HomeMy WebLinkAbout13100019 Correspondence (2)1
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Wednesday, August 20, 2014 11:55 AM
To:Mishler, Nicholas F
Subject:RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hi Nick,
Yes, we would like to have revised placards.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, August 20, 2014 8:51 AM
To: Bernida Egging
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida, it just occurred to me that your original placards may say “Foundation Only” Do you need new
placards for this project?
Thanks,
Nick Mishler
Administrative Assistant
2
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Ellison, Christopher M
Sent: Friday, August 08, 2014 9:00 AM
To: Mishler, Nicholas F; Lux, Pamela K
Cc: Ellison, Christopher M; Knott, Bruce
Subject: Fwd: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
FYI, project is cleared for full permitting at this time.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
Begin forwarded message:
From: "Mishler, Nicholas F" <nmishler@carmel.in.gov>
Date: July 22, 2014 at 1:08:17 PM EDT
To: 'Bernida Egging' <begging@spectrumretirement.com>
Cc: "Knott, Bruce" <BKnott@carmel.in.gov>, "Ellison, Christopher M"
<CEllison@carmel.in.gov>, "Blanchard, Jim E" <JBlanchard@carmel.in.gov>
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Bernida, this project is currently foundation only, and we will just need to verify that the roads,
hydrants, etc are complete prior to allowing any materials on site. I haven’t been contacted by
any contractors in the last month or so.
Thanks,
Nick Mishler
3
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, July 22, 2014 1:02 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Hi Nick,
Due to the very wet spring/summer, we still have not completed our slab pours or the asphalt
paving. We are hoping to make some headway and should hopefully be complete by the end of
this month.
Just for my knowledge, has the contractor not been in touch with you or your department?
Thank you,
Bernida Egging
Vice President of Construction
Spectrum
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
4
begging@spectrumretirement.com
On Jul 22, 2014, at 11:54 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Hi Bernida, I just wanted to see if you had any updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, June 13, 2014 12:18 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hello Nick,
Do to the weather, we have not completed the slab pours or the asphalt drive yet.
Once we do, we will have our contractor contact CFD for “inspection” and
approval to start going vertical.
Thank you,
5
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, June 12, 2014 12:09 PM
To: Bernida Egging
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hi Bernida-
The GC for this job was in our office today asking about the status of this project.
I had told him the last update I had was from March 31 that we were still waiting
on CFD access and fire hydrants before we can give a full release to bring
materials on site. Do you have any further updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
6
P Please consider the environment before printing this email
From: Mishler, Nicholas F
Sent: Monday, March 31, 2014 11:55 AM
To: 'Bernida Egging'
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hi Bernida-
I will be out of the office next week so I’m trying to get an idea of where all of the
current projects stand so I can let Pam know. Do you have any updates on the
Fire Department access, as well as installation of the fire hydrants?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, February 18, 2014 12:52 PM
To: Mishler, Nicholas F
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
7
Hi Nick,
I am just touching base with you to see if you and Bruce were able to meet
regarding the unit numbering at Carmel Senior Living last week. Please advise if
there are any questions or concerns that I may answer.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, February 10, 2014 8:45 AM
To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013
in which the access need was stated as paved/binder all around the loop of the
building and all hydrants to be in place and working prior to vertical construction
and wood on the site.
Part of the issue with this site is that:
8
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to
constantly be monitored. Emergency apparatus will need to have access 24/7 .
Having access to only half or less of the building (prosed highlighted access) will
make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus
around once committed to the access road.
#4. Required hydrants on the East side of the site would not be accessible if the
complete access were not provided.
#5. The limited parking and extra space on this site is going to make it difficult
for construction equipment (and vehicles) to allow for 24/7 emergency access
without altering the loop road binder, and our experience shows that dirt and or
gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in
which we discussed the unit numbering as well as the required paved surface for
our construction project prior to going vertical.
1. Unit Numbering
9
a. I have attached two possible solutions for our unit numbering. I believe
these options address your concerns from our meeting and hope we can come to
an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved
Surface.pdf”. I would like to propose that we definitely install the yellow
highlighted area for fire department paved access, but would like to confirm
acceptance of using Illinois Street and W. 136th Street as part of our required
“paved surfaces” due to their proximity to our jobsite. Can you please confirm
acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
10
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Friday, August 08, 2014 9:00 AM
To:Mishler, Nicholas F; Lux, Pamela K
Cc:Ellison, Christopher M; Knott, Bruce
Subject:Fwd: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
FYI, project is cleared for full permitting at this time.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
Begin forwarded message:
From: "Mishler, Nicholas F" <nmishler@carmel.in.gov>
Date: July 22, 2014 at 1:08:17 PM EDT
To: 'Bernida Egging' <begging@spectrumretirement.com>
Cc: "Knott, Bruce" <BKnott@carmel.in.gov>, "Ellison, Christopher M"
<CEllison@carmel.in.gov>, "Blanchard, Jim E" <JBlanchard@carmel.in.gov>
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Bernida, this project is currently foundation only, and we will just need to verify that the roads, hydrants, etc are complete prior
to allowing any materials on site. I haven’t been contacted by any contractors in the last month or so.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, July 22, 2014 1:02 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hi Nick,
Due to the very wet spring/summer, we still have not completed our slab pours or the asphalt
paving. We are hoping to make some headway and should hopefully be complete by the end of
this month.
Just for my knowledge, has the contractor not been in touch with you or your department?
Thank you,
Bernida Egging
11
Vice President of Construction
Spectrum
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
On Jul 22, 2014, at 11:54 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Hi Bernida, I just wanted to see if you had any updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, June 13, 2014 12:18 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hello Nick,
Do to the weather, we have not completed the slab pours or the asphalt drive yet.
Once we do, we will have our contractor contact CFD for “inspection” and
approval to start going vertical.
12
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, June 12, 2014 12:09 PM
To: Bernida Egging
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hi Bernida-
The GC for this job was in our office today asking about the status of this project.
I had told him the last update I had was from March 31 that we were still waiting
on CFD access and fire hydrants before we can give a full release to bring
materials on site. Do you have any further updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
13
(317) 571-2489
P Please consider the environment before printing this email
From: Mishler, Nicholas F
Sent: Monday, March 31, 2014 11:55 AM
To: 'Bernida Egging'
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hi Bernida-
I will be out of the office next week so I’m trying to get an idea of where all of the
current projects stand so I can let Pam know. Do you have any updates on the
Fire Department access, as well as installation of the fire hydrants?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, February 18, 2014 12:52 PM
To: Mishler, Nicholas F
14
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hi Nick,
I am just touching base with you to see if you and Bruce were able to meet
regarding the unit numbering at Carmel Senior Living last week. Please advise if
there are any questions or concerns that I may answer.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, February 10, 2014 8:45 AM
To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
15
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013
in which the access need was stated as paved/binder all around the loop of the
building and all hydrants to be in place and working prior to vertical construction
and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to
constantly be monitored. Emergency apparatus will need to have access 24/7 .
Having access to only half or less of the building (prosed highlighted access) will
make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus
around once committed to the access road.
#4. Required hydrants on the East side of the site would not be accessible if the
complete access were not provided.
#5. The limited parking and extra space on this site is going to make it difficult
for construction equipment (and vehicles) to allow for 24/7 emergency access
without altering the loop road binder, and our experience shows that dirt and or
gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hello Nick, Bruce and Chris,
16
I wanted to follow up with you regarding our meeting on January 22, 2014 in
which we discussed the unit numbering as well as the required paved surface for
our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe
these options address your concerns from our meeting and hope we can come to
an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved
Surface.pdf”. I would like to propose that we definitely install the yellow
highlighted area for fire department paved access, but would like to confirm
acceptance of using Illinois Street and W. 136th Street as part of our required
“paved surfaces” due to their proximity to our jobsite. Can you please confirm
acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
17
Mishler, Nicholas F
From:Robert Terral [rterral@catamountinc.com]
Sent:Friday, August 08, 2014 7:45 AM
To:Ellison, Christopher M
Cc:Ron Bokinskie; Mishler, Nicholas F; Joyce Terral
Subject:RE: Carmel Sr. Living Follow up
Attachments:Flow Test for Hydrants 001.jpg
Mr. Ellison, you will find the flow test attached for your use and review. If there is anything else needed, please don’t
hesitate to contact me.
Thanks,
Robert Terral
Catamount Constructors, Inc.
720-301-0481
From: Robert Terral
Sent: Thursday, August 07, 2014 5:23 PM
To: 'Ellison, Christopher M'
Cc: Ron Bokinskie; Mishler, Nicholas F
Subject: RE: Carmel Sr. Living Follow up
Thank you very much. Have them call me when they start over please.
720 301 0481
RT
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Thursday, August 07, 2014 4:54 PM
To: Robert Terral
Cc: Ron Bokinskie; Mishler, Nicholas F
Subject: Re: Carmel Sr. Living Follow up
The test reports can email to me directly via PDF file. A member of our staff will complete a drive-by tomorrow to
complete a quick site visit.
Respectfully,
Capt. Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On Aug 7, 2014, at 4:38 PM, "Robert Terral" <rterral@catamountinc.com> wrote:
Mr. Ellison, I will have the entirety of the asphalt binder course install today as well as the flow test
required by your office for the release of our building permit for vertical construction. How would you
like for me to deliver the test results of the flow test to you, or your office?
Robert Terral
Catamount Constructors, Inc.
18
720-301-0481
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Wednesday, August 06, 2014 10:16 AM
To: Ron Bokinskie
Cc: Robert Terral; Mishler, Nicholas F
Subject: RE: Carmel Sr. Living Follow up
The flow test needs to be provided in Gallons per minute for each fire hydrant on site.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
From: Ron Bokinskie [mailto:rbokinskie@catamountinc.com]
Sent: Wednesday, August 06, 2014 10:12 AM
To: Ellison, Christopher M
Cc: Robert Terral; Mishler, Nicholas F
Subject: Re: Carmel Sr. Living Follow up
Chris,
Thank you for the information. Can you please confirm which flow test is required by Carmel FD,
Gallons per minute or Cubic feet per minute.
Because we typically do this at time of Fire Sprinkler we are ordering the test now.
Thank you
Ron Bokinskie
Sent from my iPhone
On Aug 6, 2014, at 9:29 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
Ron,
Per our conversation please provide notification to me once the asphalt binder is in
place. Additionally, please provide documentation that the fire hydrants on site have
been flow tested(provide flow test report) and are in service and are available for fire
fighting operations.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
19
317-571-2674 Fax
cellison@carmel.in.gov
<image003.png>
CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain
information which is confidential, attorney work-product and/or subject to the
attorney-client privilege, and is intended solely for the receipient(s) named above. If you
are not a named recipient, any interception, copying, distribution, disclosure or use of
this transmission or any information contained in it is strictly prohibited, and may be
subject to criminal and civil penalties under State or Federal law. If you have received
this transmission in error, please immediately call us at (317) 571-2600, delete the
transmission from all forms of electronic or other storage, and destroy all hard copies.
DO NOT forward this transmission. Any error in addressing or sending this e-mail is not a
waiver of confidentiality or privilege and does not waive consent to copying or
distribution of this e-mail or attachments. Thank You.
20
Mishler, Nicholas F
From:Robert Terral [rterral@catamountinc.com]
Sent:Thursday, August 07, 2014 5:23 PM
To:Ellison, Christopher M
Cc:Ron Bokinskie; Mishler, Nicholas F
Subject:RE: Carmel Sr. Living Follow up
Thank you very much. Have them call me when they start over please.
720 301 0481
RT
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Thursday, August 07, 2014 4:54 PM
To: Robert Terral
Cc: Ron Bokinskie; Mishler, Nicholas F
Subject: Re: Carmel Sr. Living Follow up
The test reports can email to me directly via PDF file. A member of our staff will complete a drive-by tomorrow to
complete a quick site visit.
Respectfully,
Capt. Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On Aug 7, 2014, at 4:38 PM, "Robert Terral" <rterral@catamountinc.com> wrote:
Mr. Ellison, I will have the entirety of the asphalt binder course install today as well as the flow test
required by your office for the release of our building permit for vertical construction. How would you
like for me to deliver the test results of the flow test to you, or your office?
Robert Terral
Catamount Constructors, Inc.
720-301-0481
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Wednesday, August 06, 2014 10:16 AM
To: Ron Bokinskie
Cc: Robert Terral; Mishler, Nicholas F
Subject: RE: Carmel Sr. Living Follow up
The flow test needs to be provided in Gallons per minute for each fire hydrant on site.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
21
317-571-2674 Fax
cellison@carmel.in.gov
From: Ron Bokinskie [mailto:rbokinskie@catamountinc.com]
Sent: Wednesday, August 06, 2014 10:12 AM
To: Ellison, Christopher M
Cc: Robert Terral; Mishler, Nicholas F
Subject: Re: Carmel Sr. Living Follow up
Chris,
Thank you for the information. Can you please confirm which flow test is required by Carmel FD,
Gallons per minute or Cubic feet per minute.
Because we typically do this at time of Fire Sprinkler we are ordering the test now.
Thank you
Ron Bokinskie
Sent from my iPhone
On Aug 6, 2014, at 9:29 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
Ron,
Per our conversation please provide notification to me once the asphalt binder is in
place. Additionally, please provide documentation that the fire hydrants on site have
been flow tested(provide flow test report) and are in service and are available for fire
fighting operations.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
<image003.png>
CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain
information which is confidential, attorney work-product and/or subject to the
attorney-client privilege, and is intended solely for the receipient(s) named above. If you
are not a named recipient, any interception, copying, distribution, disclosure or use of
this transmission or any information contained in it is strictly prohibited, and may be
subject to criminal and civil penalties under State or Federal law. If you have received
this transmission in error, please immediately call us at (317) 571-2600, delete the
transmission from all forms of electronic or other storage, and destroy all hard copies.
DO NOT forward this transmission. Any error in addressing or sending this e-mail is not a
22
waiver of confidentiality or privilege and does not waive consent to copying or
distribution of this e-mail or attachments. Thank You.
23
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Thursday, August 07, 2014 4:54 PM
To:Robert Terral
Cc:Ron Bokinskie; Mishler, Nicholas F
Subject:Re: Carmel Sr. Living Follow up
The test reports can email to me directly via PDF file. A member of our staff will complete a drive-by tomorrow to
complete a quick site visit.
Respectfully,
Capt. Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On Aug 7, 2014, at 4:38 PM, "Robert Terral" <rterral@catamountinc.com> wrote:
Mr. Ellison, I will have the entirety of the asphalt binder course install today as well as the flow test
required by your office for the release of our building permit for vertical construction. How would you
like for me to deliver the test results of the flow test to you, or your office?
Robert Terral
Catamount Constructors, Inc.
720-301-0481
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Wednesday, August 06, 2014 10:16 AM
To: Ron Bokinskie
Cc: Robert Terral; Mishler, Nicholas F
Subject: RE: Carmel Sr. Living Follow up
The flow test needs to be provided in Gallons per minute for each fire hydrant on site.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
From: Ron Bokinskie [mailto:rbokinskie@catamountinc.com]
Sent: Wednesday, August 06, 2014 10:12 AM
To: Ellison, Christopher M
Cc: Robert Terral; Mishler, Nicholas F
Subject: Re: Carmel Sr. Living Follow up
Chris,
24
Thank you for the information. Can you please confirm which flow test is required by Carmel FD,
Gallons per minute or Cubic feet per minute.
Because we typically do this at time of Fire Sprinkler we are ordering the test now.
Thank you
Ron Bokinskie
Sent from my iPhone
On Aug 6, 2014, at 9:29 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
Ron,
Per our conversation please provide notification to me once the asphalt binder is in
place. Additionally, please provide documentation that the fire hydrants on site have
been flow tested(provide flow test report) and are in service and are available for fire
fighting operations.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
<image003.png>
CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain
information which is confidential, attorney work-product and/or subject to the
attorney-client privilege, and is intended solely for the receipient(s) named above. If you
are not a named recipient, any interception, copying, distribution, disclosure or use of
this transmission or any information contained in it is strictly prohibited, and may be
subject to criminal and civil penalties under State or Federal law. If you have received
this transmission in error, please immediately call us at (317) 571-2600, delete the
transmission from all forms of electronic or other storage, and destroy all hard copies.
DO NOT forward this transmission. Any error in addressing or sending this e-mail is not a
waiver of confidentiality or privilege and does not waive consent to copying or
distribution of this e-mail or attachments. Thank You.
25
Mishler, Nicholas F
From:Robert Terral [rterral@catamountinc.com]
Sent:Thursday, August 07, 2014 4:37 PM
To:Ellison, Christopher M; Ron Bokinskie
Cc:Mishler, Nicholas F
Subject:RE: Carmel Sr. Living Follow up
Mr. Ellison, I will have the entirety of the asphalt binder course install today as well as the flow test required by your
office for the release of our building permit for vertical construction. How would you like for me to deliver the test
results of the flow test to you, or your office?
Robert Terral
Catamount Constructors, Inc.
720-301-0481
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Wednesday, August 06, 2014 10:16 AM
To: Ron Bokinskie
Cc: Robert Terral; Mishler, Nicholas F
Subject: RE: Carmel Sr. Living Follow up
The flow test needs to be provided in Gallons per minute for each fire hydrant on site.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
From: Ron Bokinskie [mailto:rbokinskie@catamountinc.com]
Sent: Wednesday, August 06, 2014 10:12 AM
To: Ellison, Christopher M
Cc: Robert Terral; Mishler, Nicholas F
Subject: Re: Carmel Sr. Living Follow up
Chris,
Thank you for the information. Can you please confirm which flow test is required by Carmel FD, Gallons per minute or
Cubic feet per minute.
Because we typically do this at time of Fire Sprinkler we are ordering the test now.
Thank you
Ron Bokinskie
Sent from my iPhone
26
On Aug 6, 2014, at 9:29 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
Ron,
Per our conversation please provide notification to me once the asphalt binder is in place. Additionally,
please provide documentation that the fire hydrants on site have been flow tested(provide flow test
report) and are in service and are available for fire fighting operations.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
<image003.png>
CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain information
which is confidential, attorney work-product and/or subject to the attorney-client privilege, and is
intended solely for the receipient(s) named above. If you are not a named recipient, any interception,
copying, distribution, disclosure or use of this transmission or any information contained in it is strictly
prohibited, and may be subject to criminal and civil penalties under State or Federal law. If you have
received this transmission in error, please immediately call us at (317) 571-2600, delete the transmission
from all forms of electronic or other storage, and destroy all hard copies. DO NOT forward this
transmission. Any error in addressing or sending this e-mail is not a waiver of confidentiality or privilege
and does not waive consent to copying or distribution of this e-mail or attachments. Thank You.
27
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Wednesday, August 06, 2014 10:16 AM
To:'Ron Bokinskie'
Cc:Robert Terral; Mishler, Nicholas F
Subject:RE: Carmel Sr. Living Follow up
The flow test needs to be provided in Gallons per minute for each fire hydrant on site.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
From: Ron Bokinskie [mailto:rbokinskie@catamountinc.com]
Sent: Wednesday, August 06, 2014 10:12 AM
To: Ellison, Christopher M
Cc: Robert Terral; Mishler, Nicholas F
Subject: Re: Carmel Sr. Living Follow up
Chris,
Thank you for the information. Can you please confirm which flow test is required by Carmel FD, Gallons per minute or
Cubic feet per minute.
Because we typically do this at time of Fire Sprinkler we are ordering the test now.
Thank you
Ron Bokinskie
Sent from my iPhone
On Aug 6, 2014, at 9:29 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
Ron,
Per our conversation please provide notification to me once the asphalt binder is in place. Additionally,
please provide documentation that the fire hydrants on site have been flow tested(provide flow test
report) and are in service and are available for fire fighting operations.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
28
317-571-2674 Fax
cellison@carmel.in.gov
<image003.png>
CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain information
which is confidential, attorney work-product and/or subject to the attorney-client privilege, and is
intended solely for the receipient(s) named above. If you are not a named recipient, any interception,
copying, distribution, disclosure or use of this transmission or any information contained in it is strictly
prohibited, and may be subject to criminal and civil penalties under State or Federal law. If you have
received this transmission in error, please immediately call us at (317) 571-2600, delete the transmission
from all forms of electronic or other storage, and destroy all hard copies. DO NOT forward this
transmission. Any error in addressing or sending this e-mail is not a waiver of confidentiality or privilege
and does not waive consent to copying or distribution of this e-mail or attachments. Thank You.
29
Mishler, Nicholas F
From:Ron Bokinskie [rbokinskie@catamountinc.com]
Sent:Wednesday, August 06, 2014 10:12 AM
To:Ellison, Christopher M
Cc:Robert Terral; Mishler, Nicholas F
Subject:Re: Carmel Sr. Living Follow up
Chris,
Thank you for the information. Can you please confirm which flow test is required by Carmel FD, Gallons per minute or
Cubic feet per minute.
Because we typically do this at time of Fire Sprinkler we are ordering the test now.
Thank you
Ron Bokinskie
Sent from my iPhone
On Aug 6, 2014, at 9:29 AM, "Ellison, Christopher M" <CEllison@carmel.in.gov> wrote:
Ron,
Per our conversation please provide notification to me once the asphalt binder is in place. Additionally,
please provide documentation that the fire hydrants on site have been flow tested(provide flow test
report) and are in service and are available for fire fighting operations.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
<image003.png>
CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain information
which is confidential, attorney work-product and/or subject to the attorney-client privilege, and is
intended solely for the receipient(s) named above. If you are not a named recipient, any interception,
copying, distribution, disclosure or use of this transmission or any information contained in it is strictly
prohibited, and may be subject to criminal and civil penalties under State or Federal law. If you have
received this transmission in error, please immediately call us at (317) 571-2600, delete the transmission
from all forms of electronic or other storage, and destroy all hard copies. DO NOT forward this
transmission. Any error in addressing or sending this e-mail is not a waiver of confidentiality or privilege
and does not waive consent to copying or distribution of this e-mail or attachments. Thank You.
30
31
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Wednesday, August 06, 2014 9:29 AM
To:'rbokinskie@catamountinc.com'; 'rterral@catamountinc.com'
Cc:Mishler, Nicholas F
Subject:Carmel Sr. Living Follow up
Ron,
Per our conversation please provide notification to me once the asphalt binder is in place. Additionally, please provide
documentation that the fire hydrants on site have been flow tested(provide flow test report) and are in service and are
available for fire fighting operations.
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Department
2 Civic Square, Carmel IN 46032
317-571-2600 Headquarters
317-571-2674 Fax
cellison@carmel.in.gov
CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain information which is confidential,
attorney work-product and/or subject to the attorney-client privilege, and is intended solely for the receipient(s) named
above. If you are not a named recipient, any interception, copying, distribution, disclosure or use of this transmission or
any information contained in it is strictly prohibited, and may be subject to criminal and civil penalties under State or
Federal law. If you have received this transmission in error, please immediately call us at (317) 571-2600, delete the
transmission from all forms of electronic or other storage, and destroy all hard copies. DO NOT forward this
transmission. Any error in addressing or sending this e-mail is not a waiver of confidentiality or privilege and does not
waive consent to copying or distribution of this e-mail or attachments. Thank You.
32
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Tuesday, July 22, 2014 1:20 PM
To:Mishler, Nicholas F
Cc:Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E; Robert Terral; Joyce Terral; Ron
Bokinskie; Erik Bentley
Subject:Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick,
You are correct and we are aware of this requirement. I have copied our contractor on this email so he is also in
the loop on this correspondence.
You should be hearing from then directly when they are ready for you to come out and inspect.
Thank you,
Bernida Egging
Vice President of Construction
Spectrum
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
On Jul 22, 2014, at 12:08 PM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Bernida, this project is currently foundation only, and we will just need to verify that the roads,
hydrants, etc are complete prior to allowing any materials on site. I haven’t been contacted by
any contractors in the last month or so.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
33
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, July 22, 2014 1:02 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Hi Nick,
Due to the very wet spring/summer, we still have not completed our slab pours or the asphalt
paving. We are hoping to make some headway and should hopefully be complete by the end of
this month.
Just for my knowledge, has the contractor not been in touch with you or your department?
Thank you,
Bernida Egging
Vice President of Construction
Spectrum
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
On Jul 22, 2014, at 11:54 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Hi Bernida, I just wanted to see if you had any updates on this?
34
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, June 13, 2014 12:18 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hello Nick,
Do to the weather, we have not completed the slab pours or the asphalt drive yet.
Once we do, we will have our contractor contact CFD for “inspection” and
approval to start going vertical.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
35
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, June 12, 2014 12:09 PM
To: Bernida Egging
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hi Bernida-
The GC for this job was in our office today asking about the status of this project.
I had told him the last update I had was from March 31 that we were still waiting
on CFD access and fire hydrants before we can give a full release to bring
materials on site. Do you have any further updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Mishler, Nicholas F
Sent: Monday, March 31, 2014 11:55 AM
To: 'Bernida Egging'
Cc: Knott, Bruce; Ellison, Christopher M
36
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hi Bernida-
I will be out of the office next week so I’m trying to get an idea of where all of the
current projects stand so I can let Pam know. Do you have any updates on the
Fire Department access, as well as installation of the fire hydrants?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, February 18, 2014 12:52 PM
To: Mishler, Nicholas F
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hi Nick,
I am just touching base with you to see if you and Bruce were able to meet
regarding the unit numbering at Carmel Senior Living last week. Please advise if
there are any questions or concerns that I may answer.
37
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, February 10, 2014 8:45 AM
To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013
in which the access need was stated as paved/binder all around the loop of the
building and all hydrants to be in place and working prior to vertical construction
and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to
constantly be monitored. Emergency apparatus will need to have access 24/7 .
Having access to only half or less of the building (prosed highlighted access) will
make it impossible to quickly deal with an emergency.
38
#3. The proposed highlighted access serves no options to turn fire apparatus
around once committed to the access road.
#4. Required hydrants on the East side of the site would not be accessible if the
complete access were not provided.
#5. The limited parking and extra space on this site is going to make it difficult
for construction equipment (and vehicles) to allow for 24/7 emergency access
without altering the loop road binder, and our experience shows that dirt and or
gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for
Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in
which we discussed the unit numbering as well as the required paved surface for
our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe
these options address your concerns from our meeting and hope we can come to
an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved
Surface.pdf”. I would like to propose that we definitely install the yellow
39
highlighted area for fire department paved access, but would like to confirm
acceptance of using Illinois Street and W. 136th Street as part of our required
“paved surfaces” due to their proximity to our jobsite. Can you please confirm
acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
40
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Tuesday, July 22, 2014 1:02 PM
To:Mishler, Nicholas F
Cc:Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject:Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hi Nick,
Due to the very wet spring/summer, we still have not completed our slab pours or the asphalt paving. We are
hoping to make some headway and should hopefully be complete by the end of this month.
Just for my knowledge, has the contractor not been in touch with you or your department?
Thank you,
Bernida Egging
Vice President of Construction
Spectrum
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
On Jul 22, 2014, at 11:54 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Hi Bernida, I just wanted to see if you had any updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
41
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, June 13, 2014 12:18 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Hello Nick,
Do to the weather, we have not completed the slab pours or the asphalt drive yet. Once we do,
we will have our contractor contact CFD for “inspection” and approval to start going vertical.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, June 12, 2014 12:09 PM
To: Bernida Egging
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Hi Bernida-
42
The GC for this job was in our office today asking about the status of this project. I had told him
the last update I had was from March 31 that we were still waiting on CFD access and fire
hydrants before we can give a full release to bring materials on site. Do you have any further
updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Mishler, Nicholas F
Sent: Monday, March 31, 2014 11:55 AM
To: 'Bernida Egging'
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Hi Bernida-
I will be out of the office next week so I’m trying to get an idea of where all of the current
projects stand so I can let Pam know. Do you have any updates on the Fire Department access,
as well as installation of the fire hydrants?
Thanks,
43
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, February 18, 2014 12:52 PM
To: Mishler, Nicholas F
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Hi Nick,
I am just touching base with you to see if you and Bruce were able to meet regarding the unit
numbering at Carmel Senior Living last week. Please advise if there are any questions or
concerns that I may answer.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
44
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, February 10, 2014 8:45 AM
To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the
access need was stated as paved/binder all around the loop of the building and all hydrants to be
in place and working prior to vertical construction and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be
monitored. Emergency apparatus will need to have access 24/7 . Having access to only half or
less of the building (prosed highlighted access) will make it impossible to quickly deal with an
emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once
committed to the access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access
were not provided.
#5. The limited parking and extra space on this site is going to make it difficult for construction
equipment (and vehicles) to allow for 24/7 emergency access without altering the loop road
binder, and our experience shows that dirt and or gravel has not held up in the past and does not
support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
45
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we
discussed the unit numbering as well as the required paved surface for our construction project
prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options
address your concerns from our meeting and hope we can come to an agreement on how to
proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would
like to propose that we definitely install the yellow highlighted area for fire department paved
access, but would like to confirm acceptance of using Illinois Street and W. 136th Street as part
of our required “paved surfaces” due to their proximity to our jobsite. Can you please confirm
acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
46
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
47
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Friday, June 13, 2014 12:18 PM
To:Mishler, Nicholas F
Cc:Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject:RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick,
Do to the weather, we have not completed the slab pours or the asphalt drive yet. Once we do, we will have our
contractor contact CFD for “inspection” and approval to start going vertical.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, June 12, 2014 12:09 PM
To: Bernida Egging
Cc: Knott, Bruce; Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hi Bernida-
The GC for this job was in our office today asking about the status of this project. I had told him the last update
I had was from March 31 that we were still waiting on CFD access and fire hydrants before we can give a full
release to bring materials on site. Do you have any further updates on this?
Thanks,
48
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Mishler, Nicholas F
Sent: Monday, March 31, 2014 11:55 AM
To: 'Bernida Egging'
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hi Bernida-
I will be out of the office next week so I’m trying to get an idea of where all of the current projects stand so I
can let Pam know. Do you have any updates on the Fire Department access, as well as installation of the fire
hydrants?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
49
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, February 18, 2014 12:52 PM
To: Mishler, Nicholas F
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hi Nick,
I am just touching base with you to see if you and Bruce were able to meet regarding the unit numbering at
Carmel Senior Living last week. Please advise if there are any questions or concerns that I may answer.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, February 10, 2014 8:45 AM
To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida,
50
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the access need was
stated as paved/binder all around the loop of the building and all hydrants to be in place and working prior to
vertical construction and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be monitored. Emergency
apparatus will need to have access 24/7 . Having access to only half or less of the building (prosed highlighted
access) will make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the
access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access were not
provided.
#5. The limited parking and extra space on this site is going to make it difficult for construction equipment (and
vehicles) to allow for 24/7 emergency access without altering the loop road binder, and our experience shows
that dirt and or gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit
numbering as well as the required paved surface for our construction project prior to going vertical.
51
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to confirm
acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces” due to their
proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
52
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Thursday, June 12, 2014 9:28 AM
To:Mishler, Nicholas F
Cc:Knott, Bruce
Subject:Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
I have no information. Maybe Bruce knows something.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On Jun 12, 2014, at 9:19 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Hey guys, do you have any updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ellison, Christopher M
Sent: Monday, March 31, 2014 11:54 AM
To: Knott, Bruce
Cc: Mishler, Nicholas F
Subject: Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
We have not received any updates from them in reference to Fire dept access and installation of fire
hydrants.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On Mar 31, 2014, at 11:47 AM, "Knott, Bruce" <BKnott@carmel.in.gov> wrote:
I thought this was already done, I will look at the old emails
From: Mishler, Nicholas F
Sent: Monday, March 31, 2014 11:28 AM
To: Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Hey guys, any updates on this one?
Thanks,
53
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ellison, Christopher M
Sent: Tuesday, March 04, 2014 10:32 AM
To: Mishler, Nicholas F
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
From: Knott, Bruce
Sent: Monday, February 10, 2014 10:45 AM
To: 'Bernida Egging'; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in
which the access need was stated as paved/binder all around the loop of the building
and all hydrants to be in place and working prior to vertical construction and wood on
the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be
monitored. Emergency apparatus will need to have access 24/7 . Having access to only
half or less of the building (prosed highlighted access) will make it impossible to quickly
deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around
once committed to the access road.
#4. Required hydrants on the East side of the site would not be accessible if the
complete access were not provided.
#5. The limited parking and extra space on this site is going to make it difficult for
construction equipment (and vehicles) to allow for 24/7 emergency access without
altering the loop road binder, and our experience shows that dirt and or gravel has not
held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
54
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical
Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we
discussed the unit numbering as well as the required paved surface for our construction
project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe
these options address your concerns from our meeting and hope we can
come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved
Surface.pdf”. I would like to propose that we definitely install the
yellow highlighted area for fire department paved access, but would like
to confirm acceptance of using Illinois Street and W. 136th Street as part
of our required “paved surfaces” due to their proximity to our jobsite.
Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
55
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Monday, March 31, 2014 11:54 AM
To:Knott, Bruce
Cc:Mishler, Nicholas F
Subject:Re: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
We have not received any updates from them in reference to Fire dept access and installation of fire hydrants.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On Mar 31, 2014, at 11:47 AM, "Knott, Bruce" <BKnott@carmel.in.gov> wrote:
I thought this was already done, I will look at the old emails
From: Mishler, Nicholas F
Sent: Monday, March 31, 2014 11:28 AM
To: Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hey guys, any updates on this one?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ellison, Christopher M
Sent: Tuesday, March 04, 2014 10:32 AM
To: Mishler, Nicholas F
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
From: Knott, Bruce
Sent: Monday, February 10, 2014 10:45 AM
To: 'Bernida Egging'; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
56
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the access
need was stated as paved/binder all around the loop of the building and all hydrants to be in place and
working prior to vertical construction and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be monitored.
Emergency apparatus will need to have access 24/7 . Having access to only half or less of the building
(prosed highlighted access) will make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once committed to
the access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access were
not provided.
#5. The limited parking and extra space on this site is going to make it difficult for construction
equipment (and vehicles) to allow for 24/7 emergency access without altering the loop road binder, and
our experience shows that dirt and or gravel has not held up in the past and does not support the
emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the
unit numbering as well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options
address your concerns from our meeting and hope we can come to an agreement on
how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would
like to propose that we definitely install the yellow highlighted area for fire department
paved access, but would like to confirm acceptance of using Illinois Street and W. 136th
Street as part of our required “paved surfaces” due to their proximity to our jobsite.
Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
57
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
58
Mishler, Nicholas F
From:Knott, Bruce
Sent:Monday, March 31, 2014 11:52 AM
To:Mishler, Nicholas F
Cc:Ellison, Christopher M
Subject:FW: addressing
I am finding no responses since I sent this email.
No responses to the site requirements either.
From: Knott, Bruce
Sent: Tuesday, February 18, 2014 3:15 PM
To: 'Bernida Egging (begging@spectrumretirement.com)'
Cc: Mishler, Nicholas F; Knott, Bruce
Subject: addressing
Hello Bernida,
Nick and I met last week, sorry my personal life got in the way last week and its been non-stop this week so far.
We like the way the addressing looks for Option #1.
We did have a question come up:
We noticed that there are signs showing numbers that don’t exist. Sometimes several numbers being skipped and just
curious about why that is? i.e. First floor (option 1) the sign shows 160-199 but there are no units 160-167.
Same thing with 130 – 199 there are no 130-139. Thought it might be for future expansion, but there are not enough
rooms in each case.
We briefly discussed that the signs show i.e. 100 – 109, but the rooms are actually located 109 – 100. We don’t have an
issue with it, but wondered if you thought it would be an issue for the residents. Probably not, just pointing it out.
Nick please reply if I forgot anything.
Thanks, have a great Tuesday
Bruce A. Knott
Fire Marshal
City of Carmel Fire Dept.
(317) 571-2600
Honor guard logo
cfd logo
cfai_2color (2)
“Good judgement comes from experience, and a lot of that comes from bad judgement.”
Will Rogers
59
Mishler, Nicholas F
From:Knott, Bruce
Sent:Monday, March 31, 2014 11:48 AM
To:Mishler, Nicholas F; Ellison, Christopher M
Subject:RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
I thought this was already done, I will look at the old emails
From: Mishler, Nicholas F
Sent: Monday, March 31, 2014 11:28 AM
To: Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hey guys, any updates on this one?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ellison, Christopher M
Sent: Tuesday, March 04, 2014 10:32 AM
To: Mishler, Nicholas F
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
From: Knott, Bruce
Sent: Monday, February 10, 2014 10:45 AM
To: 'Bernida Egging'; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the access need was stated as
paved/binder all around the loop of the building and all hydrants to be in place and working prior to vertical
construction and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be monitored. Emergency
apparatus will need to have access 24/7 . Having access to only half or less of the building (prosed highlighted access)
will make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access were not provided.
60
#5. The limited parking and extra space on this site is going to make it difficult for construction equipment (and vehicles)
to allow for 24/7 emergency access without altering the loop road binder, and our experience shows that dirt and or
gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit numbering as
well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to
confirm acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces”
due to their proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
61
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Thursday, March 06, 2014 10:32 AM
To:Mishler, Nicholas F
Subject:RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Thank you, Nick.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, March 06, 2014 8:20 AM
To: Bernida Egging
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida, I just got a call from someone from the US Census office asking a few details about the project. I gave
her the info I knew off the top of my head but there were a few questions I didn’t know, such as gas/electric
heat and if it used wood or metal framing. I gave her your number, so she may be calling you sometime soon.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
62
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, February 10, 2014 2:11 PM
To: Knott, Bruce; Mishler, Nicholas F; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Bruce,
Thank you for your quick response! I appreciate it. I will communicate this clearly to our contractor so they
know what is expected prior to starting vertical construction and staging wood onsite.
I look forward to hearing from you and/or Nick regarding the unit numbering later this week.
As always, please feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
63
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, February 10, 2014 8:45 AM
To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the access need was
stated as paved/binder all around the loop of the building and all hydrants to be in place and working prior to
vertical construction and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be monitored. Emergency
apparatus will need to have access 24/7 . Having access to only half or less of the building (prosed highlighted
access) will make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the
access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access were not
provided.
#5. The limited parking and extra space on this site is going to make it difficult for construction equipment (and
vehicles) to allow for 24/7 emergency access without altering the loop road binder, and our experience shows
that dirt and or gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
64
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit
numbering as well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to confirm
acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces” due to their
proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
65
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
66
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Tuesday, March 04, 2014 10:33 AM
To:Mishler, Nicholas F
Subject:RE: Spectrum Sr Living
See the e-mail Bruce Knott sent on 2/10/14. We are still needing confirmation that all Fire hydrants in service and
asphalt binder are in place for the loop road.
Thanks,
Chris Ellison
CFD
From: Mishler, Nicholas F
Sent: Tuesday, March 04, 2014 9:10 AM
To: Ellison, Christopher M
Subject: Spectrum Sr Living
Chris, is the Spectrum Senior Living cleared for full release? I still show that it’s foundation only pending your approval.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
67
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Tuesday, March 04, 2014 10:32 AM
To:Mishler, Nicholas F
Subject:FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
From: Knott, Bruce
Sent: Monday, February 10, 2014 10:45 AM
To: 'Bernida Egging'; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the access need was stated as
paved/binder all around the loop of the building and all hydrants to be in place and working prior to vertical
construction and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be monitored. Emergency
apparatus will need to have access 24/7 . Having access to only half or less of the building (prosed highlighted access)
will make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access were not provided.
#5. The limited parking and extra space on this site is going to make it difficult for construction equipment (and vehicles)
to allow for 24/7 emergency access without altering the loop road binder, and our experience shows that dirt and or
gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit numbering as
well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
68
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to
confirm acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces”
due to their proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
69
Mishler, Nicholas F
From:Knott, Bruce
Sent:Tuesday, February 18, 2014 3:15 PM
To:'Bernida Egging (begging@spectrumretirement.com)'
Cc:Mishler, Nicholas F; Knott, Bruce
Subject:addressing
Hello Bernida,
Nick and I met last week, sorry my personal life got in the way last week and its been non-stop this week so far.
We like the way the addressing looks for Option #1.
We did have a question come up:
We noticed that there are signs showing numbers that don’t exist. Sometimes several numbers being skipped and just
curious about why that is? i.e. First floor (option 1) the sign shows 160-199 but there are no units 160-167.
Same thing with 130 – 199 there are no 130-139. Thought it might be for future expansion, but there are not enough
rooms in each case.
We briefly discussed that the signs show i.e. 100 – 109, but the rooms are actually located 109 – 100. We don’t have an
issue with it, but wondered if you thought it would be an issue for the residents. Probably not, just pointing it out.
Nick please reply if I forgot anything.
Thanks, have a great Tuesday
Bruce A. Knott
Fire Marshal
City of Carmel Fire Dept.
(317) 571-2600
Honor guard logo
cfd logo
cfai_2color (2)
“Good judgement comes from experience, and a lot of that comes from bad judgement.”
Will Rogers
70
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Tuesday, February 18, 2014 12:52 PM
To:Mishler, Nicholas F
Subject:FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hi Nick,
I am just touching base with you to see if you and Bruce were able to meet regarding the unit numbering at Carmel
Senior Living last week. Please advise if there are any questions or concerns that I may answer.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, February 10, 2014 8:45 AM
To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the access need was
stated as paved/binder all around the loop of the building and all hydrants to be in place and working prior to
vertical construction and wood on the site.
Part of the issue with this site is that:
71
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be monitored. Emergency
apparatus will need to have access 24/7 . Having access to only half or less of the building (prosed highlighted
access) will make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the
access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access were not
provided.
#5. The limited parking and extra space on this site is going to make it difficult for construction equipment (and
vehicles) to allow for 24/7 emergency access without altering the loop road binder, and our experience shows
that dirt and or gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit
numbering as well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
72
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to confirm
acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces” due to their
proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
73
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Wednesday, February 12, 2014 9:33 AM
To:Mishler, Nicholas F
Subject:Spectrum's Carmel Senior Living
Nick,
Bernida Egging, with Spectrum Retirement Communities, mentioned that she met with you regarding obtaining an
administrative adjustment to our approved, permitted, project of Carmel Senior Living at 13390 N Illinois. I have
attached the Addendum Release from IDHS. How many drawing sets do you need from me and do they need the signed
stickers?
Thank you,
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0834 direct | designwithinsight.com
74
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Monday, February 10, 2014 2:11 PM
To:Knott, Bruce; Mishler, Nicholas F; Ellison, Christopher M
Subject:RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Bruce,
Thank you for your quick response! I appreciate it. I will communicate this clearly to our contractor so they know what
is expected prior to starting vertical construction and staging wood onsite.
I look forward to hearing from you and/or Nick regarding the unit numbering later this week.
As always, please feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, February 10, 2014 8:45 AM
To: Bernida Egging; Mishler, Nicholas F; Ellison, Christopher M
Cc: Knott, Bruce
Subject: RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
75
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the access need was
stated as paved/binder all around the loop of the building and all hydrants to be in place and working prior to
vertical construction and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be monitored. Emergency
apparatus will need to have access 24/7 . Having access to only half or less of the building (prosed highlighted
access) will make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the
access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access were not
provided.
