HomeMy WebLinkAbout2012 Sewer Bond pay request 34 110514 a rn�el Utilities
30 W.Main St., Ste.220 Carmel, IN 46032 / 317-571-2443 / 317-571-2265 fax
EXHIBIT B
Disbursement Direction #34
E-Mail or FAX the signed Disbursement Direction to:
The Huntington National Bank Corporate Trust Department(INHP22)Attn: Kim Wilson Tel: (317) 229-
4094 Fax: (317)229-4094 E-Mail: Kim.Wilson(w.huntington.com
Re: Depositary Agreement between the City of Carmel and The Huntington National Bank,
dated May 16, 2012 -Trust#4087000067
Dear Kim:
On November 4, 2014 , you are hereby authorized and directed, as the Depositary under the above-
referenced Agreement,to pay the amounts set forth on the attached Register of Claims from the above-
referenced Trust account and overnight checks to:
Cannel Utilities
Attn: Lisa Kempa
30 West Main Ste 220
Carmel, IN 46032
City of Carmel, Indiana
By: /J.( 4,;:uk tA4-277_,#
Name: Diana L. Cordray Title: C etc-Treasurer
(*) Your Alternate contact at Huntington National Bank will be:
Ellen Campbell-Tel # (616)235-5941 Ellen.Campbell @huntington.com
CARMEL UTILITIES
Register of Claims
11(4/2014
PAYMENT REQUISITION NO 34
AMOUNT OF Wire
VENDOR ADDRESS FUND CLAIM MEMORANDUM Instructions
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 76,286.77 engrg services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 2,790.00 engrg services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 15,479.50 engrq services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 4,649.50 engrg services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 3,477.64 engrg services
PO Box 2533
MK Betts Engineering Anderson, IN 46018 Cons $ 2,650.00 construction
PO Box 2533
MK Betts Engineering Anderson, IN 46018 Cons $ 133,150.00 construction
1415 Fairview St
Mofab Anderson, IN 46016 Cons $ 663.78 supplies
478 N.CR 1100 E
TPI Utility Construction Zionsville,IN 46077 Cons $ 8,955.00 construction
478 N.CR 1100 E
TPI Utility Construction Zionsville, IN 46077 Cons $ 83,750.00 construction
26717 Network Place
Xylem Water Solutions Chicago, IL 60673 Cons $ 7,529.23 supplies
26717 Network Place
Xylem Water Solutions Chicago, IL 60673 Cons $ 7,246.00 supplies
26717 Network Place
Xylem Water Solutions Chicago, IL 60673 Cons $ 3,500.00 supplies
TOTAL $ 350,127.42
ALLOWANCE OF CLAIMS
We have examined the claims listed on the foregoing Register of Claims,consisting of 1 page,and except for claims not allowed as
shown on the regist such claims are hereby allowed in the total amount of $350,127.42
I//illy
John ffy, Ut ity ector Date
PLEASE OVERNIGHT CHECKS TO:
Carmel Utilities
Attn: Lisa Kempa
30 West Main St Ste 220
Carmel,IN 46032
Jones & Henry Engineers, Ltd.
t 3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
fl J�" 419.473.9611
CITY OF CARMEL Invoice number 64950
MR. JOHN DUFFY Date 09/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6531 WWTP SECONDARY
CARMEL, IN 46032 EXPANSION`
Professional services performed through August 31, 2014 .
Professional engineering services in connection with a new final calrifier, septage receiving, belt filter press,
diversion structure covers and modifications to final clarifier 1 in conformance with our Letter Agreement No. 1-
12 and 5-14 as authorized by Professional Services Agreement dated November 3, The projected fee is
$481,000..
