REQUEST FOR QUOTE FOR 116TH STREET AND EDEN GLEN DRIVE
DRAINAGE IMPROVEMENTS
September 16, 2011
To: Yardberry Landscape Excavating Co.
9940 South 1000 West
Anderson,IN 46017
Contact: Tim Yarberry
Ph# 765-378-5783
Fax#765-378-0376
tyarb(a,aol.com
Re: Request for Quote for Drainage Improvements at 116th Street and Eden Glen Drive at
11601 Eden Glen Drive and 3528 E. 116th Street, Carmel, IN 46032
To whom it may concern:
Notice is hereby given that the Board of Public Works and Safety for the City of Cannel,
Hamilton County, Indiana will receive sealed quotes for the "116TH STREET AND
EDEN GLEN DRIVE DRAINAGE IMPROVEMENTS" at the office of the Clerk
Treasurer, One Civic Square, Carmel, Indiana (City Hall) anytime prior to, and no
later than 10:00 a.m. Local Time on, October 5, 2011, and commencing as soon as
practicable thereafter during the Board of Public Works Meeting on the same date, such
quotes will be publicly opened and read aloud in the Council Chambers of City Hall. No
late bids will be accepted.
All bids and proposals shall be properly and completely executed on the proposal forms
provided with this request and specifications and submitted as follows:
1. Bid Proposal Summary Page and Bid proposal Sheet,pages 5 and 6.
2. Followed by a copy of this request, sheets 1-4.
The bid envelope must be sealed and have the words "BID — 116TH STREET AND
EDEN GLEN DRIVE DRAINAGE IMPROVEMENTS".
It is intended that actual construction of all work divisions shall be started as soon as
practicable or as directed, and each bidder shall be prepared to enter promptly into a
construction contract, furnish a performance bond, and begin work without delay in the
event the award is made to him.
Page 2 of 6
The Project consists of,but is not necessarily limited to,the following:
Installation of pump drainage system for drainage and driveway culvert pipe including
excavation, grading, pipe and restoration as outlined in the provided construction
documents.
Bidders shall assure that they have obtained complete sets of drawings and Contract
Documents and shall assume the risk of any errors or omissions in bids prepared in
reliance on incomplete sets of drawings and Contract Documents.
This Project will be funded by City of Carmel.
For special accommodations needed by handicapped individuals planning to attend the
public bid opening meeting, please call or notify the city of Carmel, Engineer's Office, at
(317) 571-2441 at least forty-eight (48)hours prior thereto.
The City of Carmel reserves the right to reject and/or cancel any and all bids, solicitations
and/or offers in whole or in part as specified in the solicitations when it is not in the best
interests of the governmental body as determined by the purchasing agency in accordance
with IC 5-22-18-2.
Specifications:
Please refer to INDOT 2010 Standard Specifications.
1, General: Please find construction drawings and details included. Construction
consulting and coordination information shall be provided to the awarded firm
with the lowest and most responsive quote. Quotes shall be based on itemized
proposal items and shall include all incidental work to complete the
improvements required and this shall include removals and any work for which
no specific pay items exist. Inspection and consultation for the project shall also
be provided by CrossRoad Engineers. Coordination shall not be paid separately
but shall be included within the cost of the items in the itemized proposal. The
Work shall consist of installation of a pump and piping as shown in the plans
including electrical supply to the pump from the existing service at the house
located on the property. The work shall also include directional drilling of a
culvert pipe and any grading and restoration to return the property to a
satisfactory growth of lawn in the work areas or any disturbed areas to complete
the work.
2. Common Excavation and Grading: All removals and costs associated with
such removals shall be included in the items in the itemized proposal. The items
shall include common excavation, saw-cutting, or any other removals necessary
for the installation of the improvements.
3. Restoration shall include mulched seeding of any excavated or graded lawn
areas. Top soil shall be placed at a minimum depth of three inches and fine
graded for the suitable growth of vegetation. The top soil shall be per INDOT
specifications and graded such that settlement to the surrounding grade of the
excavated area is accounted for.
