HomeMy WebLinkAbout093 IMPA Bid Set 3 - P202.pdf�
��
�
�
�
�
��
�
�
SCALE: �is�� _ � �-o��
-
GENERAL NOTES:
1. SEE SHEET P001 FOR PLUMBING
GENERAL PLAN NOTES.
PLAN N4TES:
1 8" STORM DOWN IN CHASE AND PROVIDE
CLEANOUT AT THE BASE OF THE STORM
RISER PIPE. SEE ARCHITECTURAL PLANS
FOR CHASE LOCATION.
2 3" DOMESTIC WATER DOWN. SEE SHEET
P200B FOR CONTINUATION.
3 6" FIRE MAIN DOWN. SEE SHEET P200B
FOR CONTINUATION.
4 SEE FIRE PROTECTION SPRINKLER
CONTRACTOR DRAWINGS FOR
CONTINUATION.
5 �/2" CW, %2" HW, AND 2" WASTE DOWN.
PROVIDE AIR ADMITTANCE VALVE ON
SINK WASTE LINE PER MANUFACTURER'S
REC�MMENQATION.
6 �/2" RO DROP IN WALL FOR CONNECTION
TO (WH-2) WITHIN CASEWORK.
PROVIDE %2" HW SUPPLY TO SINK.
7 �/2" RO WITH I N-LI NE DUAL CH ECK VALVE
LIKE WILKINS MODEL 700-XL, DOWN IN
WALL FOR CONNECTION TO COFFEE AND
JUICE MACHINE.
8 2" NON-POTABLE WATER LINE THRU WALL
AND TURNED DOWN 6" FOR
CONTINUATION BY IRRIGATION
=TER BY CONTRACTOR.
J CONTR.
9
FIRE SPRINKLER LINE D�WN TO
BENEATH THE WOOD DECK AND
ABOVE THE FINISHED FLOOR SLAB.
10 SEE FIRE SPRINKLER CONTRACTOR
DRAWINGS FOR CONTINUATION. THIS
FIRE SPRINKLER SYSTEM IS INTENDED
TO BE A WET SYSTEM AND SUPPLY
THE AREA ABOVE THE FINISHED
FLOOR SLAB AND BELOW THE WOOD
FLOOR DECK.
�� THIS FLOOR DRAIN IS INSTALLED
IN THE FINISHED FL04R SLAB, BEL4W
THE WOOD FLO�R DECK.
12 3" CW, FIRE SPRINKLER, AND 1" RO
LINES TO RISE UP AND RUN ABOVE
HIGH CEILING OF LOBBY 108.
13 4" FIRE LINE DOWN. SEE SHEET P200B
14 FOR CONTINUATION TO FIRE
DEPARTMENT CONNECTION.
2" WASTE STANDPIPE WITH P-TRAP
CONNECTED TO {CDB-1) IN WALL AND
STUBBED UP TO 72" A.F.F. TO RECEIVE
CONDENSATE FROM {RTU'S}. SEE 'H'
�5 SERIES DRAWINGS FOR
COORDINATION.
3/4" CW DROWN IN WALL FOR
CONNECTION TO {HYD-1}.