Loading...
HomeMy WebLinkAboutMarch 21 2005 C8 Underground Detention Detailsv 0 U 0 0 Ea D o I 0 0 3zh /7 .P ox o z, McL L PRODUCT SPECIFICATIONS STORMTECH GENERAL NOTES 6. STONE PLACEMENT BETWEEN CHAMBERS ROWS AND AROUND PERIMETER MUST FOLLOW INSTRUCVDNIS AS INDICATED IN THE MOST CURRENT VERSION OF STORMTECKS INSTALLATION INSTRUCTIONS. 7. BACKFILUNG OVER THE CHAMBERS MUST FOLLOW REQUIREMENTS AS INDICATED IN THE MOST CURRENT VERSION OF STORMTECKS INSTALLATION INSTRUCTIONS. 8. THE CONTRACTOR MUST REFER TO STO RMTECH-S INSTALLATION INSTRUCTIONS FORA TABLE OF ACCEPTABLE VEHICLE LOADS AT VARIOUS DEPTHS OF COVER- THIS INFORMATION IS ALSO AVAILABLE AT STORMTECHS WESSITE: WWW,STDRMTECH.COM. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING VEHICLES THAT EXCEED STORMTECHS REOUIREMENTS FROM TRAVELING ACROSS OR PARKING OVER THE STORMWATER SYSTEM. TEMPORARY FENCING. WARNING TAPE AND APPROPRIATELY LOCATED SIGNS ALE COMMONLY USED TO PREVENT UNAUTHORIZED VEHICLES FROM ENTERING SENSITIVE CONSTRUCTION AREAS. 8. THE CONTRACTOR MUST APPLY EROSION AND SEDIMENT CONTROL MEASURES TO PROTECT THE STORMWATER SYSTEM DURING ALL PHASES OF SITE CONSTRUCTION PER LOCAL CODES AND DESIGN ENGINEER'S SPECIFICATION$ 10, STORMTECH PRODUCT WARRANTY IS LIMITED. SEE CURRENT PRODUCT WARRANTY FOR DETAILS. TO ACQUIRE A COPY CALL STORIATECH AT '1 244 OR VISIT W W W ATORMTECH.COM . j FOR .ECHN'CA,. AND ;.ES ON RELATED QI ;FS ?!DNS 2.7 THE ' HAM$ R - SHALL HAVE TWO ORIFICES NEAR ITS 3.5 IHE. PRIMARY FACE OF AN END CAP SHA_,. BE CURVE^ PLEASE CONTACT MIKE UNGlRAN AT M5d61 4J1 TOP TO ALLOW FOR EOuAZATiON OF AIR PRESSURE DUTWARD TO RES75T. HORIZONTAL LOADS GENERATED BETWEEN I'S INTERIOR AND EXTERIOR. NEAR THE EDGES OF BEDS 'OR PWLNC ,S" PP V. AND INSTAI( A'ON yGE5110NS :PLEASE ;:ON ?ACT YOJR ADSIIEPAT800.0I1- 9'710 _.. 2.8 THE CiAMBER SHALL HAV BC -1 CE ITS ENDS OPEN -0 3.6 THE END CAP SHALL BE MANLFACTL'REO IN AN !SC ALLOW FOR -N IMPEDED HYD4ALA C F CWS ANC 9CC12000 CERLF TED FACIL'Y. -- - -_ "- VISUAL INSPECTIONS DOWN A ROW'S EMIRE LENGTH. 1A ACCEPTABLE FILL MATERIALS - -- A 8 0.90 h (Z77 mm) 3E5 h (95; m l STORMTECH SC -740 CHAMBER SYSTEMS STORM/LL 1.1 STORMTECH CHAMBERS ARE CONTROL 2.9 HE CHAMBER SHALL HAVE 14 CORRUGATIONS L S:ORMTEC, .LC / "S RM'FCH "' RECU RES NSTA.0 NG B h (150 mn) STORMWATER RUNOFF. ASAS($SURFACE RETENTION SUBSURFACE INSTALLATIONS MAY HAVE STRINGENT MATERIAL,, AND PREPARATION