Loading...
HomeMy WebLinkAbout088 IMPA Bid Set 3 - P001.pdfABBREVIATIONS A AFF AFG APPROX ARCH B LDG BP BTU BTUH CO CP CW DIA OR � DWG EC ECO E LEC EQUIP ET EX �F FCO FD G GAL GALV GC GPH GPM GT GW HB HP HVAC HW HX HYD HZ IMB IN KW KWH L LA LB LF LP COMPRESSED AIR (100 PSIG} ABOVE FINISHED FLOOR ABOVE FINISHED GRADE APPR�XI MATELY ARCHITECT BUILDING BOOSTER PUMP BRITISH THERMAL UNIT BTU PER HOUR CLEAN OUT CIRCULATOR PUMP COLD WATER DIAMETER DRAWING ELECTRICAL CONTRACTOR EXTERIOR CLEANOUT E LECTRIC EQUIPMENT EXPANSION TANK EXISTING DEGREES FAHRENHEIT FLOOR �LEANOUT FLOOR DRAIN NATU RAL GAS GALLONS GALVANIZED GENERAL C�NTRACTOR GALLONS PER HOUR GALLONS PER MINUTE GREASE TRAP GREASE WASTE HOSE BIB HORSEPOWER HEATING VENTILATING AND AIR CONDITIONING HOT WATER HEAT EXCHANGER WALL HYDRANT H E RTZ ICE MAKER BOX INCH KI LOWATT KILOWATT HOUR LAVATO RY LAB COMPRESS AIR (15 PSIG) POUND LINEAR FEET LIQUIFIED PETROLEUM GAS DRAWING SYMBOLS 1 1 2 P401 A P401 ABBREVIATIONS MAX MBH MC MCA MECH MFR MIN MISC N/A N NO O OS P C PD PH PSI PSIA PSIG PW PWR RPZ RD SAN SH SK SPEC SQ FT ST STD TD TMV TYP UR V VAC VERT VOL VTR W W/ WB WC WCO WH WS YCO CONNECT NEW TO EXISTING DRAWING REVISION NUMBER PLAN NOTE NUMBER � � MAXIMUM 1000 BTU PER HOUR MECHANICAL CONTRACTOR MINIMUM CIRCUIT AMPACITY MECHANICAL MAN U FACTU RE R MINIMUM M ISCE LLAN EOUS NOT APPLICABLE NITROGEN NITROUS OXIDE OXYGEN O I L S E PARATO R PLUMBING CONTRACTOR PRESSURE DROP PHASE P�UNDS PER SQUARE INCH POUNDS PER SQUARE INCH ABSOLUTE POUNDS PER SQUARE INCH GAGE PURE WATER (CAP 2� PURE WATER RETURN {CAP 2} REDUCED PRESSURE BA�KFLOW PREVENTER RO� F D RAI N SANITARY SHOWER SINK SPECIFICATION SQUARE FEET STORM STANDARD TRENCH DRAIN THERMOSTATIC MIXING VALVE TYPICAL URINAL VOLT / VENT VACUUM VERTICAL VOLUME VENT THROUGH ROOF WASTE WITH WAS H E R BOX WATER CLOSET WALL CLEANOUT WATER HEATER WATER SOFTENER YARD CLEAN �UT SECTION NUMBER WITH SHEET REFERENCE DETAIL NUMBER WITH SHEET REFERENCE PIPING LEGEND - -- A � G G {2 PSI) PW PWR VAC - I I // III �// - - - - - - - - D 0 N N MV WAG D � DOMESTIC COLD WATER DOMESTIC HOT WATER DOMESTIC HOT WATER RETURN CQMPRESSED AIR LAB COMPRESSED AIR NATURAL GAS (10" w.c.) NATU RAL GAS (2 PSI ) PURE WATER PURE WATER RETURN VAGUUM NON-POTABLE WATER SANITARY {SUSPENDED} SANITARY (BURIED) STORM (SUSPENDED) STORM (BURIED) ACID WASTE (SUSPENDED) ACID WASTE (BURIED) VENT D RAI N OXYGEN NITROGEN NITROUS OXIDE MEDICAL VACUUM WASTE AN ESTHES IA GAS DRAI N DIRECTION OF FLOW DIRECTION OF PITCH EXISTING PIPE PIPE TO BE REMOVED PIPIN� SYMBOLS CAP � GLEAN OUT � oRaP REDUCER RISE � TEE - BOTTQM CONNECTION v TEE - SIDE CONNECTION I TEE - TaP CONNECTION BALL VALVE BUTTERFLY VALVE �.