Loading...
HomeMy WebLinkAboutE201.pdf1 TEMP GENSET SWITCH SHALL HAVE CONCRETE PAD PROVIDEDBY E.C. PAD SHALL OFFSET A {MINIMUM} 3" DISTANCE ON ALLSIDES FROM EQUIPMENT FOOTPRINT DIMENSIONS. PRIMARY SERVICE CONDUITS AND CONDUCTORS BELOWGRADE TO PAD MOUNTED TRANSFORMER BY UTILITYCOMPANY. REFER TO CIVIL PLANS FOR DETAILS. {UNDERGROUND SERVICE CONDUITS AND CONDUCTORS INTHIS AREA SHALL BE SIZED PER THE RISER DIAGRAM ONDRAWING E600. REFER TO SPECIFICATIONS FOR CONDUITREQUIREMENTS. }E.C. SHALL STUB UP (2) SPARE 4"C. IN STOCK ROOM - SEAL ALLOPENINGS AND LABEL CONDUIT CAPS. E.C. SHALL PROVIDE ALL SECONDARY CONDUITS ANDCONDUCTORS AS LISTED ON RISER DIAGRAM. EXTEND (6) 4"C.BELOW GRADE AND {STUB UP IN STOCK ROOM - SEAL ALLOPENINGS. PROVIDE LENGTH OF CONDUCTORS FOR FUTURECONNECTION TO DISTRIBUTION EQUIPMENT. }(2) 4" TELEPHONE SERVICE CONDUITS & (1) 2" CABLE SERVICECONDUIT BELOW GRADE PROVIDED BY E.C. STUB UP 6" ABOVEFLOOR IN STOCK ROOM - SEAL ALL OPENINGS. E.C. SHALL PROVIDE (1) 2" SCH. 80 PVC CONDUIT WITHPULLWIRE BETWEEN TRANSFORMER AND METER BASE. METERBASE AND METER FURNISHED BY UTILITY COMPANY FOR E.C.TO INSTALL AT INDICATED LOCATION. SEE DRAWING E600 FORALL WORK TO BE INCLUDED. A)