REQUIREMENTS. CONTRACTORS TO USE AND UNDERSTAND i SUBGRADE REQUIREMENTS, SYSTEM, STORMTECH CHAMBERS RETAIN AND ALLOLY 2.i T E CHAMBER SHALL :A /. H C.R ,AR, :NSF N -' FLAT SURFACE S.ORMTcCHS AIES NSfAL.LA 'v YSTR ,C',ONS -�- ��-_ -- COMPACT IN 6" LIFTS TO A MINIMUM 95% j STANDARD PROCTOR DENSITY. ROLLER EFFECTIVE INFILTRATION OF WATER INTO THE AS ON TH -0P v Tr- CHAMBER .OR AN °R OP TO BEL,�N NiN� SYS?EV NS. A'LATION. 7.7p n (1B6 A SUBSURFACE DETENTION SYSTEM, STORMSEpF OP,ONAL 4 : :NCH INSPECTION PORT OR CLEAN-OUT. (M EMBEDMENT STONE SURROUNDING AND TO A 6" ELEVATION ABOVE WASHED ANGULAR STONE WITH THE i'' 3, 35714 467, 5,' WA MAJORITY OF PARTICLES BETWEEN 56,57 CHAMBERS DETAIN AND ALLOW FOR THE METERED j CHAMBERS 2. _)R 7ECHN! At SERVICES DEPARTMENT OFFERS &C740�Et6B SC7400%IST , FLOW OF WATER TO AN DUTFAIL 2.'1THE CHAMBER SHAL BE ANALYZED AND DESIGNED NS:AL:ATION CONSUI ATiONS TO INSTALLING WASHED ANGULAR STONE WI'M THE I 3, 357, 4, 467, USING AASH 0 METHODS FOR THERMOPLASTIC CONTRACTORS CON Ac„ OJR TECHNICAL SERVICES I 20 CHAMBER PARAMETERS CULVERTS COY AIMED IN HE RFD BR.Ou DESIGN REPRESEN A iVE A' EAST, 30 DAYS PR!DR TO 9C74019PE268 .lone wu uvsonwia 2.1 THE CHAMBER SHALL 8 NJECTI01 MO DED OF SPECIFICATIONS 2N EDITION !NC UDING INTERIM SPECIFICATIONS THRO.JGH SYSTEM INSTA -ATICN TO ARRANGE A PR. ^N PLEASE NOTE: THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS PO- YPRCP"_EN_ RESIN ILO BE INH_RLNTL- RESISTANT 2CC DESIGN !U< 'LCgD SHA_L BE THE AASHTC HS20 ,NSTA`IAII CONSULTATION. OUR REPRESENTATIVES CAN ANGULAR NO.4 STONE. TO ENVIRONMENTAL STRESS CRACKING (ESCR), AND TO MAINTAIN ADEQUATE STIFFNESS ,RUCK. DESIGN SHALL CONSIOER EARTH ANC LIVE LOADS AS APPROPRIATE THEN ANSWER CUES 1. ^NS r ADDRESS COMMENTS UN THE S;DRMTECH CHAMBER THROu H HiGrER TEMPERATURES EXPERIENCED FOR THE MINIMUM TO MAXIMBM SPECIFIED DEPTH O S SEM AND ;NF T. =. INSTALLING CON: RACTDR OF DURIN INST.A._L A-!ON AND SERVICE. FILL - 2.'27�'E CHAMBER SHALL BE MANUFACTURED THL MINIMUM INSTAL_A ON REOL) REMENTS BEFORE BEGINNING THE SYSTEM 6 CON67PUCT ION. VICIT WYYYY9TORM7ECH.COY 22 SF CHAMBER 'DIMENSIONS Ow IN AN 'SG 90CL200D CERTIFIED FACILITY. 70 RECEIVE A COPY OF O.,R IJSTA�LATION TECH S. S?ORMT Cn SC 740 SNA L BE 30.0 INCHES !ALL, SLC INSTRI. TONS. INCHES WIDE AND 90.7 INCHES T.