HomeMy WebLinkAboutE&B Paving/ENG/CO 2/increase 9,761.05/Illinois Street ExtensionCITY OE CARMEL
TO: E&8 Paving, Inc.
17042 Middletown Avenue
Noblesville, IN 46060
CONTRACT CHANGE ORDER NO. 2
DATE: 7/15/2014
PROJECT NAME: 10 -10 Illinois St. Ext.
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
25297
12/18/2013
1. You are directed to make the following changes in this Contract:
Add RCP End Section per RPE #1 and as quoted in attached support documentation.
SCHEDULED ADJUSTMENT
ITEM AMOUNT ( +) OR ( - ) DAYS
Item CO 3 - 18" RCP End Section
$1,078.61
0 Days
Item CO 4 - 24" RCP End Section
$1,162.61
0 Days
Item CO 5 - 36" RCP End Section
$1,610.61
0 Days
Item CO 6 - 54" RCP End Section
$2,562.61
0 Days
Item CO 7 - 60" RCP End Section
$3,346.61
0 Days
II. The following referenced Documents further describe the changes outlined in Paragraph 1,
and are to be considered a part of this Change Order: R.E.P.: _ #1 W.D.C. NO.:
Other: By Request from the City of Carmel
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order
Contract Price will be increased /decreased by this Change Order
New Contract Price including this Change Order
Contract Time prior to this Change Order 426 Days
Net increased /decreased resulting from this Change Order
Current Contract Time including this Change Order 426 Days
$6,520,968.87
$9,761.05
$6.530,729.92
6/1 /2015 Completion Date
0 Days
6/1/2015 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Approved
Recommended
CROSSROAD ENGINEERS
ENGINEER
3417 Sherman Drive
Address
Beech Grove. IN 46107
City/State/Zip
Date: 7% 7//4
Accepted
E &13 Paving, Inc.
CONTRACTOR
17042 Middletown Avenue
Address
Noblesville. IN 46060
City/Starr Zip
By: i
Ph!. ic: 317- 773 -4137
1//6/11
Date:
ames Brainard, Mayor
Ata
Kas i tn, Ci ✓�ng
a
♦ •
tp1 e, Member
Lori Watson. Member
."T..
• s
aCO I ay, .C.41‘
D _
Date:
I
k- Treasurer
T[}: Gradex Inc.
CITY 0FC9kNEL
REQUEST FOR PROPOSAL NO 1
DATE. 06/11/2014
PROJECT A M Illinois Street Extension
PKO)[CT!10.: }V')O
Specification Reference: 1N[){)T715.10
Drawing Reference: Final Consu'uciion Details Drawing Date: Rev. h?D)/14
Identification u[Attachments: /<i!
Please submit within Fifteen (.15) calendar days of dns request date a proposal showing increase,
decrease or no change in Contract Price and/or Cvo/rau Time. Proposal shall be accompanied by
four (4) copies o( breakdown showing, quantities. cost o[ material. equipment, labor. overhead. profi/
and basis for the additional time any.
DESCRIPTION OF PROPOSED CHANG[ COVERED 8Y 'Di |%REQUEST:
Pricing is needed for the installation oi 4 Pipe 1:ind Sections that were not included in the
projcct iicmizecl proposal in acRIiIion [0 not being addressed otherwise io the construction documents.
The locations u[the are as thtlows:
• |2+92|,00 Line PK-%-|A.24^RCP, Sheet 33.
• 49+VOKon Line |,R'6, 54^KCP. Sheet 37.
• 55+28Lon Line YK'&]6''RCP, Skeet 38 and installed wnV6/00/Z0|4.
• |4+04Kno Line /`K'I8'l'K.)8'' RCP, Sheet 39.
R.E/\S()N FOR CHANGE:
SPECIAL INSTRUCTIONS: N//\
THIS R[(lUI:SY|)(}-14S NOT AUTITORWAT-TTYOUT(lPR()C[E[—W|:}|THE ABOVE-WORK
NOR USLl-SC|-|t-)1--JETA[>W(}|TKT—Hipn-eppnxJaC\n*roc!C|acns{)nd*+*nd-a
Notice' ToProceed will be Dinned. The above work can proceed during pricing and sonic work has
already been performed.