- CHECK VALVE BALANCING VALVE WITH MEMORY STOP � GATE VALVE � � GAS VALVE PRESSURE REDUCING VALVE P/T PLUG RELIEF VALVE THERMOMETER uNioN , IN-LINE CIRCULAT�R PUMP BACKFLOW PREVENTER ASSEMBLY PLUMBING NOTES: (APPLY TO ALL PLUMBING DRAWINGS} 1. ALL PLUMBING SYSTEMS TO BE INSTALLED TO MEET THE REQUIREMENTS OF THE INDIANA PLUMBING CODE �2006 INTERNATIONAL PLUMBING CODE WITH THE LATEST INDIANA AMMENDMENTS). 2. ALL SOIL, WASTE, VENT, AND STORM PIPING SHALL BE INSTALLED AT THE FOLLOWING MINIMUM SLOPE: %" {1%) PER FOOT GRADE FOR PIPE SIZES 3" AND LARGER. %4" (2%) PER FOOT GRADE FOR PIPE SIZES 2%2" AND SMALLER. 3. PIPING AND/OR EQUIPMENT SHALL NOT BE SUPPORTED FROM STRUCTURAL MEMEBERS WITHOUT PRIOR REVIEW AND APPROVAL FROM THE STRUCTURAL ENGINEER. 4. PROVIDE FREEZE PROTECTION FOR ALL DOMESTIC WATER PIPING AND TRAPS INSTALLED IN UNHEATED AREAS. USE ELECTRIC HEAT TRACE CABLE AND INCLUDE ALL ACCESSORIES FOR A COMPLETE AUTOMATIC OPERATING FREEZE PROTECTION SYSTEM. COVER WITH INSULATION. ALL HEAT TRACING COMPONENTS SHALL BE PROVIDED AND INSTALLED BY THE PLUMIBNG CONTRACTOR. FINAL CONNECTION TO THE ELECTRICAL SYSTEM SHALL BE MADE BY THE ELECTRICAL CONTRACTOR. 5. CONTRACTOR IS PROHIBITED FROM USING LEAD-BASED SOLDER. 6. ALL DOMESTIC WATER PIPING SHALL BE INSULATED. REFER TO INSULATION SCHEDULE IN SPECIFICATIONS. 7. ALL PLUMBING FIXTURES AND EQUIPMENT SHALL CONFORM TO ALL APPLICABLE ENERGY CONSERVATION CODES. $. ALL PIPING, VALVES, AND ACCESSORIES SERVING EQUIPMENT SHALL CONFORM TO ALL APPLICABLE ENERGY CONSERVATION CODES. 9. ANCILLARY SYSTEMS NOT ASSOCIATED WITH EQUIPMENT SHALL NOT BE INSTALLED SO AS T� INHIBIT SERVICING AND/OR REMOVAL OF SAID EQUIPMENT. 1�. STERILIZE DOMESTIC WATER PIPING SYSTEM IN ACCORDANCE WITH STATE AND LOCAL CODES, AND BASE BUILDING SPECIFICATIONS. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN ON-SITE FLOW TEST AT THE NEAREST FIRE HYDRANT. THE RESULTS OF THIS TEST SHALL BE SUBMITTED TO THE ENGINEER OF RECORD UPON COMPLETION OF TEST. 12. PRIOR TO THE INSTALLTIQN, FABRICATION, REMOVAL, OR RELOCATION OF ANY WORK, THE CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THE ACTUAL CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND SHALL FULLY COORDINATE ALL WORK WITH THE ARCHITECTURAL PLANS, BUILDING STRUCTURE, AND WORK OF ALL OTHER TRADES. CONTRACTOR SHALL VERIFY EXISTING INVERTS PRIOR TO CONSTRUCTION. 13. FOUNDATION AND FOOTINGS SHALL NOT BE DISTURBED WITHOUT OBTAINING PERMISSION FRaM THE ARCHITECT AND/OR STRUCTURAL ENGINEER. PROPER UNDERPINNING METHODS SHALL BE USED TO PROTECT AFFECTED FOUNDATION COMPONENTS. 14. PROVIDE SLEEVES FOR ALL PIPING THAT PENETRATES FULL HEIGHT WALLS, WHETHER SHOWN OR NOT. 15. PROVIDE A CHECK VALVE ON HOT AND COLD WATER BRANCH LINES SERVING ALL MOP SINKS, WHETHER SHOWN ON NOT. 16. PROVIDE WATER HAMMER ARRESTERS PRIOR TO C�UICK-CLOSING VALVES (ie: ELECTRIC, PNEUMATIC, SPRING LOADED VALVES OR DEVICES, QUICK HAND CLOSURE VALVES OR FIXTURE TRIM). SIZE ARRESTERS PER SCHEDULE ON DRAWINGS AND PDI-WH 201 CERTIFIED STANDARD. 