Loading...
HomeMy WebLinkAbout051 IMPA Bid Set 3 - A100.pdfWH DA T A S H E E T N U M B E R D R A W N B Y C H E C K E D B Y C E R T I F I C A T I O N R E V I S I O N S 1043 Virginia Avenue, Studio 211 Indianapolis, Indiana 46203 phone/fax 317.803.7900 www.blacklinestudio.net INDIANA MUNICIPAL POWER AGENCY 11660 NORTH COLLEGE AVENUE CARMEL, INDIANA RT AR 1 9 9 0 0 1 1 1 A C R HC E T I ST A T E O F B T T OCS No . TSI G E R ERED NETR A EP KSNI I A N A DNI XX X X XX X X BID SET 3 05.21.2014 REMOVAL PLANA1 0 0 Ex i s t i n g B u i l d i n g - R e m o v a l P l a n 1/ 8 " = 1 ' - 0 " REMOVAL L E G E N D = C A S E W O R K T O B E R E M O V E D = P L U M B I N G F I X T U R E S T O B E R E M O V E D = D O O R A N D F R A M E T O B E R E M O V E D = W A L L S T O B E R E M O V E D = E X I S T I N G W A L L S T O R E M A I N = W I N D O W U N I T T O B E R E M O V E D GENERAL DEMOLITION NOTES:A.CONTRACTOR SHALL CAREFULLY STUDY ALL OF THE CONTRACT DOCUMENTS AND SHALL VERIFYALL EXISTING SITE CONDITIONS WITH THE CONSTRUCTION DOCUMENTS PRIOR TO PROCEEDINGWITH ANY PORTION OF THE WORK AND TO NOTIFY THE ARCHITECT OF ANY DISCREPANCIES.B.EACH TRADE SHALL BE RESPONSIBLE FOR ANY LOSS OR DAMAGE TO THE OWNER OR THE WORK,MAKE GOOD ANY LOSS, DAMAGE, OR INJURY WITHOUT ADDED COST TO THE OWNER.C.REMOVE BUILDING RUBBLE IN A TIMELY MANNER AND KEEP PREMISES FREE FROMACCUMULATION OF TRASH AND DEBRIS.D.CAREFULLY REMOVE AND PROTECT ANY ITEMS THAT ARE TO BE SALVAGED. SALVAGED ITEMSSHALL BE TURNED OVER TO THE OWNER OR STORED FOR REUSE AS INDICATED.E.CONFINE ALL OPERATIONS TO AREAS OF WORK AS SHOWN. KEEP ADJACENT AREAS CLEAR ATALL TIMES.F.CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT ANY SURFACES, MATERIALS, AND/ORFIXTURES TO REMAIN DURING THE DEMOLITION PROCESS.G.UPON COMPLETION REMOVE ALL FOREIGN MATERIALS FROM ALL EXPOSED SURFACES.GENERAL DEFINITIONS:A.EXISTING - MAINTAIN COMPONENT IN SITU THROUGHOUT THE DURATION OF PROJECT TOPREVENT FURTHER DAMAGE UNLESS NOTED OTHERWISE.B.SALVAGE - REMOVE WOOD COMPONENT, INVENTORY & STORE ON-SITE. STRIP, REPAIR & PRIMEAS REQUIRED. STORE IN BASEMENT - DO NOT DISCARD.C.NEW - PROVIDE NEW COMPONENT. PRIME & INSTALL IN DESIGNATED LOCATION.D.STRIP - USE PEEL-AWAY PAINT REMOVAL SYSTEM (OR EQUAL) TO REMOVE & ABATE PAINT.ASSUME LEAD PAINT & FOLLOW PROCEDURES SET UP IN SPECIFICATION SECTION 01733 TODISPOSE OF PROPERLY.E.REPAIR - PROVIDE WOOD FILLER OR USE EPOXY CONSOLIDATES AS REQUIRED TO REPLICATEEXISTING PROFILE OR FILL VOIDS. WHERE NECESSARY, PROVIDE NEW HARDWOOD REPLACEMENTPIECES TO MATCH EXISTING PROFILE. SAND & SMOOTH TO BE UNDETECTABLE UNDER FINISHCOAT. ALL COMPONENTS TO BE SECURE. REMOVAL PLAN KEYNOTES:1.REMOVE EXIST. DOOR, FRAME, & THRESHOLD. ENLARGE OPENING IN PREPARATION FORINSTALLATION OF NEW DOOR & HARDWARE. PROVIDE NEW HEADER AS REQUIRED. PATCH &REPAIR WALL FINISHES EA. SIDE.2.REMOVE EXISTING FLOORING & ADHESIVE DOWN TO CONCRETE.3.PREP EXISTING WALL FOR INSTALLATION OF NEW OR SALVAGED DOOR, FRAME & HARDWARE -VERIFY W/ DOOR SCHEDULE. PROVIDE NEW HEADER AS REQUIRED.4.CAP EXISTING FLOOR DRAIN - SEE PLUMBING.5.REMOVE EXISTING BRICK/STONE VENEER.6.REMOVE AND SALVAGE EXISTING DOOR, HARDWARE, AND FRAME. SET ASIDE FORREINSTALLATION IN NEW DOOR OPENING. STORE IN LOCATION AWAY FROM WORK ANDPROTECT FROM DAMAGE.