Please stale in !ou/ yroyou� | the effect tk o u:, �pnc� o [ t| x K ulyca will have on the Project's
Substantial Completion and |Tino|(iorny|0000` accepted within |j days o[ proposal due date.
YOUR PROPOSAL DUE DATE: 06/27/2014
Bv: [oossQvud2neiouco,P.C.
06/|l/20|4
Engineer Date
Approved By:
e/s0pn,'veniaKirc
ISuh Totals
Recapitulation.xls
Recapitulation
Illinois Street Extension #10 -10
Pricing for 18" FES
7/11/2014
Descriptor]
Quantity
and
unit pace
material cost
unit cost
L & E cost
unit cost
Extended
Unit cost
Sub Price
materials
Labor
Equipment
Sub
$
$
$
rn
E•uimerit and Labor
_
-$
$ -
$
$ -
300 Excavator
1
HR
$ -
$ -
8 183.00
$ 183.00
$ -
Laborers(2 (o) 1 HR each
2
HR
$ -
$ 41.03
$ 82.06
$ -
$ -
O.eralor
1
HR
$ 54.95
$ 54,95
Foreman
1
HR
$ -
$ 56.80
$ 56.80
$ -
$
-_
-$
-
$ -
$
$ _
Materials
Concrete for Anchor
-_
1
CY
$ -
$
_
$ 167.00
$ 167.00
- $ -
I $
=
-$
-
$ - $
18" PIES
1
EA
$ 425.00
$ 425.00
-_ $ -
-$
$
=$
_
$ _
$ _
$
-$
$ -
$
5 -
$
-$
$
$ -
$
-�
_
=
$ -
$ -
$ -
_$
_
5 -
$
Sub Totals
$ 592.00
$ 193,81
$ 183.00
$ -
Sales Tax
Allowable Mark up
N/A
0% $
12% $ 71.04
20% $ 38,76
0%
1$ 663.04 I
I $ 23257 I { $ 183 -00
�$
TOTAL = $ 1,078.61
ISub Totals
Recapitulation xIs
Recapitulation
Illinois Street Extension #10 -10
Pricing for 24" FES
7/11/2014
Description
Quantity
unit
unit price
materials
material cost
unit cost
L & 6 cost
unit cost
Extended
Unit cost
Sub Price
Labor
Eauioment
Sub
$
-$
$ -
$
E ui.ment and Labor
$ -
$
$
$ -
300 Excavator
1
HR
$ -
$ -
$ 183.00
$ 183.00
$ -
Laborers 2 1 HR each)
2
HR
S -
$ 41.03
$ 82.06
$ -
$ -
O.erator •
1
HR
$ 54.95
$ 54.95
Foreman
11
HR
S -
$ 56.80
5 56.80
$
$
-_
$
$ -
5 -
$ -
-
$
$
$
$
Materials
Concrete for Anchor
1
CY
$ 167.00
$ 167.00
$ -
$ -
$
24" FES
=EA
$ 500.00
$ 500.00
$ $-
$ -
$ -
$ -
$
$ $ -
$
$
_
$
�$
-
$
$
$
-_-
S
$ -
8
$
S
$ -
$
Sub Totals
$ 667. D0
$ 193.81
5 183.00
$ -
Safes Tax
Allowable Mark up
N/A
0% $
12% $ 80.04
20% $ 38.76 0% $
$ 747.04 I
5 232.57 I $ 183.00 I
TOTAL = $ 1.162.61
ISub Totals
Recapitulation xls
Recapitulation
Illinois Street Extension #10 -10
Pricing for 36" FES
7111/2014
Sales Tax
Allowable Mark up
N/A
0% $
12% $ 128.04
20% $ 3876
0% $
$ 1,195.04
$ 232.57 I I $ 183.00 I
TOTAL = $ 1610.61
Descriptioq
Quantity
unit
unit once matenal cost
unit cost
Labor
L & E c st
unit cost
Equipment
Extended
Und cosh
Sub
Sub Price
materials
....�C$
$ �$
�$
Es ill. ment and Labor
$ -
$
300 Excavator
1 HR 5 -
$ -
$ 183.00
$ 183.00
Laboters(2 no 1 HR each
2
HR
$ -
$ 41.03
$ 82.06
-
$
$
0
1
HP
$ 54.95
$ 54.95
01:310 I-
Foreman
1
HR
$ -
$ 56.80
$ 56 80
-
$ -
$
__-
CY
$ 167.00
$
S.
