Ryan Hartmen; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cr. 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- I have received plans for the�new Seasons of Cannel apartments. This�will be a 14 building, 256 unit apartment complex located at approximately 98r� & Westfield Blvd. I have attached a few of the building plans. Please let me know what your depactment will require prior to the issuance of a building permit. [ have CC'd J. Maloy with CRG Residential on this emaiL Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Ad�ninistrative Assistant Building & Code Services (3 L 7) 571-2489 P Please consider the environment before printing this email 44 Mishler, Nicholas F From: Lux, Pamela K Sent: Thursday, June 12, 2014 2:54 PM To: 'Joe Langebartels' Cc: steve@pittmanpartners.com; Nick Churchill; Alex Barrett; Rex Barrett- Barrett & Stokely (rmb@barrettandstokely.com); James Maloy; Chris Reid; Mishler, Nicholas F Subject: RE`. Seasons of Carmel Thank you. I will submit the names to Hamilton County and let you know. Pam Lux euilding and Code Services City of Carmel From: Joe Langebartels [mailto:jlangebartels@crgresidential.com] � Sent: Thursday, ]une 12, 2014 2:48 PM To: Lux, Pamela K Cc: steve@pittmanpartners.com; Nick Churchill; Alex Barrett; Rex Barrett - Barrett& Stokely (rmb@barrettandstokely.com); James Maloy; Chris Reid; Mishler, Nicholas F Subject: Seasons of Carmel Pam, J Maloy stated to me that you needed the names of the streets for the Seasons of Carmel project before you are able to assign the address. I have discussed this with the ownership and the attached drawing indicates wfiat they would like to name the streets. If for any �eason these do not work please feel free to contact me. Thanks Joseph A. Langebartels Vice President J �- 805 City Genter Drive,Suite 16a Carmel,In d8032 Direct: 317.660.6278 Main: 317.575.944Q Fax:317.575.9399 www.C R G Re s i d e n t i a 3.c a m 45 Mishler, Nicholas F From: Joe Langebartels �langebartels@crgresidential.com] Sent: Thursday, June 12, 2014 2:48 PM To: Lux, Pamela K Cc: steve@pittmanpartners.com; Nick Churchill; Alex Barrett; Rex Barrett- Barrett & Stokely (rmb@barrettandstokely.com); James Maloy; Chris Reid; Mishler, Nicholas F Subject: Seasons of Carmel Pam, J Maloy stated to me that you needed the names of the streets for the Seasons of Carmel project before you are able to assign the address. I have discussed this with the ownership and fhe attached drawing indicates what they would like to name the streets. If for any reason these do not work please feel free to contact me. Thanks Joseph A. �angebartels Vice Fresident J -- 8fl5��City Cenier Drive,Sufte 164 Carmel,In ABQ32 Direct: 31 I.660.827& Main: 317.575.9400 Fax: �17.575.9399 wwvu.C R G R s s i d e n t i a l.c o m 46 Mishler, Nicholas F F�om: Kashman, Jeremy M Sent: Thursday, June 12, 2014 12:57 PM To: Mishler, Nicholas F Subject: Re: The Seasons of Carmel Ok. Thanks Nick! Sent from my iPhone On Jun 12, 2014, at 12:39 PM, "Mishler, Nicholas F" <nmishler@carmel.in.�ov> wrote: All,please disregard my previous email. I spoke to Jim and I'm now up to speed on wliat'sgoing on with the permits. Thanks, Nick Mishler Administrative assistanL Building&Code Services (317�571-2489 �,j Pleuse cons)de.r the enalronmen,before printing this email From: Kashman, Jeremy M � ��� �� Sent: Thursday, June 12, 2014 11:40 AM To: Blanchard, Jim E; Mishler, Nicholas F Cc: Duncan, Gary R; Hollibaugh, Mike P Subject: The Seasons of Carmel Jim/ Nick, I want to send this email as a notification that this project has our Conditional Approvai from the Department of Engineering and can file for building permits. This approval is Dependent upon the following conditions: -Final plan approval from the Department base upon comments sent on May 2, 2014. Plans were resubmitted on June 5, 2014. -Final approval of items sent to the Board of Public Works for approval on lune 18, 2014. Thanks, Jeremy Kashman, PE City Engineer City of Carmel One Civic Square Carmel, IN 46032 317-571-2441 47 Mishler, Nicholas F From: Kashman, Jeremy M Sent: Thursday, June 12, 2014 11:40 AM To: Blanchard, Jim E; Mishler, Nicholas F Cc: Duncan, Gary R; Hollibaugh, Mike P Subject: The Seasons of Carmel Jim / Nick; I want to send this email as a notification that this project has our Conditional Approval from the Department of Engineering and can file for building permits. This