9-001 DSGN-SECONDARY EXPANSION CONTRACT 79
Labor
Billed
Units Rate Amount
ADMINISTRATIVE ASSISTANT 4.40 35.00 154.00
ENGINEER 2.00 85.00 170.00
INTERN 11.00 45.00 495.00
PRINCIPAL 11.00 139.00 1,529.00
SENIOR ENGINEER 43.50 105.00 4,567.50
SENIOR TECHNICIAN 0.90 90.00 81.00
TECHNICIAN 43.50 69.00 3,001.50
WORD PROCESSOR 5.50 53.00 291.50
Labor subtotal 121.80 10,289.50
Reimbursable
Cost Billed
Amount Multiplier Amount
MAILING COST/UPS COSTS 84.77 84.77
Phase subtotal 10,374.27
9-002 CONST-SECONDARY EXPANSION
Labor
Billed
Units Rate Amount
ADMINISTRATIVE ASSISTANT 2.00 35.00 70.00
CONSTRUCTION SERV SPECIALIST 200.00 84.00 16,800.00
PRINCIPAL 150.00 139.00 20,850.00
SENIOR ENGINEER 268.50 105.00 28,192.50
Labor subtotal 620.50 65,912.50
Phase subtotal 65,912.50
Invoice total 76,286.77
Page 1 of 2
CITY OF CARMEL Invoice number 64950
Project 00451-6531 WWTP SECONDARY EXPANSION Date 09/10/2014
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 DSGN-SECONDARY EXPANSION CONTRACT 79
9-002 CONST-SECONDARY EXPANSION
Total 481,000.00 385,993.73 76,286.77 462,280.50
Thank you for your business.
Page 2 of 2
Jones & Henry Engineers, Ltd.
4 3103 Executive Parkway, Suite 300
' 'r Toledo, Ohio 43606
Jon.c lioray Ersjneera.`W 419.473.9611
CITY OF CARMEL Invoice number 64952
MR. JOHN DUFFY Date 09/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6770 SEWER REHAB
CARMEL, IN 46032
Professional services performed through August 31, 2014
Professional engineering services in connection with the review and evaluation of the collection system and
assistance during sewer rehabilitation projects in conformance with our agreement No.4-12,
The project fee is$130,000.
9-001 SEWER REHAB
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST 30.00 87.00 2,610.00
INTERN 4.00 45.00 180.00
Labor subtotal 34.00 2,790.00
Phase subtotal 2,790.00
Invoice total 2,790.00
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 SEWER REHAB
Total 130,000.00 124,387.00 2,790.00 127,177.00
Thank you for your business.
Page 1
cK Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
419.473.9611
CITY OF CARMEL Invoice number 64951
MR. JOHN DUFFY Date 09/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6733 106TH ST. PUMP STATION
CARMEL, IN 46032 INTERCEPTO1<
Professional services performed through August 31, 2014
Professional engineering services in connection with the design and construction of capacity improvements to
the 106th St. Pump Station and the North-South Interceptor in conformance with our agreement no.4-12.
The project fee is$280,000.
9-001 PUMP STATION IMPROVEMENTS
Labor
Billed
Units Rate Amount
PRINCIPAL 4.00 139.00 556.00
SENIOR ENGINEER 82.00 105.00 8,610.00
TECHNICIAN 91.50 69.00 6,313.50
Labor subtotal 177.50 15,479.50
Phase subtotal 15,479.50
Invoice total 15,479.50
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 PUMP STATION IMPROVEMENTS
9-002 N-S INTERCEPTOR
9-003 CONSTRUCTION
Total 280,000.00 239,512.74 15,479.50 254,992.24
Thank you for your business.
Page 1
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
Jones"`""`�"° `W
mid niw.4
419.473.9611
'•
CITY OF CARMEL Invoice number 64956
MR. JOHN DUFFY Date 09/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6898 CARMEL/REPL FORCE
CARMEL, IN 46032 MAIN FROM SUMMERTRACE
Professional services performed through August 31,2014 It/tAq
Professional engineering services in connection with designing a replacement force main from the Summertrace
Pump Station per our letter agreement 3-14 and/or Professional Services Agreement dated November 3, 1999.
The proijected fee is$31,000.
9-001 DSGN/FORCE MAIN REPL FROM SUMMERTRACE
Labor
Billed
Units Rate Amount
TECHNICIAN 0.50 75.00 37.50
9-002 CONST SRV/FORCE MAIN REPL FROM SUMMERTRACE
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST 24.00 98.00 2,352.00
INTERN 7.00 48.00 336.00
PRINCIPAL 13.00 148.00 1,924.00
Labor subtotal 44.00 4,612.00
Phase subtotal 4,612.00
Invoice total 4,649.50
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 DSGN/FORCE MAIN REPL FROM SUMMERTRACE
9-002 CONST SRV/FORCE MAIN REPL FROM SUMMERTRACE
Total 31,000.00 17,748.50 4,649.50 22,398.00
Thank you for your business.
