Loading...
HomeMy WebLinkAboutPacket 03-21-95SHURGARD STORAGE CENTERS CARMEL, INDIANA RE- DESIGN PRESENTATION March 1995 TABLE OF CONTENTS' LETTER OF INTRODUCTION SECTION 1 PRESENTATION OF BUILDING MATERIALS Ansley Park, Atlanta, Georgia Narration of Materials PROJECT SITE PLAN & BUILDING ELEVATIONS Aerial Photograph Site Plan Project Elevations Building # 1 Northwest (Meridian side) Northeast (Keystone side) Southwest (heading up S. Range Line Rd.) Southeast (view between the two buildings) Building # 2 North (view heading into this building) SECTION 2 SECTION 3 TAB 1 March 20, 1995 Carmel Plan Commission One Civic Square Carmel, Indiana 46032 Dear Members: 1201 Third Avenue, Suite 2200, Seattle,Washington 98101 Telephone- (206) 624 -8100 Fax: (206) 624 -1645 This opportunity to present, for your consideration, our revised building design for the proposed Shurgard facility in Carmel, is sincerely appreciated. The following presentation illustrates the overall design, as well as the materials and detailing, which has been very carefully reconsidered to take your recent comments and concerns into account. Our company strives, with each of our projects, to fit properly into the fabric of our immediate neighborhoods and the surrounding municipalities. A successful facility, which will serve both Shurgard and the community well, is a consistent goal for each new store. With your review of our revised design, we hope that you will agree that our proposed design will result in a superior facility of which both Carmel and Shurgard can be enthusiastically and justifiably proud. It is certain to become one of the flagship stores in our portfolio. Thank you again, very much, for your time and consideration. Jo, Director of Design j:re\letters \pincomm.ol PRESENTATION OF BUILDING MATERIALS The photo herewith presented illustrates one of' Shurgard's most highly regarded stores. It is located in an affluent •neighborhood of Atlanta, Georgia, a suburb named Ansley Park. The primary entrance to the Ansley Park neighborhood, which contains some of Atlanta's oldest homes, is located directly across the street from the entrance to our store. The photo included, illustrates the three primary materials which have been combined in the revised design of the Carmel store. They are: E.I.F.S. (Exterior Insulating Finish System) - This is a synthetic stucco material sometimes referred to as Dry -Vit, a primary manufacturer of the product. This material is located at the top of the left building, featured below the roof line and in the building on the right. The surface is textured with both raised and grooved elements for additional architectural interest. Rough Textured, Split Face Masonry - This material can be found in the piers to which the wrought iron fence is attached as well as surrounding a smoother, lighter masonry element located in the building on the left. Smooth, Scored Face Masonry - This material, as mentioned above, is the lighter colored masonry element, surrounded by the rough textured masonry in the building on the left side of the photo. In your review of the following drawings, which illustrate the revised design of the Carmel store, you will find that the materials listed above along with accents, using colored lines and glazed tiles are used exclusively. The metal surfaces previously included have been deleted from our design. TAB 3 PROJECT SITE PLAN Please refer to this plan when reviewing the various elevations of the Carmel project. The elevations have been labeled to correspond with the directional views as outlined on this site plan. For instance: The "Northwest Elevation" as indicated by an arrow, on the site plan, shows the direction one would be facing when viewing the facility. Leaving the site plan unfolded for reference may help in your review of the illustrations that follow.