Loading...
HomeMy WebLinkAboutCalumet Civil/ENG/CO 4/Increase 14,675.47/Retail Parkway CITY OF CARMEL TO: Calumet Civil Contractors Inc. CONTRACT CHANGE ORDER NO.: 4 4898 Fieldstone Drive DATE: 08/15/2014 Whitestown, IN 66075 PROJECT NAME: Retail Parkway Extension, Phase I CITY REQ. NO.: 12-06 CITY PO NO.: 0515-13 CITY PO DATE: You are directed to make the following changes in this Contract: In efforts to provide access to nearby construction sites located at the northwest and southwest corners of Retail Parkway and Michigan Rd, the existing drive along Michigan Rd. located at Sta. 361+90 Lt., Ln "A" had to remain open until access could be maintained on the completed Retail Parkway. Leaving this drive open required skipping over a section of the turn lane until access was no longer needed. The PCCP Pavement, Subbase, Subgrade Treatment, Underdrains, and Curb construction was phased around this drive and then installed at later time. In addition to this phasing, a temporary stone drive had to be constructed and maintained through the section of turn lane. This change order accounts for the time and material spent maintaining access and constructing this section of turn lane after the access was no longer needed. The original pay items for PCCP Pavement, Subbase, Subgrade Treatment, Underdrains, and Curbs found within this section will not be used and will therefore provide a savings to the Contract. SCHEDULED ADJUSTMENT ITEM QTY AMOUNT (+)OR(-) DAYS Item No. 0022 -14.00 CYS* -$504.00 0 Days Item No. 0029 -201.48 SYS* -$8,865.12 0 Days Item No. 0034 -134.00 LFT* -$2,144.00 0 Days Item No. 0042 -50.00 LFT* -$180.00 0 Days Item No, 0046 -16.00 CYS* -$464.00 0 Days Item No. 0047 -78.5 SYS* -$66.73 0 Days Item No. 0109 1.00 LS $26.899.32 0 Days *Remainders(torn onginal contract quantity amounts. 11. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: 4 W.D.C. No.: N/A Other: Attachment No. 1 (Calumet's Request for Change Order) The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order(Original +CO 1 to CO 3) $ $480,051.62 Contract Price will be increased/decreased by this Change Order $ $14,675.47 New Contract Price including this Change Order $ $494,727.09 Contract Time Prior to this Change Order N/A Days N/A Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order N/A Days N/A Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Accepted: ���� Clark Dietz Inc. C.Alu�g: Civet C-draecsdts )Vic- 14-rP ENGINEER CONTRACTOR �a Braun d, May 8900 Keystone Crossing i4 q Cs.a3bS1 ewt p6iJ 4 �'� Address Address aryil _ Burk , Member Indianapolis, IN 46240 \. i tc cio a 1 S.tJ 4«1c City/State/Zip City/State/Zip Lori WatQ 'n, Member ireexu V By:� By. ST: Phone:_I-317-844-8900 Phone:OH) `I L5-KO-o _ Tana Cordray Cler re surer Date: 9-78- 5/ Date: Q-tg--)604 Date: /D//de / CITY OF CARMEL TO: Calumet Civil Contractors Inc. REQUEST FOR PROPOSAL NO 4 4898 Fieldstone Drive DATE: 08-15-14 Whitestown, IN 66075 PROJECT NAME: Retail Parkway Extension,Phase 1 PROJECT NO.: 12-06 CRO) , I Specification Reference: N/A oc Drawing Reference: N/A Drawing Date: N/A Identification of Attachments: No Attachments Please submit within fifteen (15) calendar days of this request date a proposal showing increase, decrease or no change in Contract Price and/or Contract Time. Proposal shall be accompanied by four (4) copies of breakdown showing quantities, cost of material, equipment, labor, overhead, profit and basis