-ONG. THE NCM'NA, 3.0 END CAP PARAMETERS 'S CHAMBER DIME NSICNS OF THE STi'RM _CH SC 3'0 SHALL .60 ' 3 -1 THE EN'D CAP SHALE BE NUFCI.CN MCLDE OF SiORMTECF REQUIREMENTS FOR S ;EMS W'ITN 3. PAVEMENT DESIGN 9 INCHES TALL, 34.0 INCHES WILD= AN^ 90.7 INCHES _ONG THE INSTAL D '_ENCT:L OF A POLYPROPYLENE RESIN TO BE IN'LREN7:1 RESISTANT (AS. HA_T, CON(.RE TE PAVERS, TD.): MINtMLIM COVER ;S 18 INCHES NOT INCLUDING �OINED CHAMBER CHAMBER SHALL BE Sfi4 INCHES. ILO ENVIRONMENTAL STRESS CRACKING, AN.. �O MANlA1N AD Q -AIE THROUGH pAVFMENT MAX'.MUM COVER IS 95 iNCitES �NCLJDING - . STfrFNE S_4 HIGHER EMf _RAT JRES EXPERIENCED ERIN E CED J' R NG N�TALLATIOk r'qV- MErvT. FOR ,NS AL� "IONS TI-:A DO NOT - - -------------------- 2.3 iris CHAMBER SRI_. HAVE A CGNTINJOUS_� CURVED AND SERVICE. INCL..Dt PAVE MFNI, WHERE RUING FROM VEHICLES SECTION PROFILE. MAY OCCUR MINIMUM REQUIRED COVER IS 24 2.4 THE CHAMBER, S-IA:.,. 3.2 THE END CAP SHALL BE DESIGNF F v-C ANY INCITES, MAX M 'M CLVER IS 96 INCHES. B._ OPEN -- BOTTOMED. CORRJGATiUN OF A CHAMBER, W :-H�A.LJWS: 4. 1�E CONTROL OR Mu5' REPORT AN' 2.5 THE CHAMBER AMBER n S. A_L INCORPORATE AN OVERLAPPING CAP A CHAMBER THAT HAS 5 'LENGTH TRIMMED; SEGMENTING WIT, CHAMBER OLNDATION MA RIASD BEPZ:NGNCIES -------------------- CORRJGAT!DN JOINT SYSTEM TO ALLOW CHAMBER ROWS INTO STORAGE BAS NS OF VA VARIOUS CAPACITIES TO THE DESIGN ENGINEER. a ROWS OF ALMOST ANY LENGTH TO BE CREATE TFIE LE LEYGT'!S. 5. OVERLAPPING CORRUGATION „O AT SYSTEM SHAD_ BE EFFECTIVE WHILE ALLOWING A CHAMBER TO BE: 3.3 THE END CAP SHA,._ HAVE SAN. GUIDES 70 A-1 OW EAS` CUING FDR AASHTD M2BB Ci ASS,, 2 NON-WOVEN GEC' -XTI_T (FILTER !ABRIC) NEST BE USED AS INDICATED N iliE TRIMMED TO SHORTEN ITS OVERAL'- LENGTH. VA.R,OUS DIAMETERS OF PIPE 'HAT MAY BE USED TO INLET THE SYSTEM. ?RODEO' PANS. 26 THE CHAMBER SHALL HAVE FORTY -EIGHT ORIFICES _� PEN r T - L '2A Ir.G THE - t 51 F G_WALLS TO ALLOW FOR LATERAL 3./ THE END CAP SHAD_ HAVE EXL' .S STRLi cOF CONVEYANCE OF WATER. OJAC ES TO ALLOW - , T:NG A � ORIFi E OF ANY SIZE SIZE A7 ANY INVERT c EVA ON. 6. STONE PLACEMENT BETWEEN CHAMBERS ROWS AND AROUND PERIMETER MUST FOLLOW INSTRUCVDNIS AS INDICATED IN THE MOST CURRENT VERSION OF STORMTECKS INSTALLATION INSTRUCTIONS. 7. BACKFILUNG OVER THE CHAMBERS MUST FOLLOW REQUIREMENTS AS INDICATED IN THE MOST CURRENT VERSION OF STORMTECKS INSTALLATION INSTRUCTIONS. 8. THE CONTRACTOR MUST REFER TO STO RMTECH-S INSTALLATION INSTRUCTIONS FORA TABLE OF ACCEPTABLE VEHICLE LOADS AT VARIOUS DEPTHS OF COVER- THIS INFORMATION IS ALSO AVAILABLE AT STORMTECHS WESSITE: WWW,STDRMTECH.COM. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING VEHICLES THAT EXCEED STORMTECHS REOUIREMENTS FROM TRAVELING ACROSS OR PARKING OVER THE STORMWATER SYSTEM. TEMPORARY FENCING. WARNING TAPE AND APPROPRIATELY LOCATED SIGNS ALE COMMONLY USED TO PREVENT UNAUTHORIZED VEHICLES FROM ENTERING SENSITIVE CONSTRUCTION AREAS. 8. THE CONTRACTOR MUST APPLY EROSION AND SEDIMENT CONTROL MEASURES TO PROTECT THE STORMWATER SYSTEM DURING ALL PHASES OF SITE CONSTRUCTION PER LOCAL CODES AND DESIGN ENGINEER'S SPECIFICATION$ 10, STORMTECH PRODUCT WARRANTY IS LIMITED. SEE CURRENT PRODUCT WARRANTY FOR DETAILS. TO ACQUIRE A COPY CALL STORIATECH AT '1 244 OR VISIT W W W ATORMTECH.COM . j FOR .ECHN'CA,. AND ;.ES ON RELATED QI ;FS ?!DNS 2.7 THE ' HAM$ R - SHALL HAVE TWO ORIFICES NEAR ITS 3.5 IHE. PRIMARY FACE OF AN END CAP SHA_,. BE CURVE^ PLEASE CONTACT MIKE UNGlRAN AT M5d61 4J1 TOP TO ALLOW FOR EOuAZATiON OF AIR PRESSURE DUTWARD TO RES75T. HORIZONTAL LOADS GENERATED BETWEEN I'S INTERIOR AND EXTERIOR. NEAR THE EDGES OF BEDS 'OR PWLNC ,S" PP V. AND INSTAI( A'ON yGE5110NS :PLEASE ;:ON ?ACT YOJR ADSIIEPAT800.0I1- 9'710 _.. 2.8 THE CiAMBER SHALL HAV BC -1 CE ITS ENDS OPEN -0 3.6 THE END CAP SHALL BE MANLFACTL'REO IN AN !SC ALLOW FOR -N IMPEDED HYD4ALA C F CWS ANC 9CC12000 CERLF TED FACIL'Y. -- - -_ "- VISUAL INSPECTIONS DOWN A ROW'S EMIRE LENGTH. STORMTECH ISOLATOR- ROW PROFILE VIEW DETAL SEE CA BASIN; (ALTERNATE #1) INLET DETAIL 12 M', ID 25" MAX CD PIPE I r-SIET 5" FROM BC 'CPA OF C~'AMBE4 2FT MIN. =1 _ SUMP - IIIrr1T -1 ✓' dEN GECTEXTILE THAT M =EIS .�, =�1- ADS 95307K iFCTFXTIL OR EC'J �BE'VJEE FOUNDATION STONE A \^ CHAMBERS I SC 740 - -5' -6 WIDE STRIP SC- 310--4' WIDE STRIP ECCENTRIC HEADEf ST0RMT -C PREFA.ERICATE END CAP'. COVER ENURE ROW WITH ADS 601 GEOTEXT _E OR EQUAL -SC -740- 8' WDE STRIP C SC-311 C - WiD_7 STRIP r-STORM _CI, :.N CA° I\ FRNAL L NDER ADAPTER INTF RN ^ CYL N L ADA E STORMTECH UNDERDRAIN DETAIL BELL PFRAAFTFR 3 TCi CL.TLE- CONTROL STRUCTURE C LIRE - STDRVTFCH OHAMBFR HLRINDATION STONE _.BENE&TH.