#5. The limited parking and extra space on this site is going to make it difficult for construction equipment (and
vehicles) to allow for 24/7 emergency access without altering the loop road binder, and our experience shows
that dirt and or gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit
numbering as well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
76
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to confirm
acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces” due to their
proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
77
Mishler, Nicholas F
From:Knott, Bruce
Sent:Monday, February 10, 2014 10:46 AM
To:Mishler, Nicholas F
Subject:RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
10am Wednesday ?
From: Mishler, Nicholas F
Sent: Monday, February 10, 2014 8:28 AM
To: Knott, Bruce
Subject: FW: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bruce, do you want to stop over sometime this week and go over these?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit numbering as
well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to
confirm acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces”
due to their proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
78
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
79
Mishler, Nicholas F
From:Knott, Bruce
Sent:Monday, February 10, 2014 10:45 AM
To:'Bernida Egging'; Mishler, Nicholas F; Ellison, Christopher M
Cc:Knott, Bruce
Subject:RE: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Bernida,
Nick Mishler and I are meeting this week to look over the addressing.
As far as the access to the site goes, there was a TAC meeting on Sept. 17th 2013 in which the access need was stated as
paved/binder all around the loop of the building and all hydrants to be in place and working prior to vertical
construction and wood on the site.
Part of the issue with this site is that:
#1. there is only one access point from a public road.
#2. The proposed access loop has very limited parking which will have to constantly be monitored. Emergency
apparatus will need to have access 24/7 . Having access to only half or less of the building (prosed highlighted access)
will make it impossible to quickly deal with an emergency.
#3. The proposed highlighted access serves no options to turn fire apparatus around once committed to the access road.
#4. Required hydrants on the East side of the site would not be accessible if the complete access were not provided.
#5. The limited parking and extra space on this site is going to make it difficult for construction equipment (and vehicles)
to allow for 24/7 emergency access without altering the loop road binder, and our experience shows that dirt and or
gravel has not held up in the past and does not support the emergency equipment.
Thank you,
Bruce Knott
Fire Marshal
Carmel Fire Dept.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, February 07, 2014 4:57 PM
To: Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject: Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit numbering as
well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to
confirm acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces”
due to their proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
80
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
81
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Friday, February 07, 2014 4:57 PM
To:Mishler, Nicholas F; Knott, Bruce; Ellison, Christopher M
Subject:Carmel Senior Living: Unit Numbering & Emergency Access for Vertical Construction
Hello Nick, Bruce and Chris,
I wanted to follow up with you regarding our meeting on January 22, 2014 in which we discussed the unit numbering as
well as the required paved surface for our construction project prior to going vertical.
1. Unit Numbering
a. I have attached two possible solutions for our unit numbering. I believe these options address your
concerns from our meeting and hope we can come to an agreement on how to proceed.
2. Paved Surface for Going Vertical
a. Please see the attached pdf named “Carmel – FD Required Paved Surface.pdf”. I would like to propose
that we definitely install the yellow highlighted area for fire department paved access, but would like to
confirm acceptance of using Illinois Street and W. 136th Street as part of our required “paved surfaces”
due to their proximity to our jobsite. Can you please confirm acceptance of this?
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
82
Mishler, Nicholas F
From:Lux, Pamela K
Sent:Wednesday, January 22, 2014 2:08 PM
To:Mishler, Nicholas F
Subject:FW: W110381 Highpointe on Meridian
Pam Lux
Building and Code Services
City of Carmel
From: Colin Patterson [mailto:pattersonc@weihe.net]
Sent: Wednesday, January 22, 2014 2:07 PM
To: Lux, Pamela K
Subject: RE: W110381 Highpointe on Meridian
Certainly. This is a complicated project.
The Highpointe on Meridian development is split into three Blocks, per the recorded plat.
Block 1 is now owned by Spectrum Retirement Communities LLC. This is the assisted living facility now under
construction closest to the round-a-bout of 136th Street and Illinois Street, the west end of the site. You may have been
contacted by Bernida Egging and/or Mike Longfellow, from Spectrum Retirement Communities; or Scott Boal, Ron
Bokinski, and/or Joni Benvenuti of Catamount Construction; or Laura Scott (the architect).
Block 2 will be owned by JC Hart Company, Inc. This will be the apartment project constructed by JC Hart, more or less
in the middle of the Highpointe on Meridian development. Construction will start in the spring. The architect, Weaver
Sherman & Associates, contacted you regarding addresses for this project.
Block 3 is still owned by Frank Regan. This is the block on the west end of Highpointe on Meridian. There will eventually
be a commercial building constructed here.
Does this help?
Thank you,
Colin R. Patterson, P.E.
Project Manager, Residential Development
Weihe Engineers, Inc.
317 | 846 - 6611
weihe.net
From: Lux, Pamela K [mailto:plux@carmel.in.gov]
Sent: Wednesday, January 22, 2014 1:23 PM
To: Colin Patterson
Subject: RE: W110381 Highpointe on Meridian
Hi Colin-
Can you clarify is Highpointe on Meridian the same thing as Spectrum Retirement Communities? We are getting
different people calling it different names. I have been working with Nick Mishler—he is just as confused as I
am…………..Thanks for your help.
83
Pam Lux
Building and Code Services
City of Carmel
From: Colin Patterson [mailto:pattersonc@weihe.net]
Sent: Tuesday, January 21, 2014 4:55 PM
To: Lux, Pamela K
Subject: RE: W110381 Highpointe on Meridian
Pam,
Attached is the recorded Plat for your records.
I apologize for not sending this to you sooner.
Thank you,
Colin R. Patterson, P.E.
Project Manager, Residential Development
Weihe Engineers, Inc.
317 | 846 - 6611
weihe.net
From: Lux, Pamela K [mailto:plux@carmel.in.gov]
Sent: Tuesday, January 21, 2014 4:28 PM
To: Colin Patterson
Subject: RE: W110381 Highpointe on Meridian
Hi Colin-
Someone from Hamilton County is asking for clarification of Highpointe on Meridian. Do you have a secondary plat yet?
Pam Lux
Building and Code Services
City of Carmel
From: Colin Patterson [mailto:pattersonc@weihe.net]
Sent: Monday, July 08, 2013 3:03 PM
To: Lux, Pamela K
Subject: RE: W110381 Highpointe on Meridian
We are finalizing the Secondary Plat for all three blocks (Spectrum, JC Hart, Regan).
Would you like me to send you a pdf of what we have right now?
Thank you,
Colin R. Patterson, P.E.
Project Manager, Residential Development
Weihe Engineers, Inc.
317 | 846 - 6611
weihe.net
From: Lux, Pamela K [mailto:plux@carmel.in.gov]
Sent: Monday, July 08, 2013 2:35 PM
To: Colin Patterson
Subject: RE: W110381 Highpointe on Meridian
Hi Colin-
Do I have a secondary plat for the Spectrum building?
84
Pam Lux
Building and Code Services
City of Carmel
From: Colin Patterson [mailto:pattersonc@weihe.net]
Sent: Monday, July 01, 2013 9:49 AM
To: Lux, Pamela K
Subject: RE: W110381 Highpointe on Meridian
Pam,
I still have not received street names for the JC Hart portion of the project. I just asked them again for those.
However, the Spectrum building will have an address on Illinois Street, right?
Have you assigned that building an address?
Thank you,l
Colin R. Patterson, P.E.
Project Manager, Residential Development
Weihe Engineers, Inc.
317 | 846 - 6611
weihe.net
From: Lux, Pamela K [mailto:plux@carmel.in.gov]
Sent: Thursday, June 20, 2013 11:35 AM
To: Colin Patterson
Subject: RE: W110381 Highpointe on Meridian
That sounds good! Thank you.
Pam Lux
Building and Code Services
City of Carmel
From: Colin Patterson [mailto:pattersonc@weihe.net]
Sent: Thursday, June 20, 2013 11:28 AM
To: Boone, Rachel M.
Cc: Lux, Pamela K; Conn, Angelina V
Subject: RE: W110381 Highpointe on Meridian
Thank you Rachel.
Pam, we asked JC Hart to provide a list of street names for their portion of the project. I will forward those to you as
soon as I receive them.
Please let me know if I need to provide any other information to you.
Thank you,
Colin R. Patterson, P.E.
Project Manager, Residential Development
Weihe Engineers, Inc.
317 | 846 - 6611
weihe.net
From: Boone, Rachel M. [mailto:rboone@carmel.in.gov]
Sent: Thursday, June 20, 2013 11:15 AM
To: Colin Patterson
85
Cc: Lux, Pamela K; Conn, Angelina V
Subject: RE: W110381 Highpointe on Meridian
Hi Colin,
I believe you will need to speak with Pam Lux in our Building and Code Services Dept. She is the one who assigns address
numbers. She is copied on this email and should be able to help you through the process.
Thanks,
Rachel
Rachel Boone
Planning Administrator
City of Carmel
Department of Community Services - 3rd Floor
One Civic Square
Carmel, IN 46032
317-571-2417
317.571.2426 fax
From: Colin Patterson [mailto:pattersonc@weihe.net]
Sent: Wednesday, June 19, 2013 4:30 PM
To: Boone, Rachel M.
Subject: W110381 Highpointe on Meridian
Rachel,
What is the process to get street names and addresses for the proposed structures on the JC Hart/Spectrum Highpointe
on Meridian project?
Thank you,
cid:image001.jpg@01CC5044.EEBBE030
Colin R. Patterson, P.E.
Project Manager, Residential Development
Weihe Engineers, Inc.
10505 N. College Avenue
Indianapolis, Indiana 46280
317 | 846 - 6611
800 | 452 - 6408
317 | 843 - 0546 fax
317 | 989 - 6564 mobile
weihe.net
This message and any files transmitted with it are confidential, may contain privileged information which is intended solely for the receipt, use and benefit of the intended
recipient of this email. If you are not the intended recipient, be advised that dissemination, distribution, printing or copying of this message is strictly prohibited and may result
in legal liability on your behalf. If you receive this message in error, or are not the named recipient, please notify the sender at either the email address or telephone number
above and delete this email from your computer. Thank you.
86
Mishler, Nicholas F
From:Hohlt, William G
Sent:Friday, January 17, 2014 10:33 AM
To:Mishler, Nicholas F
Subject:Re: Spectrum
Sure
Does she need CFD also
William Hohlt
Deputy Building Commissioner
City of Carmel
On Jan 17, 2014, at 9:50 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Can you sit in the meeting next Wed at 9:30 with Bernida Egging? Here is her note:
Hello,
This will be a quick meeting at 9:30 a.m. on Wednesday, 01/22/14 to review/discuss the unit numbering
at our Carmel Senior Living facility at 13390 Illinois Street.
I would also like to take some time at the end of the meeting to quickly discuss the fire access road
requirements in addition to building turnover in regards to furnishings, TCO/CO, etc.
I look forward to meeting with you.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
87
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Friday, January 17, 2014 9:29 AM
To:Knott, Bruce; Mishler, Nicholas F
Cc:Ellison, Christopher M
Subject:RE: Carmel Senior Living: Suite #s
Hi Bruce,
9:30 a.m. works for me. I look forward to sitting down with you.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Friday, January 17, 2014 6:39 AM
To: Bernida Egging; Mishler, Nicholas F
Cc: Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Can we make it a little later in the morning? I have a talk with our new employees until 09:00, so 09:30 should
be fine.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, January 16, 2014 2:52 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Hi Nick, et al.
88
Would 9:00 a.m. on Wednesday, 01/22/14 work for you? If so, I will plan to meet you at Building & Code
Services office.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, January 16, 2014 11:02 AM
To: Bernida Egging
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Any day in the morning would work for me. Bruce?
Thanks,
Nick Mishler
Administrative Assistant
89
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Wednesday, January 15, 2014 6:44 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Hello Nick,
I was finally able to sit down with our Operations Department this afternoon and review the unit numbering
modifications that you had sent over and they had some additional comments. I was hoping I could sit down
with you, Bruce and/or Chris to discuss their questions/concerns regarding the revised numbering.
I will be in Carmel next week from Tuesday, 01/21/14 at 10:00 a.m. through Wednesday, 01/22/14 at 12:00
p.m. (noon). Would you have the ability to sit down and discuss the unit numbers at that time? Please advise.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
90
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, January 02, 2014 12:28 PM
To: Bernida Egging
Cc: Knott, Bruce
Subject: Suite #s
Hi Bernida, sorry for the delay in getting these back to you. Please see the attached suite numbers and let me
know if they are acceptable to you. If you have any concerns, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
91
Mishler, Nicholas F
From:Knott, Bruce
Sent:Friday, January 17, 2014 8:39 AM
To:'Bernida Egging'; Mishler, Nicholas F
Cc:Ellison, Christopher M
Subject:RE: Carmel Senior Living: Suite #s
Can we make it a little later in the morning? I have a talk with our new employees until 09:00, so 09:30 should be fine.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, January 16, 2014 2:52 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Hi Nick, et al.
Would 9:00 a.m. on Wednesday, 01/22/14 work for you? If so, I will plan to meet you at Building & Code Services office.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, January 16, 2014 11:02 AM
To: Bernida Egging
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Any day in the morning would work for me. Bruce?
92
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Wednesday, January 15, 2014 6:44 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Hello Nick,
I was finally able to sit down with our Operations Department this afternoon and review the unit numbering
modifications that you had sent over and they had some additional comments. I was hoping I could sit down
with you, Bruce and/or Chris to discuss their questions/concerns regarding the revised numbering.
I will be in Carmel next week from Tuesday, 01/21/14 at 10:00 a.m. through Wednesday, 01/22/14 at 12:00
p.m. (noon). Would you have the ability to sit down and discuss the unit numbers at that time? Please advise.
Thank you,
Bernida Egging
Vice President of Construction
93
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, January 02, 2014 12:28 PM
To: Bernida Egging
Cc: Knott, Bruce
Subject: Suite #s
Hi Bernida, sorry for the delay in getting these back to you. Please see the attached suite numbers and let me
know if they are acceptable to you. If you have any concerns, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
94
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Thursday, January 16, 2014 2:52 PM
To:Mishler, Nicholas F
Cc:Knott, Bruce; Ellison, Christopher M
Subject:RE: Carmel Senior Living: Suite #s
Hi Nick, et al.
Would 9:00 a.m. on Wednesday, 01/22/14 work for you? If so, I will plan to meet you at Building & Code Services office.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, January 16, 2014 11:02 AM
To: Bernida Egging
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Any day in the morning would work for me. Bruce?
Thanks,
Nick Mishler
Administrative Assistant
95
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Wednesday, January 15, 2014 6:44 PM
To: Mishler, Nicholas F
Cc: Knott, Bruce; Ellison, Christopher M
Subject: RE: Carmel Senior Living: Suite #s
Hello Nick,
I was finally able to sit down with our Operations Department this afternoon and review the unit numbering
modifications that you had sent over and they had some additional comments. I was hoping I could sit down
with you, Bruce and/or Chris to discuss their questions/concerns regarding the revised numbering.
I will be in Carmel next week from Tuesday, 01/21/14 at 10:00 a.m. through Wednesday, 01/22/14 at 12:00
p.m. (noon). Would you have the ability to sit down and discuss the unit numbers at that time? Please advise.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
96
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, January 02, 2014 12:28 PM
To: Bernida Egging
Cc: Knott, Bruce
Subject: Suite #s
Hi Bernida, sorry for the delay in getting these back to you. Please see the attached suite numbers and let me
know if they are acceptable to you. If you have any concerns, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
97
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Wednesday, January 15, 2014 6:44 PM
To:Mishler, Nicholas F
Cc:Knott, Bruce; Ellison, Christopher M
Subject:RE: Carmel Senior Living: Suite #s
Hello Nick,
I was finally able to sit down with our Operations Department this afternoon and review the unit numbering
modifications that you had sent over and they had some additional comments. I was hoping I could sit down with you,
Bruce and/or Chris to discuss their questions/concerns regarding the revised numbering.
I will be in Carmel next week from Tuesday, 01/21/14 at 10:00 a.m. through Wednesday, 01/22/14 at 12:00 p.m.
(noon). Would you have the ability to sit down and discuss the unit numbers at that time? Please advise.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, January 02, 2014 12:28 PM
To: Bernida Egging
Cc: Knott, Bruce
Subject: Suite #s
Hi Bernida, sorry for the delay in getting these back to you. Please see the attached suite numbers and let me
know if they are acceptable to you. If you have any concerns, let me know.
Thanks,
98
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
99
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Friday, December 13, 2013 10:45 AM
To:Mishler, Nicholas F; 'Laura Scott'; 'Jana Bee Triplett'; Scott Boal; Ron Bokinskie
Subject:Carmel: Full Building Permit Release
Team,
I wanted to circle back with the entire team regarding the status of our full building permit. This has been approved by
the State of Indiana and City of Carmel.
I was able to confirm this morning that the Carmel Fire Department has released us for a “foundation only” permit until
we install our engineered road and have active hydrants. Once those are in, we are automatically released with the full
building permit.
Feel free to contact me with any questions or concerns.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
100
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Thursday, November 07, 2013 2:27 PM
To:Mishler, Nicholas F
Subject:RE: Spectrum Retirement Address revision
Thank you, Nick. The modified address with no “N.” is noted.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, November 07, 2013 9:07 AM
To: Bernida Egging
Subject: FW: Spectrum Retirement Address revision
Bernida, FYI…see below.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
101
P Please consider the environment before printing this email
From: Lux, Pamela K
Sent: Thursday, November 07, 2013 10:26 AM
To: Campbell, Scott; Conn, Angelina V; Daley, Penny J; Darren Wilson; Donahue-Wold, Alexia K; Duffy,
John M; Ellison, Christopher M; Keesling, Rachel M; Kempa, Lisa L; 'Kirkman, Jason'; Knott, Bruce;
Krueskamp, Theresa A; Stewart, Lisa M; McCoy, David W; Meri Seedorf; Mishler, Nicholas F; 'Owens,
Cynthia'; 'Richardson, Mary A'; 'Schwemmin, Bonnie'; Shanayda, Kurt A; Spears, Jack J
Subject: Spectrum Retirement Address revision
I just spoke to Amber Hawkins at Hamilton County E911. She let me know the address should be 13390 Illinois
St. There should not be a N designation on this. If you have any questions, please let me know. Thank you.
Pam Lux
Building and Code Services
City of Carmel
102
Mishler, Nicholas F
From:Lux, Pamela K
Sent:Thursday, November 07, 2013 10:26 AM
To:Campbell, Scott; Conn, Angelina V; Daley, Penny J; Darren Wilson; Donahue-Wold, Alexia K;
Duffy, John M; Ellison, Christopher M; Keesling, Rachel M; Kempa, Lisa L; 'Kirkman, Jason';
Knott, Bruce; Krueskamp, Theresa A; Stewart, Lisa M; McCoy, David W; Meri Seedorf;
Mishler, Nicholas F; 'Owens, Cynthia'; 'Richardson, Mary A'; 'Schwemmin, Bonnie'; Shanayda,
Kurt A; Spears, Jack J
Subject:Spectrum Retirement Address revision
I just spoke to Amber Hawkins at Hamilton County E911. She let me know the address should be 13390 Illinois St. There
should not be a N designation on this. If you have any questions, please let me know. Thank you.
Pam Lux
Building and Code Services
City of Carmel
103
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Tuesday, November 05, 2013 3:38 PM
To:Mishler, Nicholas F
Subject:Permit #13100019 Carmel Senior Living
Nick,
It is my understanding that permits were granted for foundation package and full building yesterday. The full building
drawings that you have reviewed for permit release include the Addendum #1 to revise the building slab. Addendum #1
for the full building was reviewed and the release received from IDHS. Since the full building drawings are all
encompassing do we even need to concern ourselves with a foundation permit? Do you still need the Addendum #1
revised foundation only drawings?
Please advise.
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0834 direct | designwithinsight.com
104
Mishler, Nicholas F
From:Scott Boal [SBoal@catamountinc.com]
Sent:Wednesday, October 30, 2013 5:03 PM
To:Mishler, Nicholas F
Cc:'Bernida Egging'
Subject:RE: Permit ready for pick-up
Thanks, Nick. We will be in town on Monday doing our Engineering Pre-Con on site. I expect we will be by to pick it up
after that.
Scott Boal
Catamount Constructors, Inc.
T 303.679.4264
F 303.679.1506
C 303.944.5289
www.catamountinc.com
Atlanta…Denver...Hartford…San Antonio...Savannah
CATAMOUNT OPERATES GREEN. Please print this e-mail only if necessary
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, October 30, 2013 2:17 PM
To: Scott Boal
Cc: 'Bernida Egging'
Subject: Permit ready for pick-up
Good afternoon-
The following building permit has been reviewed and is now ready for pick-up. I have attached an invoice for a breakdown of the fees.
**********
Carmel Senior Living @ 13390 N. Illinois St.
Cost: $184,527.90
**********
We accept exact cash or check. If paying by check, please make your check payable to City of Carmel.
Our office is open for financial transactions from 8:00am until 4:30pm, Monday through Friday.
If you have any questions, please feel free to contact our office at (317) 571-2444.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
105
Mishler, Nicholas F
From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov]
Sent:Wednesday, October 30, 2013 4:06 PM
To:Mishler, Nicholas F
Subject:RE: Carmel Senior Living
Yes, we stamped plans today. Still waiting on a bond, but you can let them go. Thanks.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, October 30, 2013 4:03 PM
To: Greg R. Hoyes
Subject: Carmel Senior Living
Hi Greg, is Carmel Senior Living (Spectrum) at 13390 N. Illinois St. ok to issue with your department? I just wanted to make absolutely sure
before I call them.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
106
Mishler, Nicholas F
From:Foley, Amanda J
Sent:Wednesday, October 30, 2013 12:32 PM
To:Mishler, Nicholas F
Cc:Thomas, John G
Subject:RE: Carmel Senior Living
We have approved the construction plans. They need to submit a Stormwater Management Permit application specific
to the site. Their preconstruction meeting is scheduled for next Monday 11/4.
