Loading...
HomeMy WebLinkAboutCornice Line - Approved Materials Tingley, Connie S From: Keesling, Rachel M Sent: Wednesday, October 15, 2014 11:15 AM To: Christopher J. Brayak Cc: Jim Jaksa; Robertson Doug; Clark Brent; Conn, Angelina V;Tingley, Connie S Subject: RE: Horizon Bank- Carmel - Fascia Hi Chris, Thank you for sending this update.We are glad to hear that metal can be used instead of EIFS. Please consider this email as your approval for the material change. Please let me know if you have any other questions. Sincerely, Rachel Connie, please add these emails and attached PDF to Laserfiche under Docket No. 13070009 DP/ADLS.Thank you! 2 acheL kee'i i vIcd, Planning Administrator City of Carmel Department of Community Services- 3rd Floor One Civic Square Carmel, IN 46032 317-571-2417 317.571.2426 fax From: Christopher J. Brayak [mailto:cbrayak@awightman-assoc.com] Sent: Wednesday, October 15, 2014 10:18 AM To: Keesling, Rachel M Cc: Jim Jaksa; Robertson Doug; Clark Brent Subject: Horizon Bank- Carmel - Fascia Hi Rachael, It was nice talking with you today. Attached please find the Fascia panel shop drawings for the Horizon Bank project. We are requesting to change the 3'-0" tall fascia material at the top of the wall from EIFS to prefinished Aluminum. Aluminum was the material that we originally wanted to use but we changed it to EIFS because we did not think we could build the desired profile. We were able to find a manufacturer that can make the exact profile from Aluminum.The aluminum is heavy stock bonded to insulation that helps prevent oil canning. Please provide review and your approval of this minor revision. Thank You, Chris Christopher J. Brayak AIA, RID, LEED Green Associate Wightman and Associates, Inc. 0: 269.927.0100 I D: 269.487.9694 I C: 269.449.7735 2303 Pipestone Road Benton Harbor, MI 49022 1 www.wightman-assoc.com - PLEASE NOTE NEW DIRECT LINE PHONE NUMBER: 269.487.9694 Please consider the environment before printing this email. 2