approval is Dependent upon the following conditions: -Final plan approval from the Department base upon comments sent on May 2, 2014. Plans were resubmitted on June 5, 2014. -Final approval of items sent to the Board of Public Works for approval on June 18, 2014. Tha n ks, leremy Kashman, PE City Engineer City of Carmel One Civic Square Carmel, IN 46032 317-571-2441 48 Mishler, Nicholas F From: Knott, Bruce Sent¢ Thursday, June 12, 2014 11:01 AM To: Mishle�, Nicholas F Cc: Ellison, Christopher M Subject: Re: Carmel SeniorLiving: Unit Numbering & Emergency Access for Vertical Construction Nothing fromxheJast time we communicated with her that l can recall. Bruce Knott On Jun 12, 2014, at 6:19 AM, "Mishler, Nicholas F" <nmishler@carmel.in.eov> wrote: Hey guys,do you have any updates on this? Thanks, Nick Mishler Administrative Assistant Building&Code Services (317).571-2489 �j Picase corrslder fh�e�nv�ronmen!'brFa;e pneGrg tY•�ls email ._..m____._.___.._.._..._.._,___._.�. ____..._._.. ' '—�_____'__'.....'_'_'..__ From: Ellison, Christopher M Sent: Monday, March 31, 2014 11:54 AM To: Knott, Bruce Cc: Mishler, Nicholas F Subject: Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction We have not received any updates from them in reference to Fire dept access and installation of fire hyd ra nts. Chris Ellison Carmel fire Dept. Sent from my iPhone On Mar 31, 2014, at 11:47 AM, "Knott, Bruce" <BKnott@carmel.in.�ov>wrote: I thought this was already done, I will look at the old emails __ ____ __ — -._ � From: Misliler, Nicholas F Sent: Monday, March 31, 2014 11:28 AM To: Ellison, Christopher M Cc: Knott, Bruce Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction � Hey guys,any updates on this one? Thanks, 49 Nick Mishler Administrative Assistant Building&Code Services (3ll)571-2489 �,-'�j Please consider th2�nvir�nmevCbePorEe�rintin�;this crn�li From: Ellison, Christopher M R � T� _,__� _ _.._ Sent: Tuesday, March 04, 2014 10;32 AM To: Mishler, Nicholas F Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction From: Knott, Bruce _.__ __ .. _._^ -- Sent: Monday, February 10, 2014 10:45 AM To: 'Bernida Egging'; Mishler, Nicholas F; Ellison, Christoplier M Cc: Knott, Bruce Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construdion Bernida, Nick Mishler and I are meeting this week to look over the addressing. As far as the access to the site goes, there was a TAC meeting on Sept. llt° 2013 in which the access need was stated as paved/binder all around the loop of the building and all hydrants to be in place and working prior to vertical construction and wood on the site. Part of the issue with this site is that: ti1. there is only one access point from a public road. tt2. The proposed access loop has very limited parking which will have to constantly be monitored. Emergency apparatus will need to have access 24/7 . Having access to only half or less of the building(prosed highlighted access)will make it impossible to quickly deal with an emergency. #3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the access road. #4. Required hydrants on the East side of the site would not be accessible if the complete access were not provided. #5. The limited parking and extra space on this site is going to make it difficult for construction equipment�and vehides) to allow for 24/7 emergency access without altering the loop road binder, and our experience shows that dirt and or gravel has not held up in the past and does not support the emergency equipment. Thank you, Bruce Knott Fire Marshal Carmel Fire Dept. �__ ______.._...__.,.._..._ _____, ____.�.___��_ From: Bernida Egging [mailto:begginqColspectrumretirement.com] Sent: Friday, February 07, 2014 4:57 PM To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M so Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction Hello Nick, Bruce and Chris, I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit numbering as well as the required paved surface for our construction project prior to going vertical. 1. Unit Numbering a. I have attached two possible solutions for our unit numbering. I believe these options address your concerns from our meeting and hope we can come to an agreement on how to proceed. 