Loading...
HomeMy WebLinkAboutFlixBrewhouse Merchants Sq ComCheck.pdf. .,. �. .: .��. � . �� , �.. � , � � i. � Interior Lighting and Power Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Flix Bewhouse Construction Site: MerchanCs Square Carmel, IN Owner/Agent: Hospitality Investors 2000 South IH35 Suite Q11 Round Rock, TX 78681 512-238-0938 Section 2: Interior Lighting and Power Calculation A Area Category Des ig ner/Co ntracto r: Larson Binkley, Inc. 310 W 20th Street Suite 200 Kansas Clty, TX 64108 816 997 9601 B C D Floor Area Allowed Allowed Watts (it2) Watts! ft2 (B x C) Theather (Motion Picture Theater:Audience/Seating Area) 20578 12 24694 Lounge (Common Space Types:Dining Area - Bar Lounge/Leisure) 4099 1.4 5739 Kitchen (Common Space Types:Food Preparation) 3861 12 4633 Restroom (Common Space Types:Restrooms) 1128 0.9 1015 Stairs (Common Space Types:Stairs-Active) 160 0.6 96 Hallways (Common Space Types:Corridor(fransitlon) 8511 0.5 4256 Office (Common Space Types:Office - Enclosed) 106 1.1 117 - � Total Allowed Watts = 40549 Section 3: Interior Lighting Fixture Schedule A B C D E Flxture ID : Description f Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Flxtures Watt. Theatk{er ( Motio� Picture Theatgr:Aadience/Seating Area�20578 sq.R� �� , LED 6: D1: 8" Downlight: Other: � �� 1 68 145 � 9860 LED 6 copy 1: G1: Wall Sconce: Other: 1 52 69 3588 LED 8: F1: Flexible LED Tape 4.4w/ft: Other: 1 58 4.4 255.2 Linear Fluorescent 1: St: 4' Strip: 48" T8 32W: Electronic: 2 20 69 1380 LED 13: Z1: Downlight LED PAR 16W: 1 49 16 784 _ ... . .. ..... ..__ .... .... . .. . Lounge ( Common Space Types;Dining Area - Bar Lounge/Leisure 4099 sq.ft.) . � ' LED 3: A3: Spot Llght: LED A Lamp 25W: � � 1 7� 25 175 LED 4: B1: LED Pendant: Other: 1 9 60 540 LED 5: Ci: Color Changing LED: Other: 1 13 76 988 LED 5 copy 1: J1: Color Changing LE�: Other: 1 3 135 405 Kltchen ( Common.Space Types;Food Preparation 3861 sq.ft.) LED 1: A1: 2x4 Recessed LED: Other: � �� � � � 4 63 � 59 �� 3717 �� LED 13 copy 1: G2: Pendant: Other: 1 23 28 644 Restroom ( Common Space Types:ResVooms 1128 sq.fl.�-�. . � LED 9: Hi: 4" Downlight LED PAR 11 W: � � 1 73 �� 11 � 803 � LED 11: V1: Wall Mounted Vanity: LED PAR 15W: 1 5 15.6 78 6fairs� ( Common Space Types:Stairs-Active �7.60 sq.ft.� . LED 6 copy 1: D2: 8" Downlight: Other. � 1 5��� 145 725 � Hallways ( Gommon� Space Types:Corridor/Transition 8519:_ sq.ft J �: Project Title: Flix Bewhouse Report date: 07/15/14 Data filename: \�Srv1007\departments\_Projects\Active�2013\01201373.02\01201373.02.Calcs and Support\90.1-2007 Linear Fluarescent 1 copy 1: W1: 4' Sirip: 48" TS 32W: Electronic: 2 18 69 9242 Office ( Common Space Types:Office - Er�closed 106 sy.ft.} LEd 1 copy 1: A2: 2x4 Recessed LED: Other: 4 3 59 177 Tatal Proposed Watts = 25361 Intereor Lighiing PASSES: L7esign 37°fo 6e�ter than code. 5ection 4: Compliance Statement Compliance Statement: The praposed lighting design represented in th'ts document is consistent with the building plans, specifcations and other calculations submitted with t�is permit applicaiion. She propased lighting system has been designed to meet the 90.1 (2DD7J 5tandard requirements in COMcheckVersion 3.9.3 and to comply w€th ihe mand ❑ry r�quirements in the Requirements Checklist. Scott Young - Electrical 471� 5/14 Name - 7itle Signature Da1e Section 5: Post Construction Compliance Statement Record Drawings and Operating ar�d Mainfenance Manuals. � 1. Construction documents with racard drawings and operating and maintenance manuals prov'sded ta the owner. Lighting Designer or Contractor Name Signat�re Date �- �. f -�/ �����,0�';�,�'��'�'�'q��?cA�': �, 4'. • 4 � � ,'Q` ti � i r r = No.1130p274 # . �•; STAiEOF =�= .� � - �'��• �w � .� �f%��'' .HDIANP� ���' �`. . f '�.....••• t�e ''�•,sSloNA4��l`�! y � Project Title: Flix 8ewhouse Report date: 07/15/14 Data fifename: 11srv10d71departmentsl_ProjectslActive12013101201373.02101201373.02.Calcs and Support190.1-2007 C�M�he�k S��tw�r� Version 3.9.� Inspection Checklist Energy Code: 90.1 (2007) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. 