Loading...
HomeMy WebLinkAbout14090129 Correspondence1 Mishler, Nicholas F From:John Auble <Jauble@cjiinc.com> Sent:Monday, March 16, 2015 10:54 AM To:Mishler, Nicholas F Subject:RE: Penske Honda Car Wash Good morning Nick, On the Penske Honda car wash project we just completed, there was no landscaping as the building was placed in the middle of an existing parking lot adjacent to the other buildings. Let me know if still required and I’ll contact them to set something up for when I’m down there tomorrow. Thanks. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, March 16, 2015 10:51 AM To: John Auble Subject: RE: Penske Honda Car Wash John, I just received your check for the re-inspection fee. I believe the last thing I will need is a confirmation that your landscaping inspection passed. If you haven’t already done this, you would Daren Mindham, the Urban Forester, at 571-2283. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 2 Please consider the environment before printing this email From: John Auble [ mailto:Jauble@cjiinc.com ] Sent: Friday, March 06, 2015 4:12 PM To: Mishler, Nicholas F Subject: RE: Penske Honda Car Wash Good afternoon, Attached please find the signed and sealed accessibility form as requested. Let me know if anything further needed. Thank you. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient (s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, February 23, 2015 4:01 PM To: John Auble Subject: RE: Penske Honda Car Wash John, I have attached the accessibility form I will need to have signed/sealed by your design professional prior to a C/O being issued for the carwash. If you have any questions, let me know. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: John Auble [ mailto:Jauble@cjiinc.com ] Sent: Tuesday, September 23, 2014 2:44 PM 3 To: Mishler, Nicholas F Subject: Penske Honda Car Wash Good afternoon Nick. Following our discussion yesterday afternoon, attached please find the approvals that we understand get us to the point of submitting to you. The approvals from Utilities, Storm Water and Engineering came in the form of e-mail. There were no other approval letters provided. I have meetings in Carmel tomorrow so I was going to take the opportunity and submit these drawings. I have three (3) sets of drawings as requested in addition to the Plan Authentication Certification & Agreement stickers. Please review this information and let me know if there is anything else required prior to submitting the three (3) sets of drawings to you. Thanks again for your assistance and we’ll talk soon. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you 4 Mishler, Nicholas F From:Mindham, Daren Sent:Monday, March 16, 2015 10:53 AM To:Mishler, Nicholas F Subject:FW: Docket No. Assignment: Penske Honda Car Wash Addition (#14050009 ADLS Amend) No landscaping required. Daren Mindham | Urban Forester One Civic Square, Carmel, Indiana 46032 Ph: 317-571-2417 From: Conn, Angelina V Sent: Monday, May 12, 2014 3:00 PM To: Mindham, Daren Subject: RE: Docket No. Assignment: Penske Honda Car Wash Addition (#14050009 ADLS Amend) No, no landscaping. Going from pavement area to a car wash building addition. Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail From: Mindham, Daren Sent: Monday, May 12, 2014 2:56 PM To: Conn, Angelina V Subject: RE: Docket No. Assignment: Penske Honda Car Wash Addition (#14050009 ADLS Amend) The app said there are landscape plans. Does this project plan for landscaping? I don’t think I would have any specific requirements for a small addition like this. Daren Mindham | Urban Forester One Civic Square, Carmel, Indiana 46032 Ph: 317-571-2417 From: Conn, Angelina V Sent: Monday, May 12, 2014 1:11 PM To: Keesling, Rachel M; Barnes, David R; Blanchard, Jim E; Boone, Tiffany; Donahue-Wold, Alexia K; Duncan, Gary R; Haney, Douglas C; Hollibaugh, Mike P; 'John Molitor'; Kashman, Jeremy M; Kass, Joslyn; Keeling, Adrienne M; Littlejohn, David W; Lux, Pamela K; Maki, Sue; Martin, Candy; Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Speth, Nichole M; Stewart, Lisa M; Thomas, John G; Tingley, Connie S; Crediford, Maggie; Jordan, Alex Cc: 'Mark Ferfolia'; Jeff Ningard ( JNingard@cjiinc.com ) Subject: Docket No. Assignment: Penske Honda Car Wash Addition (#14050009 ADLS Amend) 5 I have issued the Docket Number for Penske Honda Car Wash Addition (ADLS Amend ). (Plans are attached.) It is the following: Docket No. 14050009 ADLS Amend: Penske Honda Car Wash Addition. The applicant seeks administrative site plan and design approval for car wash building addition, to the west side of the existing building. It is zoned B-3/Business and does not lie within any overlay zone. Filed by Jeff Ningard of CJI, Inc. for Penske Automotive. (Jeff can be contacted at (330) 425-2300.) FILING FEE: ADLS Amend - Building $125.50 ( Already Paid) Total still due: $0.00 Petitioner, please note the following: 1. This item does not need to be on a meeting agenda of the Technical Advisory Committee (TAC). 2. Mailed and Published Public Notice is not required for this petition type. 3. The Filing Fee has already been paid. 4. Proof of Notice is not required. 5. This item will be reviewed administratively. 6. Please refer to the application/checklist for more details. 7. No review comments will be issued; everything looks good. The Letter of Grant will be issued very soon. Sincerely, Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail 6 Mishler, Nicholas F From:John Auble <Jauble@cjiinc.com> Sent:Friday, March 06, 2015 4:12 PM To:Mishler, Nicholas F Subject:RE: Penske Honda Car Wash Good afternoon, Attached please find the signed and sealed accessibility form as requested. Let me know if anything further needed. Thank you. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient (s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, February 23, 2015 4:01 PM To: John Auble Subject: RE: Penske Honda Car Wash John, I have attached the accessibility form I will need to have signed/sealed by your design professional prior to a C/O being issued for the carwash. If you have any questions, let me know. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 7 From: John Auble [ mailto:Jauble@cjiinc.com ] Sent: Tuesday, September 23, 2014 2:44 PM To: Mishler, Nicholas F Subject: Penske Honda Car Wash Good afternoon Nick. Following our discussion yesterday afternoon, attached please find the approvals that we understand get us to the point of submitting to you. The approvals from Utilities, Storm Water and Engineering came in the form of e-mail. There were no other approval letters provided. I have meetings in Carmel tomorrow so I was going to take the opportunity and submit these drawings. I have three (3) sets of drawings as requested in addition to the Plan Authentication Certification & Agreement stickers. Please re view this information and let me know if there is anything else required prior to submitting the three (3) sets of drawings to you. Thanks again for your assistance and we’ll talk soon. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you 8 Mishler, Nicholas F From:John Auble <Jauble@cjiinc.com> Sent:Tuesday, February 24, 2015 9:27 AM To:Mishler, Nicholas F Subject:RE: Penske Honda Car Wash Good morning Nick, We have forwarded the accessibility form to our architect. They are from out of state but will plan to visit the site and complete this form as soon as possible. We are trying for this week so I can get to you by the end of the week. I’ll keep you posted. Thank you. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, February 23, 2015 4:01 PM To: John Auble Subject: RE: Penske Honda Car Wash John, I have attached the accessibility form I will need to have signed/sealed by your design professional prior to a C/O being issued for the carwash. If you have any questions, let me know. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 9 Please consider the environment before printing this email From: John Auble [ mailto:Jauble@cjiinc.com ] Sent: Tuesday, September 23, 2014 2:44 PM To: Mishler, Nicholas F Subject: Penske Honda Car Wash Good afternoon Nick. Following our discussion yesterday afternoon, attached please find the approvals that we understand get us to the point of submitting to you. The approvals from Utilities, Storm Water and Engineering came in the form of e-mail. There were no other approval letters provided. I have meetings in Carmel tomorrow so I was going to take the opportunity and submit these drawings. I have three (3) sets of drawings as requested in addition to the Plan Authentication Certification & Agreement stickers. Please review this information and let me know if there is anything else required prior to submitting the three (3) sets of drawings to you. Thanks again for your assistance and we’ll talk soon. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you 10 Mishler, Nicholas F From:Mishler, Nicholas F Sent:Monday, February 23, 2015 4:01 PM To:'John Auble' Subject:RE: Penske Honda Car Wash John, I have attached the accessibility form I will need to have signed/sealed by your design professional prior to a C/O being issued for the carwash. If you have any questions, let me know. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: John Auble [mailto:Jauble@cjiinc.com] Sent: Tuesday, September 23, 2014 2:44 PM To: Mishler, Nicholas F Subject: Penske Honda Car Wash Good afternoon Nick. Following our discussion yesterday afternoon, attached please find the approvals that we understand get us to the point of submitting to you. The approvals from Utilities, Storm Water and Engineering came in the form of e-mail. There were no other approval letters provided. I have meetings in Carmel tomorrow so I was going to take the opportunity and submit these drawings. I have three (3) sets of drawings as requested in addition to the Plan Authentication Certification & Agreement stickers. Please r eview this information and let me know if there is anything else required prior to submitting the three (3) sets of drawings to you. Thanks again for your assistance and we’ll talk soon. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) 11 by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you 12 Mishler, Nicholas F From:John Auble <Jauble@cjiinc.com> Sent:Tuesday, September 30, 2014 4:57 PM To:Mishler, Nicholas F Subject:RE: Penske Honda Car Wash Good afternoon Nick. Different projects, same dealership. Let me know if you need anything else. Thanks. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly pr ohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, September 30, 2014 4:39 PM To: John Auble Subject: RE: Penske Honda Car Wash John, is this project and the addition/remodel I received for Penske Honda the same project? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 13 From: John Auble [ mailto:Jauble@cjiinc.com ] Sent: Tuesday, September 23, 2014 2:44 PM To: Mishler, Nicholas F Subject: Penske Honda Car Wash Good afternoon Nick. Following our discussion yesterday afternoon, attached please find the approvals that we understand get us to the point of submitting to you. The approvals from Utilities, Storm Water and Engineering came in the form of e-mail. There were no other approval letters provided. I have meetings in Carmel tomorrow so I was going to take the opportunity and submit these drawings. I have three (3) sets of drawings as requested in addition to the Plan Authentication Certification & Agreement stickers. Please review this information and let me know if there is anything else required prior to submitting the three (3) sets of drawings to you. Thanks again for your assistance and we’ll talk soon. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you 14 Mishler, Nicholas F From:John Auble <Jauble@cjiinc.com> Sent:Thursday, September 25, 2014 10:23 AM To:Mishler, Nicholas F Subject:RE: Penske Honda Car Wash It’ll go out tonight and you’ll have tomorrow. Thanks. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Thursday, September 25, 2014 10:20 AM To: John Auble Subject: RE: Penske Honda Car Wash Disc would be better. Here is the address: Nick Mishler City of Carmel Building & Code Services – 1st Floor One Civic Square Carmel, IN 46032 Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 15 From: John Auble [ mailto:Jauble@cjiinc.com ] Sent: Thursday, September 25, 2014 10:17 AM To: Mishler, Nicholas F Subject: Penske Honda Car Wash Good morning Nick, Thanks for your time and assistance with the permit application yesterday morning. I look forward to hearing from you next week. On the electronic version of the drawings you requested, The file is too big to send via e-mail so we can put on disc and overnight to you or send you a drop box link where you can view and/or download any respective drawing. Please let me know which you’d prefer. Thank you. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you 16 Mishler, Nicholas F From:John Auble <Jauble@cjiinc.com> Sent:Thursday, September 25, 2014 10:17 AM To:Mishler, Nicholas F Subject:Penske Honda Car Wash Good morning Nick, Thanks for your time and assistance with the permit application yesterday morning. I look forward to hearing from you next week. On the electronic version of the drawings you requested, The file is too big to send via e-mail so we can put on disc and overnight to you or send you a drop box link where you can view and/or download any respective drawing. Please let me know which you’d prefer. Thank you. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you 17 Mishler, Nicholas F From:John Auble <Jauble@cjiinc.com> Sent:Tuesday, September 23, 2014 2:44 PM To:Mishler, Nicholas F Subject:Penske Honda Car Wash Good afternoon Nick. Following our discussion yesterday afternoon, attached please find the approvals that we understand get us to the point of submitting to you. The approvals from Utilities, Storm Water and Engineering came in the form of e-mail. There were no other approval letters provided. I have meetings in Carmel tomorrow so I was going to take the opportunity and submit these drawings. I have three (3) sets of drawings as requested in addition to the Plan Authentication Certification & Agreement stickers. Please review this information and let me know if there is anything else required prior to submitting the three (3) sets of drawings to you. Thanks again for your assistance and we’ll talk soon. John Auble CJI Inc. 1333 Highland Rd, Suite A Macedonia, OH 44056 (T) 330.425-2300 ext. 129 (F) 330.425-2313 (C) 440.396-8204 jauble@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you 18 Mishler, Nicholas F From:Conn, Angelina V Sent:Thursday, September 18, 2014 12:31 PM To:Keesling, Rachel M; Barnes, David R; Blanchard, Jim E; Boone, Tiffany; Lopez, Alexia K; Duncan, Gary R; Haney, Douglas C; Hollibaugh, Mike P; 'John Molitor'; Kashman, Jeremy M; Kass, Joslyn; Keeling, Adrienne M; Littlejohn, David W; Lux, Pamela K; Maki, Sue; Martin, Candy; Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Speth, Nichole M; Stewart, Lisa M; Thomas, John G; Tingley, Connie S; Boone, Tiffany; Jordan, Alex; Crediford, Maggie; 'Greg Ilko'; Knott, Bruce; Ellison, Christopher M; Kallen, Matt J Cc:Jeffrey Huhta; Jason Longhurst; Dresselhouse,Allen; Bryan Smith; 'Petr Kotrba' Subject:Docket No. Assignment: Penske Honda Service Addition (#14090007 ADLS Amend) I have issued the docket number for Penske Honda Service Addition (ADLS Amend). It is the following: Docket No. 14090007 ADLS Amend: Penske Honda – Service Addition. The applicant seeks site plan and design approval for a 4,935 sq. ft. building addition to the east for a new service area, and also enclosing the existing showroom area located on the south for an expanded showroom area. The site is located at 4141 E. 96 th Street. It is zoned B-3/Business and does not lie within any overlay zone. Filed by Jason Longhurst of Nowak & Fraus Engineers, on behalf of Penske Honda. Jason, project engineer, can be contacted at (248) 332-7931. FILING FEE: ADLS Amend (Building/site) $ 643.00 Total due: $643.00 Petitioner, please note the following: 1. This item will not be on a meeting agenda of the Technical Advisory Committee (TAC); however, please email the plans to all TAC members . The contact list in online at: http://www.carmel.in.gov/index.aspx?page=567. 2. Mailed and Published Public Notice is not required for this petition type. 3. The Filing Fee and 9 Informational Packets must be delivered to Plan Commission Secretary Lisa Motz no later than Noon , Friday, Sept.26. (Checks can be made out to The City of Carmel.) 4. Proof of Notice is not required. 5. This item will appear on the Tuesday, Oct. 7 meeting agenda of the Plan Commission Special Studies Committee, which begins at 6 pm. (A representative must be present.) 6. Please refer to the application/checklist for more details. 7. Review comments from the Planning/Zoning Dept. will be issued within 5 business days. Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail 19 Mishler, Nicholas F From:Conn, Angelina V Sent:Thursday, August 28, 2014 4:40 PM To:'Dave Hanson' Cc:'Jason Longhurst'; Jeff Ningard; adresselhouse@penskeautomotive.com; Mishler, Nicholas F Subject:RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition Good afternoon, Dave – Thanks for stopping in this afternoon. I spoke with Nick Mishler in the Carmel Building Permits Dept., and I also emailed Bonnie Robison and Dave Moses at the Indiana State Dept. of Homeland Security with a preliminary set of your car wash plans. I am sorry to say that you will need a Construction Design Release from the State. Please continue working with Nick Mishler in the Carmel Building Permits Dept., as well as the State DHS to get your permits reviewed and approved. (These are the last few steps you need to take.) Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail From: Dave Hanson [mailto:DHanson@cjiinc.com] Sent: Wednesday, August 27, 2014 2:53 PM To: Thomas, John G; Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R; Jeff Ningard; Dresselhouse,Allen Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition The estimate was given emailed to Gary Duncan when the he requested the changes made to the storm water prevention bond. It was submitted with the revised drawings. Anyway, I glad you have everything you needed, I will make sure that you are copied in the future. Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended 20 recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Thomas, John G [ mailto:jthomas@carmel.in.gov ] Sent: Wednesday, August 27, 2014 2:49 PM To: Dave Hanson; Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition Please disregard my previous email, we found the estimate attached to the submitted bond. For future projects, we need to review and approve this estimate before the bond is submitted. Everything checks out on this one, so no further action needed. Sincerely, John Thomas, CPESC, CMS4S Storm Water Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Thomas, John G Sent: Wednesday, August 27, 2014 2:45 PM To: 'Dave Hanson'; Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition We received a performance bond for erosion control on this project today, but I don’t have the engineer’s estimate for how this amount was determined. Please send over at your earliest convenience. Thank you. Sincerely, John Thomas, CPESC, CMS4S Storm Water Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Dave Hanson [ mailto:DHanson@cjiinc.com ] Sent: Friday, May 23, 2014 1:59 PM To: Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Thomas, John G; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition The drawings sent were only the preliminary car wash drawings for your reference. CJI INC will be submitting a full set a Architectural, Civil and MEP Drawings. These drawings will be stamped “ Permit Set “ and will be submitted as soon as they are complete 21 Thank you for the quick response and I will forwarded the comments below to our Architect and Civil Engineer as well. Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Duncan, Gary R [ mailto:gduncan@carmel.in.gov ] Sent: Thursday, May 22, 2014 4:25 PM To: Dave Hanson; Jeff Ningard; Mark Ferfolia Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Thomas, John G; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition All, we have reviewed the plans and have the following questions/comments: Is the proposed car wash facility self contained? Are all discharges collected and discharged to the sanitary sewer? Are there trench drains at the exit points? Do these drain to the sanitary sewer? Is the addition enclosed or is it open and subject to inundation from storm water? Are there underground storage tanks for process water? The area is within the 1-year time of travel of the City wells…please confirm with the Utility Department if they have any requirements for protecting the water supply. Please indicate construction phase inlet protection and perimeter protection that is effective when placed directly on pavement. A concrete washout is required for any concrete work. Please provide details for construction phase erosion and sediment control measures. A right-of-way permit will be required for construction equipment access to the site from the public right-of-way. Please contact Fred Glaser. Thanks so much! 22 Gary From: Duncan, Gary R Sent: Wednesday, May 21, 2014 4:32 PM To: 'Dave Hanson'; Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Mr. Ferfolia, I got your voice mail. We will review this as quickly as possible. We have a large number of plans in the queue for review…we will try to get to this ASAP. Thanks so much, Gary From: Dave Hanson [ mailto:DHanson@cjiinc.com ] Sent: Friday, May 16, 2014 11:51 AM To: Duncan, Gary R; Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Attached are the preliminary drawings for the Car wash for your review. Please contact me if you have any questions. Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Duncan, Gary R [ mailto:gduncan@carmel.in.gov ] Sent: Friday, May 16, 2014 11:02 AM 23 To: Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Dave Hanson; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) All, we will need to review this in more detail since it is a car wash. Thanks so much, Gary From: Conn, Angelina V Sent: Monday, May 12, 2014 3:20 PM To: 'Jeff Ningard ( JNingard@cjiinc.com )'; Motz, Lisa Cc: 'Mark Ferfolia'; Mishler, Nicholas F; Blanchard, Jim E; Duncan, Gary R; Boone, Tiffany; 'Dave Hanson' Subject: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Good afternoon, Jeff – Attached is a scanned copy of the Planning/Zoning Department’s Letter of Grant . The paper copy will be mailed to you tomorrow. Please continue to work with the Carmel Building Permits Dept. for your building permit approvals. Their number is (317) 571-2444. Lastly, please note that the Carmel Engineering Dept. might issue review comments, too, as it relates to any BPW approvals, right of way permits, or construction for this project. (Lisa – please add this pdf to Laser Fiche. ) Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail From: Conn, Angelina V Sent: Monday, May 12, 2014 1:11 PM To: Keesling, Rachel M; Barnes, David R; Blanchard, Jim E; Boone, Tiffany; Donahue-Wold, Alexia K; Duncan, Gary R; Haney, Douglas C; Hollibaugh, Mike P; 'John Molitor'; Kashman, Jeremy M; Kass, Joslyn; Keeling, Adrienne M; Littlejohn, David W; Lux, Pamela K; Maki, Sue; Martin, Candy; Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Speth, Nichole M; Stewart, Lisa M; Thomas, John G; Tingley, Connie S; Crediford, Maggie; Jordan, Alex Cc: 'Mark Ferfolia'; Jeff Ningard ( JNingard@cjiinc.com ) Subject: Docket No. Assignment: Penske Honda Car Wash Addition (#14050009 ADLS Amend) I have issued the Docket Number for Penske Honda Car Wash Addition (ADLS Amend ). (Plans are attached.) It is the following: Docket No. 14050009 ADLS Amend: Penske Honda Car Wash Addition. The applicant seeks administrative site plan and design approval for car wash building addition, to the west side of the existing building. It is zoned B-3/Business and does not lie within any overlay zone. Filed by Jeff Ningard of CJI, Inc. for Penske Automotive. (Jeff can be contacted at (330) 425-2300.) 24 FILING FEE: ADLS Amend - Building $125.50 ( Already Paid) Total still due: $0.00 Petitioner, please note the following: 1. This item does not need to be on a meeting agenda of the Technical Advisory Committee (TAC). 2. Mailed and Published Public Notice is not required for this petition type. 3. The Filing Fee has already been paid. 4. Proof of Notice is not required. 5. This item will be reviewed administratively. 6. Please refer to the application/checklist for more details. 7. No review comments will be issued; everything looks good. The Letter of Grant will be issued very soon. Sincerely, Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail 25 Mishler, Nicholas F From:Thomas, John G Sent:Wednesday, August 27, 2014 2:49 PM To:'Dave Hanson'; Duncan, Gary R; 'Jeff Ningard'; 'Mark Ferfolia'; 'Vadim Kaplan'; 'Jason Longhurst' Cc:Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject:RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition Please disregard my previous email, we found the estimate attached to the submitted bond. For future projects, we need to review and approve this estimate before the bond is submitted. Everything checks out on this one, so no further action needed. Sincerely, John Thomas, CPESC, CMS4S Storm Water Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Thomas, John G Sent: Wednesday, August 27, 2014 2:45 PM To: 'Dave Hanson'; Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition We received a performance bond for erosion control on this project today, but I don’t have the engineer’s estimate for how this amount was determined. Please send over at your earliest convenience. Thank you. Sincerely, John Thomas, CPESC, CMS4S Storm Water Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Dave Hanson [ mailto:DHanson@cjiinc.com ] Sent: Friday, May 23, 2014 1:59 PM To: Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Thomas, John G; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition The drawings sent were only the preliminary car wash drawings for your reference. CJI INC will be submitting a full set a Architectural, Civil and MEP Drawings. These drawings will be stamped “ Permit Set “ and will be submitted as soon as they are complete Thank you for the quick response and I will forwarded the comments below to our Architect and Civil Engineer as well. 26 Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Duncan, Gary R [ mailto:gduncan@carmel.in.gov ] Sent: Thursday, May 22, 2014 4:25 PM To: Dave Hanson; Jeff Ningard; Mark Ferfolia Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Thomas, John G; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition All, we have reviewed the plans and have the following questions/comments: Is the proposed car wash facility self contained? Are all discharges collected and discharged to the sanitary sewer? Are there trench drains at the exit points? Do these drain to the sanitary sewer? Is the addition enclosed or is it open and subject to inundation from storm water? Are there underground storage tanks for process water? The area is within the 1-year time of travel of the City wells…please confirm with the Utility Department if they have any requirements for protecting the water supply. Please indicate construction phase inlet protection and perimeter protection that is effective when placed directly on pavement. A concrete washout is required for any concrete work. Please provide details for construction phase erosion and sediment control measures. A right-of-way permit will be required for construction equipment access to the site from the public right-of-way. Please contact Fred Glaser. Thanks so much! Gary 27 From: Duncan, Gary R Sent: Wednesday, May 21, 2014 4:32 PM To: 'Dave Hanson'; Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Mr. Ferfolia, I got your voice mail. We will review this as quickly as possible. We have a large number of plans in the queue for review…we will try to get to this ASAP. Thanks so much, Gary From: Dave Hanson [ mailto:DHanson@cjiinc.com ] Sent: Friday, May 16, 2014 11:51 AM To: Duncan, Gary R; Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Attached are the preliminary drawings for the Car wash for your review. Please contact me if you have any questions. Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Duncan, Gary R [ mailto:gduncan@carmel.in.gov ] Sent: Friday, May 16, 2014 11:02 AM To: Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Dave Hanson; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) 28 All, we will need to review this in more detail since it is a car wash. Thanks so much, Gary From: Conn, Angelina V Sent: Monday, May 12, 2014 3:20 PM To: 'Jeff Ningard ( JNingard@cjiinc.com )'; Motz, Lisa Cc: 'Mark Ferfolia'; Mishler, Nicholas F; Blanchard, Jim E; Duncan, Gary R; Boone, Tiffany; 'Dave Hanson' Subject: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Good afternoon, Jeff – Attached is a scanned copy of the Planning/Zoning Department’s Letter of Grant . The paper copy will be mailed to you tomorrow. Please continue to work with the Carmel Building Permits Dept. for your building permit approvals. Their number is (317) 571-2444. Lastly, please note that the Carmel Engineering Dept. might issue review comments, too, as it relates to any BPW approvals, right of way permits, or construction for this project. (Lisa – please add this pdf to Laser Fiche. ) Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail From: Conn, Angelina V Sent: Monday, May 12, 2014 1:11 PM To: Keesling, Rachel M; Barnes, David R; Blanchard, Jim E; Boone, Tiffany; Donahue-Wold, Alexia K; Duncan, Gary R; Haney, Douglas C; Hollibaugh, Mike P; 'John Molitor'; Kashman, Jeremy M; Kass, Joslyn; Keeling, Adrienne M; Littlejohn, David W; Lux, Pamela K; Maki, Sue; Martin, Candy; Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Speth, Nichole M; Stewart, Lisa M; Thomas, John G; Tingley, Connie S; Crediford, Maggie; Jordan, Alex Cc: 'Mark Ferfolia'; Jeff Ningard ( JNingard@cjiinc.com ) Subject: Docket No. Assignment: Penske Honda Car Wash Addition (#14050009 ADLS Amend) I have issued the Docket Number for Penske Honda Car Wash Addition (ADLS Amend ). (Plans are attached.) It is the following: Docket No. 14050009 ADLS Amend: Penske Honda Car Wash Addition. The applicant seeks administrative site plan and design approval for car wash building addition, to the west side of the existing building. It is zoned B-3/Business and does not lie within any overlay zone. Filed by Jeff Ningard of CJI, Inc. for Penske Automotive. (Jeff can be contacted at (330) 425-2300.) FILING FEE: ADLS Amend - Building $125.50 ( Already Paid) 29 Total still due: $0.00 Petitioner, please note the following: 1. This item does not need to be on a meeting agenda of the Technical Advisory Committee (TAC). 2. Mailed and Published Public Notice is not required for this petition type. 3. The Filing Fee has already been paid. 4. Proof of Notice is not required. 5. This item will be reviewed administratively. 6. Please refer to the application/checklist for more details. 7. No review comments will be issued; everything looks good. The Letter of Grant will be issued very soon. Sincerely, Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail 30 Mishler, Nicholas F From:Duncan, Gary R Sent:Wednesday, August 27, 2014 2:46 PM To:Thomas, John G; 'Dave Hanson'; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc:Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject:RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition John, I have it. Sorry about that. The numbers looked good to me. Gary From: Thomas, John G Sent: Wednesday, August 27, 2014 2:45 PM To: 'Dave Hanson'; Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition We received a performance bond for erosion control on this project today, but I don’t have the engineer’s estimate for how this amount was determined. Please send over at your earliest convenience. Thank you. Sincerely, John Thomas, CPESC, CMS4S Storm Water Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Dave Hanson [ mailto:DHanson@cjiinc.com ] Sent: Friday, May 23, 2014 1:59 PM To: Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Ni cholas F; Blanchard, Jim E; Jordan, Alex; Thomas, John G; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition The drawings sent were only the preliminary car wash drawings for your reference. CJI INC will be submitting a full set a Architectural, Civil and MEP Drawings. These drawings will be stamped “ Permit Set “ and will be submitted as soon as they are complete Thank you for the quick response and I will forwarded the comments below to our Architect and Civil Engineer as well. Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. 31 F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Duncan, Gary R [ mailto:gduncan@carmel.in.gov ] Sent: Thursday, May 22, 2014 4:25 PM To: Dave Hanson; Jeff Ningard; Mark Ferfolia Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Thomas, John G; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition All, we have reviewed the plans and have the following questions/comments: Is the proposed car wash facility self contained? Are all discharges collected and discharged to the sanitary sewer? Are there trench drains at the exit points? Do these drain to the sanitary sewer? Is the addition enclosed or is it open and subject to inundation from storm water? Are there underground storage tanks for process water? The area is within the 1-year time of travel of the City wells…please confirm with the Utility Department if they have any requirements for protecting the water supply. Please indicate construction phase inlet protection and perimeter protection that is effective when placed directly on pavement. A concrete washout is required for any concrete work. Please provide details for construction phase erosion and sediment control measures. A right-of-way permit will be required for construction equipment access to the site from the public right-of-way. Please contact Fred Glaser. Thanks so much! Gary From: Duncan, Gary R Sent: Wednesday, May 21, 2014 4:32 PM To: 'Dave Hanson'; Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) 32 Mr. Ferfolia, I got your voice mail. We will review this as quickly as possible. We have a large number of plans in the queue for review…we will try to get to this ASAP. Thanks so much, Gary From: Dave Hanson [ mailto:DHanson@cjiinc.com ] Sent: Friday, May 16, 2014 11:51 AM To: Duncan, Gary R; Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Attached are the preliminary drawings for the Car wash for your review. Please contact me if you have any questions. Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Duncan, Gary R [ mailto:gduncan@carmel.in.gov ] Sent: Friday, May 16, 2014 11:02 AM To: Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Dave Hanson; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) All, we will need to review this in more detail since it is a car wash. Thanks so much, Gary 33 From: Conn, Angelina V Sent: Monday, May 12, 2014 3:20 PM To: 'Jeff Ningard ( JNingard@cjiinc.com )'; Motz, Lisa Cc: 'Mark Ferfolia'; Mishler, Nicholas F; Blanchard, Jim E; Duncan, Gary R; Boone, Tiffany; 'Dave Hanson' Subject: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Good afternoon, Jeff – Attached is a scanned copy of the Planning/Zoning Department’s Letter of Grant. The paper copy will be mailed to you tomorrow. Please continue to work with the Carmel Building Permits Dept. for your building permit approvals. Their number is (317) 571-2444. Lastly, please note that the Carmel Engineering Dept. might issue review comments, too, as it relates to any BPW approvals, right of way permits, or construction for this project. (Lisa – please add this pdf to Laser Fiche. ) Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail From: Conn, Angelina V Sent: Monday, May 12, 2014 1:11 PM To: Keesling, Rachel M; Barnes, David R; Blanchard, Jim E; Boone, Tiffany; Donahue-Wold, Alexia K; Duncan, Gary R; Haney, Douglas C; Hollibaugh, Mike P; 'John Molitor'; Kashman, Jeremy M; Kass, Joslyn; Keeling, Adrienne M; Littlejohn, David W; Lux, Pamela K; Maki, Sue; Martin, Candy; Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Speth, Nichole M; Stewart, Lisa M; Thomas, John G; Tingley, Connie S; Crediford, Maggie; Jordan, Alex Cc: 'Mark Ferfolia'; Jeff Ningard ( JNingard@cjiinc.com ) Subject: Docket No. Assignment: Penske Honda Car Wash Addition (#14050009 ADLS Amend) I have issued the Docket Number for Penske Honda Car Wash Addition (ADLS Amend ). (Plans are attached.) It is the following: Docket No. 14050009 ADLS Amend: Penske Honda Car Wash Addition. The applicant seeks administrative site plan and design approval for car wash building addition, to the west side of the existing building. It is zoned B-3/Business and does not lie within any overlay zone. Filed by Jeff Ningard of CJI, Inc. for Penske Automotive. (Jeff can be contacted at (330) 425-2300.) FILING FEE: ADLS Amend - Building $125.50 ( Already Paid) Total still due: $0.00 Petitioner, please note the following: 1. This item does not need to be on a meeting agenda of the Technical Advisory Committee (TAC). 2. Mailed and Published Public Notice is not required for this petition type. 3. The Filing Fee has already been paid. 34 4. Proof of Notice is not required. 5. This item will be reviewed administratively. 6. Please refer to the application/checklist for more details. 7. No review comments will be issued; everything looks good. The Letter of Grant will be issued very soon. Sincerely, Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail 35 Mishler, Nicholas F From:Thomas, John G Sent:Wednesday, August 27, 2014 2:45 PM To:'Dave Hanson'; Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc:Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject:RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition We received a performance bond for erosion control on this project today, but I don’t have the engineer’s estimate for how this amount was determined. Please send over at your earliest convenience. Thank you. Sincerely, John Thomas, CPESC, CMS4S Storm Water Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Dave Hanson [mailto:DHanson@cjiinc.com] Sent: Friday, May 23, 2014 1:59 PM To: Duncan, Gary R; Jeff Ningard; Mark Ferfolia; 'Vadim Kaplan'; 'Jason Longhurst' Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Thomas, John G; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition The drawings sent were only the preliminary car wash drawings for your reference. CJI INC will be submitting a full set a Architectural, Civil and MEP Drawings. These drawings will be stamped “ Permit Set “ and will be submitted as soon as they are complete Thank you for the quick response and I will forwarded the comments below to our Architect and Civil Engineer as well. Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in 36 error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Duncan, Gary R [ mailto:gduncan@carmel.in.gov ] Sent: Thursday, May 22, 2014 4:25 PM To: Dave Hanson; Jeff Ningard; Mark Ferfolia Cc: Mishler, Nicholas F; Blanchard, Jim E; Jordan, Alex; Thomas, John G; Kashman, Jeremy M; Conn, Angelina V; Barnes, David R Subject: City of Carmel Docket 14050009 ADLS Amend Penske Honda Car Wash Addition All, we have reviewed the plans and have the following questions/comments: Is the proposed car wash facility self contained? Are all discharges collected and discharged to the sanitary sewer? Are there trench drains at the exit points? Do these drain to the sanitary sewer? Is the addition enclosed or is it open and subject to inundation from storm water? Are there underground storage tanks for process water? The area is within the 1-year time of travel of the City wells…please confirm with the Utility Department if they have any requirements for protecting the water supply. Please indicate construction phase inlet protection and perimeter protection that is effective when placed directly on pavement. A concrete washout is required for any concrete work. Please provide details for construction phase erosion and sediment control measures. A right-of-way permit will be required for construction equipment access to the site from the public right-of-way. Please contact Fred Glaser. Thanks so much! Gary From: Duncan, Gary R Sent: Wednesday, May 21, 2014 4:32 PM To: 'Dave Hanson'; Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Mr. Ferfolia, I got your voice mail. We will review this as quickly as possible. We have a large number of plans in the queue for review…we will try to get to this ASAP. Thanks so much, Gary From: Dave Hanson [ mailto:DHanson@cjiinc.com ] Sent: Friday, May 16, 2014 11:51 AM To: Duncan, Gary R; Conn, Angelina V; Jeff Ningard; Motz, Lisa 37 Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Attached are the preliminary drawings for the Car wash for your review. Please contact me if you have any questions. Dave Hanson Project Manager CJI INC 1333 Highland Road, Suite A Macedonia, Oh 44056 P (330) 425-2300 ext 116. F (330) 425-2313 C (330) 840-9336 dhanson@cjiinc.com www.cjiinc.com Certified: SBE, FBE, & EDGE CONFIDENTIAL: This electronic mail (including any attachments) may contain information that is privileged, confidential, and/or otherwise protected from disclosure to anyone other than its intended recipient(s). Any dissemination or use of this electronic email or its contents (including any attachments) by persons other than the intended recipient(s) is strictly prohibited. If you have received this message in error, please notify us immediately by reply email so that we may correct our internal records. Please then delete the original message (including any attachments) in its entirety. Thank you From: Duncan, Gary R [ mailto:gduncan@carmel.in.gov ] Sent: Friday, May 16, 2014 11:02 AM To: Conn, Angelina V; Jeff Ningard; Motz, Lisa Cc: Mark Ferfolia; Mishler, Nicholas F; Blanchard, Jim E; Boone, Tiffany; Dave Hanson; Jordan, Alex; Thomas, John G Subject: RE: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) All, we will need to review this in more detail since it is a car wash. Thanks so much, Gary From: Conn, Angelina V Sent: Monday, May 12, 2014 3:20 PM To: 'Jeff Ningard ( JNingard@cjiinc.com )'; Motz, Lisa Cc: 'Mark Ferfolia'; Mishler, Nicholas F; Blanchard, Jim E; Duncan, Gary R; Boone, Tiffany; 'Dave Hanson' Subject: Letter of Grant: Penske Honda Car Wash Addition (#14050009 ADLS Amend) Good afternoon, Jeff – Attached is a scanned copy of the Planning/Zoning Department’s Letter of Grant . The paper copy will be mailed to you tomorrow. 38 Please continue to work with the Carmel Building Permits Dept. for your building permit approvals. Their number is (317) 571-2444. Lastly, please note that the Carmel Engineering Dept. might issue review comments, too, as it relates to any BPW approvals, right of way permits, or construction for this project. (Lisa – please add this pdf to Laser Fiche. ) Angie Conn , Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail From: Conn, Angelina V Sent: Monday, May 12, 2014 1:11 PM To: Keesling, Rachel M; Barnes, David R; Blanchard, Jim E; Boone, Tiffany; Donahue-Wold, Alexia K; Duncan, Gary R; Haney, Douglas C; Hollibaugh, Mike P; 'John Molitor'; Kashman, Jeremy M; Kass, Joslyn; Keeling, Adrienne M; Littlejohn, David W; Lux, Pamela K; Maki, Sue; Martin, Candy; Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Speth, Nichole M; Stewart, Lisa M; Thomas, John G; Tingley, Connie S; Crediford, Maggie; Jordan, Alex Cc: 'Mark Ferfolia'; Jeff Ningard ( JNingard@cjiinc.com ) Subject: Docket No. Assignment: Penske Honda Car Wash Addition (#14050009 ADLS Amend) I have issued the Docket Number for Penske Honda Car Wash Addition (ADLS Amend ). (Plans are attached.) It is the following: Docket No. 14050009 ADLS Amend: Penske Honda Car Wash Addition. The applicant seeks administrative site plan and design approval for car wash building addition, to the west side of the existing building. It is zoned B-3/Business and does not lie within a ny overlay zone. Filed by Jeff Ningard of CJI, Inc. for Penske Automotive. (Jeff can be contacted at (330) 425-2300.) FILING FEE: ADLS Amend - Building $125.50 ( Already Paid) Total still due: $0.00 Petitioner, please note the following: 1. This item does not need to be on a meeting agenda of the Technical Advisory Committee (TAC). 2. Mailed and Published Public Notice is not required for this petition type. 3. The Filing Fee has already been paid. 4. Proof of Notice is not required. 5. This item will be reviewed administratively. 6. Please refer to the application/checklist for more details. 