Loading...
HomeMy WebLinkAboutBid Information and Packets alCiao rU Ali 0 tl C- ���, DE131 iii Ill Q EIO wits tw CITY' OF AZMEL JAMES BRAINARD, MAYOR November 9. 2009 Re: Clearing quotes for the Main and Keystone Parkway Intersection in Cannel. IN The following is a Request for Quotes by the City of Carmel for tree clearing and building demolition necessary for utility relocations at Main Street for the Keystone Parkway Reconstruction Project in Cannel. IN. The City of Cannel is pursuing and accepting quotes for review and anticipating awarding the project for construction at the December 2. 2009 Board of Public Works Meeting. If awarded. the City would require a contract with the awarded contractor. All right-of-way is currently staked and a field visit to review the areas of clearing is suggested but not required. The following should also be considered in the quote: I. The quote should he for all work shown in the Contract Items and Unit Prices Summary Table for the entire intersection as directed by the City of Carmel and in conjunction with the attached plans. 2. Tree clearing shall consist of any tree shown within the right-of-way and per the plans and any trees designated otherwise by the Engineer. Tree removal shall include stump removal unless directed by the City of Carmel or the Engineer. 3. Anything smaller than 6" will be considered brush removal and should be removed, including the stump. 4. Restoration will he required at the time of clearing. The City requests a separate price for -Mulched Seeding. U", including fertilizer and grading if necessary. This shall be paid by the square yard (SYS). 5. The areas of removal will be staked with -light-of-way" or "clearing limits" stakes. Any removal outside of these stakes without prior approval of the City of Carmel will he the responsibility of the contractor, The City of Cannel will not he liable for any unauthorized removal. 6. The cost for all Maintenance of Traffte necessary to complete the project shall not be paid for directly but be included in the cost of other items. No road closures wiEl be considered and any restrictions shall be coordinated with the City of Carmel at least 48 hours in advance of the restriction. 7. All incidental labor; equipment, materials and any other incidental work necessary to complete the work as described above shall he included in the Lump Sum cost for the work. DEIMIn;MYJI Of ICNGINEE111NC ONE Clvlc SCI me, C IuIEL, IN 46032 Orrice 317.57:12441 FAX 317571.2439 L'IA]]. engineerinaInrmcl3n.w∎ 8. All work performed on this project shall be in compliance with the 2010 INDOT Standard Specifications Book. Thank you for your consideration of this project. The deadline for submitting a quote is 9:00 am on November 18, 2009. Quotes must be hand delivered to the City of Cannel Office of the Clerk-Treasurer. Please feel free to contact myself at 317-571-2309 with any questions. Sincerely, Jeremy Kaslunan, PE City of Carmel One Civic Square Carmel, Indiana 46032 Fax#317-571-2439 Enclosed: Demolition of Existing Structures Contract Items and Unit Prices Plan Sheets depicting parcel locations DEMOLITION OF EXISTING STRUCTURES 1.4 THE WORK 1.1 The Structures. The successful Bidder(Contractor) shall provide all labor, material, equipment, machinery, tools and services necessary for the complete dismantling, demolition and removal of the following structures located in the City of Cannel hereinafter referred to as the "Work": (1) Structure A, (Parcel No. 66), 9 Carlin Drive Lot 43 in Carmel Meadows Section 2. A property description is included in Exhibit A. City has possession of this structure. (2) Structure B, (Parcel No. 75), 918 Main Street E. Lot 188 in 1:Iarrowgate Section 3. A property description is included in Exhibit B. Current Property owner to vacate the property on or before November 24, 2009. (3) Structure C, (Parcel No. 74), 810 Main Street E. Lot 174 in Harrowgate Section 3. A property description is included in Exhibit C. Current Property owner to vacate the property on or before December 1, 2009.. (Hereinafter referred to as the "Structures"). For purposes hereof, each of the Structures consists of the entire structure, including all pieces, parts, components, and materials thereof, the building foundation, basement walls, roof, concrete pads, and all components, attachments and fixtures thereto and equipment and machinery therein, including appurtenant structures such as chimneys, stairways, and porches. In addition, all nonattached