Loading...
HomeMy WebLinkAboutDuke Energy/ENG/97,485.41/Main Street Improvements Guilford to IllinoisUTILITY REIMBURSEMENT AGREEMENT City of Carmel — Main Street Improvements THIS AGREEMENT, made and effective this • / 1l�f day of 2014, is by and between Duke Energy Indiana, Inc. an Indiana electric public utility corporation (hereinafter referred to as "DEI "), and the City of Carmel in Indiana (hereinafter referred to as "the Local Government "). WITNESSETH: WHEREAS, as an Indiana public utility, DEI has the right under Indiana law to construct, operate and maintain its utility facilities upon Indiana public road right of way and within private utility easements, including but not limited to, the Local Government's Main Street between Illinois and Old Meridian in Hamilton County, Clay Township, City of Carmel, Indiana; and WHEREAS, DEI has constructed and now operates and maintains certain electric line facilities upon and /or along Main Street between Illinois and Old Meridian, all of which are more particularly described on the attached Exhibit "A" (hereinafter referred to as "the Utility Facilities "); and WHEREAS, the Local Government needs to make certain improvements to Main Street between Illinois and Old Meridian Carmel and the Local Government and DEI have determined that the Utility Facilities will need to be relocated before this improvement can be made by the Lbcal Government; and WHEREAS, the Local Government has acquired or will acquire at the expense of the Local Government, a relocation area on the public road right of way of Main Street between Illinois and Old Meridian, Carmel for the Utility Facilities, which area DEI has determined is suitable and is hereinafter referred to as "said relocation area "; and WHEREAS, the Local Government has requested DEI to relocate the Utility Facilities to said relocation area, as described on Exhibit "A;" and WHEREAS, DEI is willing to relocate the Utility Facilities to said relocation area; provided that the Local Government reimburses DEI for the costs actually incurred by DEI so to do (with preliminary established cost as hereinafter described, being paid to DEI by the Local Government before DEI commences "the Work" as such term is hereinafter defined); and WHEREAS, the Local Government is willing to reimburse DEI for such costs subject to the terms and conditions contained herein. NOW, THEREFORE, for and in consideration of the mutual promises from, to and between DEI and the Local Government, hereinafter contained, DEI and the Local Government do hereby agree to and with each other, as follows: SECTION I. DEI with its regular construction or maintenance crew and personnel, at its standard schedule of wages and working hours, or by an approved contractor, will relocate the Utility Facilities to said relocation area, as described on Exhibit "A" (hereinafter referred to as "the Work "). The preliminary estimated cost thereof is $97,485.41 as shown on the attched Exhibit "B ". SECTION II. The Local Government shall reimburse DEI for said actual costs incurred by DEI to perform the work within thirty (30) days after receiving a written, itemized statement from DEI. Statement shall include supporting documentation to substantiate claim. Such supporting documentation shall include, but shall not be limited to, copies of material invoices, time sheets, vendor and /or contractor invoices and other such documents as may be deemed necessary by the Local Government to support such invoice. DEI shall have the right to submit such statements for progress payments as the Work proceeds. When the work is completed, the actual costs incurred by DEI to perform the Work are less than said preliminary estimated cost, DEI shall remit the difference to the Local Government. SECTION III. DEI shall not start the Work until the following has occurred: (a) written notice has been given to DEI by the Local Government that the Work has been authorized and funds are available to reimburse DEI, (b) the Local Government has denoted the public road right -of -way line by staked survey at not more than 100 foot intervals with station markings, (c) the Local Government has trimmed /removed all vegetation away from the public road right -of -way as reasonably determined by DEI for the entire length of the project, (d) the Local Government and DEI have executed