2. Paved Surface for Going Vertical a. Please see the attached pdf named "Carmel—FD Required Paved Surface.pdf". I would like to propose that we definitely install the yellow highlighted area for fire department-paved access, but would like to confirm acceptance of using Illinois Street and W. 136`h Street as part of our required "paved surfaces" due to their proximity to our jobsite. Can you please confirm acceptance of this? Feel free to contact me with any questions or concerns. Thank you, Bernida Egging Vice President of Construction <image001.gif> 200 Spruce St,Suite 200 . Denver,CO 80230 ph:303.360.8812 fax:303.360.8814 beqqinq(a)spectrumretirement.com Check out our diqital lifestvle maqazine! 51 Mishler, Nicholas F From: Conn, Angelina V Sent: Wednesday, June 11, 2014 4:14 PM To: 'Joe Langebartels'; Nick Churchill Cc: steve@pittmanpartners.com; Rex Barrett - Barrett & Stokely(rmb@barrettandstokely.com); Chris Reid; Alex Barrett; Schrage, Brad; Fetahagic, Alen; James Maloy; Mishler, Nicholas F Subject: RE: Seasons of Carmel Apartments Good afternoon, Joe - The Planning Dept. has a few questions and comments regarding the Elevations and Site Plan. Please reply to each comment below, so we can proceed with rzview and approvals of the Elevations and Site Plan. Thank you. 1. Building Cl Front Elevation—please provide us with more details about the garage door materials, color, and design. (These look different than what the PC approved) 2. Building e front Elevation—please provide us with more details about the garage door material, color, and design. (It looks different than what the PC approved) 3. Building C3 Rear Elevation—the timbers on the middle architectural featureneed to be more massive/thicker, so that it matches what the'PC approved. (see attached marked up elevation, pdf 12033A5.8.) 4. Building C3 Front Elevation—please provide uswith more details about the garage doormaterials, color, and design. (These look different than what the PC approved) 5. Building C2 Front Elevation —please provide us with more detaiis about the garage doormaterials, color, and design. (These look different than what the PC approved) 6. Building C2 Side Elevation—cannot find there this matches what the PC approved. ( Nick, is this one of the elevations that is changing, per the meeting you had with us a month or so ago?) 7. Building A Rear Elevation—please provide us with more detaiis about the garage door materials, color, and design. (These look different than what the PC approved) 8. Building A side elevatiom—looks like a gable or roof plane is missing just below the dock.{see attached ma�ked up plan, pdf 12033A5.2} 9. Site Plan & dumpster access—the site plan does not match what the Plan Commission {PC)approved for the dumpster area and access. Please change back to the prior version so that the dumpster area can be accessed from within the site and not just from 98`" Street. This is nonnegotiable. (see attached marked up plan, pdf C100) 10. Site Plan and parking space locations-the site plan does not match what the Plan Commission approved for the location of several 'pods' of parking spaces; please explain why these changes were made. (see attached marked up plan Angie Conn, Pianning Administrator City of Carmel.Planning &�Zoning Division . Dept. of Community Services 1 CivicSquare, 3rd Fir., Carmel, IN 46032 Office: 3ll-571-2417 � Direct: 317-571-2281 � Fax: 317-571-2426 I E-mail: aconnCacarmel.in.qov � Web: www.carmeldocs.com Please consider the enviranmenl before printing this e-maii ��._.._.._......._.__ ..,____. ..._...._....___.____, ._,._._._.._..___..._,..�.._...._........ From: Joe Langebartels [mailto:jlangebartelsc�crqresidentiaLcom] Sent: Tuesday, June 10, 2014 8:13 AM To: Conn, Angelina V Cc: Nick Churchill; steveCapittmanpartners.com; Rex Barrett - Barrett & Stokely (rmhCabarrettandstokely.com); Chris sz Reid; Alex earrett; Schrage, Brad; Fetahagic, Alen; James Maloy; Mishler, Nicholas F Subject: Seasons of Carmel Apartments Angie, As reques5ed, attached are the elevations of all the buildings at Seasons of Carmel. Also attached is a site plan. Please let me know if you have any questions or need further information. Thanks Joseph A. Langebartels Vice Fresident J -- 8a5 City Genter Drive,Suite 160 Carmel, In 45032 Direct: 317.