HomeMy WebLinkAbout088 IMPA Bid Set 3 - P001.pdfABBREVIATIONS
A
AFF
AFG
APPROX
ARCH
B LDG
BP
BTU
BTUH
CO
CP
CW
DIA OR �
DWG
EC
ECO
E LEC
EQUIP
ET
EX
�F
FCO
FD
G
GAL
GALV
GC
GPH
GPM
GT
GW
HB
HP
HVAC
HW
HX
HYD
HZ
IMB
IN
KW
KWH
L
LA
LB
LF
LP
COMPRESSED AIR (100 PSIG}
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
APPR�XI MATELY
ARCHITECT
BUILDING
BOOSTER PUMP
BRITISH THERMAL UNIT
BTU PER HOUR
CLEAN OUT
CIRCULATOR PUMP
COLD WATER
DIAMETER
DRAWING
ELECTRICAL CONTRACTOR
EXTERIOR CLEANOUT
E LECTRIC
EQUIPMENT
EXPANSION TANK
EXISTING
DEGREES FAHRENHEIT
FLOOR �LEANOUT
FLOOR DRAIN
NATU RAL GAS
GALLONS
GALVANIZED
GENERAL C�NTRACTOR
GALLONS PER HOUR
GALLONS PER MINUTE
GREASE TRAP
GREASE WASTE
HOSE BIB
HORSEPOWER
HEATING VENTILATING AND AIR CONDITIONING
HOT WATER
HEAT EXCHANGER
WALL HYDRANT
H E RTZ
ICE MAKER BOX
INCH
KI LOWATT
KILOWATT HOUR
LAVATO RY
LAB COMPRESS AIR (15 PSIG)
POUND
LINEAR FEET
LIQUIFIED PETROLEUM GAS
DRAWING SYMBOLS
1
1
2
P401
A
P401
ABBREVIATIONS
MAX
MBH
MC
MCA
MECH
MFR
MIN
MISC
N/A
N
NO
O
OS
P
C
PD
PH
PSI
PSIA
PSIG
PW
PWR
RPZ
RD
SAN
SH
SK
SPEC
SQ FT
ST
STD
TD
TMV
TYP
UR
V
VAC
VERT
VOL
VTR
W
W/
WB
WC
WCO
WH
WS
YCO
CONNECT NEW TO EXISTING
DRAWING REVISION NUMBER
PLAN NOTE NUMBER
� �
MAXIMUM
1000 BTU PER HOUR
MECHANICAL CONTRACTOR
MINIMUM CIRCUIT AMPACITY
MECHANICAL
MAN U FACTU RE R
MINIMUM
M ISCE LLAN EOUS
NOT APPLICABLE
NITROGEN
NITROUS OXIDE
OXYGEN
O I L S E PARATO R
PLUMBING CONTRACTOR
PRESSURE DROP
PHASE
P�UNDS PER SQUARE INCH
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH GAGE
PURE WATER (CAP 2�
PURE WATER RETURN {CAP 2}
REDUCED PRESSURE BA�KFLOW PREVENTER
RO� F D RAI N
SANITARY
SHOWER
SINK
SPECIFICATION
SQUARE FEET
STORM
STANDARD
TRENCH DRAIN
THERMOSTATIC MIXING VALVE
TYPICAL
URINAL
VOLT / VENT
VACUUM
VERTICAL
VOLUME
VENT THROUGH ROOF
WASTE
WITH
WAS H E R BOX
WATER CLOSET
WALL CLEANOUT
WATER HEATER
WATER SOFTENER
YARD CLEAN �UT
SECTION NUMBER WITH SHEET REFERENCE
DETAIL NUMBER WITH SHEET REFERENCE
PIPING LEGEND
-
--
A
�
G
G {2 PSI)
PW
PWR
VAC
-
I I
//
III
�//
- - - - - - - -
D
0
N
N
MV
WAG D
�
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
CQMPRESSED AIR
LAB COMPRESSED AIR
NATURAL GAS (10" w.c.)