Page 1
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
Jon.Fl � ���. 419.473.9611
CITY OF CARMEL Invoice number 64957
MR.JOHN DUFFY Date 09/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6938 SEWER REHAB ROLLING
CARMEL, IN 46032 SPRINGS
Professional services performed through August 31, 2014 &A/1/1 411/1k
Professional engineering services in connection with the preparation of bid documents for sewer lining in the
Rolling Springs Area per our Letter Agreement No.4-14 and Professional Services Agreement dated November
3, 1999.
The projected fee is$33,000.
9-001 DSGN -SEWER REHAB ROLLING SPRINGS
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST 4.00 98.00 392.00
PRINCIPAL 16.00 148.00 2,368.00
Labor subtotal 20.00 2,760.00
Reimbursable
Cost Billed
Amount Multiplier Amount
MAILING COST/UPS COSTS 78.13 1.10 85.95
OTHER CONTRACT COST 115.98 1.10 127.58
PRINTING,COPYING,BLUEPRINTING 458.28 1.10 504.11
Reimbursable subtotal 652.39 717.64
Phase subtotal 3,477.64
Invoice total 3,477.64
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 DSGN -SEWER REHAB ROLLING SPRINGS
9-002 CONSTR -SEWER REHAB ROLLING SPRINGS
Total 33,000.00 2,362.70 3,477.64 5,840.34
Thank you for your business.
Page 1
•
•
APPLICATION AND CERTIFICATE FOR PAYMENT A/A DOCUMENT 0702 (Instructions on reverse side) PACE ONE OF PAGES
TO (OWNER): City of Carmel PROJECT: Final Clarifier & Misc. APPLICATION NO:Nineteen Distribution to:
Once Civic Square Improvements — Contract 79 (19) L OWNER
Carmel, IN 46032 PERIOD TO: 09/30/14 , C ARCHITECT
❑ CONTRACTOR
FROM (CONTRACTOR): VIA (ARO...VI `i : ARCHITECT'S E
M. K. Betts Engineering Engineer: Jones & Henry Engineers PROJECT NO:
D
& Contracting, Inc.
CONTRACT FOR: Invoice 13-124. 19 CONTRACT DATE:
CONTRACTOR'S APPLICATION FOR PAYMENT Continuation Sheet,fAIA Document G703,liss atY chedCOnnection with the Contract.
CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM $ 3,423,000.00
Change Orders approved in I ADDITIONS DEDUCTIONS 2. Net change by Change Orders $ (199,087.36)
previous months by Owner 3. CONTRACT SUM TO DATE (Line 1 2) $ 3,223,912.64
TOTAL 4. TOTAL COMPLETED & STORED TO DATE $ 3,223,912.64
Approved this Month - (Column G on G703)
Number I Date Approved 5. RETAINAGE:
a. _ % of Completed Work $
CO//1 1 + $ 24,391.50 — $102,233.00 (Column D+Eon G703)
C0#2 —0— — $ 8,290.60
b. _ % of Stored Material $
C0#3 —0— — $112,955.26 (Column F on G703)
Total Retainage (Line 5a+5b or
TOTALS + $ 24,391.50 — $223,478.86 Total in Column I of G703) $ 171,150.00
Net change by Change Orders 6. TOTAL EARNED LESS RETAINAGE $ 3,052,762.64
g g — $199,087.36
The undersigned Contractor certifies that to the best of the Contractor's knowledge, (Line 4 less Line 5 Total)
information and belief the Work covered by this Application for Payment has been 7. LESS PREVIOUS CERTIFICATES FOR
completed in accordance with the Contract Documents, that all amounts have been PAYMENT (Line 6 from prior Certificate) $ 3,050,112.64
paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE $ 2,650.00 _
issued and payments received from the Owner, and that current payment shown 9. BALANCE TO FINISH, PLUS RETAINAGE $ 171,150.00
herein is now due.