$60.8278 Mzin: 317:575.9400 Fax: 317.575.9�99 www.C RG Res ide nt i al.com 53 Mishler, Nicholas F From: Conn, Angelina V Sent: Tuesday, June 10, 2014 10:46 AM To: 'Joe Langebartels' Cc: Nick Churchill; steve@pittmanpartners.com; Rex Barrett - Barrett & Stokely (rmb@barrettandstokely.com); Chris Reid; AlexBarrett; Schrage, Brad; Fetahagic, Alen; James Maloy; Mishler, Nicholas F Subject: RE: Seasons of Carmel Apartments Thank you,loe. The Planning/Zoning Dept. wiil review these, and will let you know if we need anything additional. Angie Conn, P�anning Administraror Gity of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 � Direct: 317-571-2281 � Fax: 3ll-571-2426 � E-mail: aconnCalcarmel.in.qov I Web: www.carmeldocs.com Please consider fhe�environment befoia printing ihis e-mai( .__._._...__..__.__. _ _.____�__..._...____._. __.. .�.________..___.._._......__.._.._ From: ]oe Langebartelsjmailto:iia�ge6arteis;�crgresidentiai.cam] Sent: Tuesday, June 10, 2014 8:13 AM To: Conn, Angelina V Ce: Nick Churchill; steve�ittmanpartners com; Rex Barrett - Barrett & Stokely (rmb,o barrettandstok2lv.com); Chris Reid; Alex Barrett; Schrage, Brad; Fetahagic, Alen; James Maloy; Mishler, Nicfiolas F Subject: Seasons of Carmel Apartments Angie, As requested, attached are the elevations of ali the buildings at Seasons of CarmeL Also attached is a site plan. Please let me know if you have any questions or need further informatio�. Thanks Joseph A. Lange6aReis Vice Presideni � $05 City�Center Drive, Suite 180 Carmel, In 46032 Direct: 317.fi60.8278 Main: 317.575.9400 Fax: 317.575.9399 Www.CRGResidentiaLcom 54 Mishler, Nicholas F From: Joe Langebartels [jlangebartels@crgresidential.com] Sent: Tuesday, June 10, 2014 8:13 AM To: Conn, Angelina V Cc: Nick Churchill; steve@pittmanpartners.com; Rex Barrett - Barrett& Stokely (rmb@barrettandstokely.com); Chris Reid; Alex Barrett; Schrage, Brad; Fetahagic, Alen; James Maloy; Mishler, Nicholas F Subject: Seasons of Carmel Apartments Angie, As requested, attached are the elevations of all the buildings at Seasons of Carmel. Also attached is a site plan. Please let me know if you have any questions or need further information. Thanks Joseph A. Langebartels Vice President � 805 City Center Drive, Suite t&0 Carmel,In 46Q32 Direct: 317.660.6278 Main: 317.575.9400 Fax:317.575.9399 www.0 RGResidential.com 55 Mishler, Nicholas F From: Conn, A�gelina V Sent: Monday, June 09, 2014 12:57 PM To: Mishler; Nicholas F Cc: 'jmaloy@crgresidential.com` 'Nick Churchill'; Keesling, Rachef M Subject: RE: Seasons of Carmel (building permits) Hi, Nick (Mishler)— Nick Churchill with Pittman Partners is supposed to get us some additional info about what they are proposing to change on the building exteriors. We have not received that yet. In the meantime,J. Maloy should email us all of the exterior architectural building elevations (all sides)for all buildings, as well a5a site plan, so that we can makesure that what they want to building matches what the Plan Commission approved under P{an Commission docket no. 12120015 ADLS. Then, the Planning Dept. can review those and stamp them approved, as soon as we get all the info we need, and then they can move forward with building permits. Thanks! Angie Gonn; Planning Administrator City af Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-24ll � Direct: 317-571-2281 � Fax: 317-571-2426 � E-mail: aconnCo)carmel.in.qov � Web: www.carmeldocs.com Piease consrder the environment before�pri,hting this e-mail ___._.___ .._—...._ . .__._..._.—___... .___.._._.._ ..—.._..__ ___ _._.___ From: Mishler, Nicholas F Sent: Friday, June 06, 2014 3:05 PM To: Conn;Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Harfman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- l have received plans for the new Seasons of Carme{apartmeou. This will be a 14 building,256 unit apartment complex located at approximately 98`�&Westfield Blvd. I haveattached a few of�the building plans. PleaseJet me know what your department will require prior to the issuance of a building permit. I have CCd 1.Maloy with CRG Residentialbn this email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administrative Assistani Building&Code Services (317)571-2489 p,-fj 44V ase csnsidex the enY:;enmect befo*e printing thls en;ail 56 Mishler, Nicholas F From: James Maloy[jmaloy@crgresidential.com] Sent: Monday, June 09, 2014 10:06 AM To: Mishler, Nicholas F Subject: Re: Seasons of Carmel Nick; Does this mean I need to get 2 full copies to the utility dept. or the sets I dropped off Friday go ? Thanks Sent from my iPhone J Maloy Project Superintendent 317-518-7947 CRG Residential LLC On Jun 9, 2�14, at 8:41 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov>wrote: FYI Thanks, Nick Mishler Administrative Assistant Building&Code Services (317)571-2459 5,.