Loading...
HomeMy WebLinkAboutGerig-Ottenweller/ENG/CO 1/inc 1975/River Road Culvert Replacement over Elzabeth Warren DrainCITY OF CARMEL TO: Gerig - Ottenweller CONTRACT CHANGE ORDER NO.: 1 3010 Independence Drive DATE:April 2, 2013 Fort Wayne, IN 46808 PROJECT NAME: River Road Culvert Replacement over Elizabeth Warren Drain CITY REQ. NO.: n/a CITY PO NO.: 26567 CITY PO DATE: 2/6/13 1. You are directed to make the following changes in this Contract: Delete Temporary Silt Fence and Replace with Coir Logs, as requested by Soil and Water Office and per Work Directive No. 1, Dated 02/22/2013. SCHEDULED ADJUSTMENT ITEM AMOUNT ( +) OR ( -) DAYS No. 37, Temporary Silt Fence <$1,425.00> ZERO No. 51, Coir Logs $3,400.00 ZERO H. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: W.D.C. No.: 1, Dated 02.22/2013. Other: Specification reference TS9 and TS 50; The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 659,671.00 Contract Price will be increased by this Change Order $ 1,975.00 New Contract Price including this Change Order $ 661,646.00 Contract Time Prior to this Change Order 08/15/2013 Completion Date Net increased/decreased resulting from this Change Order: ZERO Days Current Contract Time including this Change Order: 0885/2013 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Recommended Accepted: ( Lrrl 1hr /hy tic. (.cert�- 011cnweller Conirc&cb NGINEER / ' CONTRACTOR YGUS- .H41 TF . >J1r0(1, 3010 indePentlence ar• Address Address 4/62 V0(* wayre SN'ME City/State/Zip City /State /Zip Lori Wats By: B : 3 0 Mfr. _C3_roS4 ee r ATTEST: Phone: 3(7- 7,5-d-373/ Phone: co - rt /£3'/-4(83 �lli nNNL u r,.u. / !�'J yo .!-LIat aka. y 41' n, Member e2Nlember Date: y0)!"3 Date: yi9/13 AR -5 /Diana Cordr Treasurer Date: Gerig - Ottenweller L C O N T R A C T I flux. uc. 3010 Independence Dr. Fort Wayne, IN 46808 Date: March 25, 2013 To: City of Carmel Attn: Gary Duncan Project: River Road Culvert Replacement Work Directive Change No. 1 Description of Work: Add 320 lineal feet of Coir Logs while deleting the 475 lineal feet of silt fence on page C 401. When the digging begins for the structure the coir logs will be move to the east side of the project and stacked on top of each other for sediment control for the duration of the project. Gerig - Ottenweller is asking that an addition of S 1,975.00 be added to the contract to perform the changes outlined in Work Directive Change No. I. Submitted By: Justin Broshear Accepted By: Garry Duncan Phone (260)484 -9183 Fax (260)484 -9187 TO: CITY OF CARMEL WORK DIRECTIVE CHANGE NO. I DATE: 02/22/2013 PROJECT NAME: River Road Culvert Replacement Over Elizabeth Warner Drain PROJECT NO.: 11 -07 Specification Reference TS 9 and TS 50 Drawing Reference: Replace Sheets C40I, C402 and C403 in their entirety DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE: Remove Silt Fence previous illustrated on the C401 sheet and replace with Coir Log or approved equal product in locations as defined on the Sheet C401. Also updated Details on Sheet C403 and Notes on Sheet C402. Please notify is this work Will be an ADD, DEDUCT, or UNCI -IANGE prior to performing any work. REASON FOR THIS ORDER: Requested by local Soil and Water Review AUTHORIZATION: THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS OUTLINED. A Contract Change Order in the amount of $ h 9 7 5 '3 will be issued to you in the near future to cover this Work Directive Change. PROJECT CpMPLETION DATE: ADD /DEDUCT /UNCHANGED 0 DAYS. By: Owner's Representative ATTEST: Diana L. Cordray, Clerk- Treasurer Date: Approved By: CITY OF CARMEL BOARD OF PUBLIC WORKS AND SAFETY By: James Brainard, Mayor By Mary Ann Burke, Member By: Lori Watson, Member DATE: