Mishler, Nicholas F
From:Hohlt, William G
Sent:Tuesday, May 20, 2014 3:46 PM
To:Mishler, Nicholas F; Blanchard, Jim E; Schriner, Adam J; Miser, Craig
Cc:Liggett, Brent E; Lux, Pamela K; Kass, Joslyn; Ellison, Christopher M; Knott, Bruce
Subject:RE: 89 First Ave SW
All is ok at this point.
We are waiting on final drawings/approvals from the state. Chris is also in need of several different items. No rough ins
are completed at the interior. The builder is aware he should have not went vertical and will stop all work at this point
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Mishler, Nicholas F
Sent: Tuesday, May 20, 2014 10:19 AM
To: Blanchard, Jim E; Hohlt, William G; Schriner, Adam J; Miser, Craig
Cc: Liggett, Brent E; Lux, Pamela K; Kass, Joslyn; Ellison, Christopher M; Knott, Bruce
Subject: 89 First Ave SW
I’ve received word that this commercial remodel at 89 First Ave SW (Permit #13090106) has basically completed their work. The problem is they
only had a foundation release for the exterior façade work and never sent the CFD the required info to get a full release. The builder never called
in a rough-in or final so we never were able to stop them from proceeding.
Can someone stop by this site today and find out if there is anything we can do? I have attached the inspection report.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
2
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Tuesday, May 20, 2014 10:01 AM
To:Mishler, Nicholas F
Subject:Fwd: Request for Information
See the request for information below. This information was never provided to me.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
Begin forwarded message:
From: "Ellison, Christopher M" <CEllison@carmel.in.gov>
Date: April 21, 2014 at 3:36:47 PM EDT
To: "Ellison, Christopher M" <CEllison@carmel.in.gov>
Subject: FW: Request for Information
From: Basil Pappas [mailto:bgpappas@tds.net]
Sent: Thursday, October 03, 2013 10:25 AM
To: Ellison, Christopher M
Subject: Re: Request for Information
Chris,
I should have the appropriate drawings and information very soon
concerning 89 1st Ave SW.
I will send the information as soon as I can.
Thanks
Basil Pappas
Sent from my iPhone
On Sep 24, 2013, at 8:51 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First
Ave. SW, Carmel, IN 46032. We are not able to complete a plan review at this time due
to missing information. Be advised the State of Indiana Construction Design Release
(365971) and the submitted building plans for this project identify that this building will
be protected with an Automatic Fire Sprinkler System. Please provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler
systems Fire Department Connection at an approved location by the Carmel Fire
Dept. Additionally, the utility drawing shall show fire and domestic water lines
and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
Respectfully,
3
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
4
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Tuesday, May 20, 2014 9:59 AM
To:Mishler, Nicholas F
Subject:Re: 89 1st Street
No. They never provided all the documents we required. Looks like the building had been constructed.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On May 20, 2014, at 9:54 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Chris, did you ever grant them a full release for this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ellison, Christopher M
Sent: Thursday, October 10, 2013 1:16 PM
To: Mishler, Nicholas F
Subject: FW: 89 1st Street
This project is cleared for foundation permitting only.
Thanks,
Chris Ellison
CFD
From: Basil Pappas [mailto:bgpappas@tds.net]
Sent: Thursday, October 10, 2013 12:50 PM
To: Ellison, Christopher M
Subject: Fwd: 89 1st Street
Christopher,
Below is the fire protection contractor we have chosen to do the project on 89 1st ave. SW. I am
forwarding a letter from RYAN as well.
We had discussed the release of the footing permits so I can get started .
I would appreciate it if you would accept this letter from RYAN as an assurance of our intentions to
comply with all applicable codes and contact Nick in the building department so as to release the
foundation permits.
Please contact me if you have any questions.
Thank you
Basil Pappas
5
Sent from my iPhone
Begin forwarded message:
From: "Steve Hoffman" <steve@hoffmanengineers.com>
Date: October 10, 2013 at 11:58:22 AM EDT
To: "'Basil Pappas'" <bgpappas@tds.net>
Subject: FW: 89 1st Street
Reply-To: <steve@hoffmanengineers.com>
Stephen C. Hoffman, P.E.
Hoffman Engineers, P.C.
From: Edwin Frieden [mailto:efrieden@ryanfp.com]
Sent: Wednesday, October 09, 2013 5:20 PM
To: 'steve@hoffmanengineers.com'
Cc: George Hanlon
Subject: 89 1st Street
See attached.