From: Mishler, Nicholas F
Sent: Wednesday, October 30, 2013 11:32 AM
To: Foley, Amanda J
Cc: Thomas, John G
Subject: RE: Carmel Senior Living
Amanda, any updates on this? The builder is claiming they received the OK from Engineering last Friday.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Foley, Amanda J
Sent: Wednesday, October 23, 2013 9:21 AM
To: Mishler, Nicholas F
Cc: Thomas, John G
Subject: RE: Carmel Senior Living
Nick,
We are still waiting on one last revision on the construction plans. I will keep you updated.
Thanks for checking with us.
Amanda
From: Mishler, Nicholas F
Sent: Wednesday, October 23, 2013 9:07 AM
To: Foley, Amanda J
Cc: Thomas, John G
Subject: Carmel Senior Living
Amanda-
are you OK with the Carmel Senior Living (Spectrum) project being released?
Thanks,
Nick Mishler
107
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
108
Mishler, Nicholas F
From:Thomas, John G
Sent:Wednesday, October 30, 2013 11:32 AM
To:Mishler, Nicholas F
Subject:Automatic reply: Carmel Senior Living
Thank you for your email, but I will out of the office until Monday, November 4th. I will respond as soon as possible upon my return.
If you have need of immediate assistance, please call the Engineering Department at 317-571-2441.
Sincerely,
John Thomas
109
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Wednesday, October 30, 2013 11:22 AM
To:Mishler, Nicholas F
Subject:RE: Carmel Senior Living
Nick,
The Owner told me that the project received Engineering sign-off last Friday, but I have not heard anything from your
office on plan review status or permit approval.
Thank you,
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0834 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 24, 2013 11:50 AM
To: Laura Scott
Subject: RE: Carmel Senior Living
Engineering is still reviewing the plans according to Amanda Foley yesterday. I can tell you that the fees will be $184,527.90 once the permit is ready
to go. I have attached an invoice so you can see the fee breakdown.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Laura Scott [mailto:lscott@designwithinsight.com]
Sent: Thursday, October 24, 2013 12:15 PM
To: Mishler, Nicholas F
Subject: Carmel Senior Living
Nick,
I’m doing my weekly follow up on Carmel Senior Living. Is Engineering still reviewing the footings and foundations?
Have you been able to determine the permit fees? Also, I have attached the release from IDHS for the Addendum.
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0834 direct | designwithinsight.com
110
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Thursday, October 24, 2013 3:55 PM
To:Mishler, Nicholas F
Subject:RE: Carmel Senior Living
Nick,
Do we know what the delay is with Engineering? I believe that in the meeting back in September they told the Owner
that they would not do anything to hold up the review and permit issue. Any insight you have would be greatly
appreciated. Thank you for the permit fee amount.
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0834 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 24, 2013 11:50 AM
To: Laura Scott
Subject: RE: Carmel Senior Living
Engineering is still reviewing the plans according to Amanda Foley yesterday. I can tell you that the fees will be $184,527.90 once the permit is ready
to go. I have attached an invoice so you can see the fee breakdown.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Laura Scott [mailto:lscott@designwithinsight.com]
Sent: Thursday, October 24, 2013 12:15 PM
To: Mishler, Nicholas F
Subject: Carmel Senior Living
Nick,
I’m doing my weekly follow up on Carmel Senior Living. Is Engineering still reviewing the footings and foundations?
Have you been able to determine the permit fees? Also, I have attached the release from IDHS for the Addendum.
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0834 direct | designwithinsight.com
111
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Thursday, October 24, 2013 12:15 PM
To:Mishler, Nicholas F
Subject:Carmel Senior Living
Nick,
I’m doing my weekly follow up on Carmel Senior Living. Is Engineering still reviewing the footings and foundations?
Have you been able to determine the permit fees? Also, I have attached the release from IDHS for the Addendum.
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0834 direct | designwithinsight.com
112
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Wednesday, October 23, 2013 9:41 AM
To:Mishler, Nicholas F
Subject:RE: Suite #s
Hello Nick,
It appears that they sent over some final comments on Monday for our civil to address. He sent them PDF copies of his
responses last night in hopes that they would give him the head nod to submit the final, stamped and signed drawings
today.
The issues that mostly have are associated with JC Hart’s property and not our portion.
I am hoping we can get this resolved soon so we can begin scheduling our pre-cons. Is there any way we could start our
pre-cons early (prior to getting engineering final approval on the entire site development plans)?
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, October 23, 2013 7:02 AM
To: Bernida Egging
Subject: RE: Suite #s
Bernida-
I believe the last department I’m waiting for to get your permit is Engineering. Do you have any updates from
them?
113
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, October 15, 2013 10:43 AM
To: Mishler, Nicholas F
Subject: RE: Suite #s
Hello Nick,
To clarify, the unit numbers are only going to be a three digit number. (Example, looking at the first floor plan,
top left hand corner of the page, unit numbers will be: 130, 131, etc.).
The letter designation (i.e. A1, A2, B, etc.) are showing our standard room modules. We show these on the
plans to aid our construction team. All A1s are the exact same layout, all A2s are the exact same layout, all Bs
are the exact same layout, etc. There will be no room designation or signage stating A1, A2, etc on the exterior
of the door. Only the rooms three digit number.
I hope that helps clarify what we are doing.
Thank you,
Bernida Egging
Vice President of Construction
114
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, October 15, 2013 8:33 AM
To: Bernida Egging
Subject: FW: Suite #s
Bernida-
See Bruce Knott’s comment below regarding suite numbers.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
115
From: Knott, Bruce
Sent: Tuesday, October 15, 2013 10:33 AM
To: Mishler, Nicholas F
Cc: Ellison, Christopher M
Subject: RE: Suite #s
Nick,
The numbering seems to be in order, however the labels are concerning to me. The units are A1 A2 B C1 C2
but the room labels are all over the place.
I would like to know what those individual labels are referring to and what will they be calling each of the unit
areas? Will they use A1, A2 etc. and the sub room labels also?
Thanks
From: Mishler, Nicholas F
Sent: Tuesday, October 15, 2013 9:54 AM
To: Knott, Bruce
Cc: Ellison, Christopher M
Subject: Suite #s
Bruce-
Would you and Chris be able to take a look at the attached floor plan for the Carmel Senior Living center and
let me know if these suite numbers will work?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
116
(317) 571-2489
P Please consider the environment before printing this email
117
Mishler, Nicholas F
From:Foley, Amanda J
Sent:Wednesday, October 23, 2013 9:21 AM
To:Mishler, Nicholas F
Cc:Thomas, John G
Subject:RE: Carmel Senior Living
Nick,
We are still waiting on one last revision on the construction plans. I will keep you updated.
Thanks for checking with us.
Amanda
From: Mishler, Nicholas F
Sent: Wednesday, October 23, 2013 9:07 AM
To: Foley, Amanda J
Cc: Thomas, John G
Subject: Carmel Senior Living
Amanda-
are you OK with the Carmel Senior Living (Spectrum) project being released?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
118
Mishler, Nicholas F
From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov]
Sent:Wednesday, October 23, 2013 9:06 AM
To:Mishler, Nicholas F
Subject:RE: Carmel Senior Living
They contacted us yesterday about posting our required bond and it sounds like Engineering is ready for plan approval,
along with us, so they should be good to go. I don’t have everything I need in hand today, but sounds like it is getting
very close and we should have everything within the next week or 2. Let them get started.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, October 23, 2013 9:03 AM
To: Greg R. Hoyes
Subject: RE: Carmel Senior Living
Either/or. I was just curious where you stood on it because they’re getting close to having everything else done.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Greg R. Hoyes [mailto:Greg.Hoyes@hamiltoncounty.in.gov]
Sent: Wednesday, October 23, 2013 9:01 AM
To: Mishler, Nicholas F
Subject: RE: Carmel Senior Living
Foundation or full building?
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, October 23, 2013 9:00 AM
To: Greg R. Hoyes
Subject: Carmel Senior Living
Greg, are you OK with the Carmel Senior Living (Spectrum) project being released?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
119
Please consider the environment before printing this email
120
Mishler, Nicholas F
From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov]
Sent:Wednesday, October 23, 2013 9:01 AM
To:Mishler, Nicholas F
Subject:RE: Carmel Senior Living
Foundation or full building?
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, October 23, 2013 9:00 AM
To: Greg R. Hoyes
Subject: Carmel Senior Living
Greg, are you OK with the Carmel Senior Living (Spectrum) project being released?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
121
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Tuesday, October 15, 2013 11:49 AM
To:Lux, Pamela K
Cc:Mishler, Nicholas F
Subject:RE: Address - Spectrum Retirement Community-
Thank you, Pam.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Lux, Pamela K [mailto:plux@carmel.in.gov]
Sent: Tuesday, October 15, 2013 8:52 AM
To: Bernida Egging
Cc: Mishler, Nicholas F
Subject: Address - Spectrum Retirement Community-
Hi Bernida-
The permanent address for you Community in Carmel is as follows:
13390 N Illinois St.
Carmel, IN 46032
If you have any questions or concerns, please do not hesitate to contact me at 317-571-2288. Thank you.
122
Pam Lux
Building and Code Services
City of Carmel
123
Mishler, Nicholas F
From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com]
Sent:Tuesday, October 15, 2013 11:47 AM
To:Mishler, Nicholas F
Subject:RE: Spectrum Carmel Senior Living
Nick,
I found the information I need. Duke is set to go. Thanks
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, October 15, 2013 9:38 AM
To: Hunter, Shirley A
Subject: RE: Spectrum Carmel Senior Living
Shirley, do you have everything you need on this project?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Hunter, Shirley A [mailto:Shirley.Hunter@duke-energy.com]
Sent: Monday, July 08, 2013 5:11 PM
To: Mishler, Nicholas F
Cc: mgearheart@designwithinsight.com
Subject: RE: Spectrum Carmel Senior Living
Duke Energy has a site layout plan only. We will require a full set of construction plans when actual construction is
planned.
Shirley Hunter
Sr. Distribution Eng Specialist
Duke Energy
16475 Southpark Dr
Westfield, IN 46074
317.896.6711
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living
Good afternoon-
124
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
125
Mishler, Nicholas F
From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com]
Sent:Tuesday, October 15, 2013 11:45 AM
To:Mishler, Nicholas F
Subject:RE: Spectrum Carmel Senior Living
I am so far behind in my work, I honestly had to think hard as to what I have! Do you recall the interior street name
they were using for this building? I cannot find that detail and don’t know if I have received the service request.
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, October 15, 2013 9:38 AM
To: Hunter, Shirley A
Subject: RE: Spectrum Carmel Senior Living
Shirley, do you have everything you need on this project?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Hunter, Shirley A [mailto:Shirley.Hunter@duke-energy.com]
Sent: Monday, July 08, 2013 5:11 PM
To: Mishler, Nicholas F
Cc: mgearheart@designwithinsight.com
Subject: RE: Spectrum Carmel Senior Living
Duke Energy has a site layout plan only. We will require a full set of construction plans when actual construction is
planned.
Shirley Hunter
Sr. Distribution Eng Specialist
Duke Energy
16475 Southpark Dr
Westfield, IN 46074
317.896.6711
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living
Good afternoon-
126
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
127
Mishler, Nicholas F
From:Lux, Pamela K
Sent:Tuesday, October 15, 2013 10:52 AM
To:Bernida Egging (begging@spectrumretirement.com)
Cc:Mishler, Nicholas F
Subject:Address - Spectrum Retirement Community-
Hi Bernida-
The permanent address for you Community in Carmel is as follows:
13390 N Illinois St.
Carmel, IN 46032
If you have any questions or concerns, please do not hesitate to contact me at 317-571-2288. Thank you.
Pam Lux
Building and Code Services
City of Carmel
128
Mishler, Nicholas F
From:Lux, Pamela K
Sent:Tuesday, October 15, 2013 10:46 AM
To:Campbell, Scott; Conn, Angelina V; Daley, Penny J; Darren Wilson; Donahue-Wold, Alexia K;
Duffy, John M; Ellison, Christopher M; 'Gajownik, Brooke'; Keesling, Rachel M; Kempa, Lisa L;
'Kirkman, Jason'; Knott, Bruce; Krueskamp, Theresa A; Stewart, Lisa M; McCoy, David W;
Meri Seedorf; Mishler, Nicholas F; 'Owens, Cynthia'; 'Richardson, Mary A'; 'Schwemmin,
Bonnie'; Shanayda, Kurt A; Spears, Jack J
Subject:Spectrum Retirement Community
A new address has been assigned for Spectrum Retirement Community. This is located at approximately 136th St & N
Illinois St.
The new address is 13390 N Illinois St. Carmel, IN 46032
If you have any questions or concerns, please do not hesitate to contact me at 317-571-2288. Thank you.
Pam Lux
Building and Code Services
City of Carmel
129
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Tuesday, October 15, 2013 10:43 AM
To:Mishler, Nicholas F
Subject:RE: Suite #s
Hello Nick,
To clarify, the unit numbers are only going to be a three digit number. (Example, looking at the first floor plan, top left
hand corner of the page, unit numbers will be: 130, 131, etc.).
The letter designation (i.e. A1, A2, B, etc.) are showing our standard room modules. We show these on the plans to aid
our construction team. All A1s are the exact same layout, all A2s are the exact same layout, all Bs are the exact same
layout, etc. There will be no room designation or signage stating A1, A2, etc on the exterior of the door. Only the rooms
three digit number.
I hope that helps clarify what we are doing.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, October 15, 2013 8:33 AM
To: Bernida Egging
Subject: FW: Suite #s
Bernida-
See Bruce Knott’s comment below regarding suite numbers.
130
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Knott, Bruce
Sent: Tuesday, October 15, 2013 10:33 AM
To: Mishler, Nicholas F
Cc: Ellison, Christopher M
Subject: RE: Suite #s
Nick,
The numbering seems to be in order, however the labels are concerning to me. The units are A1 A2 B C1 C2
but the room labels are all over the place.
I would like to know what those individual labels are referring to and what will they be calling each of the unit
areas? Will they use A1, A2 etc. and the sub room labels also?
Thanks
From: Mishler, Nicholas F
Sent: Tuesday, October 15, 2013 9:54 AM
To: Knott, Bruce
Cc: Ellison, Christopher M
Subject: Suite #s
Bruce-
131
Would you and Chris be able to take a look at the attached floor plan for the Carmel Senior Living center and
let me know if these suite numbers will work?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
132
Mishler, Nicholas F
From:Knott, Bruce
Sent:Tuesday, October 15, 2013 10:33 AM
To:Mishler, Nicholas F
Cc:Ellison, Christopher M
Subject:RE: Suite #s
Nick,
The numbering seems to be in order, however the labels are concerning to me. The units are A1 A2 B C1 C2 but the
room labels are all over the place.
I would like to know what those individual labels are referring to and what will they be calling each of the unit areas?
Will they use A1, A2 etc. and the sub room labels also?
Thanks
From: Mishler, Nicholas F
Sent: Tuesday, October 15, 2013 9:54 AM
To: Knott, Bruce
Cc: Ellison, Christopher M
Subject: Suite #s
Bruce-
Would you and Chris be able to take a look at the attached floor plan for the Carmel Senior Living center and let me know if these suite numbers will
work?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
133
Mishler, Nicholas F
From:Foley, Amanda J
Sent:Tuesday, October 15, 2013 9:58 AM
To:Mishler, Nicholas F; Duncan, Gary R; Redden, Nick; Thomas, John G; Barnes, David R
Subject:RE: Carmel Senior Living
No. We have not approved the final construction plans yet.
Thanks,
Amanda
From: Mishler, Nicholas F
Sent: Tuesday, October 15, 2013 9:40 AM
To: Foley, Amanda J; Duncan, Gary R; Redden, Nick; Thomas, John G; Barnes, Jeff
Subject: Carmel Senior Living
Good morning-
Is your department ok with a foundation only release for the Carmel Senior Living Center, located at 136th St. and Illinois?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
134
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Tuesday, October 15, 2013 9:52 AM
To:Mishler, Nicholas F
Subject:RE: City of Carmel Commercial Submittal requirements
Nick,
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0834 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, October 15, 2013 8:50 AM
To: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Laura, while I’m waiting for a few other departments to get back to me, one thing I will need to calculate fees will be a breakdown of the following:
Of the 139 total units, how many:
• Assisted Living units
• Memory Care units
• Independent Living units
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Laura Scott [mailto:lscott@designwithinsight.com]
Sent: Tuesday, October 15, 2013 9:34 AM
To: Mishler, Nicholas F
Subject: RE: City of Carmel Commercial Submittal requirements
Nick,
I was just following up on the status of the permit release for the foundations of Carmel Senior Living. I know that the
Owner paid the tap fees. Is there anything else you need from me? The contractor is ready to start.
135
Thank you,
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0834 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 10, 2013 8:31 AM
To: Matt Gearheart
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Yes, I received the application last week. It is still in review but should be released soon.
I put 4 stickers in yesterday’s outgoing mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Thursday, October 10, 2013 9:29 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
Just following up on this e-mail. The Foundation application should have arrived around
last Thursday 10-3, can you verify this for us please.
The full-building drawings should be arriving at your office by Friday (tomorrow).
We do really need one more affidavit sticker to apply to an addendum for the Foundations
drawings, please let us know if you can send that soon.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Tuesday, October 08, 2013 8:22 AM
To: 'Mishler, Nicholas F'
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Good morning Nick-
Hopefully by now you have received the Foundation application. Please let me know if not and if you
need anything else. Also, we are preparing to send the full building construction drawings soon. If
possible, could we please request one additional affidavit sticker? (we are short one).
136
Thank you,
Matt Gearheart
GWH+BB
817 Wyandotte
Kansas City, MO 64105
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:12 AM
To: Matt Gearheart
Subject: RE: City of Carmel Commercial Submittal requirements
Matt, I received the two packages containing building plans, project manuals, etc. today but I have not received the permit application. I just wanted to
make sure that wasn’t supposed to be included with everything you sent…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
137
(317) 571-2489
Please consider the environment before printing this email
138
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Tuesday, October 15, 2013 9:34 AM
To:Mishler, Nicholas F
Subject:RE: City of Carmel Commercial Submittal requirements
Nick,
I was just following up on the status of the permit release for the foundations of Carmel Senior Living. I know that the
Owner paid the tap fees. Is there anything else you need from me? The contractor is ready to start.
Thank you,
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0834 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 10, 2013 8:31 AM
To: Matt Gearheart
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Yes, I received the application last week. It is still in review but should be released soon.
I put 4 stickers in yesterday’s outgoing mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Thursday, October 10, 2013 9:29 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
Just following up on this e-mail. The Foundation application should have arrived around
last Thursday 10-3, can you verify this for us please.
The full-building drawings should be arriving at your office by Friday (tomorrow).
We do really need one more affidavit sticker to apply to an addendum for the Foundations
drawings, please let us know if you can send that soon.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
139
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Tuesday, October 08, 2013 8:22 AM
To: 'Mishler, Nicholas F'
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Good morning Nick-
Hopefully by now you have received the Foundation application. Please let me know if not and if you
need anything else. Also, we are preparing to send the full building construction drawings soon. If
possible, could we please request one additional affidavit sticker? (we are short one).
Thank you,
Matt Gearheart
GWH+BB
817 Wyandotte
Kansas City, MO 64105
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:12 AM
To: Matt Gearheart
Subject: RE: City of Carmel Commercial Submittal requirements
Matt, I received the two packages containing building plans, project manuals, etc. today but I have not received the permit application. I just wanted to
make sure that wasn’t supposed to be included with everything you sent…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
140
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
141
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Thursday, October 10, 2013 9:34 AM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: City of Carmel Commercial Submittal requirements
Thank you.
much appreciated.
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 10, 2013 8:31 AM
To: Matt Gearheart
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Yes, I received the application last week. It is still in review but should be released soon.
I put 4 stickers in yesterday’s outgoing mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Thursday, October 10, 2013 9:29 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
Just following up on this e-mail. The Foundation application should have arrived around
last Thursday 10-3, can you verify this for us please.
The full-building drawings should be arriving at your office by Friday (tomorrow).
We do really need one more affidavit sticker to apply to an addendum for the Foundations
drawings, please let us know if you can send that soon.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
142
From: Matt Gearheart
Sent: Tuesday, October 08, 2013 8:22 AM
To: 'Mishler, Nicholas F'
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Good morning Nick-
Hopefully by now you have received the Foundation application. Please let me know if not and if you
need anything else. Also, we are preparing to send the full building construction drawings soon. If
possible, could we please request one additional affidavit sticker? (we are short one).
Thank you,
Matt Gearheart
GWH+BB
817 Wyandotte
Kansas City, MO 64105
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:12 AM
To: Matt Gearheart
Subject: RE: City of Carmel Commercial Submittal requirements
Matt, I received the two packages containing building plans, project manuals, etc. today but I have not received the permit application. I just wanted to
make sure that wasn’t supposed to be included with everything you sent…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
143
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
144
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Thursday, October 10, 2013 9:29 AM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: City of Carmel Commercial Submittal requirements
Nick-
Just following up on this e-mail. The Foundation application should have arrived around
last Thursday 10-3, can you verify this for us please.
The full-building drawings should be arriving at your office by Friday (tomorrow).