} HAMBER PER�ORATEG :,ND_RDRA!N P,PE A.S 60,1 OR EUJAL 4x Pr 0 MN �SIONE dL ID.NC UN ER DRAINAGE PIPE (PER DES:C,A SECTION A-A STORMTECH CHAMdEit\ FOUNDAHBA BENEATH } y' 4x PIPE 0 ,MIN STONE BECDINO UNDER DRAINAGE PIPE (PER DESIGN" j 'SECTION B-8 TNT --RNA' CYLINDER A � I ADAPTER I I I j A,` A STORMTECH SINGLE TEE MANUFACTURED BY ADS i STORMTECH DOUBLE MANIFOLD MANUFACTURED BY ADS N E RNA, DART- -+ FGA' ADS NFORM,ATION STORMTECHTRIPLE MANIFOLD CAL_ 571 G MANUFACTURED BY ADS SC-740 END CAP - SC-740 CHAMBER - - 21NCH WASHED, CRUSHED, ANGULAR STONE -- ADS cC` GE TEXTLE OP EQUAL -X ISOLATOR 20'>AJ (A TLRNATEE #1' I -7, 9 DESIGN ENGINEER IS RESPONSIBLE FOR MIN. ENSURING SUITABILITY OF SUBGRADE SOILS' - 'SEE STORMTECH'S DESIGN MANUAL FOR STORM`EC :- :NFDRMA7!ON CALL ` -B88 -892 -2694 STORMTECH SC-740 CHAMBER SYSTEM TYPICAL CROSS SECTION DETAIL A I SECTION VIEW A -A GRANULAR WELL GRADED SOIL /AGGREGATE MIXTURES, <35% FINES. COMPACT IN 6 IN LIFTS TO 95 % PROCTOR DENSITY. SEE THE TABLE OF ACCEPTABLE FILL MATERIALS IN STORMTECHS DESIGN MANUAL, INSTALLATION MANUAL, OR WWW.STORMTECH.COM. w•rnacnu S-E RA✓ N, STIR C:U.R NFORMA'IO "J STORMILCf CRAM SLt CRADINO AND DRAINAGE z:'_AN--, FOR PIf'E S:ZL AND ELEVAliGN j IsoLAT� RcW I 1 STGRV 7 L C1- NDERDR IN M " ✓= 843.90 � BOTTOM OF C iAMBER L V. - 732.90' I OIINDATION -/ STONE ELEV. 732.40' SECTION B -B I/ I9 E -Ev ._ 32.40. SL-- GRADINNG AND DRAINAGE PLAN 3 ACCEPTS 4' SCH 40 PIPE FOR rcLEANOUTOR INSPECTION PORT { 30,0" t - w.7ACTUAL LENGTH - - -�-j -86.4" INSTALLED- - B' H- r_ -A - -{ _'A L4T2RMMCH SC "719 CHAMBER ,L TECHNICAL SPECIRCATIONS 4 DJ NOMINAL CHAMBER SPECIFICATIONS SIZE (W x H x INSTALLED LENGTH) 51.0"x 30.Vx 65.4" CHAMBER STORAGE 45.9 CUBIC FEET MINIMUM INSTALLED STORAGE 74.9 CUBIC FEET WEIGHT 75 LBS. STUBS A' LOP DF END CAP FOR STUBS A" BCHUU 0: ND zA° PARTS NUMBERS ENNN3 WITH FOR PARTS NUMBERS END,Ni . -B' 2 PART tJ SC740FFT-%T _ T ACCEPTABLE FILL MATERIALS - -- A 8 0.90 h (Z77 mm) 3E5 h (95; m l STORMTECH SC -740 CHAMBER SYSTEMS I FILL MATERIAL FROM 16' ANY SOILIROCK MATERIALS, NATIVE WA WA TO GRADE ABOVE CHAMBERS SOILS OR PER ENGINEERS PLANS, I PREPARE PER ENGINEER'S PLANS. PAVED B h (150 mn) CHECK PLANS FOR PAVEMENT INSTALLATIONS MAY HAVE STRINGENT MATERIAL,, AND PREPARATION REQUIREMENTS. I i SUBGRADE REQUIREMENTS, i V FILL MATERIAL FOR B' TO 18' ELEVATION ABOVE CHAMBERS - GRANULAR WELL- GRADED 3, 357, 4, 467, I A- 1�� I SOIVAGGREGATE MDCTURES, 15, 56, 57, G, A -2 -�- ��-_ -- COMPACT IN 6" LIFTS TO A MINIMUM 95% j STANDARD PROCTOR DENSITY. ROLLER (24" FOR UNPAVED INSTALLATIONS <W% FINES. 