NATU RAL GAS (2 PSI )
PURE WATER
PURE WATER RETURN
VAGUUM
NON-POTABLE WATER
SANITARY {SUSPENDED}
SANITARY (BURIED)
STORM (SUSPENDED)
STORM (BURIED)
ACID WASTE (SUSPENDED)
ACID WASTE (BURIED)
VENT
D RAI N
OXYGEN
NITROGEN
NITROUS OXIDE
MEDICAL VACUUM
WASTE AN ESTHES IA GAS DRAI N
DIRECTION OF FLOW
DIRECTION OF PITCH
EXISTING PIPE
PIPE TO BE REMOVED
PIPIN� SYMBOLS
CAP
� GLEAN OUT
� oRaP
REDUCER
RISE
� TEE - BOTTQM CONNECTION
v
TEE - SIDE CONNECTION
I TEE - TaP CONNECTION
BALL VALVE
BUTTERFLY VALVE
�.-
CHECK VALVE
BALANCING VALVE WITH MEMORY STOP
� GATE VALVE
� � GAS VALVE
PRESSURE REDUCING VALVE
P/T PLUG
RELIEF VALVE
THERMOMETER
uNioN
, IN-LINE CIRCULAT�R PUMP
BACKFLOW PREVENTER ASSEMBLY
PLUMBING NOTES:
(APPLY TO ALL PLUMBING DRAWINGS}
1. ALL PLUMBING SYSTEMS TO BE INSTALLED TO MEET THE
REQUIREMENTS OF THE INDIANA PLUMBING CODE �2006
INTERNATIONAL PLUMBING CODE WITH THE LATEST INDIANA
AMMENDMENTS).
2. ALL SOIL, WASTE, VENT, AND STORM PIPING SHALL BE INSTALLED AT
THE FOLLOWING MINIMUM SLOPE:
%" {1%) PER FOOT GRADE FOR PIPE SIZES 3" AND LARGER.
%4" (2%) PER FOOT GRADE FOR PIPE SIZES 2%2" AND SMALLER.
3. PIPING AND/OR EQUIPMENT SHALL NOT BE SUPPORTED FROM
STRUCTURAL MEMEBERS WITHOUT PRIOR REVIEW AND APPROVAL
FROM THE STRUCTURAL ENGINEER.
4. PROVIDE FREEZE PROTECTION FOR ALL DOMESTIC WATER PIPING
AND TRAPS INSTALLED IN UNHEATED AREAS. USE ELECTRIC HEAT
TRACE CABLE AND INCLUDE ALL ACCESSORIES FOR A COMPLETE
AUTOMATIC OPERATING FREEZE PROTECTION SYSTEM. COVER WITH
INSULATION. ALL HEAT TRACING COMPONENTS SHALL BE PROVIDED
AND INSTALLED BY THE PLUMIBNG CONTRACTOR. FINAL
CONNECTION TO THE ELECTRICAL SYSTEM SHALL BE MADE BY THE
ELECTRICAL CONTRACTOR.
5. CONTRACTOR IS PROHIBITED FROM USING LEAD-BASED SOLDER.
6. ALL DOMESTIC WATER PIPING SHALL BE INSULATED. REFER TO
INSULATION SCHEDULE IN SPECIFICATIONS.
7. ALL PLUMBING FIXTURES AND EQUIPMENT SHALL CONFORM TO ALL
APPLICABLE ENERGY CONSERVATION CODES.
$. ALL PIPING, VALVES, AND ACCESSORIES SERVING EQUIPMENT SHALL
CONFORM TO ALL APPLICABLE ENERGY CONSERVATION CODES.
9. ANCILLARY SYSTEMS NOT ASSOCIATED WITH EQUIPMENT SHALL NOT
BE INSTALLED SO AS T� INHIBIT SERVICING AND/OR REMOVAL OF
SAID EQUIPMENT.
1�. STERILIZE DOMESTIC WATER PIPING SYSTEM IN ACCORDANCE WITH
STATE AND LOCAL CODES, AND BASE BUILDING SPECIFICATIONS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN ON-SITE
FLOW TEST AT THE NEAREST FIRE HYDRANT. THE RESULTS OF THIS
TEST SHALL BE SUBMITTED TO THE ENGINEER OF RECORD UPON
COMPLETION OF TEST.
12. PRIOR TO THE INSTALLTIQN, FABRICATION, REMOVAL, OR
RELOCATION OF ANY WORK, THE CONTRACTORS SHALL FAMILIARIZE
THEMSELVES WITH THE ACTUAL CONDITIONS UNDER WHICH THE
WORK IS TO BE PERFORMED AND SHALL FULLY COORDINATE ALL
WORK WITH THE ARCHITECTURAL PLANS, BUILDING STRUCTURE, AND
WORK OF ALL OTHER TRADES. CONTRACTOR SHALL VERIFY
EXISTING INVERTS PRIOR TO CONSTRUCTION.
13. FOUNDATION AND FOOTINGS SHALL NOT BE DISTURBED WITHOUT
OBTAINING PERMISSION FRaM THE ARCHITECT AND/OR STRUCTURAL
ENGINEER. PROPER UNDERPINNING METHODS SHALL BE USED TO
PROTECT AFFECTED FOUNDATION COMPONENTS.
14. PROVIDE SLEEVES FOR ALL PIPING THAT PENETRATES FULL HEIGHT
WALLS, WHETHER SHOWN OR NOT.