for the additional time if any. DESCRIPTION OF PROPOSED CHANGE COVERED BY THIS REQUEST: Additional work caused by phasing construction so that the existing drive located at Sta. 361+90 Lt., Ln "A" could remain open as long as possible to provide access to nearby project sites. REASON FOR CHANGE: In efforts to provide access to nearby construction sites located at the northwest and southwest corners of Retail Parkway and Michigan Rd, the existing drive along Michigan Rd. located at Sta. 361+90 Lt., Ln "A" had to remain open until access could be maintained on the completed Retail Parkway. Leaving this drive open required skipping over a section of the turn lane until access was no longer needed. The PCCP Pavement, Subbase, Subgrade Treatment, Underdrains, and Curb construction was phased around this drive and then installed at later time. In addition to this phasing, a temporary stone drive had to be constructed and maintained through the section of turn lane. Providing this access and phasing work around it required additional time and materials to be spent by the Contractor. SPECIAL INSTRUCTIONS: No Special Instructions. THIS REQUEST DOES NOT AUTHORIZE YOU TO PROCEED WITH THE ABOVE WORK NOR STOP PREVIOUSLY SCHEDULED WORK. Upon approval a Contract Change Order and a Notice To Proceed will be issued. Please state in your proposal the effect the acceptance of this Request will have on the Project's Substantial Completion and Final Completion, if accepted within days of proposal due date. YOUR PROPOSAL DUE DATE: 08-30-14 By: Jason Umlaut' 08-15-14 Engineer Date Approved By: Owners Representative AT... ,.n No, CALUMET CALUMET CIVIL CONTRACTORS, INC LETTER OF TRANSMITTAL TO: Clark Dietz DATE: 6/24/2013 PROJECT: Retail Parkway Extension JOB: 13030 ATTN: Mr. Jason Umlauf RE: EWA: T&M @ Outback Drive _ We Are Sending._ . _ _ Submitted itted For: _ _ _ _ Action Taken. Shop Drawings X__ Approval _ Approved as Submitted _ Letter _ _ Your Use _ _ _ Approved as Noted _ Prints/Plans _ As Requested _ _ Returned After Loan X_ Change Order _. Review Comment Resubmit Copies Samples _ _ ' Submit Copies Specifications _Sent Via Hand Delivered to F.O._ _ _ Returned Other: _ X Attached _ Returned for Corrections Separate Cover Via. - Due_Date' Notes/Remarks: Jason, Please use the pricing below to assist you in processing a Change Order as described below. Thank you. ITEM DESCRIPTION QTY UNIT UNIT PRICE _ EXTENSION 99905 Excavate Outback Drive 1 LS $2,239.54 $2,239.54 99906 Underdrain Pipe 1 LS $ 3,754.80 $ 3,754.80 99907 PCCP Stone 1 LS $2,032.66 $2,032.66 99908 PCCP, 12" 1 LS $ 16,290 23 $ 16,290.23 99909 8"Curb 1 LS $2,582.09 _ $2,582.09 TOTAL $26,899.32 qprt ✓tewn Ryan Ream— Project Manager 4898 Fieldstone Dr. Whitestown, IN 46075 317-769-1900 FAX 317-769-7424 IMMINF CALUMET lir PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE Retail Parkway Extension Excavate Outback Drive 13030 99905 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE LABOR AMT LABOR MU 11/4/2013 Laborer 5 ST $40.58 $55.00 $202.90 $40 58 11/4/2013 Foreman 5 ST $52 67 $72 24 $263.35 $52.67 Sum of LABOR $466.25 $93 25 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 11/4/2013 Truck-Pickup 4x4 5 $16.09 80.45 $9.65 11/4/2013 Compactor Bomag BW 138AC 5 $31.12 155 6 $18 67 11/4/2013 Backhoe CAT 420E-IT 5 $40.57 202 85 $24 34 Sum of Equipment $438.90 $52.67 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 11/4/2013 Dump Fees 