67, &8, 7, 78, A -3 GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000IBS. 7.7p n (1B6 B, 69, 9, 10 DYNAMIC FORCE NOT TO EXCEED 2D,000 IBS. (M EMBEDMENT STONE SURROUNDING AND TO A 6" ELEVATION ABOVE WASHED ANGULAR STONE WITH THE i'' 3, 35714 467, 5,' WA MAJORITY OF PARTICLES BETWEEN 56,57 NO COMPACTION REQUIRED I ! j CHAMBERS % -2 INCH &C740�Et6B SC7400%IST , x 740 SC 740 15 n (375 mm) 1 16 h l 460 I ®FOUNDATION STONE BELOW ! CHAMBERS WASHED ANGULAR STONE WI'M THE I 3, 357, 4, 467, NIA PLATE COMPACT OR ROLL TO ACHIEVE A j I MAJORTTI' OF PARTICLES BETWEEN i 5, 56, 57 95% STANDARD PROCTOR DENSITY 9C74019PE268 .lone wu uvsonwia % - 2 INCH n h IWO ) - - LM in (470 - PLEASE NOTE: THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS 0000-- 0000 --- 0000 -- ONLY. THE STONE MUST ALSO BE WASHED CRUSHED ANGULAR. FOR EXAMPLE, THE STONE MUST BE SPECIFIED AS WASHED, CRUSHED, ANGULAR NO.4 STONE. STORMTECH ISOLATOR- ROW PROFILE VIEW DETAL SEE CA BASIN; (ALTERNATE #1) INLET DETAIL 12 M', ID 25" MAX CD PIPE I r-SIET 5" FROM BC 'CPA OF C~'AMBE4 2FT MIN. =1 _ SUMP - IIIrr1T -1 ✓' dEN GECTEXTILE THAT M =EIS .�, =�1- ADS 95307K iFCTFXTIL OR EC'J �BE'VJEE FOUNDATION STONE A \^ CHAMBERS I SC 740 - -5' -6 WIDE STRIP SC- 310--4' WIDE STRIP ECCENTRIC HEADEf ST0RMT -C PREFA.ERICATE END CAP'. COVER ENURE ROW WITH ADS 601 GEOTEXT _E OR EQUAL -SC -740- 8' WDE STRIP C SC-311 C - WiD_7 STRIP r-STORM _CI, :.N CA° I\ FRNAL L NDER ADAPTER INTF RN ^ CYL N L ADA E STORMTECH UNDERDRAIN DETAIL BELL PFRAAFTFR 3 TCi CL.TLE- CONTROL STRUCTURE C LIRE - STDRVTFCH OHAMBFR HLRINDATION STONE _.BENE&TH.} HAMBER PER�ORATEG :,ND_RDRA!N P,PE A.S 60,1 OR EUJAL 4x Pr 0 MN �SIONE dL ID.NC UN ER DRAINAGE PIPE (PER DES:C,A SECTION A-A STORMTECH CHAMdEit\ FOUNDAHBA BENEATH } y' 4x PIPE 0 ,MIN STONE BECDINO UNDER DRAINAGE PIPE (PER DESIGN" j 'SECTION B-8 TNT --RNA' CYLINDER A � I ADAPTER I I I j A,` A STORMTECH SINGLE TEE MANUFACTURED BY ADS i STORMTECH DOUBLE MANIFOLD MANUFACTURED BY ADS N E RNA, DART- -+ FGA' ADS NFORM,ATION STORMTECHTRIPLE MANIFOLD CAL_ 571 G MANUFACTURED BY ADS SC-740 END CAP - SC-740 CHAMBER - - 21NCH WASHED, CRUSHED, ANGULAR STONE -- ADS cC` GE TEXTLE OP EQUAL -X ISOLATOR 20'>AJ (A TLRNATEE #1' I -7, 9 DESIGN ENGINEER IS RESPONSIBLE FOR MIN. ENSURING SUITABILITY OF SUBGRADE SOILS' - 'SEE STORMTECH'S DESIGN MANUAL FOR STORM`EC :- :NFDRMA7!ON CALL ` -B88 -892 -2694 STORMTECH SC-740 CHAMBER SYSTEM TYPICAL CROSS SECTION DETAIL A I SECTION VIEW A -A GRANULAR WELL GRADED SOIL /AGGREGATE