�-q Please corslder the environmer�befcre printing Fhis?maii _.,...�..._.._ __�_...._,...._._._, .�...._ ...�____._...,._,_...,.. From: Kempa, Lisa L Sent: Monday, June 09, 2014 8:41 AM To: Mishler,Nicholas F Subject: RE: Seasons of Carmel Please have them send me two paper sets of plans. Thanks. �isa /�e��ia Carmel Utilities 30 West Main Ste 200 Carmel, IN 46032 317/571-2267 �______m __ _ —_ _ _._ __._---__......_,___ From: Mishler, Nicholas F Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Do�ahue-Wold, Alezia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'iclarkColvectren.com'; 'Ryan Hartman'; Duffy; John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, Davitl R; 'Larry Beard'; Luz, Pamela K; Kass, ]oslyn; Jordan, Alex Ccp 'jmaloyCalcrgresidential.com' Subject: Seasons of Carmel Good afternoon- 57 I have:received plans for the new Seasons of Carmel apartments. This will be a 14 building,256 unit apartment complex located at approximately 98`h&Westfield Blvd. I have attached a few of the building plans. Please let me know what�your departmentwill require prior to the issuance of a building permit. I have CC'd 1. Maloy with CRG Residential on[his email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administrative Assistant Building&Code Services (317�571-2489 �j 2laare mn;ider the en�iron,mem before printing[hls emtnl 58 Mishler, Nicholas F From: Kempa, Lisa L Sent: Monday, June 09, 2014 8:41 AM To: Mishler, Nicholas F Subject: RE: Seasons of Carmel Please have them send me two paper sets of plans. Thanks. lisa /�em�ia Carmel Utilities 30 WestMain Ste 200 Carmel, IN 46032 317/571-2267 �__.____._ ��.____.. _..._.___—___m_�___---°.---,._ From: Mishler, Nicholas F Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindfiam, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, ]oslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- I have received plans for the new Seasons of�Carmel apartments. This will be a 14 building,256 unit apartment complex located at approximateiy 98`�&Westfield Blvd. I have attached a few of the bui�ding plans. Please le4 me know what your department will require prior to the issuance of a building�permit. I have CCd 1.Maloy with CRG Resldential on this email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administrative Assistant Building&Code Services {317)571-2489 �-j.Plea>e consl;!er the emiircnment.6efore Nrintir,g thi�einaii 59 Mishler, Nicholas F From: Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov] Sent: Friday, June O6, 2014 3:16 PM To: Mishler, Nicholas F; Conn, Angelina V; 'Ryan Hartman'; Duncan, Gary R; Thomas, John G; Barnes, David R; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Ca�mel Nick The Hamilton County Surveyor's Office has no outstanding issues on this project. .��Ce� ,;3�a�e�> llC', �✓ll; C'i£SC' Plan Reviewer Hamilton County Surveyor's Office – ----._..�—.. .__..__ __ .._. ----– – _ __.. _._ _. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; Greg R. Hoyes; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; 'Kempa, Lisa L; David E. Lucas; Duncan, Gary R; Thomas, John G; Barnes, David R; Larry D. Beard; Lux, Pamela K; Kass, ]oslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- I have received plans:fo�the new Seasons of Carme�apartments. This will be a 14 building,256 unit apartment complex located at approximately 98`h&Westfield Blvd. I have attached a few of the building plans. Please let me know what your department will require prior to the issuance of a building permit. I have CC'd 1. Maloy with CRG Residential on this email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administra[ive Assistant Building�&Code Services (3ll)571-2489 �,�Please consider the envkonment befor?printinS this 2ml�u 60 Mishler, Nicholas F From: ftyan Hartman [Ryan.Hartman@CTRWD.ORG] SenL• Friday, June 06, 2014 4:30 PM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard` Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Carmel Nick, Plans for this project are still under review. Thank you. I� Ryan Hartman, District Engineer Clay Township Regional Waste District 10701 N. College Avenue, Suite A Indianapolis, Indiana 46280 Phone - 317-844-9200 Mobile - Website - www.ctrwd.orq Email - rvan.hartmanCa�ctrvvd.org 2013 Public Education Award Recipient 2013 Governor's Award Recipient �� J Public Education Category Outreach/Education Category �._�� _._�—__ ____----.