1 LS $17500 175 $21.00 Sum of MATERIAL $175.00 $21.00 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 11/4/2013 Trucking 10.25 $85.00 $871 25 $104 55 Sum of RENT $871.25 $104.55 Retail Parkway Extension Excavate Outback Drive 13030 99905 SUBCONTRACTS Date SUBCONTRACT ,SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 0 0 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $1,951.40 TOTAL MU $271.47 BONDS/INSURANCE $1667 TOTAL $2,239.54 CAL®ET PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE Retail Parkway Extension Underdrain @ Outback Drive 13030 -99906 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE LABOR AMT LABOR MU 11/4/2013 Laborer 2 5 ST $40.58 $55 00 $101.45 $20.29 11/4/2013 Foreman • 3 ST $52.67 $72.24 $158.01 $31.60 11/5/2013 Laborer 6.5 ST $40.58 $5500 $263.77 $5275 11/5/2013 Foreman 1 OT $52.67 $72 24 $72.24 $14.45 11/5/2013 Foreman 6 ST $52.67 $72 24 $316.02 $63 20 Sum of LABOR $911.49 $182.30 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 11/4/2013 Skid Steer CAT 3 $27.60 82.8 $9 94 11/4/2013 Backhoe CAT 420E-IT 3 $40.57 121.71 $14.61 11/4/2013 Truck-Pickup 4x4 3 $16.09 48.27 $5.79 11/5/2013 Truck-Pickup 4x4 7 $16.09 112.63 $13.52 11/5/2013 Skid Steer CAT 7 $27.60 193.2 $23.18 11/5/2013 Backhoe CAT 420E-IT 7 $40.57 283 99 $34.08 Sum of Equipment $842.60 $101.11 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 11/4/2013 k8 STONE 10 TON $14.25 142.5 $17.10 11/4/2013 UNDERDRAIN PIPE 36 LFT $1.80 64.8 $7.78 11/4/2013 GEOTEXTILE 30 SYS $0.80 24 $2 88 Retail Parkway Extension Underdrain @ Outback Drive 13030 99906 Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 11/5/2013 Dump Fees 1 LS 5105.00 105 $12.60 11/5/2013 #8 STONE 11 TON $1425 156.75 $18.81 11/5/2013 UNDERDRAIN PIPE 50 LFT $1.80 90 $1080 11/5/2013 GEOTEXTILE 41 SYS $0.80 328 $3.94 Sum of MATERIAL 5615.85 $73.90 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 11/4/2013 TRUCKING 3 $85 00 $255.00 $30.60 11/5/2013 TRUCKING 7 5 $85.00 $637.50 $76.50 Sum of RENT $892.50 $107 10 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB UjP SUB AMT SUB MU 0 0 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $3,262.44 TOTAL MU $464.41 BONDS/ INSURANCE $27.95 TOTAL $3,754.80 MIMI CALUMET ir PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE Retail Parkway Extension PCCP Stone Outback Drive 13030 99907 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE LABOR AMT LABOR MU 11/4/2013 Laborer 2 ST $40.58 $55.00 $81.16 $16.23 11/4/2013 Foreman 2 OT $52.67 $72 24 $144 48 $28.90 11/5/2013 Laborer 15 ST $40.58 $55.00 $6087 $12.17 11/5/2013 Foreman 1.5 ST $52.67 $72.24 $79.01 $15.80 , Sum of LABOR $365.52 $73.10 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 11/4/2013 Truck-Pickup 4x4 2 $16.09 32.18 $3.86 11/4/2013 Compactor SD-70 2 $40 83 81.66 $9.80 11/4/2013 Skid Steer CAT 2 $27.60 55.2 $6.62 11/4/2013 Backhoe CAT 420E-IT 2 $40.57 81.14 $9.74 11/5/2013 Truck-Pickup 4x4 1.5 $16.09 24.135 $2.90 11/5/2013 Compactor SD-70 1.5 $40.83 61.245 $7.35 11/5/2013 Skid Steer CAT 1.5 $27.60 41.4 $4.97 Sum of Equipment $376.96 $45.24 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 11/4/2013 #53 Stone 10.14 Ton $11.00 111.54 $13.38 11/5/2013 #53 Stone 41.19 TON $11 00 453 09 $54 37 11/5/2013 #8 Stone 29 87 TON $14.25 425.6475 $51.08 Retail Parkway Extension PCCP Stone Outback Drive 13030 99907 Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU Sum of MATERIAL $990.28 $118.83 