(Line 3 less Line 6)
CONTRACT M. K. Betts Engineering & Contracting, Inc.. State of: Indiana County of: Madison
Subscribed and sworn to before me this 30th day of Sept. , 2014
/3Y. � � > � " Notary Public> P,,..� , —!'Yl `--
Date: Sept. 30, 2014_ My Commission expires: October 28 , 2015
AR C ITECT'S ERTIF ATE FOR PAYMENT AMOUNT CERTIFIED
(Attach explanation if amount certified differs from the amount applied fora
In accordance with the Contract Documents, based on on-site observations and the ARCHITECT: r.--
data comprising the above application,the Architect certifies to the Owner that to the
,
best of the Architect's knowledge,information and belief the Work has progressed as By: ,�� Date Date: v�, a /4
indicated,the quality of the Work is in accordance with the Contract Documents,and This Certificate is not negotiable. The AMOUNT CERTIFIED is payab e only to the
the Contractor is entitled to payment of the AMOUNT CERTIFIED. Contractor named herein. Issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
AIA DOCUMENT G702• •PPEICATIC.N AND CERTIFICATE Fria PAVIIF■T• „w 1U141 cninr,.,. 51.,• . .,,,.,
APPLICATION AND CERTIFICATE FOR PAYMENT A/A DOCUMENT G702 (Instructions on reverse sides PAGE ONE OF PAGES
TO (OWNER): City of Carmel PROJECT: Final Clarifier & Misc. APPLICATION NO: Twenty(20)Distribution to:
Once Civic Square Improvements - Contract 79 Retainage [, OWNER
Carmel, IN 46032 PERIOD TO: 10/29/14 C ARCHITECT
D CONTRACTOR
FROM (CONTRACTOR): VIA (ARC(-Tflft.14r: ARCHITECT'S C
M. K. Betts Engineering Engineer: Jones & Henry Engineers PROJECT NO: C
& Contracting, Inc.
CONTRACT FOR: Invoice 13-124.20 Retainage CONTRACT DATE:
CONTRACTOR'S APPLICATION FOR. PAYMENT Continuation for Payment, as shown below, in
Document C703, is attached.connection with the Contract..
CHANCE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM $ 3,423,000.00
j 2. Net change by Change Orders $ (237,087.36)
Change Orders approved in ADDITIONS DEDUCTIONS 3,185,912.64
revious months by Owner 3. CONTRACT SUM TO DATE (Line 1 =2) $
P )' 3,185,912.64
TOTAL 4. TOTAL COMPLETED & STORED TO DATE s
Approved this Month (Column G on G703)
Number 1 Date Approved 5. RETAINAGE:
CO#1 + $ 24,391.50 – $102,233.00 a. — 90 of Completed Work $
li
(Column D+Eon G703)
00162 –0– – $ 8,290.60 b. _ "/o of Stored Material $
C0163 –0– – $112,955.26 (Column F on G703)
COI/it –0– – $ 38,000.00 Total Retainage (Line 5a+5b or _
TOTALS + $ 24,391.50 – $261 ,478.86 Total in Column I of G703) $ –0
Net change by Change Orders – $2372087.36 6. TOTAL EARNED LESS RETAINAGE $ 3,185,912.64
The undersigned Contractor certifies that to the best of the Contractor's knowledge, (Line 4 less Line 5 Total)
information and belief the Work covered by this Application for Payment has been 7. LESS PREVIOUS CERTIFICATES FOR
completed in accordance with the Contract Documents, that all amounts have been PAYMENT (Line 6 from prior Certificate) $ 3,052,762.64
paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE $ 133,150.00
issued and payments received from the Owner, and that current payment shown 9. BALANCE TO FINISH, PLUS RETAINAGE $ –0
herein is now due. (Line 3 less Line 6)
CONTRACTOR: M. K. Betts Engineering & Contracting, Inc.. State of: Indiana County of: Madison
Subscribed and sworn to before me this 29th day of Oct. , 2014
/ Notary Pdblic:2�o `rr
By; �/, , Date: Oct. 29, 2104 _ tvly Commission expires: October 28 , 2015
AMOUNT CERTIFIED S
ARCHITECT'S CERTIFICATE FOR PAYMENT (Attach explanation it amount certified differs from the amount applied fort
In accordance with the Contract Documents, based on on-site observations and the ARCHITECT: //
data comprising the above application,the Architect certifies to the Owner that to the /
best of the Architect's knowledge,information and belief the Work has progressed as gv: Date: (U
indicated,the quality of the Work is in accordance with the Contract Documents,and This Certificate is not negotiable. The AMOUNT CERTIFIED is payable my to the
the Contractor is entitled to payment of the AMOUNT CERTIFIED. Contractcr named herein. Issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
AMA OOCUMCNT n702•APPIICATIC'N AND CERTIFICATE-FOR PA'r. tE.'T•MAY 19H.1 EDITION•AIA• • c 1983 6702.19II3
, , .,cam,.,,T.. ..c >oruirortt ,i, v,tv vncc >vF nn:r n•tr ��•::;:+I..CTON. D i.. 'oi;i,
1415 FAIRVIEW ST._ /289'�� _ ANDERSON, IN 46016 3524 HXN PHONE(765)649-5577 91912
QUALITY SINCE 1958 FAX:(765)641-1555
PLEASE PAY I,Ro1I THis INVOICE-NET.30 DAYS INVOICE
•
STEEL— CUT WELD PRIME RED PLASMA 0 �
• BEND PRIME GREY CUTTING
• d , H
01- (10-4 rei-e_V _ ----/V 116 o-741( T .