Thank you!
Edwin Frieden
Tenant/Service Estimating and Deficiency Technician
6
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Thursday, October 10, 2013 1:16 PM
To:Mishler, Nicholas F
Subject:FW: 89 1st Street
This project is cleared for foundation permitting only.
Thanks,
Chris Ellison
CFD
From: Basil Pappas [mailto:bgpappas@tds.net]
Sent: Thursday, October 10, 2013 12:50 PM
To: Ellison, Christopher M
Subject: Fwd: 89 1st Street
Christopher,
Below is the fire protection contractor we have chosen to do the project on 89 1st ave. SW. I am forwarding a letter
from RYAN as well.
We had discussed the release of the footing permits so I can get started .
I would appreciate it if you would accept this letter from RYAN as an assurance of our intentions to comply with all
applicable codes and contact Nick in the building department so as to release the foundation permits.
Please contact me if you have any questions.
Thank you
Basil Pappas
Sent from my iPhone
Begin forwarded message:
From: "Steve Hoffman" <steve@hoffmanengineers.com>
Date: October 10, 2013 at 11:58:22 AM EDT
To: "'Basil Pappas'" <bgpappas@tds.net>
Subject: FW: 89 1st Street
Reply-To: <steve@hoffmanengineers.com>
Stephen C. Hoffman, P.E.
Hoffman Engineers, P.C.
From: Edwin Frieden [mailto:efrieden@ryanfp.com]
Sent: Wednesday, October 09, 2013 5:20 PM
To: 'steve@hoffmanengineers.com'
Cc: George Hanlon
Subject: 89 1st Street
7
See attached.
Thank you!
Edwin Frieden
Tenant/Service Estimating and Deficiency Technician
8
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Monday, October 07, 2013 7:52 AM
To:'Basil Pappas'
Cc:Mishler, Nicholas F; Lux, Pamela K; Kass, Joslyn; Knott, Bruce
Subject:RE: Request for Information
I received your voice mail in reference to your request for a foundation only permit. In order for the Carmel Fire Dept.
to authorize the release of that permit we will need a signed letter from you stating that the proposed building at 89
First Ave, SW will be protected by an automatic fire sprinkler system. Additionally the letter must state that the system
will be installed to comply with the 2010 Edition of NFPA 13 as adopted in the State of Indiana and the 2008 Indiana Fire
Code.
Be advised we will not be able to approve the release of the full structural permit until all the items requested in my
Sept. 24th e-mail are received.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
From: Basil Pappas [mailto:bgpappas@tds.net]
Sent: Thursday, October 03, 2013 10:25 AM
To: Ellison, Christopher M
Subject: Re: Request for Information
Chris,
I should have the appropriate drawings and information very soon
concerning 89 1st Ave SW.
I will send the information as soon as I can.
Thanks
Basil Pappas
Sent from my iPhone
On Sep 24, 2013, at 8:51 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel,
IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised
the State of Indiana Construction Design Release (365971) and the submitted building plans for this
project identify that this building will be protected with an Automatic Fire Sprinkler System. Please
provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire
Department Connection at an approved location by the Carmel Fire Dept. Additionally, the
utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System
Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
Respectfully,
9
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
10
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, September 24, 2013 12:57 PM
To:Mishler, Nicholas F
Subject:RE: Request for Information (89 First Ave SW)
Right. the building will not be expanding in size.
I will sit tight for now. let me know if I need to do anything.
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 12:49 PM
To: Conn, Angelina V
Subject: RE: Request for Information (89 First Ave SW)
Angie, I’m not really sure Chris is saying this was not on TAC but if it is all interior I’m not sure why it would be…Bill reviewed it too and said he
couldn’t see any addition being done on the plans. I just want to make sure what you approved and what he submitted are the same thing, because I
know this has changed from when he originally talked to us.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Tuesday, September 24, 2013 12:41 PM
To: Mishler, Nicholas F
Subject: RE: Request for Information (89 First Ave SW)
Hi, Nick – What do you need me to do on this? Looks like Basil Pappas just needs to work with Chris Ellison directly to
get him the correct plan he needs, and vice versa with Chris contacting Basil Pappas directly…
Let me know.