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU Trucking 0.5 $85.00 $42.50 $5.10 Sum of RENT $42.50 $5.10 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 0 0 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $1,775.25 TOTAL MU $242.27 BONDS/INSURANCE $15.13 TOTAL $2,032.66 e CALUMET PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE Retail Parkway Extension PCCP OUTBACK DRIVE 13030 99908 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE LABOR AMT LABOR MU 11/8/2013 Laborer 3.5 OT $40.58 $55.00 $192 50 $38.50 11/8/2013 Laborer 36.5 ST 540 58 $55.00 $1,481.17 $296 23 11/8/2013 Foreman 1 OT $52 67 $72 24 $72.24 $14.45 11/8/2013 Foreman 9.5 ST $52.67 $72.24 $50037 $100.07 11/9/2013 Foreman 2.5 OT $52.67 $72 24 $180.60 $36.12 11/12/2013 Laborer 44 ST $40.58 $55.00 $1,785.52 $357.10 11/12/2013 Foreman 11 5 ST $52.67 $72 24 $605.71 $121.14 11/19/2013 Operator 103 4 ST $52.67 $72 24 $210.68 $42.14 11/19/2013 Foreman 4 ST $52.67 $72 24 $210.68 $42.14 Sum of LABOR $5,239.46 $1,047.89 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 11/8/2013 Truck-Pickup 4x4 10.5 $16.09 168 945 $20 27 11/9/2013 Truck-Pickup 4x4 2.5 $16.09 40.225 $4.83 11/9/2013 Concrete Saw 2.5 $27.32 68.3 $8.20 11/12/2013 Truck-Pickup 4x4 11 5 $16.09 185.035 $22.20 11/19/2013 Truck-Pickup 4x4 4 $16.09 64.36 $7.72 Sum of Equipment $526.87 $63.22 Retail Parkway Extension PCCP OUTBACK DRIVE 13030 99908 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 11/8/2013 Concrete 76 CYS $80.00 6080 $729.60 11/8/2013 D-1 Baskets 110 LF $6.35 698.5 $83.82 11/8/2013 Bars 115 EA $4 50 517.5 $62 10 11/12/2013 Concrete 12 5 CYS $80.00 1000 $120.00 Sum of MATERIAL $8,296.00 $995.52 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 0 $0.00 $0.00 $0 00 Sum of RENT $0.00 $0 00 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 0 0 0 $0.00 0 Sum of SUBCONTRACTS $0.00 $0.00 TOTAL COST $14,062.33 TOTAL MU $2,106.64 BONDS/ INSURANCE $121.27 TOTAL $16,290.23 CALUMET ir PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE Retail Parkway Extension 8"Curb @ Outback 13030 99909 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE LABOR AMT LABOR MU 11/12/2013 Laborer 30 ST $40.58 $55.00 $1,217.40 $243 48 11/12/2013 Foreman 7.5 ST $52.67 $72 24 $395.03 $79 01 Sum of LABOR $1,612.43 $322.49 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU Truck-Pickup 4x4 7.5 $16.09 120.675 $14.48 Sum of Equipment $120.68 $14.48 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU Concrete 5.5 CYS $80.00 440 $52.80 Sum of MATERIAL $440.00 $52.80 RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 0 $0.00 $0.00 $0.00 Sum of RENT $0.00 $0.00 Retail Parkway Extension 8"Curb @ Outback 13030 99909 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT • SUB MU 0 0 0 $0.00 0 Sum of SUBCONTRACTS $0 00 $0.00 TOTAL COST $2,173.10 TOTAL MU $389.77 BONDS/ INSURANCE $19.22 TOTAL $2,582.09 Laiumet etWII warm Vasnboand .uyr. v• This from was submitted on 2013-11-10 15 35'17 front lP address 50 148 120.147 cill(7.-- Employee Nome Union No. Employee No.T5n ode Code Code Main Information 1,„.,� yyy _...,_ _ [.. RK,S�.'fNON I_ I I1o3 11 1 Rap-I&'S.o[�7 .a9_R _O }1. I 1 1 Item Type: r 6 M OT 11 �/�___._I _052 I I L Job No.: :3030 WINFREY, k L 1203 123010 Rug. gap_ .mpg_ Lr Job Name: Retail Parkway / Or Day: Monday __._.__ Weather: Cold Rag. C I Form Date: 11/04n 3 OT I County, Hamil°I/' J Rap. I Foramen: Sharon Clark 01 - 1 Union Jmiedktlon: Trucking No. coat Cade Nana L I Reg 1 r J 1 i 4t747 rfsfr5.