We do really need one more affidavit sticker to apply to an addendum for the Foundations
drawings, please let us know if you can send that soon.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Tuesday, October 08, 2013 8:22 AM
To: 'Mishler, Nicholas F'
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Good morning Nick-
Hopefully by now you have received the Foundation application. Please let me know if not and if you
need anything else. Also, we are preparing to send the full building construction drawings soon. If
possible, could we please request one additional affidavit sticker? (we are short one).
Thank you,
Matt Gearheart
GWH+BB
817 Wyandotte
Kansas City, MO 64105
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:12 AM
To: Matt Gearheart
Subject: RE: City of Carmel Commercial Submittal requirements
Matt, I received the two packages containing building plans, project manuals, etc. today but I have not received the permit application. I just wanted to
make sure that wasn’t supposed to be included with everything you sent…
Thanks,
145
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
146
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Tuesday, October 08, 2013 9:22 AM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: City of Carmel Commercial Submittal requirements
Good morning Nick-
Hopefully by now you have received the Foundation application. Please let me know if not and if you
need anything else. Also, we are preparing to send the full building construction drawings soon. If
possible, could we please request one additional affidavit sticker? (we are short one).
Thank you,
Matt Gearheart
GWH+BB
817 Wyandotte
Kansas City, MO 64105
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:12 AM
To: Matt Gearheart
Subject: RE: City of Carmel Commercial Submittal requirements
Matt, I received the two packages containing building plans, project manuals, etc. today but I have not received the permit application. I just wanted to
make sure that wasn’t supposed to be included with everything you sent…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
147
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
148
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Monday, October 07, 2013 2:37 PM
To:Mishler, Nicholas F
Subject:FW: Excavator
Nick,
Please see the response below from our contractor. It appears it will be either Merrit Contracting or Poindexter
Excavating.
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Ron Bokinskie [mailto:rbokinskie@catamountinc.com]
Sent: Monday, October 07, 2013 9:46 AM
To: Bernida Egging; Scott Boal
Subject: RE: Excavator
Bernida,
Currently we are entertaining Two of our Bidding Subcontractors:
· Merritt Contracting, Inc.
· Poindexter Excavating, Inc.
Ron Bokinskie
149
Project Manager
Office 303-679-4298
Fax 303-679-1506
Mobile 720-345-4975
Catamount Constructors, Inc.
www.catamountinc.com
P CATAMOUNT OPERATES GREEN. Please consider the environment before printing this e-mail.
The content of this e-mail message and any attachments are confidential and may be legally privileged, intended
solely for the addressee. If you are not the intended recipient, be advised that any use, dissemination,
distribution, or copying of this e-mail is strictly prohibited. If you receive this message in error, please notify
the sender immediately by reply email and destroy the message and its attachments
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, October 07, 2013 8:13 AM
To: Ron Bokinskie; Scott Boal
Subject: FW: Excavator
Ron,
Please see below. Can you please advise who will be performing this work?
Thank you,
Bernida Egging
Vice President of Construction
150
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, October 07, 2013 6:41 AM
To: Bernida Egging
Subject: Excavator
Bernida, can you let me know the excavator you will be using to connect to water & sewer? I need to make
sure they are on our list of active bonded excavators.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
151
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Tuesday, October 01, 2013 11:13 AM
To:Mishler, Nicholas F
Cc:Hohlt, William G; Blanchard, Jim E
Subject:RE: Carmel: Spectrum Senior Living
Thank you, Nick.
Have a great rest of your day.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, October 01, 2013 9:12 AM
To: Bernida Egging
Cc: Hohlt, William G; Blanchard, Jim E
Subject: RE: Carmel: Spectrum Senior Living
Bernida, I just spoke to Jim Blanchard to confirm, and yes, once this portion of the project is complete, we will
issue a C/O.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
152
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 6:16 PM
To: Hohlt, William G
Cc: Mishler, Nicholas F
Subject: FW: Carmel: Spectrum Senior Living
Hello Bill,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be required in
order for our project to receive our Certificate of Occupancy. We understand that we will need to have all final
life safety system completed in addition to site development for Block 1 of the master site plan completed
(including landscaping) as well as all final building inspections. It was also mentioned that we would be able to
get our Certificate of Occupancy regardless of the state of site development of our neighbors (currently
appearing to be JC Hart and Frank Regan). Can you please confirm this?
I have received confirmation below from both the Fire Department and Engineering that they would allow the
release of our C of O as long as we had completed the site development on our property and that it would not be
held up by our neighbors. As you are aware, our building cannot begin the licensure process with the state to
certify our facility for assisted living until we achieve C of O (not TCO). That being said, this particular project
needs confirmation that we can achieve C of O regardless of the other developers and the state of their projects.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
153
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Monday, September 30, 2013 12:32 PM
To: Bernida Egging
Cc: Mishler, Nicholas F
Subject: RE: Carmel: Spectrum Senior Living
I cannot speak for Building and Code office, but if the site has access, drinking and firefighting water, sanitary
sewer, and enough of the storm sewer detention and treatment facilities installed such that the runoff from this
site is detained and treated, we will support the release of the C of O.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 2:03 PM
To: Duncan, Gary R
Cc: Mishler, Nicholas F
Subject: FW: Carmel: Spectrum Senior Living
Gary and Nick,
Can you please advise if the Building Department will grant a C of O for our property/project regardless of
whether JC Hart of Frank Regan have completed the development of their site?
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
154
Check out our digital lifestyle magazine!
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Monday, September 30, 2013 9:06 AM
To: Bernida Egging
Subject: RE: Carmel: Spectrum Senior Living
Once all conditions and requirements of the Indiana Fire Code are met and there is approved clear unobstructed
fire department access provided from Illinois street, you should be able to get your required approvals from the
fire dept. Be advised the Certificates of Occupancies are issued by the building inspectors office. You need to
follow up with them as well.
This is the first time I have had a developer/or owner have this type of concern or question. Is there something
specific that you are worried/concerned about?
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 10:23 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Duncan, Gary R
Subject: Carmel: Spectrum Senior Living
Good Morning, Chris,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be required in
order for our project to receive our Certificate of Occupancy. We understand that we will need to have all final
life safety system completed in addition to site development for Block 1 of the master site plan completed,
including landscaping. It was also mentioned that we would be able to get our Certificate of Occupancy
regardless of the state of site development of our neighbors (currently appearing to be JC Hart and Frank
Regan). Can you please confirm this?
155
As you are aware, our building cannot begin the licensure process with the state to certify our facility for
assisted living until we achieve C of O (not TCO). That being said, this particular project needs confirmation
that we can achieve C of O regardless of the other developers and the state of their projects prior to us
beginning construction.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
156
Mishler, Nicholas F
From:Hohlt, William G
Sent:Tuesday, October 01, 2013 11:12 AM
To:Mishler, Nicholas F
Cc:Bernida Egging; Blanchard, Jim E
Subject:Re: Carmel: Spectrum Senior Living
Thank you
William Hohlt
Deputy Building Commissioner
City of Carmel
On Oct 1, 2013, at 11:11 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Bernida, I just spoke to Jim Blanchard to confirm, and yes, once this portion of the project is complete, we will issue a C/O.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 6:16 PM
To: Hohlt, William G
Cc: Mishler, Nicholas F
Subject: FW: Carmel: Spectrum Senior Living
Hello Bill,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be
required in order for our project to receive our Certificate of Occupancy. We understand that we will
need to have all final life safety system completed in addition to site development for Block 1 of the
master site plan completed (including landscaping) as well as all final building inspections. It was also
mentioned that we would be able to get our Certificate of Occupancy regardless of the state of site
development of our neighbors (currently appearing to be JC Hart and Frank Regan). Can you please
confirm this?
I have received confirmation below from both the Fire Department and Engineering that they would
allow the release of our C of O as long as we had completed the site development on our property and
that it would not be held up by our neighbors. As you are aware, our building cannot begin the licensure
process with the state to certify our facility for assisted living until we achieve C of O (not TCO). That
being said, this particular project needs confirmation that we can achieve C of O regardless of the other
developers and the state of their projects.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
157
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Monday, September 30, 2013 12:32 PM
To: Bernida Egging
Cc: Mishler, Nicholas F
Subject: RE: Carmel: Spectrum Senior Living
I cannot speak for Building and Code office, but if the site has access, drinking and firefighting
water, sanitary sewer, and enough of the storm sewer detention and treatment facilities installed
such that the runoff from this site is detained and treated, we will support the release of the C of
O.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 2:03 PM
To: Duncan, Gary R
Cc: Mishler, Nicholas F
Subject: FW: Carmel: Spectrum Senior Living
Gary and Nick,
Can you please advise if the Building Department will grant a C of O for our property/project
regardless of whether JC Hart of Frank Regan have completed the development of their site?
Thank you,
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
158
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Monday, September 30, 2013 9:06 AM
To: Bernida Egging
Subject: RE: Carmel: Spectrum Senior Living
Once all conditions and requirements of the Indiana Fire Code are met and there is approved
clear unobstructed fire department access provided from Illinois street, you should be able to get
your required approvals from the fire dept. Be advised the Certificates of Occupancies are issued
by the building inspectors office. You need to follow up with them as well.
This is the first time I have had a developer/or owner have this type of concern or question. Is
there something specific that you are worried/concerned about?
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 10:23 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Duncan, Gary R
Subject: Carmel: Spectrum Senior Living
Good Morning, Chris,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would
be required in order for our project to receive our Certificate of Occupancy. We understand that
we will need to have all final life safety system completed in addition to site development for
159
Block 1 of the master site plan completed, including landscaping. It was also mentioned that we
would be able to get our Certificate of Occupancy regardless of the state of site development of
our neighbors (currently appearing to be JC Hart and Frank Regan). Can you please confirm
this?
As you are aware, our building cannot begin the licensure process with the state to certify our
facility for assisted living until we achieve C of O (not TCO). That being said, this particular
project needs confirmation that we can achieve C of O regardless of the other developers and the
state of their projects prior to us beginning construction.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
<image001.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
160
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Monday, September 30, 2013 6:16 PM
To:Hohlt, William G
Cc:Mishler, Nicholas F
Subject:FW: Carmel: Spectrum Senior Living
Hello Bill,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be required in order for
our project to receive our Certificate of Occupancy. We understand that we will need to have all final life safety system
completed in addition to site development for Block 1 of the master site plan completed (including landscaping) as well
as all final building inspections. It was also mentioned that we would be able to get our Certificate of Occupancy
regardless of the state of site development of our neighbors (currently appearing to be JC Hart and Frank Regan). Can
you please confirm this?
I have received confirmation below from both the Fire Department and Engineering that they would allow the release of
our C of O as long as we had completed the site development on our property and that it would not be held up by our
neighbors. As you are aware, our building cannot begin the licensure process with the state to certify our facility for
assisted living until we achieve C of O (not TCO). That being said, this particular project needs confirmation that we can
achieve C of O regardless of the other developers and the state of their projects.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Monday, September 30, 2013 12:32 PM
To: Bernida Egging
Cc: Mishler, Nicholas F
Subject: RE: Carmel: Spectrum Senior Living
I cannot speak for Building and Code office, but if the site has access, drinking and firefighting water, sanitary
sewer, and enough of the storm sewer detention and treatment facilities installed such that the runoff from this
site is detained and treated, we will support the release of the C of O.
161
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 2:03 PM
To: Duncan, Gary R
Cc: Mishler, Nicholas F
Subject: FW: Carmel: Spectrum Senior Living
Gary and Nick,
Can you please advise if the Building Department will grant a C of O for our property/project regardless of
whether JC Hart of Frank Regan have completed the development of their site?
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Monday, September 30, 2013 9:06 AM
To: Bernida Egging
Subject: RE: Carmel: Spectrum Senior Living
Once all conditions and requirements of the Indiana Fire Code are met and there is approved clear unobstructed
fire department access provided from Illinois street, you should be able to get your required approvals from the
162
fire dept. Be advised the Certificates of Occupancies are issued by the building inspectors office. You need to
follow up with them as well.
This is the first time I have had a developer/or owner have this type of concern or question. Is there something
specific that you are worried/concerned about?
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 10:23 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Duncan, Gary R
Subject: Carmel: Spectrum Senior Living
Good Morning, Chris,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be required in
order for our project to receive our Certificate of Occupancy. We understand that we will need to have all final
life safety system completed in addition to site development for Block 1 of the master site plan completed,
including landscaping. It was also mentioned that we would be able to get our Certificate of Occupancy
regardless of the state of site development of our neighbors (currently appearing to be JC Hart and Frank
Regan). Can you please confirm this?
As you are aware, our building cannot begin the licensure process with the state to certify our facility for
assisted living until we achieve C of O (not TCO). That being said, this particular project needs confirmation
that we can achieve C of O regardless of the other developers and the state of their projects prior to us
beginning construction.
Thank you in advance for your response. It is appreciated.
163
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
164
Mishler, Nicholas F
From:Hohlt, William G
Sent:Monday, September 30, 2013 2:42 PM
To:Mishler, Nicholas F; Blanchard, Jim E
Subject:RE: Carmel: Spectrum Senior Living
Nick,
I believe this was discussed during the pre-submittal meeting and everyone was on board as being ok with issuing the
full C/O as long as all issues are complete. JC Hart will be having a separate permit and really not involved with this
project at all
Jim, are you ok with this?
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Mishler, Nicholas F
Sent: Monday, September 30, 2013 2:12 PM
To: Blanchard, Jim E; Hohlt, William G
Subject: FW: Carmel: Spectrum Senior Living
Can someone answer this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 2:03 PM
To: Duncan, Gary R
Cc: Mishler, Nicholas F
Subject: FW: Carmel: Spectrum Senior Living
Gary and Nick,
Can you please advise if the Building Department will grant a C of O for our property/project regardless of whether JC
Hart of Frank Regan have completed the development of their site?
Thank you,
165
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Monday, September 30, 2013 9:06 AM
To: Bernida Egging
Subject: RE: Carmel: Spectrum Senior Living
Once all conditions and requirements of the Indiana Fire Code are met and there is approved clear unobstructed
fire department access provided from Illinois street, you should be able to get your required approvals from the
fire dept. Be advised the Certificates of Occupancies are issued by the building inspectors office. You need to
follow up with them as well.
This is the first time I have had a developer/or owner have this type of concern or question. Is there something
specific that you are worried/concerned about?
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 10:23 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Duncan, Gary R
Subject: Carmel: Spectrum Senior Living
166
Good Morning, Chris,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be required in
order for our project to receive our Certificate of Occupancy. We understand that we will need to have all final
life safety system completed in addition to site development for Block 1 of the master site plan completed,
including landscaping. It was also mentioned that we would be able to get our Certificate of Occupancy
regardless of the state of site development of our neighbors (currently appearing to be JC Hart and Frank
Regan). Can you please confirm this?
As you are aware, our building cannot begin the licensure process with the state to certify our facility for
assisted living until we achieve C of O (not TCO). That being said, this particular project needs confirmation
that we can achieve C of O regardless of the other developers and the state of their projects prior to us
beginning construction.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
167
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Monday, September 30, 2013 2:32 PM
To:Bernida Egging
Cc:Mishler, Nicholas F
Subject:RE: Carmel: Spectrum Senior Living
I cannot speak for Building and Code office, but if the site has access, drinking and firefighting water, sanitary sewer, and
enough of the storm sewer detention and treatment facilities installed such that the runoff from this site is detained and
treated, we will support the release of the C of O.
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 2:03 PM
To: Duncan, Gary R
Cc: Mishler, Nicholas F
Subject: FW: Carmel: Spectrum Senior Living
Gary and Nick,
Can you please advise if the Building Department will grant a C of O for our property/project regardless of whether JC
Hart of Frank Regan have completed the development of their site?
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Monday, September 30, 2013 9:06 AM
To: Bernida Egging
Subject: RE: Carmel: Spectrum Senior Living
Once all conditions and requirements of the Indiana Fire Code are met and there is approved clear unobstructed
fire department access provided from Illinois street, you should be able to get your required approvals from the
fire dept. Be advised the Certificates of Occupancies are issued by the building inspectors office. You need to
follow up with them as well.
168
This is the first time I have had a developer/or owner have this type of concern or question. Is there something
specific that you are worried/concerned about?
Capt. Chris Ellison
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 10:23 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Duncan, Gary R
Subject: Carmel: Spectrum Senior Living
Good Morning, Chris,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be required in
order for our project to receive our Certificate of Occupancy. We understand that we will need to have all final
life safety system completed in addition to site development for Block 1 of the master site plan completed,
including landscaping. It was also mentioned that we would be able to get our Certificate of Occupancy
regardless of the state of site development of our neighbors (currently appearing to be JC Hart and Frank
Regan). Can you please confirm this?
As you are aware, our building cannot begin the licensure process with the state to certify our facility for
assisted living until we achieve C of O (not TCO). That being said, this particular project needs confirmation
that we can achieve C of O regardless of the other developers and the state of their projects prior to us
beginning construction.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
169
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
170
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Monday, September 30, 2013 2:03 PM
To:Duncan, Gary R
Cc:Mishler, Nicholas F
Subject:FW: Carmel: Spectrum Senior Living
Gary and Nick,
Can you please advise if the Building Department will grant a C of O for our property/project regardless of whether JC
Hart of Frank Regan have completed the development of their site?
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov]
Sent: Monday, September 30, 2013 9:06 AM
To: Bernida Egging
Subject: RE: Carmel: Spectrum Senior Living
Once all conditions and requirements of the Indiana Fire Code are met and there is approved clear unobstructed
fire department access provided from Illinois street, you should be able to get your required approvals from the
fire dept. Be advised the Certificates of Occupancies are issued by the building inspectors office. You need to
follow up with them as well.
This is the first time I have had a developer/or owner have this type of concern or question. Is there something
specific that you are worried/concerned about?
Capt. Chris Ellison
171
Deputy Fire Marshal
Carmel Fire Dept.
317-571-2621
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 30, 2013 10:23 AM
To: Ellison, Christopher M
Cc: Mishler, Nicholas F; Duncan, Gary R
Subject: Carmel: Spectrum Senior Living
Good Morning, Chris,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be required in
order for our project to receive our Certificate of Occupancy. We understand that we will need to have all final
life safety system completed in addition to site development for Block 1 of the master site plan completed,
including landscaping. It was also mentioned that we would be able to get our Certificate of Occupancy
regardless of the state of site development of our neighbors (currently appearing to be JC Hart and Frank
Regan). Can you please confirm this?
As you are aware, our building cannot begin the licensure process with the state to certify our facility for
assisted living until we achieve C of O (not TCO). That being said, this particular project needs confirmation
that we can achieve C of O regardless of the other developers and the state of their projects prior to us
beginning construction.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
172
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
173
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Monday, September 30, 2013 10:23 AM
To:Ellison, Christopher M
Cc:Mishler, Nicholas F; Duncan, Gary R
Subject:Carmel: Spectrum Senior Living
Good Morning, Chris,
Per our meeting on September 17th at the City of Carmel offices, we had discussed what would be required in order for
our project to receive our Certificate of Occupancy. We understand that we will need to have all final life safety system
completed in addition to site development for Block 1 of the master site plan completed, including landscaping. It was
also mentioned that we would be able to get our Certificate of Occupancy regardless of the state of site development of
our neighbors (currently appearing to be JC Hart and Frank Regan). Can you please confirm this?
As you are aware, our building cannot begin the licensure process with the state to certify our facility for assisted living
until we achieve C of O (not TCO). That being said, this particular project needs confirmation that we can achieve C of O
regardless of the other developers and the state of their projects prior to us beginning construction.
Thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
174
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Friday, September 27, 2013 5:35 PM
To:Lux, Pamela K
Cc:Mishler, Nicholas F
Subject:RE: Spectrum Eblueprint Plat Confirmation
Pam,
Can you please confirm that you received the hard copy of our plat on Thursday, 09/26/2013?
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Bernida Egging
Sent: Wednesday, September 25, 2013 2:32 PM
To: 'plux@carmel.in.gov'
Cc: Nick Mishler (nmishler@carmel.in.gov)
Subject: FW: Spectrum Eblueprint Plat Confirmation
Hello Pam,
Attached is the confirmation from our printer for the full size plat that you will be receiving via overnight delivery
tomorrow for our project located in Carmel, IN. This is the same plat that was approved by the board on 09/18/2013
and is ready for recording once we get our development agreement with the other parcels. Our site is the east-most
lot.
Per our conversation, we are trying to close on our construction loan and the bank is not allowing us to until we have an
address. Please let me know if you need anything else from me.
Thank you in advance for your help. I appreciate it.
Bernida Egging
Vice President of Construction
175
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: April Cordova
Sent: Wednesday, September 25, 2013 2:05 PM
To: Bernida Egging
Subject: Eblueprint confirmation
Bernida
Attached is the confirmation from eblueprint.
Thanks
April Cordova
Executive Assistant
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
ACORDOVA@SPECTRUMRETIREMENT.COM
Check out our digital lifestyle magazine!
176
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Thursday, September 26, 2013 11:33 AM
To:Mishler, Nicholas F
Subject:Carmel: Recording of Plat
Hello Nick,
I wanted to confirm that once our plat is approved (which occurred on 09/18/2013 by the Board of Public Works), there
is nothing else required prior to getting it recorded. Can you please confirm this?
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
177
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Thursday, September 26, 2013 11:14 AM
To:Mishler, Nicholas F
Subject:RE: City of Carmel Commercial Submittal requirements
Nick: Thank you very much.
Side note: We wish we were informed about the meeting last week, could
have helped ease some confusion. Not your fault, the developer did not
communicate this to us.