$ $ -
-
$
$
$ �
$
$
Materials
$ 167.00
$ -
$ -
$ -
Cancels for Anchor
1
36" FES
1
_
EA
$ 900 00
-
S 900.00
$ -
$ -
$
$
$
$
$ -
$
S.
$
$
$ _
$
$
$ -
-
$
$ -
$
$
Sub Totals_
5 1,067.00
$ 193.81
$ 183.00
$ -
Sales Tax
Allowable Mark up
N/A
0% $
12% $ 128.04
20% $ 3876
0% $
$ 1,195.04
$ 232.57 I I $ 183.00 I
TOTAL = $ 1610.61
ISub Totals
Recapitulation.xls
Recapitulation
Illinois Street Extension #10 -10
Pricing for 64" FES
7/11/2014
Description
Quantity
unit
unit price
material cost
i nit coot
1. & E Cost
unit cost
Extended
Unit cost
auk
Sub Price
materialz
Labor
Equipment
-�_
$
-S
$
$ -
E.ul.mentand Labor
_�
$ -
$ -
$
$
ca
300 Exvator
1
HR
$ -
$ -
$ 183.00
$ 183.00
$ -
Laborers(2 (a? 1 HR each)
2
HR
$ -
$ 41.03
$ 82.05
-
-_
$ -
--
$
$ -
$
Operator
1
HR
$ 54.95
$ 56.80
$ 54.95
$ 56.80
Foreman
1
HR
-
$ -
Materials
$
$ -
-
$ -
$ -
_
$
S
$
$
Concrete for Anchor
1
CY
$ 167.00
$ 167.00
$ -
S -
$ _
54" FES
1
EA
51,750.00
$ 1,750.00
$ -
$
$
=
$ - �
$ -
=
_
$
5
$
$
5 -
$ -
$
$ -
$ -
5 -
5 -
$ -
5 - -$ -
-$ -
$
Sub "Totals
-_
5 1,917.00 $ 193.81
- $ 18300
$ -
Sales Tax
Allowable Mark up
N/A
0% 5
12% $ 230.04
20% $ 38.76
0% $
$ 2,147 04
- $ 232.57 Is 183.00
1
$
TOTAL = $ 2,562 61
!Sub Totals
Recapitulation.xls
Recapitulation
Illinois Street Extension #10 -10
Pricing for 60" FES
7/11/2014
Sales Tax
Allowable Mark up
N/A
0% $
12% $ 314.04
20% $ 38.76
0% $
10% $
7% $
$ 2,931.04 1
T S 232.57 [ 1 $ 183.00 1
TOTAL = $ 3,346 61
Sub Price
Quantity
Unit
UOIt g.is&
materials
Olaterial cost
1 nit cost
Labor
t• & E cost
unit cost
Extended
Unit cost
Sub
Pescriotion
Equipment
_
-
--
$
$
E. ui ment and Labor
_
$
$ _
$
183 00
$ -
300 Excavator
1
HR
$ -
$
$ 183.00
$
$
Laborers 2 0) 1 HR each
2
HR
$ -
$ 41.03
$ 82.06
$
-
$ -
0 erator
1
HR
5 54.95
$ 54.95
$ $
1
HR.
