Loading...
HomeMy WebLinkAbout093 IMPA Bid Set 3 - P202.pdf� �� � � � � �� � � SCALE: �is�� _ � �-o�� - GENERAL NOTES: 1. SEE SHEET P001 FOR PLUMBING GENERAL PLAN NOTES. PLAN N4TES: 1 8" STORM DOWN IN CHASE AND PROVIDE CLEANOUT AT THE BASE OF THE STORM RISER PIPE. SEE ARCHITECTURAL PLANS FOR CHASE LOCATION. 2 3" DOMESTIC WATER DOWN. SEE SHEET P200B FOR CONTINUATION. 3 6" FIRE MAIN DOWN. SEE SHEET P200B FOR CONTINUATION. 4 SEE FIRE PROTECTION SPRINKLER CONTRACTOR DRAWINGS FOR CONTINUATION. 5 �/2" CW, %2" HW, AND 2" WASTE DOWN. PROVIDE AIR ADMITTANCE VALVE ON SINK WASTE LINE PER MANUFACTURER'S REC�MMENQATION. 6 �/2" RO DROP IN WALL FOR CONNECTION TO (WH-2) WITHIN CASEWORK. PROVIDE %2" HW SUPPLY TO SINK. 7 �/2" RO WITH I N-LI NE DUAL CH ECK VALVE LIKE WILKINS MODEL 700-XL, DOWN IN WALL FOR CONNECTION TO COFFEE AND JUICE MACHINE. 8 2" NON-POTABLE WATER LINE THRU WALL AND TURNED DOWN 6" FOR CONTINUATION BY IRRIGATION =TER BY CONTRACTOR. J CONTR. 9 FIRE SPRINKLER LINE D�WN TO BENEATH THE WOOD DECK AND ABOVE THE FINISHED FLOOR SLAB. 10 SEE FIRE SPRINKLER CONTRACTOR DRAWINGS FOR CONTINUATION. THIS FIRE SPRINKLER SYSTEM IS INTENDED TO BE A WET SYSTEM AND SUPPLY THE AREA ABOVE THE FINISHED FLOOR SLAB AND BELOW THE WOOD FLOOR DECK. �� THIS FLOOR DRAIN IS INSTALLED IN THE FINISHED FL04R SLAB, BEL4W THE WOOD FLO�R DECK. 12 3" CW, FIRE SPRINKLER, AND 1" RO LINES TO RISE UP AND RUN ABOVE HIGH CEILING OF LOBBY 108. 13 4" FIRE LINE DOWN. SEE SHEET P200B 14 FOR CONTINUATION TO FIRE DEPARTMENT CONNECTION. 2" WASTE STANDPIPE WITH P-TRAP CONNECTED TO {CDB-1) IN WALL AND STUBBED UP TO 72" A.F.F. TO RECEIVE CONDENSATE FROM {RTU'S}. SEE 'H' �5 SERIES DRAWINGS FOR COORDINATION. 3/4" CW DROWN IN WALL FOR CONNECTION TO {HYD-1}.