15. PROVIDE A CHECK VALVE ON HOT AND COLD WATER BRANCH LINES
SERVING ALL MOP SINKS, WHETHER SHOWN ON NOT.
16. PROVIDE WATER HAMMER ARRESTERS PRIOR TO C�UICK-CLOSING
VALVES (ie: ELECTRIC, PNEUMATIC, SPRING LOADED VALVES OR
DEVICES, QUICK HAND CLOSURE VALVES OR FIXTURE TRIM). SIZE
ARRESTERS PER SCHEDULE ON DRAWINGS AND PDI-WH 201
CERTIFIED STANDARD.
17. INSULATE ALL PLASTIC PIPING IN RETURN AIR PLENUMS TO MAINTAIN
25/50 FIRE SMOKE RATING AND AS DIRECTED IN SPECIFICATIONS.
18. COORDINATE VENT PENETRATIONS WITH MECHANICAL ROOF TOP
EQUIPMENT, REFER TO "H" SERIES DRAWINGS. OFFSET VENTS AS
REQUIRED TO MAINTAIN MINIMUM 10'-0" SEPARATION FROM AIR
I NTAKES.
19. INSULATE ALL DOMESTIC WATER PIPING (COLD WATER, HOT WATER
AND HOT WATER RETURN) LOCATED WITHIN MECHANICAL ROOMS.
20. PROVIDE "LEAD-FREE", "NO-LEAD", AND/OR "LQW-LEAD" PLUMBING
FITTIN�S COMPLIANT WITH THE FEDERAL LAW IN EFFECT ON
JANUARY 4, 2014 - MAXIMUM 0.25% LEAD CONTENT.
DEMOLITION NOTES:
1. CONTRACTOR SHALL COORDINATE WORK WITH ALL OTHER TRADES
PRIOR TO INSTALLATION.
2. CONTRACTOR SHALL COORDINATE SHUT DOWN OF ANY PLUMBING
SYSTEM WITH THE OWNER AND ANY AUTHORITY HAVING
JURISDICTION.
3. CONTRACT�R SHALL PROVIDE TEMPORARY CAPS FQR ALL SERVICES
AS REQUIRED SO EXISTING SYSTEMS WILL REMAIN OPERATIONAL.
4. CONTRACTORS SHALL PROTECT ALL EXISTING OWNER FACILITIES
DURING CONSTRUCTION. ANY FACILITIES DAMAGED OR
DISCONNECTED BY CONTRACTOR OPERATIONS SHALL BE FULLY
RESTORED TO PREVIOUS OPERATING AND APPEARANCE CONDITION.
5. CONTRACTOR SHALL REPAIR OR REPLACE PIPE INSULATION
DAMAGED DURING DEMOLITION OR RENOVATION WORK TO MATCH
ORIGINAL CONDITION.
6. CONTRACTOR SHALL COORDINATE WITH APPROPRIATE TRADE TO
CUT AND PATCH FINISHED AREAS AS REQUIRED, UNLESS OTHERWISE
NOTED ON DOCUMENTS.
7. CONTRACTOR SHALL REMOVE AND REPLACE CEILINGS, LIGHT
FIXTURES, ETC. IN EXISTING BUILDING AS REQUIRED TO PERFORM
DEMOLITION AND RENOVATION WORK. AFTER WORK IS COMPLETE,
DAMAGED ITEMS SHALL BE REPAIRED TO ORIGINAL CONDITION OR
REPLACED.
8. CONTRACTOR SHALL REMOVE ALL PIPING, VALVES, ETC. MADE
OBSOLETE AS A RESULT OF NEW CONSTRUCTION AND/OR
RENOVATION.
9. CONTRACTOR SHALL THOROUGHLY REVIEW ALL DRAWINGS PRIOR
TO ANY DEMOLITION WORK. ANY DEVICES REMOVED ACCIDENTALLY
WILL BE REPLACED AT NO ADDITIONAL COST TO OWNER.
10. DISPOSAL OF DEMOLISHED MATERIALS SHALL COMPLY WITH ALL
LOCAL, STATE AND FEDERAL REGULATIONS.
FIRE PR�TECTIQN NOTES:
(APPLY TO ALL PLUMBING DRAWINGS)
1. FIRE PROTECTION SYSTEM FOR BUILDING SHALL BE DESIGNED FOR
LIGHT HAZARD, 0.10 �PM PER SQUARE FOOT OVER 1,500 SQUARE
FEET. MECHANICAL, STORAGE AND LAB AREAS SHALL BE DESIGNED
FOR ORDINARY HAZARD, 0.15 GPM PER SQUARE FOOT OVER 1,500
SQUARE FEET.
2. SPRINKLER SYSTEM SHALL BE HYDRAULLICALLY CALCULATED, FULLY
SUPERVISED AND INSTALLED ACCORDING TO NFPA 13.