improvements on the lot including, but not limited to, sheds, garages, sidewalks, fences, and driveways shall be removed unless otherwise directed by the City. All such pieces, parts, components, materials, attachments, fixtures and equipment of the Structures shall hereinafter be referred to collectively as the "Property." SECTION 202, BEING LINE 232, DELETE AND INSERT AS FOLLOWS: The houses and buildings shall be demolished and removed completely. down to a point 1 ft-(O.3m)below the original ground level or the subgFadc elevation, whichever is lower. SECTION 202, BEGIN LINE 235, DELETE AND INSERT AS FOLLOWS: Prior to starting demolition operations, or when directed, all existing utilities shall be terminated and all floor drains sealed in a satisfactory manner. Water and sewer lines shall be capped at the main and removed completely as directed by the Engineer and the City of Carmel Utilities Department, DEMOLITION OF EXISTING STRUCTURES 1.2 Time of Work. Structure A - Contractor shall commence the Work on Structure A within seven (7) days of receipt of a notice to proceed from the City of Carmel. Expected completion time for the removal of Structure A is seven (7) days or less. Structure B —Contractor shall commence the Work on Structure B within seven (7) days of receipt of a notice to proceed from the City of Carmel. Expected completion time for the removal of Structure B is ten (10) days or less. Structure C- Contractor shall commence the Work on Structure C within seven (7) days of receipt of a notice to proceed from the City of Carmel. Expected completion time for the removal of Structure C is seven (7) days or less. 1.3 Proposed Work Plan. Bidders shall submit a proposed work plan, including all procedures proposed for the accomplishment of the Work in a safe and workman like manner. If the successful Bidder determines that the proposed work plan must be altered, a revised work plan shall be submitted for approval of the City of Cannel before the Work may begin. 1.4 Utilities. Contractor shall disconnect each building, both above and below ground, from all utility services, including electric, water, steam, sewer (sanitary and storm) and natural gas prior to commencement of any demolition activities. Utilities facilities within each building shall be removed as part of the Work. Water, steam and sewer lines shall be capped and/or removed to the main facility as directed by the City Engineer for the City of Carmel, Indiana. Contractor shall have no claim to any right, title or interest in a utility facility upstream of the location where such utility is disconnected. In the event that Contractor discovers any utility service that has not been turned off, Contractor shall immediately contact the Engineer so that appropriate arrangements may be made to have the service turned off. 1.5 Well Abandonment. All existing wells on a given property must be properly capped and abandoned prior to demolition of the structure. Well abandonment must be performed by a state licensed and certified well driller who is also a registered well driller in the City of Cannel, and should be completed in accordance with all applicable State and local regulations. Well abandonment will not be paid separately, but should be included as a part of the Work. 1.6 Septic Tank Removal. if present, Contractor shall pump all private septic tanks so they are free of any waste and debris. The existing tank shall be pumped and completely removed and hauled away from project site prior to demolition of the structure. Existing finger systems may be capped and abandoned in place. Disposal of all waste and materials shall be completed in accordance with all applicable state and local regulations. Contractor will be responsible for DEMOLITION OF EXISTING STRUCTURES contacting the Hamilton County Health Department prior to and upon completion of'septic tank removal. Septic tank removal will not be paid separately, but should be included as a part of the Work. 1.7 Site Vacancy and Final Grade. Contractor shall remove all salvageable Property, unsalvageable Property, waste,rubbish and debris, and equipment within ten (10) days of final completion of the demolition of the buildings. Contractor shall leave the Work sites) in a smooth and level graded condition, which includes the application of mulched seeding Type U in accordance with INDOT specifications. 2.0 STANDARDS, LAWS AND PERMITS. 2. 