this agreement and the Local Governement has paid DEI the aforestated preliminary estimated cost of $97,485.41. Delivery of said written notice by the Local Government to DEI shall also constitute the Local Government's affirmation that any necessary public road right -of -way area has been arranged for the relocation area and the Work, and (e) written notice has been given to DEI by the Local Government that it has acquired the necessary public road right -of -way area for the relocation area and the Work. 3 SECTION IV. The Local Government shall also reimburse DEI for any costs actually incurred by DEI in the future in the event the Utility Facilities need to be adjusted, removed, supported, altered, and /or relocated at any time or times (a) for another Local Government highway improvement project and /or (b) for any other project of the Local Government or other governmental entity. SECTION V. DEI, and its contractor and subcontractors, if any, shall not discriminate against any employee or applicant for employment, to be employed in the performance of this Agreement, with respect to her /his hire, tenure, terms, conditions or Privileges of employment or any matter directly or indirectly related to employment because of her / his race, color, religion, national origin or ancestry. Breach of this covenant may be regarded as a material breach of this Agreement. SECTION VI. DEI shall indemnify and hold harmless the Local Government from and against any and all legal liabilities and other expenses, claims, costs, losses, suits or judgments for damages, or injuries to or death of persons or damage to or destruction of property arising out of the Work (hereafter "Claim "); provided, however, that where the Local Government is negligent or engages in intentional misconduct with respect to the occurrence or occurrences giving rise to the Claim, DEI shall have no duty to indemnify and hold harmless the Local Government. 4 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by through their duly authorized representatives, effective the date first above written. DUKE ENERGY INDIANA, INC. QC J, 5jgnature) T. tt-y P. (Narfie, Printed or Typed) t ( Position) City of Carmel By: IV DT cZ E? ✓1 ') Printed Name: - -V-tf2 -S S'''reU nand Printed Title: L\ be- Dated: By: )ni Printed Na illy AN , /Ce Printed Title: Z30w tiler.) et Dated: 41---/ 7 - V By: / Printed Namle! to/J.. Sit c ASS: Printed Title: BPb.) ,Tha.\ \t0 g /r1�.- Dated: Attest: /4A-114f-CY Ohrft Treasurer 5 Host: http://entdukerpt.duke- energy.com/ReponServer CU Estimate Work Authorization Cost Summary Report Last Refreshed on 08/05/2014 14:40 Project ID: M5104 WO: 5623743 Contractor Hours 0 WO DESCRIPTION: INDOT City of Carmel Main St improve Illinois to Old Meridian, Hamilton Co Company Hours 1268.1 CUE: 622522 Total Hours 1268.1 OMni tlonT,x;:�,' Direct Costs Company Labor $103,279.68 Material $92,352.71 Overheads Indiana Labor $68,164.59 Indiana Material $14,776.43 Fully Loaded Construction • $278,573.41 Memo Install Items (Precapitalized) Meters, Transformers $2,264.99 Sub Total Construction Cost: $2,264.99 $280,838.40 Name City of Carmel - Jeremy Kashman Address 1 1 Civic Square Address 2 City, State, Zip Carmel, IN Basis of Charge Cost Difference between OH and UG Relocation fo Carmel Main St Project Prooess, Construction Charges: Removal Charges: O&M - Transfer OH : O&M - TRF Labor OH O&M - TRF Labor UG Transformer Charges: Adjustments /Additio n Adjustments /Subtrac Lion $278,573.41 $65,852.90 $2,476.78 $1,016.81 $246.05 $2,264.99 70.6% CHR 27.1% 1.5% 0.6% 0.2% CHR FlolifctlOpkOhMt $Freda t? M5104 M5104 M5104 M5104 M5104 R X X XU 0.0% TRANSFO M5104 I 5252,945.54 597,485.41 100.0% 08/05/2014 14:41 Informational Use Only EXHIBIT -3 Page 1 of 2 Host: http://entdukerpt.duke - energy.com /ReportServer CU Estimate Work Authorization Cost Summary Report Last Refreshed on. 08/05/2014 14:40 riOrBromalt ,1� x... wc1' ' :v.- Direct Costs g�'ti3rN.Btyy ', cA Company Labor $39,670.42 Overheads Indiana Labor 526,182.48 Salvage Credit Sub Total Retirement Cost: Total Cost:I 6350,430.951 REIMBURSABLE - COST DIFFERENCE BETWEEN OH AND UG Completion Report/Construction: Date Work Started: Completion Date: Completed By: Approval Authorization: Date Approval Authorization: Prepared By: C &M: 08/05/2014 14:41 Informational Use Only EXHIBIT Page 2 of 2