Thanks,
Angie
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 11:18 AM
To: Conn, Angelina V
Subject: FW: Request for Information
Angie, see below…
11
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ellison, Christopher M
Sent: Tuesday, September 24, 2013 11:11 AM
To: Hohlt, William G; Mishler, Nicholas F
Cc: Blanchard, Jim E; Knott, Bruce
Subject: RE: Request for Information
Things are not adding up with what is being said and what the plans show on this building. The plans clearly show
demoing of 3 exterior walls and the roof on an existing building. They show a new roof system, new foundation, 3 new
walls, emergency lighting, fire sprinkler system, doors, etc. I do not believe this project was reviewed at the TAC level as
well.
Capt. Chris Ellison
Carmel Fire Dept.
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:18 AM
To: Mishler, Nicholas F; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
Thank you
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 9:11 AM
To: Hohlt, William G; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were
too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD
before I release anything.
Thanks,
Nick Mishler
12
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:09 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Request for Information
Nick,
Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a
foundation only and CFD is ok, I am good only for that portion
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Ellison, Christopher M
Sent: Tuesday, September 24, 2013 8:51 AM
To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net'
Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela
K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R
Subject: Request for Information
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are
not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction
Design Release (365971) and the submitted building plans for this project identify that this building will be protected
with an Automatic Fire Sprinkler System. Please provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection
at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic
water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
Respectfully,
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
13
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, September 24, 2013 12:41 PM
To:Mishler, Nicholas F
Subject:RE: Request for Information (89 First Ave SW)
Hi, Nick – What do you need me to do on this? Looks like Basil Pappas just needs to work with Chris Ellison directly to
get him the correct plan he needs, and vice versa with Chris contacting Basil Pappas directly…
Let me know.
Thanks,
Angie
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 11:18 AM
To: Conn, Angelina V
Subject: FW: Request for Information
Angie, see below…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ellison, Christopher M
Sent: Tuesday, September 24, 2013 11:11 AM
To: Hohlt, William G; Mishler, Nicholas F
Cc: Blanchard, Jim E; Knott, Bruce
Subject: RE: Request for Information
Things are not adding up with what is being said and what the plans show on this building. The plans clearly show
demoing of 3 exterior walls and the roof on an existing building. They show a new roof system, new foundation, 3 new
walls, emergency lighting, fire sprinkler system, doors, etc. I do not believe this project was reviewed at the TAC level as
well.
Capt. Chris Ellison
Carmel Fire Dept.
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:18 AM
To: Mishler, Nicholas F; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
Thank you
14
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 9:11 AM
To: Hohlt, William G; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were
too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD
before I release anything.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:09 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Request for Information
Nick,
Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a
foundation only and CFD is ok, I am good only for that portion
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
15
From: Ellison, Christopher M
Sent: Tuesday, September 24, 2013 8:51 AM
To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net'
Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela
K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R
Subject: Request for Information
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are
not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction
Design Release (365971) and the submitted building plans for this project identify that this building will be protected
with an Automatic Fire Sprinkler System. Please provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection
at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic
water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
Respectfully,
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
16
Mishler, Nicholas F
From:Hohlt, William G
Sent:Tuesday, September 24, 2013 11:35 AM
To:Ellison, Christopher M
Cc:Mishler, Nicholas F; Blanchard, Jim E; Knott, Bruce
Subject:Re: Request for Information
I have had Nick pull the drawings so I can have a look at them again in regards to what the application shows and the
actual plans
William Hohlt
Deputy Building Commissioner
City of Carmel
On Sep 24, 2013, at 11:11 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
Things are not adding up with what is being said and what the plans show on this building. The plans
clearly show demoing of 3 exterior walls and the roof on an existing building. They show a new roof
system, new foundation, 3 new walls, emergency lighting, fire sprinkler system, doors, etc. I do not
believe this project was reviewed at the TAC level as well.
Capt. Chris Ellison
Carmel Fire Dept.
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:18 AM
To: Mishler, Nicholas F; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
Thank you
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 9:11 AM
To: Hohlt, William G; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an
addition, but there were too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I
will wait until I get the approval from CFD before I release anything.