i
CUSTOMER ORDER NO. O ERED BY SO BXf S VI �( Q D E/JI INVOICE DATES Jj l -M P CASH ,( CHRG I k1-- - �" 6 io(i"I f J&j 0•
QTY. B.O. S6.---CV.kS DESCRIPTION UNIT PRISE AMOUNT
3 k 3k ',hv 3o S S . 0-0 1-, Scko;•
-x 3o S'S x .,?-d K '
( 5 -
•
•
i
•
•
TERMS: 15%RESTOCKING CHARGE ON RETURNED MATERIALS. TAX
NO BACK CHARGES WILL BE ACCEPTED WITHOUT PRIOR APPROVAL.
1h%PER MONTH OR 18%ANNUAL SERVICE CHARGE FOR ALL INVOICES OVER 30 DAYS. OTAL
MOFAB,INC.IS NOT AN ENGINEERING FIRM AND ANY TECHNICAL ADVICE WE FURNISH WITH RESPECT TO THE USE OF MATERIAL / I�
IS GIVEN WITHOUT CHARGE.AND.WE SHALL HAVE NO OBLIGATION OR LIABILITY FOR THE ADVICE GIVEN OR THE RESULTS I JCLr1
OBTAINED.ALL SUCH ADVICE BEING GIVEN AND ACCEPTED AT BUYER'S RISK
THANK YOU FOR THIS ORDER.WE LOOK FORWARD TO SERVING YOU AGAIN o •
RECEIVED THEAOVE IN GOOD CONDITION /0 /f
. XiYre�s JIJ �!/ " DATE /V an
ORIGINAL INVOICE _
SR
TPI UTILITY CONSTRUCTION INVOICE
478 North 1100 East
Zionsville, IN 46077 Invoice# tpi 411 Date: 10/18/2014
Bill To:
6
Carmel Utilities 0 V
30 West Main Street • •o
Carmel, IN 46302 /:
0
UTILITY CONSTRUCTION
Terms: Bore It...Don't Restore It !
Project Name: Summer Trace Lift Station
Quantity Description Rate Amount
Replacement of 6" Force Main Sewer/Emergency Call Out hours for
Saturday 7/12/2014 and Sunday 7/13/2014
Saturday July 7th.2014 received call from Joe Faucett « 9 a.m. Saturday
morning expressing that a force main sewer had broken at the corner of
Carmel Drive and Pennsylvania Ave. Joe asked if i would be able to meet
on site and come with a plan to start replacing main ASAP for they were
unable to get to the pipe and find the leak. I was on site by 9:30 a.m. and
began instituting a plan to install a new line from lift station to manhole.
80 Laborer over time man hours....mobilized in equipment, began locating 60.00 4,800.00
existing utilities, ordering materials, and started fusion welding of pipe.
Once utilities were found we began drilling out first shot « 4;30 in the
afternoon and had the first 500ft pilot drilled by 10:00 p.m.
14 Project Supervisor I-lours....calling in locates for utilities,ordering 75.00 1,050.00
materials needed, mobilizing equipment
Sunday July 8th...leak in pipe had been repaired the night before but it was
asked that we keep going with the plan of installing new main as quick as
possible for the threat of another leak occurring in the line. Leak fixed was
« 1411 in depth and was caused by rock laying on pipe and wearing a hole
through it.
