HomeMy WebLinkAbout017300 EXECUTION.pdf Giant Eagle Market #6550 The Bridges, Carmel, Indiana
Building Shell Bid & Permit
DLA Project 2014040.00
August 12, 2014
EXECUTION 017300 - 1
SECTION 017300 - EXECUTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes the following:
1. Administrative and procedural requirements for schedules and reports required for proper
performance of the Work.
2. Contractor’s Construction Schedule.
3. Updating schedules.
B. Related Requirements:
1. Section 013100 "Project Management and Coordination.”
2. Section 013300 "Submittal Procedures."
3. Section 013200 “Construction Progress Documentation.”
4. Section 016000 “Product Requirements.”
1.3 PROJECT DRAWINGS AND SPECIFICATIONS
A. Contractor shall carefully examine the Drawings and Specifications of all trades and report all
discrepancies to the Architect in writing to obtain corrective action. No departures from the Contract
Documents will be made without prior written approval from the Architect/Engineer.
B. Questions or disputes regarding the intent or meaning of Contract Documents shall be resolved by the
interpretation of the Architect/Engineer. The Architect’s/Engineer’s interpretation is final and binding.
C. The Drawings and Specifications are not intended to define all details, finish materials, and special
construction, which may be necessary. The Contractor shall provide all installations complete and
adequate as implied by the project documents.
D. Drawings are diagrammatic only and do not show exact routes and locations of equipment and associated
materials unless specifically dimensioned. The Contractor shall verify the work of all other trades and
shall arrange their work to avoid conflicts. In the event of a conflict, the Contractor shall obtain
corrective action from the Architect/Engineer.
E. It is the Contractors responsibility to analyze existing conditions, phasing requirements and other Trades
work, in order to familiarize themselves with conditions which may affect their work. Sufficient
allowances shall be provided by the Contractor’s bid to cover work, due to existing conditions, phasing,
other Trades that will be required to complete this contract work.
F. All work shall be considered new, unless noted otherwise.
Giant Eagle Market #6550 The Bridges, Carmel, Indiana
Building Shell Bid & Permit
DLA Project 2014040.00
August 12, 2014
EXECUTION 017300 - 2
1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver products to the project properly identified with the names, model, types, grades, compliance
labels, and other information needed for distinct identification; adequately packaged and protected to
prevent damage during shipment and handling. (see Section 01321 & 01600)
B. Store equipment and materials at the site, unless off-site storage is authorized in writing. Protect stored
equipment and materials from damage.
1.5 INSTALLATION
A. General: Sequence, coordinate, and integrate the various materials and equipment. Comply with the
following requirements:
1. Coordinate refrigeration systems, production and sales equipment, and materials with other
building components.
2. Verify all dimensions by field measurements.
3. Where mounting heights are not detailed or dimensioned, install systems, materials, and
equipment to provide the maximum headroom possible.
4. Install systems, materials, and equipment to conform with approved submittal data, including
coordination drawings, to greatest extent. Conform to arrangements indicated by the Contract
Documents, recognizing that portions of the Work are shown only in diagrammatic form. Where
coordination requirements conflict with individual system requirements, refer conflict to the
Architect.
5. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other
building systems and components.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 017300