MIXTURES, <35% FINES. COMPACT IN 6 IN LIFTS TO 95 % PROCTOR DENSITY. SEE THE TABLE OF ACCEPTABLE FILL MATERIALS IN STORMTECHS DESIGN MANUAL, INSTALLATION MANUAL, OR WWW.STORMTECH.COM. w•rnacnu S-E RA✓ N, STIR C:U.R NFORMA'IO "J STORMILCf CRAM SLt CRADINO AND DRAINAGE z:'_AN--, FOR PIf'E S:ZL AND ELEVAliGN j IsoLAT� RcW I 1 STGRV 7 L C1- NDERDR IN M " ✓= 843.90 � BOTTOM OF C iAMBER L V. - 732.90' I OIINDATION -/ STONE ELEV. 732.40' SECTION B -B I/ I9 E -Ev ._ 32.40. SL-- GRADINNG AND DRAINAGE PLAN 3 ACCEPTS 4' SCH 40 PIPE FOR rcLEANOUTOR INSPECTION PORT { 30,0" t - w.7ACTUAL LENGTH - - -�-j -86.4" INSTALLED- - B' H- r_ -A - -{ _'A L4T2RMMCH SC "719 CHAMBER ,L TECHNICAL SPECIRCATIONS 4 DJ NOMINAL CHAMBER SPECIFICATIONS SIZE (W x H x INSTALLED LENGTH) 51.0"x 30.Vx 65.4" CHAMBER STORAGE 45.9 CUBIC FEET MINIMUM INSTALLED STORAGE 74.9 CUBIC FEET WEIGHT 75 LBS. STUBS A' LOP DF END CAP FOR STUBS A" BCHUU 0: ND zA° PARTS NUMBERS ENNN3 WITH FOR PARTS NUMBERS END,Ni . -B' 2 PART tJ SC740FFT-%T CHAMBERT�T 9C 740 PIPE 5 6 h (t50 rtj -- - -- A 8 0.90 h (Z77 mm) 3E5 h (95; m l --�- -- C &50 h (4701)" WA T --� D WA OSO h (13 mmji SC740@E068 8C710EPE12T x 710 x 710 B h (150 mn) -- 0.90 h (277 mm) -- � f 3B5 h -.�(96 rnr_v)I 12 h (300 mm) ALTO h (373 mm) 17.70 h (196 mm) WA__- CBC740fFPE12B x 710 f x 740 12 h (300 mm) - -- j 15h (974 1.70 h (373 mm) 7.7p n (1B6 -1-20-W(30 mm) �SC710EPE1ST 036 h (2B3 .001n (229 mm) ! WA &C740�Et6B SC7400%IST , x 740 SC 740 15 n (375 mm) 1 16 h l 460 -_- 0.40 h (167 mm10 9.70 i ( 60 ) __ 36 h (263 (272 WA 00 (177 mm) WA . -.. 130 ' .mnn 33 WA 1.60 h (41 mmj SC710�E188 x 71p 16 h (460 mm) 0.70 in (500 mm) 0.72 h (272. ___ 9C74019PE268 .lone wu uvsonwia x 740 --- n h IWO ) - - LM in (470 - 94511 (240 mm WA 0.10 in (3'R7) NOTE ALL DIMENSKINS ARE NOMINAL ALL STUBS, oXCE, FGR THE * FUR II1L 50310E Pf 17B ll-F i7" STUB I.FS SO. �E PF t29 AN- .-C74�EPE24B ARE BB.OW THE BCITOM 0'r THE ENT) CqP Pi ACED AI BOIIOM OF END CAF APPROXIMATELY U.25 ". ' H !I,E SC /4OFP -24B SUCTH THAI T7�F TUTS. DE DIAMETER 111C 24 S:Ud JCS Dt UN r'° BOTTOM ' limiLmom STORM STR. '4 a2' -3^ 2"x2" ECCE R!C MAN FOLD -------------------- -------------------- PRt EAB STORMFECH - 24 BOTON INVERT END CAP /SC740EPE24B) i -24" CC NECTION STORM STR. '4 a2' -3^ 2"x2" ECCE R!C MAN FOLD 1 I" CONNECTION - 7 CHAMBERS C 8j.4" 2'' -G' /122' -6 VJI _ ti EN,') 4�5- - - - - - % - - 0000 -- 2C CnAMBERS @ 35'.4 :42- - „ - F\ S 0000 - _ _ 4' �i4�" ' W A _ - -_+".