THANK YOU FOR YOUR BUSINESS! Total
REMIT PAYMENTS TO:
478 N.CR 1100 E
ZIONSVILLE, IN 46077
OFFICE#(317)769-4777
FAX#(317) 769-4645 Visit our website www.tpiutility.com
Page 1
TPI UTILITY CONSTRUCTION INVOICE
478 North 1100 East
Zionsville, IN 46077 Invoice# tpi 411 Date: 10/18/2014 Bill To:
Carmel Utilities ® ® ®
•30 West Main Street 1: •• ••o
Carmel, IN 46302
f 00
UTILITY CONSTRUCTION
Terms: Bore It...Don't Restore It !
Project Name: Summer Trace Lift Station
Quantity Description Rate Amount
43 Laborer over time man hours....finished fusion welding pipe and drilled 60.00 2,580.00
out with a second drill machine of 500ft north of Carmel Drive
7 Project Supervisor 14ours....finished ordering materials needed to complete 75.00 525.00
force main install and started excavating manhole location for tie-in
THANK YOU FOR YOUR BUSINESS!
Total $8,955.00
REMIT PAYMENTS TO:
478 N. CR 1100 E
ZIONSVILLE, IN 46077
OFFICE#(317)769-4777
FAX#(317)769-4645 Visit our website @ www.tpiutility.com
Page 2
TPI UTILITY CONSTRUCTION INVOICE
478 North 1100 East
Zionsville, IN 46077 Invoice# tpi 412 Date: 10/18/2014
Bill To:
r
Carmel Utilities ® ® ®® ;
30 West Main Street •
Carmel, IN 46302 r o
"1 t
UTILITY CONSTRUCTION
Terms: Bore It...Don'tRestore It !
Project Name: Summer Trace Lift Station
Quantity Description Rate Amount
Install 6" I-IDPE SDR 11 Force Main w/locate wire from lift station to
manhole.
1.350 Install 6" I-IDPE SDR 11 FM Sewer with locate wire....includes Harvey 35.00 47,250.00
Connections as needed and splice pits with electro fusion couplers.Also
includes I day of pressure testing line
1 Tie-in to existing manhole with inside drop...includes coring of manhole, 3,500.00 3,500.00
fusion welding of I-IDPE fittings,excavation and granular backfill
1 Excavation and tie-in to existing lift station valve vault includes 8,500.00 8,500.00
excavation across lift station drive,setting of shoring,and coring vault.2
days of excavation around existing utilities through drive location.
Includes removal of excavated spoils and fill with granular backfill
1 Work inside valve vault....lnstall new ductile iron sewer rated fittings,cut 6,500.00 6,500.00
and cap old force main line,and reposition vac truck connection.2 days
includes materials
Restoration asphalt and concrete restoration asphalt replaced on drive 18,000.00 18,000.00
to lift station,walking path on corner of Penn and Carmel Drive...concrete
replaced in side walk in front of manhole and ADA ramp at lift station.
Asphalt driven lift station replaced with 12"of base to match existing.
Also includes finish grade and grass restoration to site in various locations
THANK YOU FOR YOUR BUSINESS!
Total $83,750.00
REMIT PAYMENTS TO:
478 N. CR 1100 E
ZIONSVILLE, IN 46077
OFFICE#(317) 769-4777
FAX#(317)769-4645 Visit our website @ www.tpiutility.com
Xylem Water Solutions U .S.A., Inc. . 67 (7
7615 W. NEW YORK STREET
INDIANAPOLIS,IN 46214 YOUR PURCHASE ORDER
Tel Fax IN VOICE
S13878
INVOICE NO. FUS NO. DATE SHIPPED DELIVERY NOTE
• .,:` 3556805775 942681 9/17/14 B89913
E;.T. 26717 Network Place
M `- INVOICE DATE TRN WHS PAYMENT TERMS
;ItM°:` Chicago, IL 60673-1267 9/17/14 A3 088 NET 60 DAYS
Sold To Customer No 103973 Ship To
Global No 8022006
CITY OF CARMEL CARMEL WWTP
760 THIRD AVE SW ATTN: BLAINE MALLABER
9609 HAZEL DELL PARKWAY
INDIANAPOLIS IN 46280
CARMEL IN 46032
INCO TERMS DELIVERY TERMS ORDER PROCESSED BY
DAP Customer premise Prepaid FLYGT-INDIANAPOLIS, IN BRA
SHIP VIA ORDER TEXT CUSTOMER TEXT
OLD DOMINION TRUCKING BLAINE MALLABER T.PIROZZOLI / ED RYAN
QUANTITY SHIPPED UNIT PRICE
LINE ITEM/DESCRIPTION NET PRICE EXTENDED AMOUNT
UM DISCOUNT/CHARGE
Quote# 2014-IND-0005
PROJECT NAME : CARMEL 106TH STREET ADD PUMP #4
001 14094070310180 1
14" LR 90 125# X 4010 PN10 EA
FLANGE W/CLEANOUT;GASKETS;BOLT
TOT PRICE/GROUP 001 - 001 7 , 246 . 00
SUB-TOTAL OF POSITIONS 7, 246 . 00
*FREIGHT CHARGED AS LINE ITEM*
NET AMOUNT BEFORE TAXES USD 7, 246 . 00
O•DER TOTAL USD
7, 246 . 00
1
Xylem Water Solutions U .S.A., Inc.