7. No review comments will be issued; everything looks good. The Letter of Grant will be issued very soon. Sincerely, Angie Conn , Planning Administrator 39 City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov | Web: www.carmeldocs.com Please consider the environment before printing this e-mail 40 Mishler, Nicholas F From:Duncan, Gary R Sent:Wednesday, August 27, 2014 7:55 AM To:Dresselhouse,Allen Cc:Barnes, David R; Conn, Angelina V; Glaser, Fred J; Greg Ilko; Kashman, Jeremy M; Keesling, Rachel M; Lopez, Alexia K; Thomas, John G; Dave Hanson; Duffy, John M; Jordan, Alex; Mishler, Nicholas F; Jason Longhurst; Jeff Ningard Subject:RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Carwash Addition Good morning everyone. Engineering has signed the plans. I expect that Utilities is still reviewing the water and sanitary usage. Please provide an update on the status of the performance bond for the erosion and sediment control measures. We approved the amount and are waiting for the bond to be delivered. Thanks so much, Gary From: Jordan, Alex Sent: Thursday, August 21, 2014 9:59 AM To: Duncan, Gary R; Dresselhouse,Allen Cc: Barnes, David R; Conn, Angelina V; Glaser, Fred J; Greg Ilko; Kashman, Jeremy M; Keesling, Rachel M; Lopez, Alexia K; Thomas, John G; Dave Hanson; Duffy, John M Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Carwash Addition Based on our meeting yesterday and Gary’s discussions with John today, comment 7 and 9 will require the perimeter protection. Please add this to the erosion and sediment plan, add a detail for the measure, and update the bond estimate. Comment 6… what was the outcome of the meeting with the utility department? Thank you From: Duncan, Gary R Sent: Tuesday, August 19, 2014 11:13 AM To: Duncan, Gary R; Dresselhouse,Allen Cc: Barnes, David R; Conn, Angelina V; Glaser, Fred J; Greg Ilko; Jordan, Alex; Kashman, Jeremy M; Keesling, Rachel M; Lopez, Alexia K; Thomas, John G; Dave Hanson; Duffy, John M Subject: RE: City of Carmel Docket 14050009 ADLS Amend Penske Honda Carwash Addition All, I forgot to add that a performance bond equal to 100% of the value of the construction phase erosion and sediment control measures as well as any post construction BMPs is required. The bond amount shall be based on a certified engineers estimate reviewed and approved by the City. Thanks so much, Gary From: Duncan, Gary R Sent: Tuesday, August 19, 2014 11:07 AM To: 'Dresselhouse,Allen' Cc: Barnes, David R; Conn, Angelina V; Glaser, Fred J; Greg Ilko; Jordan, Alex; Kashman, Jeremy M; Keesling, Rachel M; 41 Lopez, Alexia K; Thomas, John G; 'Dave Hanson'; Duffy, John M Subject: City of Carmel Docket 14050009 ADLS Amend Penske Honda Carwash Addition Good morning Mr. Dresselhouse, We issued initial comments on 5/22/14 based on the preliminary set submitted at the time. This is the first time that we have reviewed the full set of construction plans for this project. The full construction plans were received by this office on 7/14/14. The comments below reference the 5/22/14 comments and the response to those received via email on 7/7/14 as well as the review of the construction plans themselves. We also have additional comments based on the information presented in the construction plans for which we have just now seen for the first time. 1. Is the proposed car wash facility self contained? Thank you for your response. No further comments. 2. Are all discharges collected and discharged to the sanitary sewer? Thank you for your response. No further comments. 3. Are there trench drains at the exit points? Do these drain to the sanitary sewer? Thank you for your response. It appears from the current plans that trench drains are proposed inside the building addition for the entrance/exit areas and that these drain to the reclaim tanks. 4. Is the addition enclosed or is it open and subject to inundation from storm water? Thank you for your response. No further comments. 5. Are there underground storage tanks for process water? Thank you for your response. No further comments. 6. The area is within the 1-year time of travel of the City wells…please confirm with the Utility Department if they have any requirements for protecting the water supply. Thank you for your response. The comment was not in regards to the municipal water delivery system but to pollutants being stored under ground within the 1-year time of travel to the City’s water supply system. Additional protection measures may be required by the Utility for the underground storage tanks. 7. Please indicate construction phase inlet protection and perimeter protection that is effective when placed directly on pavement. Thank you for indicating the inlet protection location and associated detail. The perimeter protection is still required along the south, west and northern limits of the work area. The location of this measure shall be indicated on the plans and a detail of the measure included in the plan set. 8. A concrete washout is required for any concrete work. Thank you for including the note on the plans. However, we require the location to be indicated on the plans and a detail of the washout to be included on the plans. 9. Please provide details for construction phase erosion and sediment control measures. Thank you for your response. Please see comment 8 above. 10. A right-of-way permit will be required for construction equipment access to the site from the public right-of- way. Please contact Fred Glaser. Thank you for your response. Please continue to work with Mr. Glaser to obtain the permit. A $5,000 license and permit bond is required for the permit. Additional comments based on the review of the construction plans 11. Will the reclaim tanks be pumped out as needed or will they be discharged to the storm system and ultimately to the MS4? Contact and process water from this operation cannot be discharged to the MS4. 12. The Department requests additional informa tion on the proposed snow melt areas. This is the first time we have been made aware that such a system is proposed. Depending on how these will be used, a BMP may be required. Is the intent to stockpile the snow from the parking lots onto this area where it will melt from the heating loops under the pavement? Also, these exterior pipes and process water may be a concern for the Utility Department since this system is within the 1-year time of travel of the City’s wellheads. 13. Please confirm if there are any proposed curbs exterior to the building addition. If so, these curbs must be City standard, the City’s curbing policy must be included in the plan set and any specifications in the plan set 42 regarding concrete (production, delivery, placement, finishing, jointing) must be revised to reference the Curbing Policy for any concrete curb. 14. Not something that I normally review but I noted that the panel board sheet is blank. Thanks so much, Gary Gary R. Duncan, Jr., PE Assistant City Engineer City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 (317) 571-2441 (317) 571-2439 (fax) gduncan@carmel.in.gov Please consider the environment before printing this e-mail