$ -
$ 56.80
$ 56.80
Foreman
$ -
$
C$
-
Materials
-_-
$
$ _
$ -
$ -
$ -
1
CY
$ 167.00
$ 167.00
$ -
C
$
Concrete for Anchor
$
60" FES
1
rnA
$1.750.00
$ 2,450.00
$ -
-_-
$
$
$
5
_
-
5 -
��
$ _
$
$
_
-��
_
$
$ -
5
Sub Totals
$ 2.617.00
$ 193.81
$ 183.00
$
Sales Tax
Allowable Mark up
N/A
0% $
12% $ 314.04
20% $ 38.76
0% $
10% $
7% $
$ 2,931.04 1
T S 232.57 [ 1 $ 183.00 1
TOTAL = $ 3,346 61
Independent Concrete Pipe Quotation
2050 South Harding Street Number ....... ...... ...:00004373 -2
Indianapolis,IN,46221 Dato • 7/11/2014
Bid Date • 7/10/2014
Telephone : 317 - 262 -4920 Quotation deadline • 8,/9/2014
Fax ' 317 - 262 -8011 Sales rep Ryan Gookins
Page 1 of 1
Customer PO ' Illinois S reef Ed
Customer Contact • Caro: Archer
Payment terms ' Net 30 days
Job Name • Illinois Street Ext
Sold to:
Gradex
12900 N. Meridian St., Suite 120
Carm eI, I N,46032
Item number
054 FESF
060 FESF
018 FESF
024 FESF
036 FESF
Ship to:
Illinois Street Ext
Carmel, IN 46032
Wall Class Description Quantity Unit Unit orice Amount
54" Flared End Section Female 1.00 Each 1,750.00 1,750.00
60" Flared End Section Female 1.00 Each 2,450.00 2,450.00
18" Flared End Section Female 1.00 Each 425.00 425.00
24" Flared End Section Female 1.00 Each 500.00 500.00
36" Flared End Section Female 1.00 Each 900.00 900.00
Unless otherwise agreed in writing, at sales are Net 30 and, by placing an order, customer
agrees to pay Interest at a rate of 8% on any unpaid invoices, costs of collection, and attorney
fees after expiration of This term.
Sales balance ..: 6,025.00
Misc. charges ..: 0.00
Sales tax 0.00
Total 6,025.00
From: IIIT
Irving Materials, Inc.
Date: November 18, 2013
Customer: GRADEX, INC.
Attention:
317 536 6849 11/19/2013 12:18 11264 P.0011001
CONCRETE QUOTATION
Project: ILLINOIS ST. EX T ENTION 2014
Location: CARMEL, INDIANA
Bid Date: NOVEMBER 20, 2013
Mix # I Concrete Description
1 1900 I CLASS A STONE
Environmental Fee, Add Per Cubic Yard
Flyash mixes are subject to availability. If flyash is not available straight cement mixes will be used.
Mixes will be priced as quoted. (11 straight cement mixes are not quoted add 52.50 to performance price)
Proper truck washout area must be provided on site.
Prices goad through December 31, 2014, add 57.00 per yard annually thereafter.
Gross Price
1 578.00
*Discount I Net Price
$3 / CY $75.00
52.00
Additional Options
Non - chloride Accelerator, per dose:
Each 1% Calcium Chloride:
High Performance Accelerator, per dose:
Type III Replacement, when available add/cy.
Additional Bag of Type I Cement, sdd/cy:
Retarding Admixture, add/cy:
Mid -Range Water Reducer, addicy:
High Range Water Reducer, eddcy:
Reinforcing Fiber, addicy,
Ice, per lb:
*Terns
54.50
52.50
$3.50
$6.00
$650
$1.00
$5.00
57.50
57.00
50.40
Additional Charges
Small load charge toy or less, per load:
Small Toad charge 2.25 to 3' 'A cy, per Toad:
Excess unloading over 30 minutes, per hr:
Saturday, per load:
Holidays and Sundays:
Winter Conditions (Nov 1 - March 31)add/cy'
Late delivery, after 5:00 pin, per load:
$90.00
550.00
$90.00
$40.00
TBD
$3.00
575.00
''The above prices do not reflect Indiana sate sales tax*
'Prices quoted valid for 60 days*
Accounts paid by the 10x' of the following wont's after date of delivery
Quote Provided By: John Dodd
Phone: 317 - 439 -0557
Email: lohn.d odd @irvmatcom
8032 N. Stale Road 9 o Greenfield, IN 46140
Corporate Office e Phone: (317) 326 -3101 • Fax: (317) 326 -3105
Sales Department o Phone: (317) 536 -6650 0 Fax: (317) 536 -6649