4. Concrete: In addition to INDOT Standards, the City of Carmel Standards and
concrete paving policy shall apply to all concrete work. Any damage to
pavement to remain in place shall be repaired at the contractor's expense and at
Page 3 of 6
the Engineers/City of Carmel's discretion unless damages occur beyond the
control of the contractor's reasonable protection,care and diligence to maintain.
5. Protection of existing structures: protection of existing structures to remain in
place including but not exclusive to the following: concrete curb or walk,
mailboxes, fences, building structures, infrastructure, etc. shall be the
responsibility of the contractor. Damages to structures to remain in place due to
any portion of the work shall be replaced or repaired at the contractor's expense
unless found to be in direct conflict with the improvements. It is not anticipated
that any permanent structures will be in the way of the work. It shall also be the
contractor's responsibility to protect the work during non-working hours,
including industry standard methods for protecting the work for general safety.
6. Coordination: the contractor shall coordinate all work with the property owners
and CrossRoad Engineers at: contact info to be provided upon acceptance of
quote and Notice to Proceed.
7. Schedule and work restrictions: The selected contractor shall coordinate work
with the property owner,the City of Carmel and CrossRoad Engineers. No work
shall take place after 7:00 PM in the evening to the following morning at 7:00
AM or on Sundays unless prior approval is obtained from the property owners or
the City. The selected contractor shall have the improvements completed within
30 calendar days of a Notice to Proceed unless receipt of materials becomes an
issue and can be proven to not be available until a date beyond the completion
date provided. If this becomes the case a schedule extension will be provided as
necessary. Completion shall include grading and lawn restoration. If lawn
restoration cannot be completed by the completion date due to specification and
weather requirements, these shall be completed as soon as feasible and
achievable within specification or at Engineers/City of Carmel's direction.
Retainage held will be released upon full completion of any remaining
temperature sensitive work and acceptance of the completed project.
8. Maintenance of Traffic: It will be the selected contractor's responsibility to
establish temporary traffic control or maintenance of traffic in accordance with
the Indiana Manual on Uniform Traffic Control Devices for Streets and
Highways. Any maintenance of traffic necessary per the Indiana Manual on
Uniform Traffic Control Devices for Streets and Highways shall be included
within the items in the itemized proposal.
9. Utilities and permitting: it shall be the contractor's responsibility to coordinate
all utility locates. It shall be the contractor's responsibility to coordinate and
acquire any necessary permits, A City of Carmel Right-of-way permit will be
necessary for any work in the right-of-way and contact information for this
permit will be provided to the selected contractor. In the event that a permit fee
is required it will be change ordered into the contract but no fee should be
anticipated for quoting purposes.
10. Notes: The above is a brief description of the work and the attached drawings
and details shall supplement the description herein. Please consider the drawing,
details and the description herein and any site visits carefully to ensure that the
quote considers all aspects of work described and necessary.
• Page 4 of 6
Thank you for your consideration of this request and feel free to contact us for a site
meeting or if any questions.
Sincerely,
Lance Stahley
CrossRoad Engineers,A.C.
3417 Sherman Drive
Beech Grove, ilk 46107
0-317-780-1555
C-317-439-5515
cc: Mr. Michael McBride,PIE, City of Cannel Engineer
lir 5 of 6
BID PROPOSAL SUMMARY PAGE
Complete the following information and place as the cover page to
your bid packet. Insert all documents into an envelope with project
name and your company name clearly marked on the outside. Seal
the envelope.
Company: \
3 v/(1
Project Name: 116TH STREET AND EDEN GLEN DRIVE
DRAINAGE IMPROVEMENTS
Date Submitted: /0 - V-- /(
v
Bid Amount: D
YES 0
(quoter) is claiming "Local Preference" on
-Circle
this project.
one
irt
Page 6 of 6
CITY OF CARMEL
BID PROPOSAL SHEET
116TH STREET AND EDEN GLEN DRIVE DRAINAGE IMPROVEMENTS
Item
Item Quantity Unit Unit Cost Total Cost
1 Myers SR1830 Simplex Sewage System 1 LS $ doom' $ / i00
2 8 Inch HDPE smooth wall drive culvert 1 LS $ o a o # S 300 °
Total Proposal $ ,(8'6 0 l