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 10:10 AM
To: Matt Gearheart
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
I will send this out in today’s mail.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Thursday, September 26, 2013 10:56 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
Please send it to my attention at:
GWH+BB Architects
817 Wyandotte
Kansas City, MO 64105
When can we expect to see this?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
178
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:20 AM
To: Matt Gearheart
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
The foundation does not have a separate application. You would apply for foundation as you would for a new project and we would just release it as a
foundation, then when we have everything we need for full release that would just be added to the notes. The carbon copy application is what you
would need to fill out.
As I said during the meeting last week, we typically don’t take these in until all departments have what they need, but we will make an exception so you
can have this reviewed while you get things finalized with the Engineering Department.
Where would you like me to send the application?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Thursday, September 26, 2013 10:16 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
Glad you received them- Footings/Foundations. Originally you indicated there wasn’t an
application or determined fee for F/F only- or perhaps there is only the carbon copy form at your
office? If there is an application needed, could you please send it to me.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:12 AM
To: Matt Gearheart
Subject: RE: City of Carmel Commercial Submittal requirements
Matt, I received the two packages containing building plans, project manuals, etc. today but I have not received the permit application. I just wanted to
make sure that wasn’t supposed to be included with everything you sent…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
179
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
180
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Thursday, September 26, 2013 10:56 AM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: City of Carmel Commercial Submittal requirements
Nick-
Please send it to my attention at:
GWH+BB Architects
817 Wyandotte
Kansas City, MO 64105
When can we expect to see this?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:20 AM
To: Matt Gearheart
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
The foundation does not have a separate application. You would apply for foundation as you would for a new project and we would just release it as a
foundation, then when we have everything we need for full release that would just be added to the notes. The carbon copy application is what you
would need to fill out.
As I said during the meeting last week, we typically don’t take these in until all departments have what they need, but we will make an exception so you
can have this reviewed while you get things finalized with the Engineering Department.
Where would you like me to send the application?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Thursday, September 26, 2013 10:16 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
Glad you received them- Footings/Foundations. Originally you indicated there wasn’t an
application or determined fee for F/F only- or perhaps there is only the carbon copy form at your
office? If there is an application needed, could you please send it to me.
181
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:12 AM
To: Matt Gearheart
Subject: RE: City of Carmel Commercial Submittal requirements
Matt, I received the two packages containing building plans, project manuals, etc. today but I have not received the permit application. I just wanted to
make sure that wasn’t supposed to be included with everything you sent…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
182
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Thursday, September 26, 2013 10:16 AM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: City of Carmel Commercial Submittal requirements
Nick-
Glad you received them- Footings/Foundations. Originally you indicated there wasn’t an
application or determined fee for F/F only- or perhaps there is only the carbon copy form at your
office? If there is an application needed, could you please send it to me.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, September 26, 2013 9:12 AM
To: Matt Gearheart
Subject: RE: City of Carmel Commercial Submittal requirements
Matt, I received the two packages containing building plans, project manuals, etc. today but I have not received the permit application. I just wanted to
make sure that wasn’t supposed to be included with everything you sent…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
183
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
184
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Wednesday, September 25, 2013 4:32 PM
To:Lux, Pamela K
Cc:Mishler, Nicholas F
Subject:FW: Spectrum Eblueprint Plat Confirmation
Hello Pam,
Attached is the confirmation from our printer for the full size plat that you will be receiving via overnight delivery
tomorrow for our project located in Carmel, IN. This is the same plat that was approved by the board on 09/18/2013
and is ready for recording once we get our development agreement with the other parcels. Our site is the east-most
lot.
Per our conversation, we are trying to close on our construction loan and the bank is not allowing us to until we have an
address. Please let me know if you need anything else from me.
Thank you in advance for your help. I appreciate it.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: April Cordova
Sent: Wednesday, September 25, 2013 2:05 PM
To: Bernida Egging
Subject: Eblueprint confirmation
Bernida
Attached is the confirmation from eblueprint.
Thanks
April Cordova
Executive Assistant
185
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
ACORDOVA@SPECTRUMRETIREMENT.COM
Check out our digital lifestyle magazine!
186
Mishler, Nicholas F
From:Lux, Pamela K
Sent:Tuesday, September 24, 2013 3:55 PM
To:Mishler, Nicholas F
Subject:RE: Carmel project
Hi Bernida-
Please call me when you get a chance---317-571-2288. Thank you.
Pam Lux
Building and Code Services
City of Carmel
From: Mishler, Nicholas F
Sent: Tuesday, September 24, 2013 3:27 PM
To: 'Bernida Egging'
Cc: Lux, Pamela K
Subject: RE: Carmel project
Call Pam Lux at 317-571-2288. I have also copied her on this email.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Tuesday, September 24, 2013 3:24 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
One last thing; who should I speak to about getting a building address for our Carmel Senior Living project? In order to
finalize our construction loan documents, we need to provide our bank with a building address. Can you please assist
me with this?
Thank you,
Bernida Egging
Vice President of Construction
187
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Bernida Egging
Sent: Monday, September 23, 2013 1:06 PM
To: 'Mishler, Nicholas F'
Subject: RE: Carmel project
Thank you, Nick.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, September 23, 2013 1:05 PM
To: Bernida Egging
Subject: RE: Carmel project
1. Send the water/sewer check directly to Carmel Utilities @ 760 Third Ave SW. Lisa Kempa will let me
know when they have what they need.
2. You can go ahead and send in the plans, stickers, and application to me. I will let you know once we have
everything we need to get the foundation permit reviewed.
Thanks,
Nick Mishler
188
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 23, 2013 2:50 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
Thank you for the confirmation.
Just to clarify two outstanding items:
1. I am having the utility check cut today for Carmel Utilities. Do I send this check to your attention or
should I have it sent to City of Carmel Utilities at: 760 Third Avenue SW, Carmel 46032? Please advise.
2. I am preparing to send you the packet of full building permit drawings that are submitted simultaneously
to the State of Indiana. Is it true that we can sign, print our name and date the stickers and send this package to
you in the mail or do we need a project representative to meet with you in person? Please advise.
Once again, thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
189
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, September 23, 2013 8:48 AM
To: Bernida Egging
Subject: RE: Carmel project
The Utilities check would need to be written to “City of Carmel”.
The building permit check would not need to be paid until after the project is reviewed. Once I receive the
package from you with the application, etc, I can enter that and let you know what the exact fees will be.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, September 20, 2013 12:02 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Nick,
190
Thank you for your responses below.
In regards to the number of units in our building; there are 139. When responding with the fee amount, can you
please also clarify to whom the check should be written, i.e. “City of Carmel” or “Carmel Utilities”?
Also, I have a phone call into Lisa Kemp regarding our utility fees. Hopefully I can get that figured out
relatively soon so we can cut that check for the building, fire and engineering department to start reviewing our
foundation permit.
Lastly, attached are the PDF files of our floor plans for the project for Bruce and Chris to give their initial
comments on regarding suite numbers.
Thank you.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, September 20, 2013 7:08 AM
To: Bernida Egging
Subject: RE: Carmel project
Bernida-
191
My responses are in red below.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, September 19, 2013 4:12 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
It was a pleasure meeting you as well. We were able to meet with engineering yesterday and feel as though it
went pretty well. We are excited to start construction on this project and have the opportunity to do business in
Carmel.
Thank you for your email below. I am pulling together the necessary information and will be sending you a
package shortly.
Also, per our conversation on Tuesday, I have the following notes regarding what is needed to determine
building permit fees:
192
1. Submit the following information to Nick Mishler:
a. A site plan.
b. The building elevations.
c. A building section.
d. Floor plans for each level.
It is my understanding that I could email you the above information and that you could aid me in figuring out
the fees are associated with our project. Please advise if I have that correct so I can start pulling together that
information as well.
As long as I know the number of living units, I can calculate the fees. As mentioned in our meeting, you will
most likely pay for six inspections up front (2 footings, 1 rough-in, 1 meter base, 1 final, 1 landscaping). I can
also tell you in regards to the Parks & Rec Impact Fee, I have been told by Angie Conn that you would only be
required to pay 10% of the current rate, which would amount to $167.90 per unit.
Lastly, in determining our utility fees (in order to pay for our foundation permit), I will need to contact the
following people:
1. Water à Lisa Kempa (sp?) at 317-571-2443 Correct
2. Sewer à Depends on who will be servicing us.
a. Most likely Carmel Utilities
i. Grease Trap à Erin (sp?) Hoover (do you happen to have his contact
info?) Aaron Hoover can be reached at 317-571-2645
ii. Sanitary à ? If it is Carmel sewer, Lisa Kempa will be able to help
you with this too
b. If it is Clay Township
i. Sanitary à Ryan Hartman at 317-844-9200 Correct
Once I pay the fees determined by the above utilities, the building department, engineers and fire department
will review the foundation drawings, correct?
Correct
193
Also, as I mentioned, at some point after the plans are approved, we need to meet with either Bruce or Chris at
CFD to finalize suite numbers. If you have these on a PDF file you can forward to me and I can get some initial
comments back to you.
Please advise if there is anything incorrect in the above summary.
Thanks again and take care!
Bernida Egging
Vice President of Construction
cid:image001.gif@01CEB554.1C472CF0
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, September 18, 2013 10:59 AM
To: Bernida Egging
Subject: Carmel project
Hi Bernida-
It was great to meet you yesterday. I just wanted to follow up with you regarding the submittal process. Was
your group able to meet with the Carmel Engineering Department yesterday?
If you’d like, you can send me the application package and I can have it reviewed it as soon as you have the
required approvals. I will need the following:
194
· Completed application
· 3 signed affidavit stickers
· Site plan
· 3 full-size sets of building plans
· CD with identical building plans of the set you submitted to the State of Indiana
You can send to the following address:
Nick Mishler
City of Carmel
Building & Code Services – 1st Floor
One Civic Square
Carmel, IN 46032
In the meantime, if you need anything else, don’t hesitate to call.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
195
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Tuesday, September 24, 2013 3:24 PM
To:Mishler, Nicholas F
Subject:RE: Carmel project
Hello Nick,
One last thing; who should I speak to about getting a building address for our Carmel Senior Living project? In order to
finalize our construction loan documents, we need to provide our bank with a building address. Can you please assist
me with this?
Thank you,
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Bernida Egging
Sent: Monday, September 23, 2013 1:06 PM
To: 'Mishler, Nicholas F'
Subject: RE: Carmel project
Thank you, Nick.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
196
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, September 23, 2013 1:05 PM
To: Bernida Egging
Subject: RE: Carmel project
1. Send the water/sewer check directly to Carmel Utilities @ 760 Third Ave SW. Lisa Kempa will let me
know when they have what they need.
2. You can go ahead and send in the plans, stickers, and application to me. I will let you know once we have
everything we need to get the foundation permit reviewed.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 23, 2013 2:50 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
Thank you for the confirmation.
197
Just to clarify two outstanding items:
1. I am having the utility check cut today for Carmel Utilities. Do I send this check to your attention or
should I have it sent to City of Carmel Utilities at: 760 Third Avenue SW, Carmel 46032? Please advise.
2. I am preparing to send you the packet of full building permit drawings that are submitted simultaneously
to the State of Indiana. Is it true that we can sign, print our name and date the stickers and send this package to
you in the mail or do we need a project representative to meet with you in person? Please advise.
Once again, thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, September 23, 2013 8:48 AM
To: Bernida Egging
Subject: RE: Carmel project
The Utilities check would need to be written to “City of Carmel”.
The building permit check would not need to be paid until after the project is reviewed. Once I receive the
package from you with the application, etc, I can enter that and let you know what the exact fees will be.
Thanks,
198
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, September 20, 2013 12:02 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Nick,
Thank you for your responses below.
In regards to the number of units in our building; there are 139. When responding with the fee amount, can you
please also clarify to whom the check should be written, i.e. “City of Carmel” or “Carmel Utilities”?
Also, I have a phone call into Lisa Kemp regarding our utility fees. Hopefully I can get that figured out
relatively soon so we can cut that check for the building, fire and engineering department to start reviewing our
foundation permit.
Lastly, attached are the PDF files of our floor plans for the project for Bruce and Chris to give their initial
comments on regarding suite numbers.
Thank you.
199
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, September 20, 2013 7:08 AM
To: Bernida Egging
Subject: RE: Carmel project
Bernida-
My responses are in red below.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
200
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, September 19, 2013 4:12 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
It was a pleasure meeting you as well. We were able to meet with engineering yesterday and feel as though it
went pretty well. We are excited to start construction on this project and have the opportunity to do business in
Carmel.
Thank you for your email below. I am pulling together the necessary information and will be sending you a
package shortly.
Also, per our conversation on Tuesday, I have the following notes regarding what is needed to determine
building permit fees:
1. Submit the following information to Nick Mishler:
a. A site plan.
b. The building elevations.
c. A building section.
d. Floor plans for each level.
It is my understanding that I could email you the above information and that you could aid me in figuring out
the fees are associated with our project. Please advise if I have that correct so I can start pulling together that
information as well.
As long as I know the number of living units, I can calculate the fees. As mentioned in our meeting, you will
most likely pay for six inspections up front (2 footings, 1 rough-in, 1 meter base, 1 final, 1 landscaping). I can
also tell you in regards to the Parks & Rec Impact Fee, I have been told by Angie Conn that you would only be
required to pay 10% of the current rate, which would amount to $167.90 per unit.
201
Lastly, in determining our utility fees (in order to pay for our foundation permit), I will need to contact the
following people:
1. Water à Lisa Kempa (sp?) at 317-571-2443 Correct
2. Sewer à Depends on who will be servicing us.
a. Most likely Carmel Utilities
i. Grease Trap à Erin (sp?) Hoover (do you happen to have his contact
info?) Aaron Hoover can be reached at 317-571-2645
ii. Sanitary à ? If it is Carmel sewer, Lisa Kempa will be able to help
you with this too
b. If it is Clay Township
i. Sanitary à Ryan Hartman at 317-844-9200 Correct
Once I pay the fees determined by the above utilities, the building department, engineers and fire department
will review the foundation drawings, correct?
Correct
Also, as I mentioned, at some point after the plans are approved, we need to meet with either Bruce or Chris at
CFD to finalize suite numbers. If you have these on a PDF file you can forward to me and I can get some initial
comments back to you.
Please advise if there is anything incorrect in the above summary.
Thanks again and take care!
Bernida Egging
Vice President of Construction
cid:image001.gif@01CEB554.1C472CF0
200 Spruce St., Suite 200
Denver, CO 80230
202
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, September 18, 2013 10:59 AM
To: Bernida Egging
Subject: Carmel project
Hi Bernida-
It was great to meet you yesterday. I just wanted to follow up with you regarding the submittal process. Was
your group able to meet with the Carmel Engineering Department yesterday?
If you’d like, you can send me the application package and I can have it reviewed it as soon as you have the
required approvals. I will need the following:
· Completed application
· 3 signed affidavit stickers
· Site plan
· 3 full-size sets of building plans
· CD with identical building plans of the set you submitted to the State of Indiana
You can send to the following address:
Nick Mishler
City of Carmel
Building & Code Services – 1st Floor
One Civic Square
203
Carmel, IN 46032
In the meantime, if you need anything else, don’t hesitate to call.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
204
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Tuesday, September 24, 2013 12:12 PM
To:Pace, Paul V; Hollander, Greg H; Cook, Steve L; Hoover, Aaron; Mishler, Nicholas F; Barnes,
David R; Duffy, John M
Subject:Spectrum
We have received water and sewer connection and availability fees for Spectrum Senior Living.
Water Connection $99,007
Sewer Connection $58,304
Water Availability $15,110
Sewer Availibility $1,0210
Review Fee $300
$182,631.00 Check No. 8538
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2267
205
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Monday, September 23, 2013 3:06 PM
To:Mishler, Nicholas F
Subject:RE: Carmel project
Thank you, Nick.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, September 23, 2013 1:05 PM
To: Bernida Egging
Subject: RE: Carmel project
1. Send the water/sewer check directly to Carmel Utilities @ 760 Third Ave SW. Lisa Kempa will let me
know when they have what they need.
2. You can go ahead and send in the plans, stickers, and application to me. I will let you know once we have
everything we need to get the foundation permit reviewed.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
206
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Monday, September 23, 2013 2:50 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
Thank you for the confirmation.
Just to clarify two outstanding items:
1. I am having the utility check cut today for Carmel Utilities. Do I send this check to your attention or
should I have it sent to City of Carmel Utilities at: 760 Third Avenue SW, Carmel 46032? Please advise.
2. I am preparing to send you the packet of full building permit drawings that are submitted simultaneously
to the State of Indiana. Is it true that we can sign, print our name and date the stickers and send this package to
you in the mail or do we need a project representative to meet with you in person? Please advise.
Once again, thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
207
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, September 23, 2013 8:48 AM
To: Bernida Egging
Subject: RE: Carmel project
The Utilities check would need to be written to “City of Carmel”.
The building permit check would not need to be paid until after the project is reviewed. Once I receive the
package from you with the application, etc, I can enter that and let you know what the exact fees will be.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, September 20, 2013 12:02 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Nick,
Thank you for your responses below.
208
In regards to the number of units in our building; there are 139. When responding with the fee amount, can you
please also clarify to whom the check should be written, i.e. “City of Carmel” or “Carmel Utilities”?
Also, I have a phone call into Lisa Kemp regarding our utility fees. Hopefully I can get that figured out
relatively soon so we can cut that check for the building, fire and engineering department to start reviewing our
foundation permit.
Lastly, attached are the PDF files of our floor plans for the project for Bruce and Chris to give their initial
comments on regarding suite numbers.
Thank you.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, September 20, 2013 7:08 AM
To: Bernida Egging
Subject: RE: Carmel project
Bernida-
My responses are in red below.
209
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, September 19, 2013 4:12 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
It was a pleasure meeting you as well. We were able to meet with engineering yesterday and feel as though it
went pretty well. We are excited to start construction on this project and have the opportunity to do business in
Carmel.
Thank you for your email below. I am pulling together the necessary information and will be sending you a
package shortly.
Also, per our conversation on Tuesday, I have the following notes regarding what is needed to determine
building permit fees:
1. Submit the following information to Nick Mishler:
a. A site plan.
210
b. The building elevations.
c. A building section.
d. Floor plans for each level.
It is my understanding that I could email you the above information and that you could aid me in figuring out
the fees are associated with our project. Please advise if I have that correct so I can start pulling together that
information as well.
As long as I know the number of living units, I can calculate the fees. As mentioned in our meeting, you will
most likely pay for six inspections up front (2 footings, 1 rough-in, 1 meter base, 1 final, 1 landscaping). I can
also tell you in regards to the Parks & Rec Impact Fee, I have been told by Angie Conn that you would only be
required to pay 10% of the current rate, which would amount to $167.90 per unit.
Lastly, in determining our utility fees (in order to pay for our foundation permit), I will need to contact the
following people:
1. Water à Lisa Kempa (sp?) at 317-571-2443 Correct
2. Sewer à Depends on who will be servicing us.
a. Most likely Carmel Utilities
i. Grease Trap à Erin (sp?) Hoover (do you happen to have his contact
info?) Aaron Hoover can be reached at 317-571-2645
ii. Sanitary à ? If it is Carmel sewer, Lisa Kempa will be able to help
you with this too
b. If it is Clay Township
i. Sanitary à Ryan Hartman at 317-844-9200 Correct
Once I pay the fees determined by the above utilities, the building department, engineers and fire department
will review the foundation drawings, correct?
Correct
Also, as I mentioned, at some point after the plans are approved, we need to meet with either Bruce or Chris at
CFD to finalize suite numbers. If you have these on a PDF file you can forward to me and I can get some initial
comments back to you.
211
Please advise if there is anything incorrect in the above summary.
Thanks again and take care!
Bernida Egging
Vice President of Construction
cid:image001.gif@01CEB554.1C472CF0
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, September 18, 2013 10:59 AM
To: Bernida Egging
Subject: Carmel project
Hi Bernida-
It was great to meet you yesterday. I just wanted to follow up with you regarding the submittal process. Was
your group able to meet with the Carmel Engineering Department yesterday?
If you’d like, you can send me the application package and I can have it reviewed it as soon as you have the
required approvals. I will need the following:
· Completed application
· 3 signed affidavit stickers
212
· Site plan
· 3 full-size sets of building plans
· CD with identical building plans of the set you submitted to the State of Indiana
You can send to the following address:
Nick Mishler
City of Carmel
Building & Code Services – 1st Floor
One Civic Square
Carmel, IN 46032
In the meantime, if you need anything else, don’t hesitate to call.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
213
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Monday, September 23, 2013 2:50 PM
To:Mishler, Nicholas F
Subject:RE: Carmel project
Hello Nick,
Thank you for the confirmation.
Just to clarify two outstanding items:
1. I am having the utility check cut today for Carmel Utilities. Do I send this check to your attention or should I
have it sent to City of Carmel Utilities at: 760 Third Avenue SW, Carmel 46032? Please advise.
2. I am preparing to send you the packet of full building permit drawings that are submitted simultaneously to the
State of Indiana. Is it true that we can sign, print our name and date the stickers and send this package to you in
the mail or do we need a project representative to meet with you in person? Please advise.
Once again, thank you in advance for your response. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, September 23, 2013 8:48 AM
To: Bernida Egging
Subject: RE: Carmel project
The Utilities check would need to be written to “City of Carmel”.
The building permit check would not need to be paid until after the project is reviewed. Once I receive the
package from you with the application, etc, I can enter that and let you know what the exact fees will be.
214
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Friday, September 20, 2013 12:02 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Nick,
Thank you for your responses below.
In regards to the number of units in our building; there are 139. When responding with the fee amount, can you
please also clarify to whom the check should be written, i.e. “City of Carmel” or “Carmel Utilities”?
Also, I have a phone call into Lisa Kemp regarding our utility fees. Hopefully I can get that figured out
relatively soon so we can cut that check for the building, fire and engineering department to start reviewing our
foundation permit.
Lastly, attached are the PDF files of our floor plans for the project for Bruce and Chris to give their initial
comments on regarding suite numbers.
Thank you.
215
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, September 20, 2013 7:08 AM
To: Bernida Egging
Subject: RE: Carmel project
Bernida-
My responses are in red below.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
216
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, September 19, 2013 4:12 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
It was a pleasure meeting you as well. We were able to meet with engineering yesterday and feel as though it
went pretty well. We are excited to start construction on this project and have the opportunity to do business in
Carmel.
Thank you for your email below. I am pulling together the necessary information and will be sending you a
package shortly.
Also, per our conversation on Tuesday, I have the following notes regarding what is needed to determine
building permit fees:
1. Submit the following information to Nick Mishler:
a. A site plan.
b. The building elevations.
c. A building section.
d. Floor plans for each level.
It is my understanding that I could email you the above information and that you could aid me in figuring out
the fees are associated with our project. Please advise if I have that correct so I can start pulling together that
information as well.
As long as I know the number of living units, I can calculate the fees. As mentioned in our meeting, you will
most likely pay for six inspections up front (2 footings, 1 rough-in, 1 meter base, 1 final, 1 landscaping). I can
also tell you in regards to the Parks & Rec Impact Fee, I have been told by Angie Conn that you would only be
required to pay 10% of the current rate, which would amount to $167.90 per unit.
217
Lastly, in determining our utility fees (in order to pay for our foundation permit), I will need to contact the
following people:
1. Water à Lisa Kempa (sp?) at 317-571-2443 Correct
2. Sewer à Depends on who will be servicing us.
a. Most likely Carmel Utilities
i. Grease Trap à Erin (sp?) Hoover (do you happen to have his contact
info?) Aaron Hoover can be reached at 317-571-2645
ii. Sanitary à ? If it is Carmel sewer, Lisa Kempa will be able to help
you with this too
b. If it is Clay Township
i. Sanitary à Ryan Hartman at 317-844-9200 Correct
Once I pay the fees determined by the above utilities, the building department, engineers and fire department
will review the foundation drawings, correct?
Correct
Also, as I mentioned, at some point after the plans are approved, we need to meet with either Bruce or Chris at
CFD to finalize suite numbers. If you have these on a PDF file you can forward to me and I can get some initial
comments back to you.
Please advise if there is anything incorrect in the above summary.
Thanks again and take care!
Bernida Egging
Vice President of Construction
cid:image001.gif@01CEB554.1C472CF0
200 Spruce St., Suite 200
Denver, CO 80230
218
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, September 18, 2013 10:59 AM
To: Bernida Egging
Subject: Carmel project
Hi Bernida-
It was great to meet you yesterday. I just wanted to follow up with you regarding the submittal process. Was
your group able to meet with the Carmel Engineering Department yesterday?
If you’d like, you can send me the application package and I can have it reviewed it as soon as you have the
required approvals. I will need the following:
· Completed application
· 3 signed affidavit stickers
· Site plan
· 3 full-size sets of building plans
· CD with identical building plans of the set you submitted to the State of Indiana
You can send to the following address:
Nick Mishler
City of Carmel
Building & Code Services – 1st Floor
One Civic Square
219
Carmel, IN 46032
In the meantime, if you need anything else, don’t hesitate to call.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
220
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Friday, September 20, 2013 12:02 PM
To:Mishler, Nicholas F
Subject:RE: Carmel project
Nick,
Thank you for your responses below.
In regards to the number of units in our building; there are 139. When responding with the fee amount, can you please
also clarify to whom the check should be written, i.e. “City of Carmel” or “Carmel Utilities”?
Also, I have a phone call into Lisa Kemp regarding our utility fees. Hopefully I can get that figured out relatively soon so
we can cut that check for the building, fire and engineering department to start reviewing our foundation permit.
Lastly, attached are the PDF files of our floor plans for the project for Bruce and Chris to give their initial comments on
regarding suite numbers.
Thank you.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, September 20, 2013 7:08 AM
To: Bernida Egging
Subject: RE: Carmel project
Bernida-
My responses are in red below.
221
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, September 19, 2013 4:12 PM
To: Mishler, Nicholas F
Subject: RE: Carmel project
Hello Nick,
It was a pleasure meeting you as well. We were able to meet with engineering yesterday and feel as though it
went pretty well. We are excited to start construction on this project and have the opportunity to do business in
Carmel.
Thank you for your email below. I am pulling together the necessary information and will be sending you a
package shortly.
Also, per our conversation on Tuesday, I have the following notes regarding what is needed to determine
building permit fees:
1. Submit the following information to Nick Mishler:
a. A site plan.
b. The building elevations.
222
c. A building section.
d. Floor plans for each level.
It is my understanding that I could email you the above information and that you could aid me in figuring out
the fees are associated with our project. Please advise if I have that correct so I can start pulling together that
information as well.
As long as I know the number of living units, I can calculate the fees. As mentioned in our meeting, you will
most likely pay for six inspections up front (2 footings, 1 rough-in, 1 meter base, 1 final, 1 landscaping). I can
also tell you in regards to the Parks & Rec Impact Fee, I have been told by Angie Conn that you would only be
required to pay 10% of the current rate, which would amount to $167.90 per unit.
Lastly, in determining our utility fees (in order to pay for our foundation permit), I will need to contact the
following people:
1. Water à Lisa Kempa (sp?) at 317-571-2443 Correct
2. Sewer à Depends on who will be servicing us.
a. Most likely Carmel Utilities
i. Grease Trap à Erin (sp?) Hoover (do you happen to have his contact
info?) Aaron Hoover can be reached at 317-571-2645
ii. Sanitary à ? If it is Carmel sewer, Lisa Kempa will be able to help
you with this too
b. If it is Clay Township
i. Sanitary à Ryan Hartman at 317-844-9200 Correct
Once I pay the fees determined by the above utilities, the building department, engineers and fire department
will review the foundation drawings, correct?
Correct
Also, as I mentioned, at some point after the plans are approved, we need to meet with either Bruce or Chris at
CFD to finalize suite numbers. If you have these on a PDF file you can forward to me and I can get some initial
comments back to you.
223
Please advise if there is anything incorrect in the above summary.
Thanks again and take care!
Bernida Egging
Vice President of Construction
cid:image001.gif@01CEB554.1C472CF0
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, September 18, 2013 10:59 AM
To: Bernida Egging
Subject: Carmel project
Hi Bernida-
It was great to meet you yesterday. I just wanted to follow up with you regarding the submittal process. Was
your group able to meet with the Carmel Engineering Department yesterday?
If you’d like, you can send me the application package and I can have it reviewed it as soon as you have the
required approvals. I will need the following:
· Completed application
· 3 signed affidavit stickers
· Site plan
224
· 3 full-size sets of building plans
· CD with identical building plans of the set you submitted to the State of Indiana
You can send to the following address:
Nick Mishler
City of Carmel
Building & Code Services – 1st Floor
One Civic Square
Carmel, IN 46032
In the meantime, if you need anything else, don’t hesitate to call.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
225
Mishler, Nicholas F
From:Bernida Egging [begging@spectrumretirement.com]
Sent:Thursday, September 19, 2013 4:12 PM
To:Mishler, Nicholas F
Subject:RE: Carmel project
Hello Nick,
It was a pleasure meeting you as well. We were able to meet with engineering yesterday and feel as though it went
pretty well. We are excited to start construction on this project and have the opportunity to do business in Carmel.
Thank you for your email below. I am pulling together the necessary information and will be sending you a package
shortly.
Also, per our conversation on Tuesday, I have the following notes regarding what is needed to determine building
permit fees:
1. Submit the following information to Nick Mishler:
a. A site plan.
b. The building elevations.
c. A building section.
d. Floor plans for each level.
It is my understanding that I could email you the above information and that you could aid me in figuring out the fees
are associated with our project. Please advise if I have that correct so I can start pulling together that information as
well.
Lastly, in determining our utility fees (in order to pay for our foundation permit), I will need to contact the following
people:
1. Water Lisa Kempa (sp?) at 317-571-2443
2. Sewer Depends on who will be servicing us.
a. Most likely Carmel Utilities
i. Grease Trap Erin (sp?) Hoover (do you happen to have his contact info?)
ii. Sanitary ?
b. If it is Clay Township
i. Sanitary Ryan Hartman at 317-844-9200
Once I pay the fees determined by the above utilities, the building department, engineers and fire department will
review the foundation drawings, correct?
Please advise if there is anything incorrect in the above summary.
Thanks again and take care!
Bernida Egging
Vice President of Construction
226
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, September 18, 2013 10:59 AM
To: Bernida Egging
Subject: Carmel project
Hi Bernida-
It was great to meet you yesterday. I just wanted to follow up with you regarding the submittal process. Was
your group able to meet with the Carmel Engineering Department yesterday?
If you’d like, you can send me the application package and I can have it reviewed it as soon as you have the
required approvals. I will need the following:
· Completed application
· 3 signed affidavit stickers
· Site plan
· 3 full-size sets of building plans
· CD with identical building plans of the set you submitted to the State of Indiana
You can send to the following address:
Nick Mishler
City of Carmel
227
Building & Code Services – 1st Floor
One Civic Square
Carmel, IN 46032
In the meantime, if you need anything else, don’t hesitate to call.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
228
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Wednesday, September 18, 2013 10:23 AM
To:Mishler, Nicholas F; Matt Gearheart
Cc:Matt Gearheart
Subject:RE: City of Carmel Commercial Submittal requirements
Nick,
Yes, but no one from our office was in attendance, only the Owner and General Contractor.
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0834 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, September 18, 2013 9:16 AM
To: Matt Gearheart
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Yes, I received them. Were your group able to meet with the Engineering Department yesterday?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Wednesday, September 18, 2013 10:01 AM
To: Mishler, Nicholas F
Cc: Laura Scott
Subject: RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
229
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
230
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Wednesday, September 18, 2013 10:01 AM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: City of Carmel Commercial Submittal requirements
Nick-
I am just following up to verify you received our CD with the Spectrum Senior Housing
drawings. (see attached transmittal). Could you please verify this and let me know if
you need any additional information?
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, August 27, 2013 10:42 AM
To: Matt Gearheart
Subject: City of Carmel Commercial Submittal requirements
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
231
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, September 17, 2013 5:00 PM
To:Mishler, Nicholas F
Cc:Hollibaugh, Mike P
Subject:PRIF for Spectrum (Highpointe on Meridian)
Hello, Nick –
I researched what our Dept. did for Bickford and PRIF, as it relates to Spectrum and what their fees will be.
For Bickford assisted living, the Planning Director supported a decrease in the Parks & Recreation Impact Fee (PRIF) so
that they would only be required to pay 10% of the fee for each assisted living unit (and $0 for the memory care units).
So, for Spectrum, we can do the same for the assisted living units to be 10% of the PRIF per unit. Then, for the memory
care units we would charge $0.00, and for the independent living units we would charge the normal PRIF rate per unit.
Please calculate the fees and forward them on to the Spectrum people and the JC Hart people. Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com
Please consider the environment before printing this e-mail
232
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, September 17, 2013 10:09 AM
To:Mishler, Nicholas F
Cc:Hohlt, William G
Subject:RE: Spectrum in town - bldg permit requirements
Yes, I believe so.
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com
Please consider the environment before printing this e-mail
_____________________________________________
From: Mishler, Nicholas F
Sent: Tuesday, September 17, 2013 8:17 AM
To: Conn, Angelina V; Hohlt, William G
Subject: RE: Spectrum in town - bldg permit requirements
Angie, are we still on for 11:30?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
-----Original Appointment-----
From: Conn, Angelina V
Sent: Friday, September 13, 2013 5:15 PM
To: Mishler, Nicholas F; Hohlt, William G
Subject: Spectrum in town - bldg permit requirements
When: Tuesday, September 17, 2013 11:30 AM-12:30 PM (GMT-05:00) Eastern Time (US & Canada).
Where: DOCS conf rm 3rd flr
233
Mishler, Nicholas F
From:Hohlt, William G
Sent:Wednesday, September 11, 2013 11:11 AM
To:Conn, Angelina V
Cc:Mishler, Nicholas F; Blanchard, Jim E
Subject:Re: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Sounds good
William Hohlt
Deputy Building Commissioner
City of Carmel
On Sep 11, 2013, at 11:06 AM, "Conn, Angelina V" <Aconn@carmel.in.gov> wrote:
Good morning, All –
Please make some time for a meeting, the late morning or early afternoon of Tuesday Sept. 17, to meet
with these guys about the next steps in the permitting process. I will send you a meeting invite soon,
once they give me the time.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W:
www.carmeldocs.com
Please consider the environment before printing this e-mail
From: John Hart [mailto:John@homeisjchart.com]
Sent: Wednesday, September 11, 2013 9:27 AM
To: Duncan, Gary R; Bernida Egging
Cc: Todd May; Rex King; Johnny Hart; Mike Longfellow; Fkregan@aol.com; Tom.Osborne@colliers.com;
Jim Shields; McBride, Mike T; Hollibaugh, Mike P; Conn, Angelina V; Barnes, David R
Subject: RE: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Gary,
Thanks for your help on this. I believe Todd May from my office is trying to coordinate a meeting with
Engineering Department, the Building Department and the Fire Marshall on Tuesday the 17th while Spectrum
representatives are in town. The development team on the Highpointe project, J C Hart, Spectrum and Frank
Regan, are trying to have a more clear picture of the remaining steps necessary to gain Carmel approval to
start site work and then what is required to commence vertical building construction. While we have been
through the process in Carmel many times, Spectrum has not, and we thought this meeting could be useful
for everyone to be prepared to take necessary steps to meet these remaining requirements. Obviously, given
the weather constraints closing in on us here in Central Indiana timing is of the essence.
Best regards,
John C. Hart, Jr.
President
J.C. Hart Company, Inc.
234
805 City Center Drive, #120
Carmel, IN 46032
ph 317.573.4800
fx 317.663.0083
www.HomeIsJCHart.com
<image001.png>
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Monday, September 09, 2013 10:56 AM
To: John Hart; Bernida Egging
Cc: Todd May; Rex King; Johnny Hart; Mike Longfellow; Fkregan@aol.com; Tom.Osborne@colliers.com;
Jim Shields; McBride, Mike T; Hollibaugh, Mike P; Conn, Angelina V; Barnes, David R
Subject: RE: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Good morning all.
Mr. Hart, do we need the plat approved at the BPW meeting on the 18th or the first meeting in October?
I have no issues with moving the approval of the plat ahead of having the surety’s in hand, provided that
we have them before the start of the construction.
Gary
From: John Hart [mailto:John@homeisjchart.com]
Sent: Thursday, September 05, 2013 4:41 PM
To: Bernida Egging
Cc: Duncan, Gary R; Todd May; Rex King; Johnny Hart; Mike Longfellow; Fkregan@aol.com;
Tom.Osborne@colliers.com; Jim Shields
Subject: RE: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Bernida,
I am copying Gary Duncan with your email below. Gary, Spectrum Retirement is building the Senior Living
project in Highpointe. The updated and final revisions to the overall Highpointe site engineering drawings
were filed today by Weihe Engineers for the department’s review. Spectrum will probably be ready to close
and start site work before J C Hart is ready to begin our project but we should be close behind. We have
reviewed with Spectrum the site improvements they would need to complete in their project to assure the
overall site can be developed. Before we can close on the site the plat must be recorded. I understand the
plat must be approved by the Board of Works and the surety requirements must be posted to record the plat
and schedule the preconstruction meeting.
Spectrum is wanting to know if they can just post surety on the improvements for their site to get the plat
recorded since our schedule is behind their schedule.
Spectrum will be in town on the 17th and we may want to meet with the Engineering Department, building
department and the Fire Marshall so they can have a complete picture of what the City will require for
Spectrum to have the right to start site work, get building permits and start vertical improvements.
Let us know if you are the right person to meet with and I can have Todd May try and coordinate meetings
with the Building Department and the Fire Marshall.
Thanks so much.
John C. Hart, Jr.
President
J.C. Hart Company, Inc.
805 City Center Drive, #120
235
Carmel, IN 46032
ph 317.573.4800
fx 317.663.0083
www.HomeIsJCHart.com
<image001.png>
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, September 05, 2013 3:25 PM
To: John Hart
Subject: Carmel Senior Living: Surety Requirements for Site Development
Hello John,
It was a pleasure speaking with you this afternoon. Thank you for your insight on the project/master
site development.
Per our conversation, you noted that you could forward a message to Gary Dunkin (sp?) at the
Engineering office regarding the surety requirements for our site, specifically:
What surety would be required for the site development of the Spectrum site (east most lot) to
begin if Spectrum were to start construction prior to the other developers onsite?
This would help us understand the bonding we would need to get in place prior to construction starting.
As a note, we would like to start construction by October 1, 2013.
Thank you in advance for your help. It is appreciated.
Bernida Egging
Vice President of Construction
<image002.gif>
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
236
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Wednesday, September 11, 2013 11:07 AM
To:Mishler, Nicholas F; Blanchard, Jim E; Hohlt, William G
Subject:FW: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Good morning, All –
Please make some time for a meeting, the late morning or early afternoon of Tuesday Sept. 17, to meet with these guys
about the next steps in the permitting process. I will send you a meeting invite soon, once they give me the time.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: John Hart [mailto:John@homeisjchart.com]
Sent: Wednesday, September 11, 2013 9:27 AM
To: Duncan, Gary R; Bernida Egging
Cc: Todd May; Rex King; Johnny Hart; Mike Longfellow; Fkregan@aol.com; Tom.Osborne@colliers.com; Jim Shields;
McBride, Mike T; Hollibaugh, Mike P; Conn, Angelina V; Barnes, David R
Subject: RE: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Gary,
Thanks for your help on this. I believe Todd May from my office is trying to coordinate a meeting with Engineering
Department, the Building Department and the Fire Marshall on Tuesday the 17th while Spectrum representatives are in town.
The development team on the Highpointe project, J C Hart, Spectrum and Frank Regan, are trying to have a more clear
picture of the remaining steps necessary to gain Carmel approval to start site work and then what is required to commence
vertical building construction. While we have been through the process in Carmel many times, Spectrum has not, and we
thought this meeting could be useful for everyone to be prepared to take necessary steps to meet these remaining
requirements. Obviously, given the weather constraints closing in on us here in Central Indiana timing is of the essence.
Best regards,
John C. Hart, Jr.
President
J.C. Hart Company, Inc.
805 City Center Drive, #120
Carmel, IN 46032
ph 317.573.4800
fx 317.663.0083
www.HomeIsJCHart.com
untitled
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Monday, September 09, 2013 10:56 AM
To: John Hart; Bernida Egging
237
Cc: Todd May; Rex King; Johnny Hart; Mike Longfellow; Fkregan@aol.com; Tom.Osborne@colliers.com; Jim Shields;
McBride, Mike T; Hollibaugh, Mike P; Conn, Angelina V; Barnes, David R
Subject: RE: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Good morning all.
Mr. Hart, do we need the plat approved at the BPW meeting on the 18th or the first meeting in October? I have no issues
with moving the approval of the plat ahead of having the surety’s in hand, provided that we have them before the start
of the construction.
Gary
From: John Hart [mailto:John@homeisjchart.com]
Sent: Thursday, September 05, 2013 4:41 PM
To: Bernida Egging
Cc: Duncan, Gary R; Todd May; Rex King; Johnny Hart; Mike Longfellow; Fkregan@aol.com; Tom.Osborne@colliers.com;
Jim Shields
Subject: RE: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Bernida,
I am copying Gary Duncan with your email below. Gary, Spectrum Retirement is building the Senior Living project in
Highpointe. The updated and final revisions to the overall Highpointe site engineering drawings were filed today by Weihe
Engineers for the department’s review. Spectrum will probably be ready to close and start site work before J C Hart is ready
to begin our project but we should be close behind. We have reviewed with Spectrum the site improvements they would need
to complete in their project to assure the overall site can be developed. Before we can close on the site the plat must be
recorded. I understand the plat must be approved by the Board of Works and the surety requirements must be posted to
record the plat and schedule the preconstruction meeting.
Spectrum is wanting to know if they can just post surety on the improvements for their site to get the plat recorded since our
schedule is behind their schedule.
Spectrum will be in town on the 17th and we may want to meet with the Engineering Department, building department and
the Fire Marshall so they can have a complete picture of what the City will require for Spectrum to have the right to start site
work, get building permits and start vertical improvements.
Let us know if you are the right person to meet with and I can have Todd May try and coordinate meetings with the Building
Department and the Fire Marshall.
Thanks so much.
John C. Hart, Jr.
President
J.C. Hart Company, Inc.
805 City Center Drive, #120
Carmel, IN 46032
ph 317.573.4800
fx 317.663.0083
www.HomeIsJCHart.com
untitled
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, September 05, 2013 3:25 PM
238
To: John Hart
Subject: Carmel Senior Living: Surety Requirements for Site Development
Hello John,
It was a pleasure speaking with you this afternoon. Thank you for your insight on the project/master site development.
Per our conversation, you noted that you could forward a message to Gary Dunkin (sp?) at the Engineering office
regarding the surety requirements for our site, specifically:
What surety would be required for the site development of the Spectrum site (east most lot) to begin if
Spectrum were to start construction prior to the other developers onsite?
This would help us understand the bonding we would need to get in place prior to construction starting. As a note, we
would like to start construction by October 1, 2013.
Thank you in advance for your help. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
239
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Monday, September 09, 2013 12:28 PM
To:Blanchard, Jim E
Cc:Mishler, Nicholas F; Hohlt, William G
Subject:FW: Carmel Senior Living: Surety Requirements for Highpointe Site Development (Spectrum)
Hi, Jim – Just wanted to keep you ‘in the loop’ about this. Please read the email chain below.