3. CONTRACTOR SHALL OBTAIN FLOW TEST DATA BY MEANS OF A FLOW
TEST PRIOR TO DESIGN HYDRAULIC CALCULATION OF SPRINKLER
SYSTEM.
4. ALL SPRINKLER SYSTEM ITEMS REQUIRED BY CODE SHALL BE THE
RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR WHETHER
SHOWN ON THE DRAWNGS AND SPECIFICATIONS OR NOT.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION,
LAYOUT, CODE COMPLIANCE AND DESIGN.
6. PROVIDE UPRIGHT HEADS IN UNFINISHED SPACES (I.E.: THOSE WITH
EXPOSED STRUCTURE}, RECESSED PENDENT HEADS IN FINISHED
SPACES (I.E.: THOSE WITH LAY-IN OR HARD CEILINGS), SIDEWALL
HEADS WHERE IMPRACTICAL TO INSTALL PENDENT OR UPRIGHT
TYPE, OR AS INDICATED OTHERWISE ON THE DRAWINGS.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
COORDINATION OF CEILING MOUNTED ITEMS.
8. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE TO ATTEND ALL
BUILDING WALK-THRU'S (AFTER BUILDING IS OCCUPIED AND PRIOR TO
THE END OF THE 1 YEAR WARRANTY PERIOD� BY THE BUILDING FIRE
MARSHAL AND IS RESPONSIBLE FOR MAKING ANY MODIFICATIONS TO
THE SYSTEM REQUIRED AS A RESULT OF THIS BUILDING INSPECTION.
9. SEISMIC RESTRAINTS: IF THE SEISMIC DESIGN CATEGORY FOR THE
BUILDING IS "C" OR WORSE, THEN THE FIRE PROTECTION SPRINKLER
SYSTEM AND SUPPORTS SHALL BE DESIGNED AND INSTALLED FOR
THE SEISMIC F�RCES IN ACCORDANCE WITH THE BUILDING CODE.
GENERAL NOTES:
1. ALL CONTRACT DOCUMENTS (SPECIFICATIONS AND DRAWINGS}, I.E.:
ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE
PROTECTION, AND ELECTRICAL ARE COMPLIMENTARY AND MUST BE
USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION
INFORMATION.
2. ALL CONFLICTS, WHICH MAY PREVENT THE COMPLETION OF WORK AS
INTENDED, SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION.
THE CONTRACTOR SHALL NOT PROCEED WITH ANY RELATED WORK
UNTIL ALL CONFLICTS ARE RESOLVED AND THE CLARIFYING
INFORMATION IS ISSUED TO THE CONTRACTOR BY THE ARCHITECT.
3. IT IS THE INTENTION OF THESE DRAWINGS TO CALL FOR FINISHED
WORK, I.E.: FULLY ADJUSTED, TESTED, AND READY FOR OPERATION.
WHEREVER THE WORD "PROVIDE" IS USED, IT SHALL MEAN, "FURNISH
AND INSTALL COMPLETE AND READY FOR USE".
4. THE PLUMBING DRAWINGS ARE DIAGRAMMATIC AND DO NOT
NECESSARILY SHOW EVERY COMPONENT AND/OR ACCESSORY
REQUIRED FOR A COMPLETE INSTALLATION. THE CONTRACTOR
SHALL INCLUDE SUCH ITEMS AS ARE REQUIRED TO ENSURE THAT
THE ENTIRE SYSTEM IS FUNCTIONING IN COMPLIANCE WITH
APPLICABLE CODES, ACCEPTED INDUSTRY STANDARDS, AND
MAN U FACTU RE R'S I NSTALLATION
REQUIREMENTS/RECOMMENDATIONS UPON C�MPLETI�N OF WORK.
5. ALL CUTTING, DRILLING AND PATCHING OF WALLS, FLOORS, AND/OR
STU�TURAL MEMBERS FOR THE INSTALLATION OF THE PLUMBING
AND FIRE PROTECTION SYSTEMS SHALL BE PROVIDED. STRUCTURAL
COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED IN ANY WAY
WITHOUT THE STRUCTURAL ENGINEER'S REVIEW AND PRIOR
WRITTEN APPROVAL.
6. PROVIDE NFPA APPROVED FIRE STOPPING WHERE PIPES PENETRATE
FIRE RATED FLOORS AND WALLS.
7. FIELD VERIFICATION: CONTRACTOR SHALL INSPECT AND VERIFY ALL
EXISTING FIELD CONDITIONS, CLEARANCES AND DIMENSIONS
BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK
CONSTITUTES ACCEPTANCE OF EXISTING �ONDITIONS. SHOULD
DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT
ARCHITECT/ENGINEER BEFORE PROCEEDING WITH ANY WORK.