7615 W. NEW YORK STREET
INDIANAPOLIS,IN 46214 YOUR PURCHASE ORDER
Tel Fax:(317)273-4480 N V C .E [ S 13878
�y t INVOICE NO. FUS NO. DATE SHIPPED DELIVERY NOTE
3556804659 942681 9/10/14 B88162
26717 Network Place
0 Chicago,0, IL 60673 1267 INVOICE DATE TRN WHS PAYMENT TERMS
9 9/10/14 A3 304 NET 60 DAYS
Sold To Customer No. 103973 Ship To:
Global No 8022006
CITY OF CARMEL CARMEL WWTP
760 THIRD AVE SW ATTN: BLAINE MALLABER
9609 HAZEL DELL PARKWAY
INDIANAPOLIS IN 46280
CARMEL IN 46032
INCO TERMS DELIVERY TERMS ORDER PROCESSED BY
DAP Customer premise WILSON(TNT) Order Po FLYGT—INDIANAPOLIS, IN BRA
SHIP VIA Ocean Freight I ORDER TEXT CUSTOMER TEXT
WILSON Selects carrier I BLAINE MALLABER T.PIROZZOLI / ED RYAN
QUANTITY SHIPPED WNIT PRfCE'
LINE ITEM/DESCRIPTION NET PRICE EXTENDED AMOUNT.
'' ;' UM,:.;> OISCOUNTlCHgRGE
Quote# 2014-IND-0005
PROJECT NAME : CARMEL 106TH STREET ADD PUMP #4
001 4000000501142 1
BASE UNIT/PANEL ASSEMBLY MAS EA
002 1400000404112 1
TRANSFORMER, CURRENT 300 : L EA
003 14094120032930 1
PANEL, CONTROL NEMA 4X W/MAS EA
TOT bRICE/GROUP 001 - 003 7, 529 . 23
SUB-TOTAL OF POSITIONS 7, 529 . 23
*FREIGHT CHARGED AS LINE ITEM*
NET AMOUNT BEFORE TAXES USD 7, 529 . 23
0 47-171
Page 1 of 1
xylem
Let's Solve Water
Bill To: Ship To: Please include the invoice number on all
CITY OF CARMEL CITY OF CARMEL remittances and include remittance copy with
760 THIRD AVE SW 760 THIRD AVE SW postal payments.
CARMEL, IN 46032 CARMEL, IN 46032 Invoice
3556800323
Remit To: Billing Date — Shipping Date
Xylem Inc. 08/12/2014
26717 Network Place Purchase Order Number
CHICAGO, IL 60673-1267 S13878
Sales Order
3556-942681
Shipping Reference Ship Via-
Customer Number ' .Customer Location
8022006 103973
Terms Due Date Salesperson Customer Contact Contact Phone Contact Fax
NET 60 10/11/2014 _ _ _
Item' Description Quantity ShippedTax , T Unit Price Extended Amount
Num
1 0000000942067# CABLE,SUBCAB 4G70 S 50No 44.00 2,200.00
2 0000000940894 CABLE,SUBCAB S12X1.5 50No 26.00 1,300.00
Tax Summary
Tax.Code Tax. . Inclusive Tax Tax Precedence Tax Extended Amount
Rate(%) - - - _ __., ._. 1
No data exists.
Special Instructions SubTotal 3,500.00
-N/A- Tax 0.00
_ Shipping 0.00
Total 3,500.00
Payments and 0.00
Credits
Financial Charges 0.00
Outstanding balance 3,500.00
as of 08/22/2014 in
USD