•�t r� °� ) lac 184 !pcl I52 'T _._-- --__I 1 Rag. ttWoi] f3_��je OT �o.� i.�so��/ I � Reg. I I r J OT Rep. 11 I I 1 f DT 11 1 motes/Comments Op out°Abates driveway and undern4 for sue-base 1 1 1 1 htmJ/www.calumetcivil.comladminlpnnt/expos-prinlabie.onn?MnjFonnTDrI8539 I U11/2013 l.III Witt Ltvll MU Va>11WarU rage L u1 6 Work Information Equipment Sheet Job No.:13030 Job No.:13030 Form Dan:11/00 3 Form Date:t troa/t3 Paybem Quantity Y location Notes Code Equipment Noun Used Equipment Doecripion J !ma Ion dug out ramp for outback WON — and replace with stone needing 9 10 ton at ramp to outback p�. yy�J�� 1 � ck '"10.14 Ion rat ramp to outba '"- 69M ,,id Y- J� 30 isy5 at ramp to outback I. B. 1676- -LG401174; /H/LAG � -��M In et ramp to outback , .-iT5� ��` &7" cg 1 i-wL street An— Lam_ Sm lallue- Ulte 9910z sm ldk,2 vcbe, httpi/www.calumcicivil com/admidprinUexoon-printable.php?lxojFonn1D-18539 11/11/2013 Calumet Civil Adman Dashboard Page 1 of 2 This hlmn was tr onuaed on 2013 11-10 15 59 04 hum IP address 50 148.120.147 / /ataao� Mein Information rnrobyee Name Union No. Ern No.Tune Coln -•-�1 Code Code Code Code Code 120225 ! I J ____� — '�_K,SM .ON 1. , 1032 3034 Reg. j.5 i i 1.5 I - Item Tope: T8M OT C [_ I �JJ Job No.: 13030 WINFREV,TO MY L j 1203 23010 Reg 1S__ _J ti5 I� . J Joe Neale: Retail Parkway OT I J i Day: Tuesday Weather: Cold Reg. - J Form Date: 11/05/13 OT 1 County. Hamilton 1 Pei. 1 1 Foremen: Shanon Clark OT Union JudWiction:Truddng No. Cost Code Hours —_ __�l Reg.�eff ?�1J6J z�'-�' .V OT ne9 ( 1 OT beg. OT or 1 [ 1 1 Notes/Comments mg out the rest al the outback driveway and put stone beet In.hook up under drain put es mound pipe lake sidewalk out north M outback hnp•!/www calunletrivil.com/admin/print/expat•printable.pbp'DrolFornllD=18540 I I/11/2013 l:alumet Uvil worm uasn00ar0 rq•,c c u1 e Work Information Equipment Sheet Job No.:13030 Job No.:13030 Form Dais:1 t/OS/13 Form Data:11,05113 Coat Coe) Peyttem Chanting 11Y _Location _�.Noma -__ ___ -._._ _- Cosa® — pmem Hours U.SEquipment Description i20225 Is I�� m North end of job by EGT/jR ._��- Meter outback / age 1 /r F 1 i4 4 Nb needing 4q'q�� EN N7 � Uh -1 ' IIIZr�550-- al outback driveway ��I" 7�Syeoutback driveway —_-._-. I A —.^I is E=Son_ -1"outback driveway I 2987 / IFon -- .1l,mtback driveway.:_ '----- I II t - 1L__ — —� I l it i hltp•/iwww.calumetcivil.com/admi/prinr/export•Orintable.php?projFortnID-18540 I I/I 1/20t:i Calumet Civil Admin DaShboard f $sa 7 T1S tam was submitted on 2013-11.10 oS39 441ram lP sdmess 174241.112.102 �yl/� q� O X.Employee Name Union No. Employee No.rurm__Code Code Code Code Code rm Main Infoation IIWNP6. J _I 1 _ __ _____ ,DE N SON,J HNNV J i 7413 4050 flop. IS T 5 I 1 1 Item Typo Contract Item OT Job No.: 13030 :OWENS,DENN 1203 15031 n.9. t65_ _ 1 S , Job Name: Retail Patkwey OT —I L_ 1 Day: wFran .LRAMOS�LUI,_ I 1203 F8066 I IL I Weather: Wertn / Reg- 7. Form Oeee: ii.VW13 ,•( OT I I I Coup: perturb f..0Cxxl - MILLER,ANT N L—� 1203 13070 Rog t5 —I ___.1 L r 1 Foremen: Johnny Dennism L r 7 Union Jurisdiction: OT ` _ . I�/ I _.-- 1 Trucking No. Cost Code Moors YONTE.,LEON D R 1203 20035 Reg, i t"e_e_ I I L DTt T _lr2v? ll 1 l ll 1 r I t I 1 Reg- I— .---J OT I I I I L Rog. I I 1 r OT 1 I Reg I 1 1 L OT 1 I r I I Notes/Comments — _ _^_ t r Set forms&baskets.DTP!mbar toles&epoxy bars in 133 Bars total&11 baskets Pour pavement. r 1 I I I I 1— I L http!