HomeMy WebLinkAboutGerig-Ottenweller/ENG/CO 1/inc 1975/River Road Culvert Replacement over Elzabeth Warren DrainCITY OF CARMEL
TO: Gerig - Ottenweller CONTRACT CHANGE ORDER NO.: 1
3010 Independence Drive DATE:April 2, 2013
Fort Wayne, IN 46808 PROJECT NAME: River Road Culvert Replacement over
Elizabeth Warren Drain
CITY REQ. NO.: n/a
CITY PO NO.: 26567
CITY PO DATE: 2/6/13
1. You are directed to make the following changes in this Contract:
Delete Temporary Silt Fence and Replace with Coir Logs, as requested by Soil and Water
Office and per Work Directive No. 1, Dated 02/22/2013.
SCHEDULED ADJUSTMENT
ITEM AMOUNT ( +) OR ( -) DAYS
No. 37, Temporary Silt Fence <$1,425.00> ZERO
No. 51, Coir Logs $3,400.00 ZERO
H. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: W.D.C. No.: 1, Dated 02.22/2013.
Other: Specification reference TS9 and TS 50;
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 659,671.00
Contract Price will be increased by this Change Order $ 1,975.00
New Contract Price including this Change Order $ 661,646.00
Contract Time Prior to this Change Order 08/15/2013 Completion Date
Net increased/decreased resulting from this Change Order: ZERO Days
Current Contract Time including this Change Order: 0885/2013 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are
Recommended Accepted:
( Lrrl 1hr /hy tic. (.cert�- 011cnweller Conirc&cb
NGINEER / ' CONTRACTOR
YGUS- .H41 TF . >J1r0(1, 3010 indePentlence ar•
Address Address
4/62 V0(* wayre SN'ME
City/State/Zip City /State /Zip Lori Wats
By: B : 3 0 Mfr. _C3_roS4 ee r ATTEST:
Phone: 3(7- 7,5-d-373/ Phone: co - rt /£3'/-4(83 �lli
nNNL u r,.u.
/
!�'J yo
.!-LIat aka. y
41'
n, Member
e2Nlember
Date: y0)!"3 Date: yi9/13
AR -5
/Diana Cordr
Treasurer
Date:
Gerig - Ottenweller
L C O N T R A C T I flux.
uc.
3010 Independence Dr. Fort Wayne, IN 46808
Date: March 25, 2013
To: City of Carmel
Attn: Gary Duncan
Project: River Road Culvert Replacement
Work Directive Change No. 1
Description of Work: Add 320 lineal feet of Coir Logs while deleting the 475 lineal feet of silt fence on page C
401. When the digging begins for the structure the coir logs will be move to the east side of the project and
stacked on top of each other for sediment control for the duration of the project.
Gerig - Ottenweller is asking that an addition of S 1,975.00 be added to the contract to perform the changes
outlined in Work Directive Change No. I.
Submitted By: Justin Broshear
Accepted By: Garry Duncan
Phone (260)484 -9183 Fax (260)484 -9187
TO:
CITY OF CARMEL
WORK DIRECTIVE CHANGE NO. I
DATE: 02/22/2013
PROJECT NAME: River Road Culvert Replacement Over
Elizabeth Warner Drain
PROJECT NO.: 11 -07
Specification Reference TS 9 and TS 50
Drawing Reference: Replace Sheets C40I, C402 and C403 in their entirety
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
Remove Silt Fence previous illustrated on the C401 sheet and replace with Coir Log or approved
equal product in locations as defined on the Sheet C401. Also updated Details on Sheet C403 and
Notes on Sheet C402. Please notify is this work Will be an ADD, DEDUCT, or UNCI -IANGE prior
to performing any work.
REASON FOR THIS ORDER: Requested by local Soil and Water Review
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $ h 9 7 5 '3 will be issued to you in
the near future to cover this Work Directive Change.
PROJECT CpMPLETION DATE: ADD /DEDUCT /UNCHANGED 0 DAYS.
By:
Owner's Representative
ATTEST:
Diana L. Cordray, Clerk- Treasurer
Date:
Approved By:
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:
James Brainard, Mayor
By
Mary Ann Burke, Member
By:
Lori Watson, Member
DATE: