Loading...
HomeMy WebLinkAbout236151 08/19/14 cgq,,f CITY OF CARMEL, INDIANA VENDOR: 108335 GS j; ONE CIVIC SQUARE GLOBE ASHPHALT PAVING CO CHECK AMOUNT: $****31,241.90* ?� CARMEL, INDIANA 46032 PO BOX 19168 CHECK NUMBER: 236151 INDIANAPOLIS IN 46219 CHECK DATE: 08/19/14 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 202 4350900 31842 1 31,241.90 OLD TOWN ALLEY PAVING CONSTRUCTION PROJECT INVOICE DATE: August 8, 2014 COMPANY NAME: Globe Asphalt Paving Co., Inc. AND ADDRESS 6445 E. 30" Street Indianapolis, Indiana 46219-1006 TELEPHONE NO.: (317)-568-9683 FAX NO.: (317)-568-4277 PROJECT NAME: NE Quad Old Town Alley Project. PROJECT NO.: City of Carmel Project#13-06. INVOICE NO.: 1 Construction pay items as per Progress Pay Estimate No. 1 as shown on the attached invoice for work completed between the dates of July 1, 2014 to July 31, 2014 TOTAL PAY THIS ESTIMATE: $ 34,713.22 MINUS 10% RETAINAGE: (-) $ 3,471.32 TOTAL NOW DUE: $ 31,241.90 Submitted by CrossRoad Engineers, PC 1'414��L 8 ! PrpjeoMpresentaive - signed name a e Lance Stahley Project Representative - printed name i of 1 CITY OF CARMEL CARMEL-2013 NE Quad Alley Project P.O.#31842 PROJECT NO.13-06 PROGRESS PAY ESTIMATE NO. 01 For work done during the period of; 711114 through 7131114 :,g,gg g" .1teft "I. I Mobilization Demobilization 1.00 LS 1.00 LS 36.500.00 $6,500.00 $6,500.00 2 Maintenance of Traffic 1.00 LS 1.00 LS $1,500.00 $1,500.00 $1,500.00 3 Clearing Right of Way 1.00 LS 1.00 LS $1,250.00 $1,260.00 $1.250.00 4 Common Excavation 281.50 CYS 281.50 CYS 1 $34.36 $9,672.34 $9,672.34 5 PCCP for Approach,6 IN. SYS SYS $106.65 6 Compacted Agg.No.53,Base TON TON $59.93 7 Porous Asphalt Surface,4"Depth SFT SFT $3.85 8 Aggregate for Porous Pavement,08 Washed Stor TON TON $25.29 9 Aggregate for Porous Pavement,(12 Stone 180.36 TON 180.36 TON $17.83 $3,216.82 $3.215.82 10 Nonwoven Geotextile Fabric 622.001 SYS 622.00 SYS- $1.48 $920.56 $920.66 11 WDouble Wall Perforated HOPE Underdrain 360.001 LFT 350.00 LFT $9.87 $3,454.50 $3,454.50 12 8"SDR 35 PVC 20.00 LFT 20.00 LFT $16.00 $320.00 $320.00 13 Nyloplast Drainage Structure 4.00 EA 4.00 EA $670.00 $2.680.00 $2,680.00 14 Mechanically Core Structure EA- EA $1,360.00 15 Concrete Slopewall EA EA $443.00 16 Water Valve.Adjust to Grade EA EA $156.00 17 Sanitary Manhole EA_ LEA] $6.509_.�O 18 Nursery Sodding SYS SYS $14.00 19 Topsoil(Undistributed) SYS I SYS $6.70 20 Erosion Control Measures 1 1.001 LS 1 1.001 LS 1 $5,200.00 $6,200.00 $5,200.00 TOTAL $34.713.22 $34,713.22 TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $34,713.22 TOTAL PAY TO DATE $34,713.22 DEDUCT 10% RETAINAGE $3,471.32 DEDUCT PREVIOUS NET PAY ESTIMATES NET PAY ESTIMATE NO. 01 $31,241.90 CrossRoad Engineers,PC zj", Inspecting Firm ByAa e GLOBE ASPHALT PAVING CO.,INC. 07 (C/ Contractor By Date Prescribed by State Board of Accounts City Forth No.201(Rev.1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Globe Asphalt Paving Purchase Order No. _ 6445 E. 30th Street Terms Indianapolis, IN 46219-1006 Date Due Invoice Invoice Description Date Number (or note attached invoice(s)or bill(s) Amount 8/8/2014 1 NE Quad Alley Project $ 31,241.90 Total $ 31,241.90 hereby certify that the attached invoice(s), or bill(s), is (are)true and correct and I have audited same in accordance with IC 5-11-10-1.6. ,20 Clerk-Treasurer VOUCHER NO WARRANT NO. Globe Asphalt Paving ALLOWED 20 6445 E. 30th Street IN SUM OF$ Indianapolis, IN 46219-1006 $ 31,241.90 ON ACCOUNT OF APPROPRIATION FOR Board Members Po#or INVOICE NO. ACCT#!TITLE AMOUNT DEPT# I hereby certify that the attached invoice(s), or 31842 1 202-4350900 $ 31,241.90 bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except 8/18/2014 Signature City Engineer Cost Distribution ledger classification if Title claim paid motor vehicle highway fund