Loading...
HomeMy WebLinkAbout086 IMPA Bid Set 3 - H402.pdfNOTES: 1. FOLLOW MANUFACTURER'S RECOMMENDATIONS ON ALL PIPE SIZING AND ROUTING. 2. PITCH ALL HORIZONTAL LINES A MINIMUM OF 1/2" IN 10 FEET IN DIRECTION OF REFRIGERANT FLOW. 3. HORIZONTAL DIMENSION OF OIL TRAPS MUST BE AS SMALL AS POSSIBLE. 4. INSULATE ALL SUCTION LINES. 5. PROPERLY SUPPORT ALL LIQUID AND SUCTION LINES AS SPECIFIED THERMOSTATIC EXPANSION VALVE SOLE NOI D VALVE SIGHT GLASS FILTER-DRIER , rANGLE VALVE EVAPORATOR COIL OIL TRAP LOOP TO TOP OF EVAPORATOR T4 PREVENT LIQUID FROM DRAINING TO COMPRESSOR SCALE: NONE ROOF DECK EXTENDED TO DUCT QPENING EXTEND AS INDICATED ON PLANS CONDENSATE P-TRAP / B E LO W ROO F J ANGLE STEEL � FRAMING FOR DUCT RTU / AI R-004LE D CONDENSING UNIT `LIQUID LINE {SIZE PER PLANS} SUCTION LINE (SIZE PER PLANS} 5/8" DENSGLASS, 2.5 PCF, 0.13 P/SQ. FT. (2} WHISPERTONE, 4.75 PCF - (2}X 0.25 P/SQ. FT. 5/8" DENSGLASS, 2.5 PCF, 0.13 P/SQ. FT. ROOF DECK � �� � � �� � �� � �� � � JOIST � �� �� �� �� �� � �� �� � � �� � � �' � � SEE DETAIL FOR RTU-1'S ADDITIONAL LAYERS � �� ON THIS SHEET (ABOVE} �� �� �� � �� �� � � �� � � / �� �� WRAP VERTICAL DUCT WITH MASS-LOADED �� �� ' VINYL (MIN 1 LB PER FT2). SEAL ALL SEAMS. �� �� �� � �� �� � �� - / �� � �� � �� / �� �� �� �� � � �� �� / , „ " �� � LINED DUCT � �� � TYPICAL FOR SUPPLY AND RETURN DUCT SCALE: NONE