17. INSULATE ALL PLASTIC PIPING IN RETURN AIR PLENUMS TO MAINTAIN 25/50 FIRE SMOKE RATING AND AS DIRECTED IN SPECIFICATIONS. 18. COORDINATE VENT PENETRATIONS WITH MECHANICAL ROOF TOP EQUIPMENT, REFER TO "H" SERIES DRAWINGS. OFFSET VENTS AS REQUIRED TO MAINTAIN MINIMUM 10'-0" SEPARATION FROM AIR I NTAKES. 19. INSULATE ALL DOMESTIC WATER PIPING (COLD WATER, HOT WATER AND HOT WATER RETURN) LOCATED WITHIN MECHANICAL ROOMS. 20. PROVIDE "LEAD-FREE", "NO-LEAD", AND/OR "LQW-LEAD" PLUMBING FITTIN�S COMPLIANT WITH THE FEDERAL LAW IN EFFECT ON JANUARY 4, 2014 - MAXIMUM 0.25% LEAD CONTENT. DEMOLITION NOTES: 1. CONTRACTOR SHALL COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. 2. CONTRACTOR SHALL COORDINATE SHUT DOWN OF ANY PLUMBING SYSTEM WITH THE OWNER AND ANY AUTHORITY HAVING JURISDICTION. 3. CONTRACT�R SHALL PROVIDE TEMPORARY CAPS FQR ALL SERVICES AS REQUIRED SO EXISTING SYSTEMS WILL REMAIN OPERATIONAL. 4. CONTRACTORS SHALL PROTECT ALL EXISTING OWNER FACILITIES DURING CONSTRUCTION. ANY FACILITIES DAMAGED OR DISCONNECTED BY CONTRACTOR OPERATIONS SHALL BE FULLY RESTORED TO PREVIOUS OPERATING AND APPEARANCE CONDITION. 5. CONTRACTOR SHALL REPAIR OR REPLACE PIPE INSULATION DAMAGED DURING DEMOLITION OR RENOVATION WORK TO MATCH ORIGINAL CONDITION. 6. CONTRACTOR SHALL COORDINATE WITH APPROPRIATE TRADE TO CUT AND PATCH FINISHED AREAS AS REQUIRED, UNLESS OTHERWISE NOTED ON DOCUMENTS. 7. CONTRACTOR SHALL REMOVE AND REPLACE CEILINGS, LIGHT FIXTURES, ETC. IN EXISTING BUILDING AS REQUIRED TO PERFORM DEMOLITION AND RENOVATION WORK. AFTER WORK IS COMPLETE, DAMAGED ITEMS SHALL BE REPAIRED TO ORIGINAL CONDITION OR REPLACED. 8. CONTRACTOR SHALL REMOVE ALL PIPING, VALVES, ETC. MADE OBSOLETE AS A RESULT OF NEW CONSTRUCTION AND/OR RENOVATION. 9. CONTRACTOR SHALL THOROUGHLY REVIEW ALL DRAWINGS PRIOR TO ANY DEMOLITION WORK. ANY DEVICES REMOVED ACCIDENTALLY WILL BE REPLACED AT NO ADDITIONAL COST TO OWNER. 10. DISPOSAL OF DEMOLISHED MATERIALS SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. FIRE PR�TECTIQN NOTES: (APPLY TO ALL PLUMBING DRAWINGS) 1. FIRE PROTECTION SYSTEM FOR BUILDING SHALL BE DESIGNED FOR LIGHT HAZARD, 0.10 �PM PER SQUARE FOOT OVER 1,500 SQUARE FEET. MECHANICAL, STORAGE AND LAB AREAS SHALL BE DESIGNED FOR ORDINARY HAZARD, 0.15 GPM PER SQUARE FOOT OVER 1,500 SQUARE FEET. 2. SPRINKLER SYSTEM SHALL BE HYDRAULLICALLY CALCULATED, FULLY SUPERVISED AND INSTALLED ACCORDING TO NFPA 13. 3. CONTRACTOR SHALL OBTAIN FLOW TEST DATA BY MEANS OF A FLOW TEST PRIOR TO DESIGN HYDRAULIC CALCULATION OF SPRINKLER SYSTEM. 4. ALL SPRINKLER SYSTEM ITEMS REQUIRED BY CODE SHALL BE THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR WHETHER SHOWN ON THE DRAWNGS AND SPECIFICATIONS OR NOT. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION, LAYOUT, CODE COMPLIANCE AND DESIGN. 6. PROVIDE UPRIGHT HEADS IN UNFINISHED SPACES (I.E.: THOSE WITH EXPOSED STRUCTURE}, RECESSED PENDENT HEADS IN FINISHED SPACES (I.E.: THOSE WITH LAY-IN OR HARD CEILINGS), SIDEWALL HEADS WHERE IMPRACTICAL TO INSTALL PENDENT OR UPRIGHT TYPE, OR AS INDICATED OTHERWISE ON THE DRAWINGS. 7. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR COORDINATION OF CEILING MOUNTED ITEMS. 8. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE TO ATTEND ALL BUILDING WALK-THRU'S (AFTER BUILDING IS OCCUPIED AND PRIOR TO THE END OF THE 1 YEAR WARRANTY PERIOD� BY THE BUILDING FIRE MARSHAL AND IS RESPONSIBLE FOR MAKING ANY MODIFICATIONS TO THE SYSTEM REQUIRED AS A RESULT OF THIS BUILDING INSPECTION. 9. SEISMIC RESTRAINTS: IF THE SEISMIC DESIGN CATEGORY FOR THE BUILDING IS "C" OR WORSE, THEN THE FIRE PROTECTION SPRINKLER SYSTEM AND SUPPORTS SHALL BE DESIGNED AND INSTALLED FOR THE SEISMIC F�RCES IN ACCORDANCE WITH THE BUILDING CODE. GENERAL NOTES: 1. ALL CONTRACT DOCUMENTS (SPECIFICATIONS AND DRAWINGS}, I.E.: ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL ARE COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. 2. ALL CONFLICTS, WHICH MAY PREVENT THE COMPLETION OF WORK AS INTENDED, SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION. THE CONTRACTOR SHALL NOT PROCEED WITH ANY RELATED WORK UNTIL ALL CONFLICTS ARE RESOLVED AND THE CLARIFYING INFORMATION IS ISSUED TO THE CONTRACTOR BY THE ARCHITECT. 3. IT IS THE INTENTION OF THESE DRAWINGS TO CALL FOR FINISHED WORK, I.E.: FULLY ADJUSTED, TESTED, AND READY FOR OPERATION. WHEREVER THE WORD "PROVIDE" IS USED, IT SHALL MEAN, "FURNISH AND INSTALL COMPLETE AND READY FOR USE". 4. THE PLUMBING DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW EVERY COMPONENT AND/OR ACCESSORY REQUIRED FOR A COMPLETE INSTALLATION. THE CONTRACTOR SHALL INCLUDE SUCH ITEMS AS ARE REQUIRED TO ENSURE THAT THE ENTIRE SYSTEM IS FUNCTIONING IN COMPLIANCE WITH APPLICABLE CODES, ACCEPTED INDUSTRY STANDARDS, AND MAN U FACTU RE R'S I NSTALLATION REQUIREMENTS/RECOMMENDATIONS UPON C�MPLETI�N OF WORK. 5. ALL CUTTING, DRILLING AND PATCHING OF WALLS, FLOORS, AND/OR STU�TURAL MEMBERS FOR THE INSTALLATION OF THE PLUMBING AND FIRE PROTECTION SYSTEMS SHALL BE PROVIDED. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED IN ANY WAY WITHOUT THE STRUCTURAL ENGINEER'S REVIEW AND PRIOR WRITTEN APPROVAL. 6. PROVIDE NFPA APPROVED FIRE STOPPING WHERE PIPES PENETRATE FIRE RATED FLOORS AND WALLS. 7. FIELD VERIFICATION: CONTRACTOR SHALL INSPECT AND VERIFY ALL EXISTING FIELD CONDITIONS, CLEARANCES AND DIMENSIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF EXISTING �ONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT ARCHITECT/ENGINEER BEFORE PROCEEDING WITH ANY WORK.