HomeMy WebLinkAbout13090106 Correspondence (2)1 Mishler, Nicholas F From:Hohlt, William G Sent:Tuesday, May 20, 2014 3:46 PM To:Mishler, Nicholas F; Blanchard, Jim E; Schriner, Adam J; Miser, Craig Cc:Liggett, Brent E; Lux, Pamela K; Kass, Joslyn; Ellison, Christopher M; Knott, Bruce Subject:RE: 89 First Ave SW All is ok at this point. We are waiting on final drawings/approvals from the state. Chris is also in need of several different items. No rough ins are completed at the interior. The builder is aware he should have not went vertical and will stop all work at this point William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Mishler, Nicholas F Sent: Tuesday, May 20, 2014 10:19 AM To: Blanchard, Jim E; Hohlt, William G; Schriner, Adam J; Miser, Craig Cc: Liggett, Brent E; Lux, Pamela K; Kass, Joslyn; Ellison, Christopher M; Knott, Bruce Subject: 89 First Ave SW I’ve received word that this commercial remodel at 89 First Ave SW (Permit #13090106) has basically completed their work. The problem is they only had a foundation release for the exterior façade work and never sent the CFD the required info to get a full release. The builder never called in a rough-in or final so we never were able to stop them from proceeding. Can someone stop by this site today and find out if there is anything we can do? I have attached the inspection report. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 2 Mishler, Nicholas F From:Ellison, Christopher M Sent:Tuesday, May 20, 2014 10:01 AM To:Mishler, Nicholas F Subject:Fwd: Request for Information See the request for information below. This information was never provided to me. Chris Ellison Carmel Fire Dept. Sent from my iPhone Begin forwarded message: From: "Ellison, Christopher M" <CEllison@carmel.in.gov> Date: April 21, 2014 at 3:36:47 PM EDT To: "Ellison, Christopher M" <CEllison@carmel.in.gov> Subject: FW: Request for Information From: Basil Pappas [mailto:bgpappas@tds.net] Sent: Thursday, October 03, 2013 10:25 AM To: Ellison, Christopher M Subject: Re: Request for Information Chris, I should have the appropriate drawings and information very soon concerning 89 1st Ave SW. I will send the information as soon as I can. Thanks Basil Pappas Sent from my iPhone On Sep 24, 2013, at 8:51 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote: The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. Respectfully, 3 Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 4 Mishler, Nicholas F From:Ellison, Christopher M Sent:Tuesday, May 20, 2014 9:59 AM To:Mishler, Nicholas F Subject:Re: 89 1st Street No. They never provided all the documents we required. Looks like the building had been constructed. Chris Ellison Carmel Fire Dept. Sent from my iPhone On May 20, 2014, at 9:54 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote: Chris, did you ever grant them a full release for this? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Ellison, Christopher M Sent: Thursday, October 10, 2013 1:16 PM To: Mishler, Nicholas F Subject: FW: 89 1st Street This project is cleared for foundation permitting only. Thanks, Chris Ellison CFD From: Basil Pappas [mailto:bgpappas@tds.net] Sent: Thursday, October 10, 2013 12:50 PM To: Ellison, Christopher M Subject: Fwd: 89 1st Street Christopher, Below is the fire protection contractor we have chosen to do the project on 89 1st ave. SW. I am forwarding a letter from RYAN as well. We had discussed the release of the footing permits so I can get started . I would appreciate it if you would accept this letter from RYAN as an assurance of our intentions to comply with all applicable codes and contact Nick in the building department so as to release the foundation permits. Please contact me if you have any questions. Thank you Basil Pappas 5 Sent from my iPhone Begin forwarded message: From: "Steve Hoffman" <steve@hoffmanengineers.com> Date: October 10, 2013 at 11:58:22 AM EDT To: "'Basil Pappas'" <bgpappas@tds.net> Subject: FW: 89 1st Street Reply-To: <steve@hoffmanengineers.com> Stephen C. Hoffman, P.E. Hoffman Engineers, P.C. From: Edwin Frieden [mailto:efrieden@ryanfp.com] Sent: Wednesday, October 09, 2013 5:20 PM To: 'steve@hoffmanengineers.com' Cc: George Hanlon Subject: 89 1st Street See attached. Thank you! Edwin Frieden Tenant/Service Estimating and Deficiency Technician 6 Mishler, Nicholas F From:Ellison, Christopher M Sent:Thursday, October 10, 2013 1:16 PM To:Mishler, Nicholas F Subject:FW: 89 1st Street This project is cleared for foundation permitting only. Thanks, Chris Ellison CFD From: Basil Pappas [mailto:bgpappas@tds.net] Sent: Thursday, October 10, 2013 12:50 PM To: Ellison, Christopher M Subject: Fwd: 89 1st Street Christopher, Below is the fire protection contractor we have chosen to do the project on 89 1st ave. SW. I am forwarding a letter from RYAN as well. We had discussed the release of the footing permits so I can get started . I would appreciate it if you would accept this letter from RYAN as an assurance of our intentions to comply with all applicable codes and contact Nick in the building department so as to release the foundation permits. Please contact me if you have any questions. Thank you Basil Pappas Sent from my iPhone Begin forwarded message: From: "Steve Hoffman" <steve@hoffmanengineers.com> Date: October 10, 2013 at 11:58:22 AM EDT To: "'Basil Pappas'" <bgpappas@tds.net> Subject: FW: 89 1st Street Reply-To: <steve@hoffmanengineers.com> Stephen C. Hoffman, P.E. Hoffman Engineers, P.C. From: Edwin Frieden [mailto:efrieden@ryanfp.com] Sent: Wednesday, October 09, 2013 5:20 PM To: 'steve@hoffmanengineers.com' Cc: George Hanlon Subject: 89 1st Street 7 See attached. Thank you! Edwin Frieden Tenant/Service Estimating and Deficiency Technician 8 Mishler, Nicholas F From:Ellison, Christopher M Sent:Monday, October 07, 2013 7:52 AM To:'Basil Pappas' Cc:Mishler, Nicholas F; Lux, Pamela K; Kass, Joslyn; Knott, Bruce Subject:RE: Request for Information I received your voice mail in reference to your request for a foundation only permit. In order for the Carmel Fire Dept. to authorize the release of that permit we will need a signed letter from you stating that the proposed building at 89 First Ave, SW will be protected by an automatic fire sprinkler system. Additionally the letter must state that the system will be installed to comply with the 2010 Edition of NFPA 13 as adopted in the State of Indiana and the 2008 Indiana Fire Code. Be advised we will not be able to approve the release of the full structural permit until all the items requested in my Sept. 24th e-mail are received. Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 From: Basil Pappas [mailto:bgpappas@tds.net] Sent: Thursday, October 03, 2013 10:25 AM To: Ellison, Christopher M Subject: Re: Request for Information Chris, I should have the appropriate drawings and information very soon concerning 89 1st Ave SW. I will send the information as soon as I can. Thanks Basil Pappas Sent from my iPhone On Sep 24, 2013, at 8:51 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote: The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. Respectfully, 9 Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 10 Mishler, Nicholas F From:Conn, Angelina V Sent:Tuesday, September 24, 2013 12:57 PM To:Mishler, Nicholas F Subject:RE: Request for Information (89 First Ave SW) Right. the building will not be expanding in size. I will sit tight for now. let me know if I need to do anything. Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com Please consider the environment before printing this e-mail From: Mishler, Nicholas F Sent: Tuesday, September 24, 2013 12:49 PM To: Conn, Angelina V Subject: RE: Request for Information (89 First Ave SW) Angie, I’m not really sure Chris is saying this was not on TAC but if it is all interior I’m not sure why it would be…Bill reviewed it too and said he couldn’t see any addition being done on the plans. I just want to make sure what you approved and what he submitted are the same thing, because I know this has changed from when he originally talked to us. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Conn, Angelina V Sent: Tuesday, September 24, 2013 12:41 PM To: Mishler, Nicholas F Subject: RE: Request for Information (89 First Ave SW) Hi, Nick – What do you need me to do on this? Looks like Basil Pappas just needs to work with Chris Ellison directly to get him the correct plan he needs, and vice versa with Chris contacting Basil Pappas directly… Let me know. Thanks, Angie From: Mishler, Nicholas F Sent: Tuesday, September 24, 2013 11:18 AM To: Conn, Angelina V Subject: FW: Request for Information Angie, see below… 11 Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Ellison, Christopher M Sent: Tuesday, September 24, 2013 11:11 AM To: Hohlt, William G; Mishler, Nicholas F Cc: Blanchard, Jim E; Knott, Bruce Subject: RE: Request for Information Things are not adding up with what is being said and what the plans show on this building. The plans clearly show demoing of 3 exterior walls and the roof on an existing building. They show a new roof system, new foundation, 3 new walls, emergency lighting, fire sprinkler system, doors, etc. I do not believe this project was reviewed at the TAC level as well. Capt. Chris Ellison Carmel Fire Dept. From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:18 AM To: Mishler, Nicholas F; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information Thank you William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Mishler, Nicholas F Sent: Tuesday, September 24, 2013 9:11 AM To: Hohlt, William G; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD before I release anything. Thanks, Nick Mishler 12 Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:09 AM To: Ellison, Christopher M Cc: Mishler, Nicholas F; Blanchard, Jim E Subject: RE: Request for Information Nick, Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a foundation only and CFD is ok, I am good only for that portion William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Ellison, Christopher M Sent: Tuesday, September 24, 2013 8:51 AM To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net' Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R Subject: Request for Information The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 13 Mishler, Nicholas F From:Conn, Angelina V Sent:Tuesday, September 24, 2013 12:41 PM To:Mishler, Nicholas F Subject:RE: Request for Information (89 First Ave SW) Hi, Nick – What do you need me to do on this? Looks like Basil Pappas just needs to work with Chris Ellison directly to get him the correct plan he needs, and vice versa with Chris contacting Basil Pappas directly… Let me know. Thanks, Angie From: Mishler, Nicholas F Sent: Tuesday, September 24, 2013 11:18 AM To: Conn, Angelina V Subject: FW: Request for Information Angie, see below… Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Ellison, Christopher M Sent: Tuesday, September 24, 2013 11:11 AM To: Hohlt, William G; Mishler, Nicholas F Cc: Blanchard, Jim E; Knott, Bruce Subject: RE: Request for Information Things are not adding up with what is being said and what the plans show on this building. The plans clearly show demoing of 3 exterior walls and the roof on an existing building. They show a new roof system, new foundation, 3 new walls, emergency lighting, fire sprinkler system, doors, etc. I do not believe this project was reviewed at the TAC level as well. Capt. Chris Ellison Carmel Fire Dept. From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:18 AM To: Mishler, Nicholas F; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information Thank you 14 William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Mishler, Nicholas F Sent: Tuesday, September 24, 2013 9:11 AM To: Hohlt, William G; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD before I release anything. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:09 AM To: Ellison, Christopher M Cc: Mishler, Nicholas F; Blanchard, Jim E Subject: RE: Request for Information Nick, Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a foundation only and CFD is ok, I am good only for that portion William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 15 From: Ellison, Christopher M Sent: Tuesday, September 24, 2013 8:51 AM To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net' Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R Subject: Request for Information The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 16 Mishler, Nicholas F From:Hohlt, William G Sent:Tuesday, September 24, 2013 11:35 AM To:Ellison, Christopher M Cc:Mishler, Nicholas F; Blanchard, Jim E; Knott, Bruce Subject:Re: Request for Information I have had Nick pull the drawings so I can have a look at them again in regards to what the application shows and the actual plans William Hohlt Deputy Building Commissioner City of Carmel On Sep 24, 2013, at 11:11 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote: Things are not adding up with what is being said and what the plans show on this building. The plans clearly show demoing of 3 exterior walls and the roof on an existing building. They show a new roof system, new foundation, 3 new walls, emergency lighting, fire sprinkler system, doors, etc. I do not believe this project was reviewed at the TAC level as well. Capt. Chris Ellison Carmel Fire Dept. From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:18 AM To: Mishler, Nicholas F; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information Thank you William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Mishler, Nicholas F Sent: Tuesday, September 24, 2013 9:11 AM To: Hohlt, William G; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD before I release anything. 17 Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:09 AM To: Ellison, Christopher M Cc: Mishler, Nicholas F; Blanchard, Jim E Subject: RE: Request for Information Nick, Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a foundation only and CFD is ok, I am good only for that portion William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Ellison, Christopher M Sent: Tuesday, September 24, 2013 8:51 AM To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net' Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R Subject: Request for Information The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. 18 Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 19 Mishler, Nicholas F From:Ellison, Christopher M Sent:Tuesday, September 24, 2013 11:11 AM To:Hohlt, William G; Mishler, Nicholas F Cc:Blanchard, Jim E; Knott, Bruce Subject:RE: Request for Information Things are not adding up with what is being said and what the plans show on this building. The plans clearly show demoing of 3 exterior walls and the roof on an existing building. They show a new roof system, new foundation, 3 new walls, emergency lighting, fire sprinkler system, doors, etc. I do not believe this project was reviewed at the TAC level as well. Capt. Chris Ellison Carmel Fire Dept. From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:18 AM To: Mishler, Nicholas F; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information Thank you William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Mishler, Nicholas F Sent: Tuesday, September 24, 2013 9:11 AM To: Hohlt, William G; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD before I release anything. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 20 From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:09 AM To: Ellison, Christopher M Cc: Mishler, Nicholas F; Blanchard, Jim E Subject: RE: Request for Information Nick, Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a foundation only and CFD is ok, I am good only for that portion William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Ellison, Christopher M Sent: Tuesday, September 24, 2013 8:51 AM To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net' Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R Subject: Request for Information The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 21 Mishler, Nicholas F From:Hohlt, William G Sent:Tuesday, September 24, 2013 9:18 AM To:Mishler, Nicholas F; Ellison, Christopher M Cc:Blanchard, Jim E Subject:RE: Request for Information Thank you William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Mishler, Nicholas F Sent: Tuesday, September 24, 2013 9:11 AM To: Hohlt, William G; Ellison, Christopher M Cc: Blanchard, Jim E Subject: RE: Request for Information From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD before I release anything. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Hohlt, William G Sent: Tuesday, September 24, 2013 9:09 AM To: Ellison, Christopher M Cc: Mishler, Nicholas F; Blanchard, Jim E Subject: RE: Request for Information Nick, Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a foundation only and CFD is ok, I am good only for that portion William Hohlt Deputy Building Commissioner 22 City of Carmel 317.571.2470 From: Ellison, Christopher M Sent: Tuesday, September 24, 2013 8:51 AM To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net' Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R Subject: Request for Information The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 23 Mishler, Nicholas F From:Hohlt, William G Sent:Tuesday, September 24, 2013 9:09 AM To:Ellison, Christopher M Cc:Mishler, Nicholas F; Blanchard, Jim E Subject:RE: Request for Information Nick, Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a foundation only and CFD is ok, I am good only for that portion William Hohlt Deputy Building Commissioner City of Carmel 317.571.2470 From: Ellison, Christopher M Sent: Tuesday, September 24, 2013 8:51 AM To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net' Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R Subject: Request for Information The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 24 Mishler, Nicholas F From:Ellison, Christopher M Sent:Tuesday, September 24, 2013 8:51 AM To:'steve@hoffmanengineers.com'; 'bgpappas@tds.net' Cc:Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R Subject:Request for Information The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction Design Release (365971) and the submitted building plans for this project identify that this building will be protected with an Automatic Fire Sprinkler System. Please provide the following: 1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants. If you have questions feel free to contact me. Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317-571-2621 25 Mishler, Nicholas F From:Duncan, Gary R Sent:Friday, September 20, 2013 7:54 AM To:Basil Pappas Cc:Conn, Angelina V; Foley, Amanda J; Hollibaugh, Mike P; McBride, Mike T; Mishler, Nicholas F Subject:RE: City of Carmel 89 First Ave SW Docket No 13070008 ADLS Amend Good morning Mr. Pappas…correct, you received approval from the BPW to close the sidewalk and the parking spaces. I would have no issues with you starting on the other aspects of your project. Gary From: Basil Pappas [mailto:bgpappas@tds.net] Sent: Thursday, September 19, 2013 10:21 AM To: Duncan, Gary R Subject: Re: City of Carmel 89 First Ave SW Docket No 13070008 ADLS Amend Gary, Let me know about a time for a meeting I don't think the final parking layout is needed for me to get started. I've turned the plans in for the building department to review. They are waiting for your department to sign off on the project before I get started. Thanks, Basil Pappas Sent from my iPhone On Sep 17, 2013, at 12:59 PM, "Duncan, Gary R" <gduncan@carmel.in.gov> wrote: Thank you Mr. Pappas. How about Thursday morning? Gary From: Basil Pappas [mailto:bgpappas@tds.net] Sent: Monday, September 16, 2013 1:35 PM To: Duncan, Gary R Subject: Re: City of Carmel 89 First Ave SW Docket No 13070008 ADLS Amend Gary, Yes , I will be available tomorrow before 12:00 pm and any time Wednesday and Thursday. Let me know which day works for you. Thanks, Basil Pappas Sent from my iPhone On Sep 16, 2013, at 11:41 AM, "Duncan, Gary R" <gduncan@carmel.in.gov> wrote: 26 Good morning Mr. Pappas, Are you available for a meeting this week to discuss your project, the on-street parking as well as the proposed on-site parking configurations? Thanks so much, Gary Gary R. Duncan, Jr., PE Assistant City Engineer City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 (317) 571-2441 (317) 571-2439 (fax) gduncan@carmel.in.gov Please consider the environment before printing this e-mail 27 Mishler, Nicholas F From:Basil Pappas [bgpappas@tds.net] Sent:Wednesday, September 18, 2013 8:36 AM To:Mishler, Nicholas F Subject:Fwd: Project 365971 cdr information attached. Begin forwarded message: From: BROBISON@dhs.in.gov Date: September 16, 2013 8:10:49 AM EDT To: steve@hoffmanengineers.com, bgpappas@tds.net, dschroeder@dhs.in.gov, jblanchard@carmel.in.gov Subject: Project 365971 cdr information attached. 28 Mishler, Nicholas F From:Conn, Angelina V Sent:Friday, August 30, 2013 12:59 PM To:Mishler, Nicholas F Cc:'bgpappas@tds.net'; Donahue-Wold, Alexia K Subject:RE: The Carmel Project (89 First Ave SW (docket no 13070008 ADLS Amend)) Hi, Nick- The Plan Commission and the Planning Dept. have approved the modifications to the building architecture and site plan, with some conditions. Here is a link to the Letter of Grant listing the conditions: http://cocdocs.ci.carmel.in.us/Weblink/DocView.aspx?id=949747&dbid=0 , and here is a link to what was approved: http://cocdocs.ci.carmel.in.us/Weblink/0/fol/942466/Row1.aspx ; once you click on and get to a specific item, you can print to pdf by clicking on the printer/.pdf icon on that web page. We are still trying to work with the City Engineering Dept. for them to give the okay on the proposed on-street parallel parking spaces. Mr. Pappas might have to contact that department, directly at 571-2441, to work out any concerns they might have with the construction details of those parking spaces and street curbing. But, I think we are making head way with them, so that is good. Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com Please consider the environment before printing this e-mail From: Mishler, Nicholas F Sent: Thursday, August 29, 2013 1:48 PM To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman- ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn Cc: 'bgpappas@tds.net' Subject: The Carmel Project Good afternoon- I have received a 2nd set of plans on The Carmel Project at 89 1st Ave. SW from Mr. Pappas, and have attached the plans. This plan is a scaled back version of what was submitted before. Mr. Pappas is currently working on getting a new State Release. Please let me know what information you will need prior to the release of permits. I have copied Mr. Pappas on this email. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email Good morning- 29 I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.” I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also, please copy Mr. Pappas on your reply. He is CC’d on this e-mail. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 30 Mishler, Nicholas F From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov] Sent:Thursday, August 29, 2013 2:08 PM To:Mishler, Nicholas F; Conn, Angelina V; Donahue-Wold, Alexia K Cc:'bgpappas@tds.net' Subject:RE: The Carmel Project Nick No issues from the revised plan from HCSO. If you have any questions, please let me know. Greg Hoyes, AC, CFM, CPESC Plan Reviewer Hamilton County Surveyor's Office From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Thursday, August 29, 2013 1:48 PM To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman- ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn Cc: 'bgpappas@tds.net' Subject: The Carmel Project Good afternoon- I have received a 2nd set of plans on The Carmel Project at 89 1st Ave. SW from Mr. Pappas, and have attached the plans. This plan is a scaled back version of what was submitted before. Mr. Pappas is currently working on getting a new State Release. Please let me know what information you will need prior to the release of permits. I have copied Mr. Pappas on this email. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email Good morning- I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.” I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also, please copy Mr. Pappas on your reply. He is CC’d on this e-mail. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 31 Please consider the environment before printing this email 32 Mishler, Nicholas F From:Basil Pappas [bgpappas@tds.net] Sent:Thursday, August 29, 2013 7:04 AM To:Mishler, Nicholas F Subject:89 1st ave. SW CARMEL PROJECT Nick. Below is attached the revised plans for the proposed renovation of 89 1st Avenue. Thanks, Basil Pappas 317 372 3496 33 Mishler, Nicholas F From:Conn, Angelina V Sent:Tuesday, August 27, 2013 1:12 PM To:Mishler, Nicholas F Cc:'bgpappas@tds.net'; Donahue-Wold, Alexia K Subject:RE: The Carmel Project (Docket No. 13070008 ADLS Amend: 89 First Ave SW) Hi, Nick – Just a quick update: Our Dept. is finalizing the Letter of Grant for this project. We met with Basil this morning to discuss the modified architecture and site plan, and have approved it with some conditions that will be written into the Letter of Grant. Thanks, Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com Please consider the environment before printing this e-mail From: Mishler, Nicholas F Sent: Wednesday, August 14, 2013 9:33 AM To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman- ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn Cc: 'bgpappas@tds.net' Subject: The Carmel Project Good morning- I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.” I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also, please copy Mr. Pappas on your reply. He is CC’d on this e-mail. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 34 Mishler, Nicholas F From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com] Sent:Friday, August 16, 2013 3:53 PM To:Mishler, Nicholas F Cc:bgpappas@tds.net Subject:RE: The Carmel Project Nick, This is going to take a major rebuild of the electrical service based on what I see on the plans. I understand that this is only finishing the shell, however we will need to evaluate their electrical needs especially if this will be a new restaurant. I will need Mr. Pappas to contact our company, 800-774-0246, to schedule an engineering appointment to discuss these issues. Thank you, Shirley Hunter Sr. Distribution Eng Specialist Duke Energy 16475 Southpark Dr Westfield, IN 46074 317.896.6711 From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Wednesday, August 14, 2013 9:33 AM To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman- ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn Cc: 'bgpappas@tds.net' Subject: The Carmel Project Good morning- I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.” I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also, please copy Mr. Pappas on your reply. He is CC’d on this e-mail. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 35 Mishler, Nicholas F From:Donahue-Wold, Alexia K Sent:Wednesday, August 14, 2013 10:06 AM To:Mishler, Nicholas F; Lux, Pamela K; Conn, Angelina V; Kass, Joslyn; Boone, Rachel M. Cc:'bgpappas@tds.net' Subject:RE: The Carmel Project Hi Nick, Basil still needs to get us a revised site plan and architectural drawings. This project was heard at the Plan Commission Committee meeting for an ADLS Amendment approval and the committee approved it based on final architectural approval by staff. There were several items discussed that Basil was going to address and then resubmit plans to us. Therefore, we have not issued a Letter of Grant yet for this. Thanks, Alexia From: Mishler, Nicholas F Sent: Wednesday, August 14, 2013 9:33 AM To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman- ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn Cc: 'bgpappas@tds.net' Subject: The Carmel Project Good morning- I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.” I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also, please copy Mr. Pappas on your reply. He is CC’d on this e-mail. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 36 Mishler, Nicholas F From:Conn, Angelina V Sent:Wednesday, August 14, 2013 10:03 AM To:Mishler, Nicholas F; Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-ryan.hartman@ctrwd.org'; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn Cc:'bgpappas@tds.net'; Boone, Rachel M. Subject:RE: The Carmel Project (89 First Ave SW) Nick - The petitioner is still working with the Planning/Zoning Dept. on getting the final architecture design approvals. Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com Please consider the environment before printing this e-mail From: Mishler, Nicholas F Sent: Wednesday, August 14, 2013 9:33 AM To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman- ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn Cc: 'bgpappas@tds.net' Subject: The Carmel Project Good morning- I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.” I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also, please copy Mr. Pappas on your reply. He is CC’d on this e-mail. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 37 Mishler, Nicholas F From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov] Sent:Wednesday, August 14, 2013 9:56 AM To:Mishler, Nicholas F; Conn, Angelina V; Donahue-Wold, Alexia K Cc:'bgpappas@tds.net' Subject:RE: The Carmel Project Nick Yes, there is a MAJOR problem, since the proposed addition is over a Hamilton County Regulated Drain. When I talked to somebody (the contractor) about this, they said they were just remodeling and refacing the building, which we were acceptable to. Now the plans show adding an addition further over the top of the regulated drain, which will require Hamilton County Drainage Board approval, and likely will not have positive recommendation from our office. Greg Hoyes, AC, CFM, CPESC Plan Reviewer Hamilton County Surveyor's Office From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Wednesday, August 14, 2013 9:33 AM To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman- ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn Cc: 'bgpappas@tds.net' Subject: The Carmel Project Good morning- I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.” I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also, please copy Mr. Pappas on your reply. He is CC’d on this e-mail. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 38 Mishler, Nicholas F From:Basil Pappas [bgpappas@tds.net] Sent:Tuesday, August 13, 2013 8:29 PM To:Mishler, Nicholas F Subject:Fwd: Project 365971 cdr information attached. Begin forwarded message: From: "John Carson" <jcarson@mintel.net> Date: August 13, 2013 12:55:51 PM GMT-04:00 To: "'Basil Pappas'" <bgpappas@tds.net> Subject: FW: Project 365971 cdr information attached. From: Steve Hoffman [mailto:steve@hoffmanengineers.com] Sent: Tuesday, August 13, 2013 12:24 PM To: John Carson Subject: FW: Project 365971 cdr information attached. Stephen C. Hoffman, P.E. Hoffman Engineers, P.C. 8261 W Baseline Road Paragon, IN 46166 765-537-2991 www.hoffmanengineers.com steve@hoffmanengineers.com GLOBAL COMMITMENT WITH A MAIN STREET ATTITUDE From: BROBISON@dhs.in.gov [mailto:BROBISON@dhs.in.gov] Sent: Tuesday, August 13, 2013 12:22 PM To: steve@hoffmanengineers.com; bgpappas@tds.net; dschroeder@dhs.in.gov; jblanchard@carmel.in.gov; steve@hoffm anengineers.com Subject: Project 365971 cdr information attached. 39 Mishler, Nicholas F From:Basil Pappas [bgpappas@tds.net] Sent:Tuesday, August 13, 2013 8:27 PM To:Mishler, Nicholas F Subject:Fwd: CARMEL PROJECT FOUNDATION RELEASE Begin forwarded message: From: "John Carson" <jcarson@mintel.net> Date: July 1, 2013 9:07:55 AM GMT-04:00 To: <steve@hoffmanengineers.com>, "'Basil Pappas'" <bgpappas@tds.net> Subject: CARMEL PROJECT FOUNDATION RELEASE HERE IS THE CARMEL PROJECT FOUNDATION RELEASE.