17
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:09 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Request for Information
Nick,
Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim
wants to do a foundation only and CFD is ok, I am good only for that portion
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Ellison, Christopher M
Sent: Tuesday, September 24, 2013 8:51 AM
To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net'
Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass,
Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L;
Simpson, Don R
Subject: Request for Information
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel,
IN 46032. We are not able to complete a plan review at this time due to missing information. Be advised
the State of Indiana Construction Design Release (365971) and the submitted building plans for this
project identify that this building will be protected with an Automatic Fire Sprinkler System. Please
provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire
Department Connection at an approved location by the Carmel Fire Dept. Additionally, the
utility drawing shall show fire and domestic water lines and their sizes, Fire Sprinkler System
Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
18
Respectfully,
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
19
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Tuesday, September 24, 2013 11:11 AM
To:Hohlt, William G; Mishler, Nicholas F
Cc:Blanchard, Jim E; Knott, Bruce
Subject:RE: Request for Information
Things are not adding up with what is being said and what the plans show on this building. The plans clearly show
demoing of 3 exterior walls and the roof on an existing building. They show a new roof system, new foundation, 3 new
walls, emergency lighting, fire sprinkler system, doors, etc. I do not believe this project was reviewed at the TAC level as
well.
Capt. Chris Ellison
Carmel Fire Dept.
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:18 AM
To: Mishler, Nicholas F; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
Thank you
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 9:11 AM
To: Hohlt, William G; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were
too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD
before I release anything.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
20
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:09 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Request for Information
Nick,
Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a
foundation only and CFD is ok, I am good only for that portion
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Ellison, Christopher M
Sent: Tuesday, September 24, 2013 8:51 AM
To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net'
Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela
K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R
Subject: Request for Information
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are
not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction
Design Release (365971) and the submitted building plans for this project identify that this building will be protected
with an Automatic Fire Sprinkler System. Please provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection
at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic
water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
Respectfully,
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
21
Mishler, Nicholas F
From:Hohlt, William G
Sent:Tuesday, September 24, 2013 9:18 AM
To:Mishler, Nicholas F; Ellison, Christopher M
Cc:Blanchard, Jim E
Subject:RE: Request for Information
Thank you
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 9:11 AM
To: Hohlt, William G; Ellison, Christopher M
Cc: Blanchard, Jim E
Subject: RE: Request for Information
From what the builder said when he submitted, there is no foundation to be done. The project was originally submitted as an addition, but there were
too many issues with that so he brought it back as a remodel only. As I do with all commercial projects, I will wait until I get the approval from CFD
before I release anything.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Hohlt, William G
Sent: Tuesday, September 24, 2013 9:09 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Request for Information
Nick,
Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a
foundation only and CFD is ok, I am good only for that portion
William Hohlt
Deputy Building Commissioner
22
City of Carmel
317.571.2470
From: Ellison, Christopher M
Sent: Tuesday, September 24, 2013 8:51 AM
To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net'
Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela
K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R
Subject: Request for Information
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are
not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction
Design Release (365971) and the submitted building plans for this project identify that this building will be protected
with an Automatic Fire Sprinkler System. Please provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection
at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic
water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
Respectfully,
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
23
Mishler, Nicholas F
From:Hohlt, William G
Sent:Tuesday, September 24, 2013 9:09 AM
To:Ellison, Christopher M
Cc:Mishler, Nicholas F; Blanchard, Jim E
Subject:RE: Request for Information
Nick,
Please put a hold on this until you hear from Chris that his items regarding fire have been resolved. If Jim wants to do a
foundation only and CFD is ok, I am good only for that portion
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Ellison, Christopher M
Sent: Tuesday, September 24, 2013 8:51 AM
To: 'steve@hoffmanengineers.com'; 'bgpappas@tds.net'
Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V; Kass, Joslyn; Lux, Pamela
K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent E; Cook, Steve L; Simpson, Don R
Subject: Request for Information
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are
not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction
Design Release (365971) and the submitted building plans for this project identify that this building will be protected
with an Automatic Fire Sprinkler System. Please provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection
at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic
water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
Respectfully,
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
24
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Tuesday, September 24, 2013 8:51 AM
To:'steve@hoffmanengineers.com'; 'bgpappas@tds.net'
Cc:Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; Mishler, Nicholas F; Conn, Angelina V;
Kass, Joslyn; Lux, Pamela K; Blanchard, Jim E; Hohlt, William G; Miser, Craig; Liggett, Brent
E; Cook, Steve L; Simpson, Don R
Subject:Request for Information
The Carmel Fire Dept. has received plans for the proposed Carmel Project, at 89 First Ave. SW, Carmel, IN 46032. We are
not able to complete a plan review at this time due to missing information. Be advised the State of Indiana Construction
Design Release (365971) and the submitted building plans for this project identify that this building will be protected
with an Automatic Fire Sprinkler System. Please provide the following:
1. Provide a utility Drawing identifying the required automatic fire sprinkler systems Fire Department Connection
at an approved location by the Carmel Fire Dept. Additionally, the utility drawing shall show fire and domestic
water lines and their sizes, Fire Sprinkler System Post Indicator Valves and Fire Hydrants.