1 Standards. Contractor and all subcontractors shall perform the Work in accordance with the requirements of applicable standard specifications of the Indiana Department of Transportation, 2.2 Laws. Contractor and all subcontractors shall comply with all applicable requirements of state and federal laws, regulations, rules, and ordinances including, but not limited to, those concerning occupational safety and health and environmental protection. 2.3 Permits. Contractor shall obtain any and all local or state permits, licenses or other approvals necessary for the performance of the Work, including hut not limited to a demolition permit from the City of Cannel. 3.0 WORK SITE REQUIREMENTS. 3.l Boundaries. The boundary of the Work site for each structure shall he clearly marked by the City of Carmel. 3.2 Site Safety. Contractor shall protect the site(s) of the Work with barricades, fencing, temporary barriers, electric flashing lights, and/or any other equipment or signals that, in the judgment of the Engineer, adequately guards excavations, piles of rubbish and debris, partially dismantled portions of the Structures, equipment, loose materials, walkways, streets, or any other potentially hazardous conditions. Contractor shall immediately notify the Engineer of the discovery or creation of any condition that maybe hazardous to the public. 3.3 Protection of Surrounding Properties/Structures. Contractor shall perform the Work and coordinate its Work with that of others, if any, in such a manner as to protect surrounding real estate, property and streets from damage and disruption. Contractor shall ensure that structural elements of any of the Structures being demolished are not overloaded, and shall construct and maintain all appropriate shoring, bracing and supports. The use of explosives is strictly prohibited. 3.4 Environmental Protection. Contractor shall perform the Work with due consideration and all practicable precautions to prevent, abate or control noise, DEMOLITION OF EXISTING STRUCTURES dust, wind-borne debris, smoke, and pollution of the air, water and land surrounding the site of the Work. Contractor shall immediately notify the Engineer of the discovery or creation of any environmentally hazardous condition. Burning or other use of fire at the Work site is strictly prohibited. 3.5 Erosion Control. If determined to be necessary by the City, an appropriate erosion and sediment control plan meeting the requirements of Indiana Administrative Code, Title 15, Chapter 5 shall be submitted to the City of Carmel and the Soil & Water Conservation Service for approval before the commencement of any Work. 4.0 CONTROL AND HANDLING OF SALVAGED PROPERTY AND WASTE. 4.1 Salvaged Property. Upon commencement of the Work, Contractor shall obtain all right, title and interest in the Property. Accordingly, Contractor may salvage for reuse or resale any or all of the Property; provided, however, no person who is not an employee of Contractor shall be give permission to remove any of the Property from the site of the Work without prior approval and coordination of the City of Carmel. Contractor shall remove all such Property from the Work site(s) by the completion date of the Work. Any of the Property removed from the Structure site for reuse or resale by the Contractor shall be so removed, reused and resold in accordance with all applicable state, local and federal laws and regulations. The City of Carmel may, in its discretion, require Contractor to document the ultimate destination of any or all materials removed from the Structure site by or at the direction of Contractor, whether for reuse, resale or disposal. 4.2 Waste. Any and all of the property that is deemed by Contractor to be unsalvageable and all rubbish and debris generated by the Work shall be removed from the Work site(s) and properly disposed of on a daily basis, unless otherwise directed or authorized by the Engineer. In the event that any rubbish, debris or other waste cannot be removed daily, then such items shall be stored in areas designated by the Engineer and stored in such a manner as to avoid the creation of dust and wind-borne debris. All waste materials removed from the Structure site for disposal shall be transported and disposed of in accordance with all applicable state, local and federal laws and regulations. 5.0 MEETING ATTENDANCE. Contractor shall attend meetings with the City of Carmel, or their agents or representatives, as may be requested to explain the Work from the Work site(s) by or at the direction of Contractor. DEMOLITION OF EXISTING STRUCTURES