/www,calumetcivit.com/admin/print/exoorLprintable.php?proiEormlD=18530 I l/I 1/2013 \.11U11F1 L.ti&!WIL S Loa111WWU rage G.uL G Work Information Equipment Sheet Job No.:13030 Job No.:13030 Form hate:11/08r13 Form Date:11108113 (/L _ — . —_. _ ._ r. __ __� � _- Code '— _ _ _ __. _ tes 1a Code Payhem Drmnti1y UM Location No C EWIPmerd Hours Used Equipment DeaergAbn s Noun 51 __ 1129 I }SY 1431E Retail Parkway pavement Meter _ CIS Reading 5 soi 130 5 I Par: Retro Fit Bars I I 1 ,31 �110 �J/!Li- D-1 n.inker.. :Joint', I 994O1C I f 1 1 1 I 11 1 1 httpJ/www.calumelcivil cotn/admidprint/expon-printable php?proiFonnlD=18530 11/11/2013 t alumet t No Aanun Uasnooara VI" Mne ' T to was submitted on 2013-I1-I1 01:101:1 from IP address 174241.224213 9�� Employee Name Union No. Employee No.Time Code C Code Code Code Code Mein Information —'I'�2_50_6,_.I ._---- I I I I rOOTENtRON _ L_ 11203 15033 Rea. 1 I Iola Type: Contract nem OT ;2.50 �1 I I I 1 Job No.: 13030 I�..__. , I 1 Rag I 1 Job Name: Retail Parkway Extension OT Oar Saturday Rag' I 1 1 Weather. warm Fonn Date: 11/09H3 a t Or 1 1 County: Natgnn I.C. b.. M.ltt7N Ron. 1 Foreman. Ron Oaten OT 1 Union Jurisdiction: Tn c$dny No. Cost Cede Hours Rag. I I 1 OT I Reg. I I 1 OT I 1 Reg. 1 OT i 1 1 I I Reg I 1 1 OT I I I. Notes/Comments __. . . ______,—.J._ ______________________.. _ __ _ .___________ I. f tittpi/www.calumetcivil.con/admintprint/export-printable.pbp'pmiForm1D=18553 11/l l/2013 trauma Uv11 A0UUn t asnooarn ac•V" c Work Information Equipment Sheet Joe N9.:13030 Joh No:13Ci0 Form Data:11/09/13 m Da s Forte:11109/13 �— _.+ Cost Code Mayhem Duantlry Ntl L make Notes Code Equipment Noe Used Equipment Description ^-�P590� 131 I 0 !/I L) north end at poured lane saw tut joints 11 ea. 0 Hour Meter Sore( along Michigan Rd. quantity reported by Reading others 1 1 I. 1 1 I httpJ/www.calumacivil.wMadmWprint/export-printabie.php?projFounID=18553 1 I/11/2013 Calumet Civil Admin Dashboard rage i or 2 %This loom was submitted of 2013-11.12 17'53 59 kw IP address 174241 96 30 /(lnn Main hdormation Employee Name Union No. Employee No.Time Cada9 i -r"t'1� Cods Cods Code Code �OOTEN FO7CD L 1 1203 15033 Reg. 55! . J i I. JJob No 13030 :DOTER,RAND ii c! 1203 15032 �9•l_I.5 �-t 1 r Job Name: Roue Parkway Extension / � � OT Day: Tuantay /// '-- yyee9rar: Cats 'GUTIERREZ $%PABLO` 1203 7029 1 Re9- ).s . _ Fenn Date: 1i/12/13-1- / ///''' 07 G^_. 4,.,c �j._ 1 County: -/aridb I T'~m N-% LEWIS.STEPH L__j (0120 12036 1 Re9' r 1W_`;.7. .; ; Foreman: Ron Olken UnicN .Jurisdiction: OT l' 31y1_...—__� Trucking No. Cos Code Hours ITONTE,LEONfHO R _! 11203 L20035 Rag �7_� j L OT ja, V . __ I 1 Reg OT 1 1 1 Reg. 1 n—1 OT J Peg. -I OT 1 Notes/Comments JDue to egret.cold temperatures necessary to cover wore wM thermal bl0nkets J I 1 httpl/www.calumetcivil com/admin/ptint/export•printable php^projFonnlD=I8Y+'/ I I/132013 Vd41•V\.1�4/�V••u•1 VaJ••VVWV ^D" "' Work Information Equipment Sheet Job Ns.:13030 Job No.:13030 Fain Date:11/12/13 Form Dote:11/12/13 Cost Code Paykem Quantity US Location Notes Code Equipment Hours Used Equipment Description 199908 DZMII M. north end along lane on Grade/form/pour a HouMeter r ('7U, Michigan Rd. south of finish/partial wreck and Reeding Str.429/north end 0 taper clean up 99909 MEE 5121.111111 same creme [ 1 1 L i I http://www.calumetcivil.com/admin/print/export-printable.phOprojFonnIo-16577 11/13/2013