If you have questions feel free to contact me.
Respectfully,
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
25
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Friday, September 20, 2013 7:54 AM
To:Basil Pappas
Cc:Conn, Angelina V; Foley, Amanda J; Hollibaugh, Mike P; McBride, Mike T; Mishler, Nicholas F
Subject:RE: City of Carmel 89 First Ave SW Docket No 13070008 ADLS Amend
Good morning Mr. Pappas…correct, you received approval from the BPW to close the sidewalk and the parking spaces. I
would have no issues with you starting on the other aspects of your project.
Gary
From: Basil Pappas [mailto:bgpappas@tds.net]
Sent: Thursday, September 19, 2013 10:21 AM
To: Duncan, Gary R
Subject: Re: City of Carmel 89 First Ave SW Docket No 13070008 ADLS Amend
Gary,
Let me know about a time for a meeting
I don't think the final parking layout is needed for me to get started.
I've turned the plans in for the building department to review.
They are waiting for your department to sign off on the project before I get started.
Thanks,
Basil Pappas
Sent from my iPhone
On Sep 17, 2013, at 12:59 PM, "Duncan, Gary R" <gduncan@carmel.in.gov> wrote:
Thank you Mr. Pappas. How about Thursday morning?
Gary
From: Basil Pappas [mailto:bgpappas@tds.net]
Sent: Monday, September 16, 2013 1:35 PM
To: Duncan, Gary R
Subject: Re: City of Carmel 89 First Ave SW Docket No 13070008 ADLS Amend
Gary,
Yes , I will be available tomorrow before 12:00 pm and any time Wednesday and Thursday. Let me know
which day works for you.
Thanks,
Basil Pappas
Sent from my iPhone
On Sep 16, 2013, at 11:41 AM, "Duncan, Gary R" <gduncan@carmel.in.gov> wrote:
26
Good morning Mr. Pappas,
Are you available for a meeting this week to discuss your project, the on-street parking
as well as the proposed on-site parking configurations?
Thanks so much,
Gary
Gary R. Duncan, Jr., PE
Assistant City Engineer
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
(317) 571-2441
(317) 571-2439 (fax)
gduncan@carmel.in.gov
Please consider the environment before printing this e-mail
27
Mishler, Nicholas F
From:Basil Pappas [bgpappas@tds.net]
Sent:Wednesday, September 18, 2013 8:36 AM
To:Mishler, Nicholas F
Subject:Fwd: Project 365971 cdr information attached.
Begin forwarded message:
From: BROBISON@dhs.in.gov
Date: September 16, 2013 8:10:49 AM EDT
To: steve@hoffmanengineers.com, bgpappas@tds.net, dschroeder@dhs.in.gov,
jblanchard@carmel.in.gov
Subject: Project 365971 cdr information attached.
28
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Friday, August 30, 2013 12:59 PM
To:Mishler, Nicholas F
Cc:'bgpappas@tds.net'; Donahue-Wold, Alexia K
Subject:RE: The Carmel Project (89 First Ave SW (docket no 13070008 ADLS Amend))
Hi, Nick-
The Plan Commission and the Planning Dept. have approved the modifications to the building architecture and site plan,
with some conditions. Here is a link to the Letter of Grant listing the conditions:
http://cocdocs.ci.carmel.in.us/Weblink/DocView.aspx?id=949747&dbid=0 , and here is a link to what was approved:
http://cocdocs.ci.carmel.in.us/Weblink/0/fol/942466/Row1.aspx ; once you click on and get to a specific item, you can
print to pdf by clicking on the printer/.pdf icon on that web page.
We are still trying to work with the City Engineering Dept. for them to give the okay on the proposed on-street parallel
parking spaces. Mr. Pappas might have to contact that department, directly at 571-2441, to work out any concerns they
might have with the construction details of those parking spaces and street curbing. But, I think we are making head
way with them, so that is good.