Also, per the City Engineering Dept., Spectrum will be in town on Sept. 17th and they may want to meet with the
Engineering Department, Building Department, and the Fire Marshall so they can have a complete picture of what the
City will require for Spectrum to have the right to start site work, get building permits, and start vertical improvements.
Thanks,
Angie
From: Duncan, Gary R
Sent: Monday, September 09, 2013 10:56 AM
To: John Hart; Bernida Egging
Cc: Todd May; Rex King; Johnny Hart; Mike Longfellow; Fkregan@aol.com; Tom.Osborne@colliers.com; Jim Shields;
McBride, Mike T; Hollibaugh, Mike P; Conn, Angelina V; Barnes, David R
Subject: RE: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Good morning all.
Mr. Hart, do we need the plat approved at the BPW meeting on the 18th or the first meeting in October? I have no issues
with moving the approval of the plat ahead of having the surety’s in hand, provided that we have them before the start
of the construction.
Gary
From: John Hart [mailto:John@homeisjchart.com]
Sent: Thursday, September 05, 2013 4:41 PM
To: Bernida Egging
Cc: Duncan, Gary R; Todd May; Rex King; Johnny Hart; Mike Longfellow; Fkregan@aol.com; Tom.Osborne@colliers.com;
Jim Shields
Subject: RE: Carmel Senior Living: Surety Requirements for Highpointe Site Development
Bernida,
I am copying Gary Duncan with your email below. Gary, Spectrum Retirement is building the Senior Living project in
Highpointe. The updated and final revisions to the overall Highpointe site engineering drawings were filed today by Weihe
Engineers for the department’s review. Spectrum will probably be ready to close and start site work before J C Hart is ready
to begin our project but we should be close behind. We have reviewed with Spectrum the site improvements they would need
to complete in their project to assure the overall site can be developed. Before we can close on the site the plat must be
recorded. I understand the plat must be approved by the Board of Works and the surety requirements must be posted to
record the plat and schedule the preconstruction meeting.
Spectrum is wanting to know if they can just post surety on the improvements for their site to get the plat recorded since our
schedule is behind their schedule.
240
Spectrum will be in town on the 17th and we may want to meet with the Engineering Department, building department and
the Fire Marshall so they can have a complete picture of what the City will require for Spectrum to have the right to start site
work, get building permits and start vertical improvements.
Let us know if you are the right person to meet with and I can have Todd May try and coordinate meetings with the Building
Department and the Fire Marshall.
Thanks so much.
John C. Hart, Jr.
President
J.C. Hart Company, Inc.
805 City Center Drive, #120
Carmel, IN 46032
ph 317.573.4800
fx 317.663.0083
www.HomeIsJCHart.com
untitled
From: Bernida Egging [mailto:begging@spectrumretirement.com]
Sent: Thursday, September 05, 2013 3:25 PM
To: John Hart
Subject: Carmel Senior Living: Surety Requirements for Site Development
Hello John,
It was a pleasure speaking with you this afternoon. Thank you for your insight on the project/master site development.
Per our conversation, you noted that you could forward a message to Gary Dunkin (sp?) at the Engineering office
regarding the surety requirements for our site, specifically:
What surety would be required for the site development of the Spectrum site (east most lot) to begin if
Spectrum were to start construction prior to the other developers onsite?
This would help us understand the bonding we would need to get in place prior to construction starting. As a note, we
would like to start construction by October 1, 2013.
Thank you in advance for your help. It is appreciated.
Bernida Egging
Vice President of Construction
200 Spruce St., Suite 200
Denver, CO 80230
241
ph: 303.360.8812
fax: 303.360.8814
begging@spectrumretirement.com
Check out our digital lifestyle magazine!
242
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Thursday, August 08, 2013 5:05 PM
To:Mishler, Nicholas F
Subject:RE: Application for Variance
Thank you very much!
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0834 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, August 08, 2013 3:55 PM
To: Laura Scott
Subject: RE: Application for Variance
I have forwarded this to all of our plan reviewers.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Laura Scott [mailto:lscott@designwithinsight.com]
Sent: Thursday, August 08, 2013 4:22 PM
To: Mishler, Nicholas F; Haboush, David G
Subject: Application for Variance
We have submitted the new Carmel Senior Living project for plan review. During the IDHS review there was an RFI
generated regarding door encroachment into path of egress within individual dwelling units. We are submitting an
Application for Variance. Per the application requirements I am submitting to you a copy of the variance application,
which I have attached. I would greatly appreciate it if you would be so kind as to send written acknowledgement of
receipt.
My apologies if you are not the individual that I am to send this to. If you are not, would you please direct me to the
correct person.
Thank you,
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0834 direct | designwithinsight.com
243
Mishler, Nicholas F
From:Laura Scott [lscott@designwithinsight.com]
Sent:Thursday, August 08, 2013 4:22 PM
To:Mishler, Nicholas F; Haboush, David G
Subject:Application for Variance
We have submitted the new Carmel Senior Living project for plan review. During the IDHS review there was an RFI
generated regarding door encroachment into path of egress within individual dwelling units. We are submitting an
Application for Variance. Per the application requirements I am submitting to you a copy of the variance application,
which I have attached. I would greatly appreciate it if you would be so kind as to send written acknowledgement of
receipt.
My apologies if you are not the individual that I am to send this to. If you are not, would you please direct me to the
correct person.
Thank you,
LAURA M. SCOTT, Assoc. AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0834 direct | designwithinsight.com
244
Mishler, Nicholas F
From:Duffy, John M
Sent:Tuesday, July 16, 2013 12:26 PM
To:Matt Gearheart
Cc:Kempa, Lisa L; Mishler, Nicholas F
Subject:RE: Spectrum Carmel Senior Living
Matt,
We typically require that water and sanitary sewer fees be paid prior to issuing any building permit, including a foundation
permit. Please contact Lisa Kempa at 317-571-2443 and she can assist in determining what the fee will be. Thank you.
J Duffy
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Tuesday, July 16, 2013 11:31 AM
To: Mishler, Nicholas F; Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: Laura Scott
Subject: RE: Spectrum Carmel Senior Living
Good morning,
We are just following up on this Foundation approval request. Could you please let us know if you require any
additional information prior to issuance to Mr. Mishler. (If you have already responded, please ignore this email).
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 08, 2013 2:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: Matt Gearheart
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
245
Please consider the environment before printing this email
246
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Tuesday, July 16, 2013 11:31 AM
To:Mishler, Nicholas F; Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari,
John A; Mindham, Daren; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-ryan.hartman@ctrwd.org';
Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc:Laura Scott
Subject:RE: Spectrum Carmel Senior Living
Good morning,
We are just following up on this Foundation approval request. Could you please let us know if you require any
additional information prior to issuance to Mr. Mishler. (If you have already responded, please ignore this email).
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 08, 2013 2:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: Matt Gearheart
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
247
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Friday, July 12, 2013 12:18 PM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: Spectrum Carmel Senior Living
Nick-
We are forwarding the requested extra prints. Do you anticipate there will be more?
When do you anticipate we will have heard from all the departments to submit
the official Foundation prints? The Developer would like to get this portion started
soon and I need to let him know a reasonable time-frame.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, July 12, 2013 10:45 AM
To: Matt Gearheart
Subject: RE: Spectrum Carmel Senior Living
We can’t take in the application until all of the departments on the attached sheet have what they need. In some cases this is hard sets of plans and in
other it is just a pdf. I have attached the submittal requirements sheet.
I sent an email to all departments on July 8 and received a few responses. I have attached those emails so you can see what each department needs.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Friday, July 12, 2013 11:40 AM
To: Mishler, Nicholas F
Subject: RE: Spectrum Carmel Senior Living
So this is in addition to the pdf files and the drawings that will be sent to the City?
I will send the requested plans – with your e-mail attached. No application
or fees at this time, I assume?
Thanks for your help,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, July 12, 2013 10:36 AM
248
To: Matt Gearheart
Subject: RE: Spectrum Carmel Senior Living
Have you sent copies of plans to the departments who requested them? I believe Utilities, Duke Energy & Engineering have all requested sets of plans.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Friday, July 12, 2013 11:24 AM
To: Mishler, Nicholas F
Subject: RE: Spectrum Carmel Senior Living
Good Morning, Nick-
Just as a follow-up, are we still waiting for a few department responses before submitting
the Foundations drawings? Please let me know, or if there is anything additional you need
from our end.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 08, 2013 2:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: Matt Gearheart
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
249
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Friday, July 12, 2013 11:40 AM
To:Mishler, Nicholas F
Subject:RE: Spectrum Carmel Senior Living
So this is in addition to the pdf files and the drawings that will be sent to the City?
I will send the requested plans – with your e-mail attached. No application
or fees at this time, I assume?
Thanks for your help,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, July 12, 2013 10:36 AM
To: Matt Gearheart
Subject: RE: Spectrum Carmel Senior Living
Have you sent copies of plans to the departments who requested them? I believe Utilities, Duke Energy & Engineering have all requested sets of plans.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Friday, July 12, 2013 11:24 AM
To: Mishler, Nicholas F
Subject: RE: Spectrum Carmel Senior Living
Good Morning, Nick-
Just as a follow-up, are we still waiting for a few department responses before submitting
the Foundations drawings? Please let me know, or if there is anything additional you need
from our end.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 08, 2013 2:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
250
Cc: Matt Gearheart
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
251
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Friday, July 12, 2013 11:24 AM
To:Mishler, Nicholas F
Subject:RE: Spectrum Carmel Senior Living
Good Morning, Nick-
Just as a follow-up, are we still waiting for a few department responses before submitting
the Foundations drawings? Please let me know, or if there is anything additional you need
from our end.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 08, 2013 2:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: Matt Gearheart
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
252
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, July 09, 2013 9:57 AM
To:Mishler, Nicholas F
Cc:'mgearheart@designwithinsight.com'; Blanchard, Jim E
Subject:RE: Spectrum Carmel Senior Living (docket no 13020020 ADLS)
Hi, Nick -
The site plan, Sheet C300D, matches what the Plan Commission approved. The Planning Dept. is okay with you issuing a
foundation only approval. Will they be required to pin and stake the footers of the building?
Later, we will need pdf’s of the exterior architectural building elevations, so that we can make sure what they want to
build is what the Plan Commission approved.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mishler, Nicholas F
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living (docket no 13020020 ADLS)
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
253
Mishler, Nicholas F
From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com]
Sent:Monday, July 08, 2013 5:11 PM
To:Mishler, Nicholas F
Cc:mgearheart@designwithinsight.com
Subject:RE: Spectrum Carmel Senior Living
Duke Energy has a site layout plan only. We will require a full set of construction plans when actual construction is
planned.
Shirley Hunter
Sr. Distribution Eng Specialist
Duke Energy
16475 Southpark Dr
Westfield, IN 46074
317.896.6711
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
254
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Monday, July 08, 2013 4:53 PM
To:Mishler, Nicholas F
Subject:RE: Spectrum Carmel Senior Living
Nick-
Will this need to be sent to John before we submit for the Foundations Permit,
or is this 2 additional copies I should send along with the Foundations Submittal?
Also, is there an independent fee or form required for the water/sanitary?
Just want to be sure I have all my ducks in a row.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 08, 2013 3:06 PM
To: Matt Gearheart; Mishler, Nicholas F
Cc: Kempa, Lisa L
Subject: RE: Spectrum Carmel Senior Living
Matt,
As far as water and sanitary sewer is concerned we are ready to review your plans. Please submit two sets to;
Carmel Utilities
760 3rd Ave SW
Carmel, IN 46033
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Monday, July 08, 2013 3:58 PM
To: Duffy, John M; Mishler, Nicholas F
Cc: Kempa, Lisa L
Subject: RE: Spectrum Carmel Senior Living
John-
Attached are pdfs of the Utility Plan and Water Main Plan drawings for this Foundation submittal.
My understanding is these e-mail approvals are required prior to us submitting the hard copies.
(We have those ready to go as well).
Please let me know if I am incorrect or you need any additional drawings
or information.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
255
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 08, 2013 2:39 PM
To: Mishler, Nicholas F
Cc: Matt Gearheart; Kempa, Lisa L
Subject: RE: Spectrum Carmel Senior Living
Nick and Matt,
We will need hard copies of the plans in order to properly review the water and sanitary sewer plan. In order to
determine the water and sanitary connection fees we will need to have an estimate provided on the projected average
monthly water consumption. Thank you.
J Duffy
Director of Utilities
571-2451
From: Mishler, Nicholas F
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
256
Mishler, Nicholas F
From:Duffy, John M
Sent:Monday, July 08, 2013 4:06 PM
To:'Matt Gearheart'; Mishler, Nicholas F
Cc:Kempa, Lisa L
Subject:RE: Spectrum Carmel Senior Living
Matt,
As far as water and sanitary sewer is concerned we are ready to review your plans. Please submit two sets to;
Carmel Utilities
760 3rd Ave SW
Carmel, IN 46033
From: Matt Gearheart [mailto:mgearheart@designwithinsight.com]
Sent: Monday, July 08, 2013 3:58 PM
To: Duffy, John M; Mishler, Nicholas F
Cc: Kempa, Lisa L
Subject: RE: Spectrum Carmel Senior Living
John-
Attached are pdfs of the Utility Plan and Water Main Plan drawings for this Foundation submittal.
My understanding is these e-mail approvals are required prior to us submitting the hard copies.
(We have those ready to go as well).
Please let me know if I am incorrect or you need any additional drawings
or information.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 08, 2013 2:39 PM
To: Mishler, Nicholas F
Cc: Matt Gearheart; Kempa, Lisa L
Subject: RE: Spectrum Carmel Senior Living
Nick and Matt,
We will need hard copies of the plans in order to properly review the water and sanitary sewer plan. In order to
determine the water and sanitary connection fees we will need to have an estimate provided on the projected average
monthly water consumption. Thank you.
J Duffy
Director of Utilities
571-2451
257
From: Mishler, Nicholas F
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
258
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Monday, July 08, 2013 3:58 PM
To:Duffy, John M; Mishler, Nicholas F
Cc:Kempa, Lisa L
Subject:RE: Spectrum Carmel Senior Living
John-
Attached are pdfs of the Utility Plan and Water Main Plan drawings for this Foundation submittal.
My understanding is these e-mail approvals are required prior to us submitting the hard copies.
(We have those ready to go as well).
Please let me know if I am incorrect or you need any additional drawings
or information.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 08, 2013 2:39 PM
To: Mishler, Nicholas F
Cc: Matt Gearheart; Kempa, Lisa L
Subject: RE: Spectrum Carmel Senior Living
Nick and Matt,
We will need hard copies of the plans in order to properly review the water and sanitary sewer plan. In order to
determine the water and sanitary connection fees we will need to have an estimate provided on the projected average
monthly water consumption. Thank you.
J Duffy
Director of Utilities
571-2451
From: Mishler, Nicholas F
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
259
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
260
Mishler, Nicholas F
From:Duffy, John M
Sent:Monday, July 08, 2013 3:39 PM
To:Mishler, Nicholas F
Cc:'mgearheart@designwithinsight.com'; Kempa, Lisa L
Subject:RE: Spectrum Carmel Senior Living
Nick and Matt,
We will need hard copies of the plans in order to properly review the water and sanitary sewer plan. In order to
determine the water and sanitary connection fees we will need to have an estimate provided on the projected average
monthly water consumption. Thank you.
J Duffy
Director of Utilities
571-2451
From: Mishler, Nicholas F
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
261
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Monday, July 08, 2013 3:15 PM
To:Mishler, Nicholas F
Subject:RE: Spectrum Carmel Senior Living
We have not seen any plans.We will need two paper sets of plans. Thanks.
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2267
From: Mishler, Nicholas F
Sent: Monday, July 08, 2013 3:13 PM
To: Duffy, John M; Kempa, Lisa L; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K; 'Hartman-
ryan.hartman@ctrwd.org'; Conn, Angelina V; Donahue-Wold, Alexia K; Littlejohn, David W; Kass, Joslyn
Cc: 'mgearheart@designwithinsight.com'
Subject: Spectrum Carmel Senior Living
Good afternoon-
I have been contacted by Matt Gearheart regarding plans that will be submitted for the new Spectrum Carmel Senior Living Center. This will be a new
senior living center located at the SW corner of 136th & Illinois St.
The builder is seeking foundation only approval at this time.
Please let me know what your department will need prior to issuance, and please also copy Matt on your replies.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
262
Mishler, Nicholas F
From:Mascari, John A
Sent:Monday, July 08, 2013 3:13 PM
To:Mishler, Nicholas F
Subject:Automatic reply: Spectrum Carmel Senior Living
Will be out of office till July 2nd till July 15th call 317 733-2855 if you need immediate assistance
John
263
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Monday, July 08, 2013 2:51 PM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached please find the Structural drawings (2 of 2) of the Foundation Submittal.
This is the last attachment of the package.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:50 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached please find the Structural drawings (1 of 2) for the Foundation Submittal.
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:45 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached please find the MEP and Specification manual for the Foundation Submittal.
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:44 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached here are Civil Sheets of this Foundation Submittal.
Thank you,
264
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:35 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: Spectrum Retirement Community - Carmel Senior Living
Nick-
Per our phone conversation, attached please find the Cover Sheet and
Architectural Floor Plans for the Foundation Package Submittal of the
Spectrum Retirement Community project: ‘Carmel Senior Living’.
This is a new multi-family development to be located at SW quadrant of
136th and Illinois Streets. I believe the Owner received Site Plan approval
on June 18th under docket No. 13020020 ADLS, Zoning ordinance Z-559-12.
The Cover Sheet has the sheet index, unit matrix and basic building information.
I will follow up with a few separate e-mails to send you other basic drawing
information. Please let me know if you need any additional information.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0817 direct | designwithinsight.com
265
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Monday, July 08, 2013 2:50 PM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached please find the Structural drawings (1 of 2) for the Foundation Submittal.
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:45 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached please find the MEP and Specification manual for the Foundation Submittal.
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:44 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached here are Civil Sheets of this Foundation Submittal.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:35 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: Spectrum Retirement Community - Carmel Senior Living
Nick-
Per our phone conversation, attached please find the Cover Sheet and
Architectural Floor Plans for the Foundation Package Submittal of the
Spectrum Retirement Community project: ‘Carmel Senior Living’.
This is a new multi-family development to be located at SW quadrant of
266
136th and Illinois Streets. I believe the Owner received Site Plan approval
on June 18th under docket No. 13020020 ADLS, Zoning ordinance Z-559-12.
The Cover Sheet has the sheet index, unit matrix and basic building information.
I will follow up with a few separate e-mails to send you other basic drawing
information. Please let me know if you need any additional information.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0817 direct | designwithinsight.com
267
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Monday, July 08, 2013 2:45 PM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached please find the MEP and Specification manual for the Foundation Submittal.
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:44 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached here are Civil Sheets of this Foundation Submittal.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:35 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: Spectrum Retirement Community - Carmel Senior Living
Nick-
Per our phone conversation, attached please find the Cover Sheet and
Architectural Floor Plans for the Foundation Package Submittal of the
Spectrum Retirement Community project: ‘Carmel Senior Living’.
This is a new multi-family development to be located at SW quadrant of
136th and Illinois Streets. I believe the Owner received Site Plan approval
on June 18th under docket No. 13020020 ADLS, Zoning ordinance Z-559-12.
The Cover Sheet has the sheet index, unit matrix and basic building information.
I will follow up with a few separate e-mails to send you other basic drawing
information. Please let me know if you need any additional information.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0817 direct | designwithinsight.com
268
269
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Monday, July 08, 2013 2:44 PM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:RE: Spectrum Retirement Community - Carmel Senior Living
Nick-
Attached here are Civil Sheets of this Foundation Submittal.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
816.569.0817 direct | designwithinsight.com
From: Matt Gearheart
Sent: Monday, July 08, 2013 1:35 PM
To: 'nmishler@carmel.in.gov'
Cc: Laura Scott
Subject: Spectrum Retirement Community - Carmel Senior Living
Nick-
Per our phone conversation, attached please find the Cover Sheet and
Architectural Floor Plans for the Foundation Package Submittal of the
Spectrum Retirement Community project: ‘Carmel Senior Living’.
This is a new multi-family development to be located at SW quadrant of
136th and Illinois Streets. I believe the Owner received Site Plan approval
on June 18th under docket No. 13020020 ADLS, Zoning ordinance Z-559-12.
The Cover Sheet has the sheet index, unit matrix and basic building information.
I will follow up with a few separate e-mails to send you other basic drawing
information. Please let me know if you need any additional information.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0817 direct | designwithinsight.com
270
Mishler, Nicholas F
From:Matt Gearheart [mgearheart@designwithinsight.com]
Sent:Monday, July 08, 2013 2:35 PM
To:Mishler, Nicholas F
Cc:Laura Scott
Subject:Spectrum Retirement Community - Carmel Senior Living
Nick-
Per our phone conversation, attached please find the Cover Sheet and
Architectural Floor Plans for the Foundation Package Submittal of the
Spectrum Retirement Community project: ‘Carmel Senior Living’.
This is a new multi-family development to be located at SW quadrant of
136th and Illinois Streets. I believe the Owner received Site Plan approval
on June 18th under docket No. 13020020 ADLS, Zoning ordinance Z-559-12.
The Cover Sheet has the sheet index, unit matrix and basic building information.
I will follow up with a few separate e-mails to send you other basic drawing
information. Please let me know if you need any additional information.
Thank you,
MATT GEARHEART, Associate AIA
Gastinger Walker Harden + BeeTriplett Buck
817 Wyandotte | Kansas City, MO | 64105
816.569.0817 direct | designwithinsight.com