HomeMy WebLinkAbout262300 Distribution Equipment.pdf Giant Eagle Market #6550 The Bridges, Carmel, Indiana
Building Shell Bid & Permit
DLA Project 2014040.00
August 12, 2014
DISTRIBUTION EQUIPMENT 262300 –1
SECTION 262300
DISTRIBUTION EQUIPMENT
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Grounding System Integrity Verification Procedures.
1.02 SUBMITTALS
A. Submittals will be furnished by Owner and forwarded to the Subcontractor.
PART 2 - EXECUTION
2.01 GROUNDING SYSTEM INTEGRITY VERIFICATION PROCEDURES
A. The purpose of this section is to provide a guideline for the installing contractor in order to find and
correct installation issues dealing with the grounding system during the construction process. Giant Eagle
will have an independent electrical testing agency monitor the electrical system for a period of one week
near project completion in order to detect power quality anomalies and grounding system installatio n
deficiencies. Completion of the following procedure will help to detect and correct these deficiencies
prior to the final testing period.
B. For each major piece of equipment, the electrical contractor must perform two tests during installation.
Prior to energizing, the continuity between the neutral, ground and isolated ground conductors (as
applicable) must be tested and recorded. Once energized, the current at the neutral ground bond of the
power source of the equipment must be measured and recorded. The order in which equipment is tested
and energized is not critical, however, dates and times must be recorded in order to determine which
equipment may be creating issues. One exception to this rule is the prefabricated powerwall assembly(ies).
This equipment should be tested prior to any other testing.
C. The following forms must be completed during project construction and handed in at a time designated by
the construction project manager. Electrical Contractor shall schedule this deadline at project kickoff
meeting. Below is a brief description of each column on the form and the required information:
Form 262300-A:
1. Column A1: Equipment Designation
2. Column A2: Record the date of testing.
3. Column A3: Record the time of day of the testing.
4. Column A4: At the time of the testing, installation of all branch circuits and feeders fed directly from
the associated panelboard must be completed. This only applies to panelboards. Insert a “Yes” to
indicate that this has been accomplished.
5. Column A5, A6 and A7: Continuity must be tested between the neutral and ground conductors (N -
G), neutral and isolated ground conductors when applicable (N-IG) and ground and isolated ground
conductors when applicable (G-IG). To do so, the source neutral, ground and isolated ground
conductors must be disconnected at their source panel or transformer and tested at this point. For
instance, when Panel ‘N’ branch circuits are all completely installed, the associated feeder from Panel
‘SDP’ shall be disconnected at SDP’s ground and neutral bars. Continuity should be tested at this
point. Insert a “No” to indicate that continuity is not present.
6. Column A8: Insert any comments specific to this equipment.
Giant Eagle Market #6550 The Bridges, Carmel, Indiana
Building Shell Bid & Permit
DLA Project 2014040.00
August 12, 2014
DISTRIBUTION EQUIPMENT 262300 –2
Form 262300-B
1. Column B1: Equipment Designation
2. Column B2: Record the date of testing.
3. Column B3: Record the time of day of the testing.
4.: Column B4: Refer to the building grounding system detail on the E700 sheets for locations on the
grounding system at which current readings should be taken. These locations correspond to the points
at which Giant Eagle’s independent testing agent will meter current. These are generally the main
bonding jumper at the main service disconnect switch and the service bonding jumpers at each
separately derived system (transformer).
5. Column B5: Immediately following energizing of the associated equipment, a current reading should
be taken at the point indicated in column B4. Record the reading taken in amps in this column.
6. Column B6: Insert any comments specific to this equipment.
Form 262300-A: Neutral-Ground Isolation testing
A1 A2 A3 A4 A5 A6 A7 A8
Equipment Date Time
Branches
Complete?
Continuity? Comments
N-G N-IG G-IG
Main Switch n/a n/a
Form 262300-B: Neutral-Ground Bond Current Testing
B1 B2 B3 B4 B5 B6
Equipment Date Time
Location to
Meter Current
Current
Measured
Comments
Main Switch A
B. It is the responsibility of the electrical contractor to eliminate all deficiencies found during this installation.
There shall be no continuity between ground, neutral and isolated ground conductors. There shall be no
current measured at the neutral ground bonds of each source. Deficiencies that can not be corrected shall
be brought to the attention of the Construction Project Manager immediately. Giant Eagle’s independent
electrical testing agency can be hired by the electrical contractor to help recti fy these deficiencies.
END OF SECTION