1 High Impact (Tier 1) �2� Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Flix Bewhouse Report date: 07/15/1 Data ��srv1007�departments�_Projects�ACtive\2013`01201373.02\01201373.02.Calcs and Page 1 of 4 Support\90.1-2007 ComCheck.cck 90.1 (2007) ��� �. Plan Review �tandard �' - �.2.2 ; Plans, specifications, and/or PR4]' :,calculations provide all information ;with which compllance can be ;determined forthe lighting and �electrical systems and equipment and � ' document where exceptions to the Istandard are clalmed. Information ' rovided should in lud int i r Complies? .��� � Comme �Complies I Requirement will be met. �Does Not ��, ]Not Observable �I 7Not Applicable ��, p c e ero ��, lighting power calculations, wattage of j I bulbs and ballasts, transformers and Icontrol devices. 8.4.11;.:?.���"; Plans, specifications, and/or ;❑Complies ;Requirement will be met. 8,4��13<��: �i[alculations provide all information j❑Does Not [PR6]a ;with which compliance can be � �determined for the electrical systems ��Not Observable � ������.,and equipment and dowment where I�Not Applicable ; ��?exceptions are claimed. Feeder ;connectors sized in accordance with ���_�approved plansand branch circuits ����sized for maxlmum drop of 3%. �� Additional Comments/Assumptions: nts(Assumptions 1 High Impact (Tier 1) � 2��' Medium impact (Tier 2) � 3� Low Impact (Tier 3) Project Flix Bewhouse Report date: 07/15/1 Data \\srv1007�departments�_ProjectsyACtive\2013\01201373.02�01201373.02.Calcs and Page 2 of 4 Support\90.1-2007 ComCheck.cck 90.1 .. �. . . � . . (2007y Rough-M Electrical Inspection Complies? �� � CommenYS(Assumptions Standard: � ; " � � 9.4.1 1 r;AUtomatk controls to shut off all � ,❑Complies ,Requirement will be met. [ELl]2 'ibuilding lighting installed in buildings I�Does Not ._...r�>5.000 ft2. ;❑Not Observable; '; jONot Applicable ; 9.4.1.2 `;Independent Iighting controls installed ;❑Complies ;Requirement will be met, [EL2]z ,jper approved lighting plans and ali �ODoes Not ; � manual controls readily accessible and; :� .��visible to occupants. �❑Not Observable I .�}� j❑Not Applicable ; 9.4.1.4 ;Separate lighting control devices for ;❑Complies ;Requirement will be met. [EL4]1 ispecific uses installed perapproved �❑Does Not ; lighting plans. ;❑Not Observable ; ;❑NotApplicable ; 9.4,2 �; Ballasted one and three lamp fixtures ;❑Complies ; Requlrement will be met. [ELS]3 ���with >30 W/lamp have two lamp j❑Does Not . � ��tandem wired ballasts when >=2 � �.. �.;fixtures in same space on same , I❑Not Observable', � �control. ;❑NotApplicable ; 9.4.3 ; Exit signs do not exceed 5 watts per ;❑Complies ; Requirement wlll be met. [EL6]� �face. ;❑DOes Not ;❑NOt Observable I �;❑NotApplicable ; 9.6.2 ;Additional interior lighting power I❑Complles ; Requirement will be met. [EL8]1 lallowed forspecial functions perthe ��,❑DOes Not '� ��,approved lighting plans and is '� ',automatically controlled and I❑NOt Observable I Iseparatedfromgenerallighting. �I❑NOtApplicable ', Additional Comments/Assumptions: 1 High Impact (Tier 1) ���2. Medium Impact (Tier 2) 3�� Low Impact (Tier 3) Project Flix Bewhouse Report date: 07/15/1 Data ��srv1007�departments\_ProjectsWctive,2013�01201373.02\01201373.02.Calcs and Page 3 of 4 Support\90.1-2007 ComCheck.cck 90.1'�.'. - - (2007) ��: .Final Inspection �Complies? ' CommenkstAssumptlons Standard 8J.1 ��; Furnished �as-built drawings for ;❑Complies � I Requirement will be met. [PI16]3��� �� Ielectric power systems within 30 days I❑Does Not � � �. �.� �;of system acceptance. � - . . � ;❑NotObservable; �� �; ;�NotApplicable ; 8J.2 -.��� I Furnished O&M instructions for ;❑Complies ; Requirement will be met. [FI17]3 ��� ���systems and equipment to the ;❑Does Not � �� �;buildingownerordesignated � . : ��;representative. I❑NotObservable; � � � ;❑Not Applicable ; 9.2.23 i Inte1'ior installed Iamp and fiXtUl'e ;❑COmplies ;See the InteriorLighting flxture schedule forvalues. [FI18]' �� lighting power is consistent with what �❑Does Not j is shown on the approved Iighting �pNot Observable ��I I plans, demonstraqng proposed watts ��Not A � are less than or e ual to allowed pplicable ��, � watts. Additional Comments/Assumptions: 1 High Impad (Tier 1) . 2.� Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Flix Bewhouse Report 07/15/14 Data ��srv1007\departments\_Projects�Active�2013\01201373.02\01201373.02.Calcs and Page 4 of 4 Support\90.1-2007 ComCheck.cck