HomeMy WebLinkAboutGerig-Ottenweller/ENG/CO 2/inc 12,776.25/River Road CulvertCITY OF CARMEL OWNER: CITY OF CARMEL FIELD ORDER NUMBER 002 DATE: 5/19/2013 PROJECT NAME: River Rd. Culvert PROJECT NO: 11 -07 You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor changes in the Work without change in Contract Price or Contract Time. If you consider that a change in Contract Price or Contract Time is required, please submit your itemized proposal to the ENGINEER immediately and before proceeding with this Work. If your proposal is found to be satisfactory and in proper order, this Field Order will in that event be superseded by a Change Order. Description: Remove additional asphalt (Item 14) to allow enough room for a large crane to be positioned close to the proposed structure location, but outside of the fill area. The area removed then requires reconstruction of the pavement removed (Items 26 and 27). Additional construction signs (Items 41 and 43) per requested by the Carmel Police Department to reduce the number of complaints and to improve compliance by the motoring public. Full plans required installation of a catch basing and 12" concrete pipe, out - letting into the culvert. This structure will he required to keep water from flowing over the future path. This structure is planned to be between the road and path, and approximately 10 feet below grade. it would be expensive to core the new culvert and install this pipe in the future, and relatively easy and inexpensive to install it now. Attachments: Plan sheet C701 VS Engineering ENGINEER: Approved By: Steve Moore, per Gary Duncan, City of Carmel Owners Representative Date: August 8, 2013 AR -1 CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 002 DATE: May 23, 2014 PROJECT NAME: River Road Culvert over Elizabeth Warren Drain CITY REQ. NO.: CITY PO NO.: 26567 CITY PO DATE: 2/6/2013 1. You are directed to make the following changes in this Contract. Remove additional asphalt (Item 14) for crane access to set concrete structure, and then reconstruct the pavement removed (Items 26 and 27). Add additional construction signs (Items 41 and 43) per request of Carmel Police. Add 8 LF of 12 IN. Dia. Concrete Pipe (Item 52) for future catch basin. Remaining items are Final Quantity Adjustments. Additional time (61 days) is requested due to the delay experienced from work for Citizens Water to install casings and a reinforced platform to protect two 36 Inch diameter concrete water supply lines. SCHEDULED ADJUSTMENT ITEM AMOUNT ( +) OR ( -1 DAYS 14 Asphalt, Remove $4,395.00 zero 24, Milling, Asphalt, 2 Inch ($4.123.00) zero 25, HMA Surface. 9.5mm ($1,201.75) zero 26 HMA Intermediate, 19.0mm 56,328.00 zero 27. LIMA Base, 25.0mm $8.658.00 zero 39 Sign and Post ($1.000.00) zero 41 Construction Sign. C $1,500.00 zero 42. Standard Barricade, Type 1MIA ($420.00) zero 43 Detour Route Marker Assembly $300.00 zero 48. End School Zone Sign ($500.00) zero 49. Bicycle Warning Sign ($1,200.00) zero 50 Bicycle Warning Sign ($600.00) zero 52 Pipe. Concrete, 12 IN. $640.00 zero TOTAL $12,776.25 zero II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order - $661,646.00 Contract Price will be increased by this Change Order $ 12 776.25 New Contract Price including this Change Order $674,422.25 Contract Time Prior to this Change Order Completion Date 8/15/2013 Net increased/decreased resulting from this Change Order 61 Days AR -2 Current Contract Time including this Change Order Completion Date 10/15/2013 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended VS Engineering, Inc. ENGINEER 4275 N. High School Rd. Address Indianapolis, IN 46254 City /State /Zip Pho e:317- 752 -9731 C/7/4/ Date The Above Changes Are Accepted: Ottenweller Contracting CONTRACTOR 3010 Independence Dr. Address 0 6808 Approved: /Mille Y t Phone: 260 - 484 -9183 Date: /4 /7/ 1 9 AR -3 e, Member Lori Watson, Member ATTEST: alt Diana Cordra Treasurer Date: I a k-