- PR: A-? - ^RM,FCH RE -- -FAQ T RN TE . _ 2, P iNJE R END CAP 2' BoTTcM N✓ END AP / STORMTECH CHAMBER LAYOUT (SC 4 1EPE12T) (S,74CEP112B) TYPICAL 8 LOCATIONS GENERAL NOTES: CONTRACTOR SHALL PROVIDE CAMERA iNSPECTIDN OF UNDERGRO' ND DETENTION F, CLAMBERS. c _ S. fv P S T T. C ON �'1A � LL B� F"; PLACEMENT tMM L, A1�LY AFTER PLAC�MEN7 GF GRANULAR FILL OVER WAS ED STONE. INSPEC i0N SHALL RESULT IN VIDEOTAPING ENTIRE LENGTH OF EACH ROW. NSPEC iO'N TO BE ACCOMI' iS Fp IN THE PRESENCE, AND AS DIRECTED BY THE ENGINEER. 2 CONTRACTOR WILL CONDUCT A PRE- iNSTAL LATiON MEETING FOR NSTALLAT:ON OF TILE STORMTECH SYSTEM. MANDATORY ATTENDANCE By STORMTECr.. REPRESENTATIVE, STORMTECH INSTAL FR, CONSTRI_I ;TION MANAGER, AND E\3.NEER. 3 vRM'E WILL L r R0 -`E A M NIMIM 8 HOUR OF CCP S RUCT ON CBSERVA'!OV 4 INSTALLER ER M',S: STR,C. Y ADHERE TO CONSTRJC :ON DRAWINGS NISTALLA:TION ,INSTRUCTIONS, INSTRL ' TIONS DETAILED AT THE PRE NSTALLATION MEETING, AND DIRECTIVES BY STORM ECH DURNG THEIR CONSTRUCTION OBSERVATION. 5. GRADATION CER:IFICATONS SHALL BE SUBMITTED FOR AL!_ GRANULAR MATERIALS USED IN STORMTEC INSTALLATION. 6. USE OF NON - SPECIFIED GRANULAR MATERIALS WILL RESULT IN R JECTICN OF TI-S INSTALLATION, NOTES: A' _ DESIGN SPr' !F:CAT NS FOR STORMTECH' CHAMBERS SHHiL BE iN ACCOkDANCE W,�H THE STORMTECn DESIGN NANUA_ 2. THE NSTA LATION OF STORP)TEC : CHAMBERS SHAL_ BE 'N ACCORDANCE VVITH THE LATEST STORMTECH INSTA: LA7!0N INST R; CT',ONS. 3. HE N- RAC''CR IS ADV S ",T' 7 RT V'` W AV') G S7,A(t THE I S.A'_sT vN iNS'RUCT,DNS PR OR TO EE ,,N NG SYSTEM INSTALLAIF A. CAL_ 1- 888. 892,2694 OR VIS17 WWW STORMTECH.COM TO RECEIVE A COPY' OF 7HE LATEST S- uRMTECH IP4STALLAI;OiV iNS7RUCTI0NS. 1 HOLEY MOL EY .SAYS "DIG SAFELY" U` i "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1 -800 -.382 -5544 CALL TOLL FREE SCALE: 1 = 2C'' PER INDIANA STATE LAW IC8 -1 -26. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND n LOCATION SERVICE TWO (2) WORKING v 10 20 4C DAYS BEFORE COMMENCING WORK. E I ( z 8, , wom � O a� w ^ x < z vu. v W r A 0 W °� a Z 000 V. i a C I � W Wo z rA w w w� x 5 W ,z In a ..i w a V ci CD l¢ ,lwc lm> 14 a IE_.. ET FI - I; c I� Q I� i s K D. Ll��� V / / / /I11It111U11VV\ PATRICK D CARL P.E. 100001111 i I I V i O i q I I O i ti �4 �o �z �. h 9 O wl �x I I I � v o� y t z o OR s SHEET NE C8 PROJECT NO 1 r o' I v