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mishler, Nicholas F
Sent: Thursday, August 29, 2013 1:48 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'bgpappas@tds.net'
Subject: The Carmel Project
Good afternoon-
I have received a 2nd set of plans on The Carmel Project at 89 1st Ave. SW from Mr. Pappas, and have attached the plans. This plan is a scaled back
version of what was submitted before. Mr. Pappas is currently working on getting a new State Release.
Please let me know what information you will need prior to the release of permits. I have copied Mr. Pappas on this email.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
Good morning-
29
I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be
only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.”
I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also,
please copy Mr. Pappas on your reply. He is CC’d on this e-mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
30
Mishler, Nicholas F
From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov]
Sent:Thursday, August 29, 2013 2:08 PM
To:Mishler, Nicholas F; Conn, Angelina V; Donahue-Wold, Alexia K
Cc:'bgpappas@tds.net'
Subject:RE: The Carmel Project
Nick
No issues from the revised plan from HCSO. If you have any questions, please let me know.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, August 29, 2013 1:48 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'bgpappas@tds.net'
Subject: The Carmel Project
Good afternoon-
I have received a 2nd set of plans on The Carmel Project at 89 1st Ave. SW from Mr. Pappas, and have attached the plans. This plan is a scaled back
version of what was submitted before. Mr. Pappas is currently working on getting a new State Release.
Please let me know what information you will need prior to the release of permits. I have copied Mr. Pappas on this email.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
Good morning-
I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be
only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.”
I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also,
please copy Mr. Pappas on your reply. He is CC’d on this e-mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
31
Please consider the environment before printing this email
32
Mishler, Nicholas F
From:Basil Pappas [bgpappas@tds.net]
Sent:Thursday, August 29, 2013 7:04 AM
To:Mishler, Nicholas F
Subject:89 1st ave. SW CARMEL PROJECT
Nick.
Below is attached the revised plans for the proposed renovation of 89 1st Avenue.
Thanks,
Basil Pappas
317 372 3496
33
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, August 27, 2013 1:12 PM
To:Mishler, Nicholas F
Cc:'bgpappas@tds.net'; Donahue-Wold, Alexia K
Subject:RE: The Carmel Project (Docket No. 13070008 ADLS Amend: 89 First Ave SW)
Hi, Nick –
Just a quick update: Our Dept. is finalizing the Letter of Grant for this project. We met with Basil this morning to discuss
the modified architecture and site plan, and have approved it with some conditions that will be written into the Letter of
Grant.
Thanks,
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mishler, Nicholas F
Sent: Wednesday, August 14, 2013 9:33 AM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'bgpappas@tds.net'
Subject: The Carmel Project
Good morning-
I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be
only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.”
I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also,
please copy Mr. Pappas on your reply. He is CC’d on this e-mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
34
Mishler, Nicholas F
From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com]
Sent:Friday, August 16, 2013 3:53 PM
To:Mishler, Nicholas F
Cc:bgpappas@tds.net
Subject:RE: The Carmel Project
Nick,
This is going to take a major rebuild of the electrical service based on what I see on the plans. I understand that this is
only finishing the shell, however we will need to evaluate their electrical needs especially if this will be a new
restaurant. I will need Mr. Pappas to contact our company, 800-774-0246, to schedule an engineering appointment to
discuss these issues.
Thank you,
Shirley Hunter
Sr. Distribution Eng Specialist
Duke Energy
16475 Southpark Dr
Westfield, IN 46074
317.896.6711
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, August 14, 2013 9:33 AM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'bgpappas@tds.net'
Subject: The Carmel Project
Good morning-
I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be
only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.”
I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also,
please copy Mr. Pappas on your reply. He is CC’d on this e-mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
35
Mishler, Nicholas F
From:Donahue-Wold, Alexia K
Sent:Wednesday, August 14, 2013 10:06 AM
To:Mishler, Nicholas F; Lux, Pamela K; Conn, Angelina V; Kass, Joslyn; Boone, Rachel M.
Cc:'bgpappas@tds.net'
Subject:RE: The Carmel Project
Hi Nick,
Basil still needs to get us a revised site plan and architectural drawings. This project was heard at the Plan Commission
Committee meeting for an ADLS Amendment approval and the committee approved it based on final architectural
approval by staff. There were several items discussed that Basil was going to address and then resubmit plans to us.