__..______._ __------...._.�_�.__ .___...—___..., .,. __.._ ,.. From: Mishler, Nicholas F [mailto:nmishlerColcarmel.in.gov] Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; Ryan Hartman; Duffy, ]ohn M; Kempa, Lisa L; 'Oavid Lucas'; Duncan, Gary R; Thomas, ]ohn G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- I have received plans for the new Seasons of Carmel apartments. This will be a 14 building, 256 unit apartment complex located at approxiinately 98°i�& Westfiel'd Blvd. I have attached a few of the building plans. Please let me know what your department will require prior to the issuance of a building permit. I have CC'd J. Maloy with CRG Kesidential on this email. Please copy him on your reply. Have a �-eat weekend!! 61 Mishler, Nicholas F From: Thomas, John G Sent: Friday, June 06, 2014 4:23 PM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Carmel This project is siill in our plan review process in our department. Sincerely, John Thomas, CPESC, CMS4S Storm WaterAdministrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Mishler, Nicholas F Sent: Friday, ]une 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; ]ordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Good afternoon- I have received plans for the new Seasons of Carmel apartments. This will be a 14 building,256 unit apartment complex located at approximately 98`n&Westfield Blvd. I have attached a few of the building plans. Please let me know what your department will require prior to the issuance of a building permit. I have CC'd 1. Maloy with CRG Residential on this email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administrative Assistant Building&Code Services (317�571-2489 b3j PleBSe censider the environment before prir[ing Ihis email 63 Mishler, Nicholas F From: Hunter, ShirleyA [Shirley.Hunter@duke-energy.com] Sent: Friday, June 06, 2014 3:24 PM To: Mishler, Nicholas F Subject: RE: Seasons of Carmel Please slow down! O From: Mishler, Nicholas F [mailto:nmishlerCalcarmel.in.gov] Sent: Friday, June 06, 2014 3:05 PM To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; Hunter, Shirley A; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; ]ordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel "" This is an EXTERNAL emaii. Exercise caution. DO NOT open attachments or click Iinks from unknown senders or unexpected email. "** Good ahernoon- I have received plans for the new Seasons of Carmel apartments. This will be a 14 building,256 unit apartment mmplex located at approximately 98`�&Westfield Blvd. I have attached a few of the building plans. Please let me know what your department wiil require prior to the issuance of a builtling permit. I have CC'd 1. Maloy with CRG Residential on this email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administrative Assistant Building&Code Services (317)571-2489 `�'j PIEaSe mnsidet[he environment before printing ihis emaii 64 Mishler, Nicholas F From: Lux, Pamela K Sent: Friday, June 06, 2014 321 PM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman'; Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: RE: Seasons of Carmel The addresses have not been assigned. That should be complete in the next day or two. Thanks Pam Lux Building and Code Services City of Carmel From: Mishler, Nicholas F � Sent: Friday, June 06, 2014 3:05 PM ' To: Conn, Angelina V; Littlejohn, David W; Donahue-Wold, Alexia K; Mindham, Daren; 'Hunter, Shirley A'; 'Greg R. Hoyes'; 'jclark@vectren.com'; 'Ryan Hartman;Duffy, John M; Kempa, Lisa L; 'David Lucas'; Duncan, Gary R; Thomas, John G; Barnes, David R; 'Larry Beard'; Lux, Pamela K; Kass, Joslyn; Jordan, Alex Cc: 'jmaloy@crgresidential.com' Subject: Seasons of Carmel Goodafternoon- I have received plans for the new Seasons of Carmel apartments. This will be a 14 building,256 unit apartment complex located at approximately 98`"&Westfield Blvd. I have attached a few of the building plans. Please let me know what your department will require prior to the issuance of a building permit. I have CC'd 1.Maloy with CRG Residential on this email. Please copy him on your reply. Have a great weekend!! Thanks, Nick Mishler Administrative Assistant Building&Code Services (3ll)571-2489 ��j PleaSe coniider the environment befare printing this einail 65