Loading...
HomeMy WebLinkAbout092 IMPA Bid Set 3 - P201.pdfGENERAL NaTES: 1. SEE SHEET P001 FOR PLUMBING GENERAL PLAN NOTES. 2. PROVIDE DRY PIPE FIRE SPRINKLER SYSTEM IN ATTIG AREA OF EXISTING BUILDING. ATTIC AREA IS A NON-HEATED SPACE WITH INSULATION AT TOP OF CEILING SPACE, NOT ATTACHED TO ROOF DECK. PLAN N�TES: 1 1%2" GAS UP. SEE SHEET P203 FOR CONTINUATI�N. 2 1" GAS UP. SEE SHEET P203 FOR CONTINUATION. 3 3" CW, 1%2" RO, AND FIRE SPRINKLER LINE UP AND PIPE ABOVE CEILING OF LOBBY 108. 4 3" CW, 1" RO, AND FIRE SPRINKLER LINE DOWN AND PIPE ABOVE CEILING OF HALL 111. 5 2" CW DROP IN WALL AND BRANCH TO SUPPLY FIXTURES. 6 PROVIDE WATER HAMMER ARRESTER TYPE {WHA-4) PRIflR TO THE LAST FLUSH VALVE. PROVIDE ACCESS PANEL IN WALL FOR MAINTENANCE. 7 PROVIDE WATER HAMMER ARRESTER TYPE {WHA-1 } PRI�R TO THE LAST FLUSH VALVE. PROVIDE ACCESS PANEL IN WALL FOR MAINTENANCE. 8 GAS REGULATOR RATED FOR 2.0 PSI DOWN TO 10" W.C. PROVIDE VENT TO ATMOSPHERE AS REQUIRED. 9 1" GAS @ 10" W.C. FOR CONNECTION TO FURNACE. �� 3/4" GAS @ 10" W.C. FOR CONNECTION TO FURNACE. 11 1" GAS @'10" W.C. FOR CONNECTI�N TO WATER HEATER. 12 AIR COMPRESSOR SIZE SHALL BE QETERMINED BY THE FIRE SPRINKLER CONTRACTOR FOR THE DRY SPRINKLER SYSTEM FOR THE ATTIC AREA. 13 �2' RO WITH IN-LINE DUAL CHECK VALVE LIKE WILKINS MODEL 700-XL, DROP IN WALL AND STUBBED OUT AT 6" ABOVE COUNTERTOP FOR CONNECTION TD JUICE MACHINE AND WATER DISPENSER. SEE ARCHITE�TURAL ELEVATIONS FOR EXACT LOCATION. 14 1" GAS @'I 0" W.C. 15 1�/4" GAS @ 10" W.C. 16 2�� GAS @ 10" W.C. 17 %2' RO WITH IN-LINE DUAL CHECK VALVE LIKE WILKINS MODEL 700-XL, DROP IN WALL AND STUBBED OUT AT 6" ABOVE COUNTERTOP FOR CONNECTION TO COFFEE MACHINE. SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATION. 1$ 2" WASTE STAN DPI PE WITH P-TRAP CONNECTED TO (CDB-1 } IN WALL AND STUBBED UP TO 72" A.F.F. TO RECEIVE CONDENSATE DRAIN FROM (RTU'S}, SEE 'H' SERIES DRAWINGS FOR COORDINATION.