Therefore, we have not issued a Letter of Grant yet for this.
Thanks,
Alexia
From: Mishler, Nicholas F
Sent: Wednesday, August 14, 2013 9:33 AM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'bgpappas@tds.net'
Subject: The Carmel Project
Good morning-
I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be
only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.”
I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also,
please copy Mr. Pappas on your reply. He is CC’d on this e-mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
36
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Wednesday, August 14, 2013 10:03 AM
To:Mishler, Nicholas F; Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari,
John A; Mindham, Daren; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-ryan.hartman@ctrwd.org';
Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc:'bgpappas@tds.net'; Boone, Rachel M.
Subject:RE: The Carmel Project (89 First Ave SW)
Nick -
The petitioner is still working with the Planning/Zoning Dept. on getting the final architecture design approvals.
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mishler, Nicholas F
Sent: Wednesday, August 14, 2013 9:33 AM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'bgpappas@tds.net'
Subject: The Carmel Project
Good morning-
I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be
only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.”
I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also,
please copy Mr. Pappas on your reply. He is CC’d on this e-mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
37
Mishler, Nicholas F
From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov]
Sent:Wednesday, August 14, 2013 9:56 AM
To:Mishler, Nicholas F; Conn, Angelina V; Donahue-Wold, Alexia K
Cc:'bgpappas@tds.net'
Subject:RE: The Carmel Project
Nick
Yes, there is a MAJOR problem, since the proposed addition is over a Hamilton County Regulated Drain. When I talked
to somebody (the contractor) about this, they said they were just remodeling and refacing the building, which we were
acceptable to. Now the plans show adding an addition further over the top of the regulated drain, which will require
Hamilton County Drainage Board approval, and likely will not have positive recommendation from our office.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, August 14, 2013 9:33 AM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'bgpappas@tds.net'
Subject: The Carmel Project
Good morning-
I have been contacted by Basil Pappas regarding an addition & remodel at 89 First Ave SW. This is a 4,300 square foot space that the contractor will be
only finishing the shell, to prepare the space for a future tenant, possibly a restaurant. The developers are referring to this as “The Carmel Project.”
I have attached a set of plans for the project. Please let me know what your department will need prior to our release of a building permit. Also,
please copy Mr. Pappas on your reply. He is CC’d on this e-mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
38
Mishler, Nicholas F
From:Basil Pappas [bgpappas@tds.net]
Sent:Tuesday, August 13, 2013 8:29 PM
To:Mishler, Nicholas F
Subject:Fwd: Project 365971 cdr information attached.
Begin forwarded message:
From: "John Carson" <jcarson@mintel.net>
Date: August 13, 2013 12:55:51 PM GMT-04:00
To: "'Basil Pappas'" <bgpappas@tds.net>
Subject: FW: Project 365971 cdr information attached.
From: Steve Hoffman [mailto:steve@hoffmanengineers.com]
Sent: Tuesday, August 13, 2013 12:24 PM
To: John Carson
Subject: FW: Project 365971 cdr information attached.
Stephen C. Hoffman, P.E.
Hoffman Engineers, P.C.
8261 W Baseline Road
Paragon, IN 46166
765-537-2991
www.hoffmanengineers.com
steve@hoffmanengineers.com
GLOBAL COMMITMENT WITH A MAIN STREET ATTITUDE
From: BROBISON@dhs.in.gov [mailto:BROBISON@dhs.in.gov]
Sent: Tuesday, August 13, 2013 12:22 PM
To: steve@hoffmanengineers.com; bgpappas@tds.net; dschroeder@dhs.in.gov; jblanchard@carmel.in.gov; steve@hoffm
anengineers.com
Subject: Project 365971 cdr information attached.
39
Mishler, Nicholas F
From:Basil Pappas [bgpappas@tds.net]
Sent:Tuesday, August 13, 2013 8:27 PM
To:Mishler, Nicholas F
Subject:Fwd: CARMEL PROJECT FOUNDATION RELEASE
Begin forwarded message:
From: "John Carson" <jcarson@mintel.net>
Date: July 1, 2013 9:07:55 AM GMT-04:00
To: <steve@hoffmanengineers.com>, "'Basil Pappas'" <bgpappas@tds.net>
Subject: CARMEL PROJECT FOUNDATION RELEASE
HERE IS THE CARMEL PROJECT FOUNDATION RELEASE.