Loading...
HomeMy WebLinkAboutIF141.6.pdf. E 10 B A 7 8 932 4.8 6.21.2 10.1 4 C D 1 9.5 CONFERENCE ROOM 4025 CPT2T RB1T P2T2 OFFICE 4024 CPT2T RB1T P2T EXAM 13 4069 LVP3T RB1T P2T2 EXAM 14 4070 LVP3T RB1T P2T2 EXAM 12 4067 LVP3T RB1T P2T2 EXAM 11 4066 LVP3T RB1T P2T2 EXAM 10 4064 LVP3T RB1T P2T2 PATIENT TOILET 4062 LVP3T RB2T EP2T2 EXAM 9 4059 LVP3T RB1T P2T2 EXAM 8 4057 LVP3T RB1T P2T2 EXAM 7 4056 LVP3T RB1T P2T2 EXAM 5 4054 LVP3T RB1T P2T2 CONSULT. 4036 CPT2T RB1T P2T2 CONSULT. 4035 CPT2T RB1T P2T2 N.S.T. 4034 LVP3T RB1T P2T2 COLPO. 4033 LVP3T RB1T P2T2 STAFF WORK 4006 CPT2T RB1T P2T STORAGE 4009 VCT1T RB1T P2T STAFF TOILET 4010 LVP3T RB2T EP2T2 I.T. 4011 VCT1T RB1T P2T EXAM 16 4026 LVP3T RB1T P2T2 EXAM 15 4027 LVP3T RB1T P2T2 STAFF TOILET 4018 LVP3T RB2T EP2T PATIENT TOILET 4029 LVP3T RB2T EP2T2 STORAGE 4014 VCT1T RB1T P2T SOILED HOLDING 4013 VCT1T RB1T EP2T BREAK ROOM 4015 VCT1T RB1T P2T 1 2 MANAGER OFFICE 4004 CPT2T RB1T P2T STORAGE 4020 CPT2T RB1T P2T COATS 4019 CPT2T RB1T P2T PATIENT TOILET 4037 LVP3T RB2T EP2T2 CHECK IN / OUT 4003 CPT2T RB1T P2T2 LAB 4039 LVP3T RB1T P2T STAFF WORK 4007 CPT2T RB1T P2T STAFF WORK 4008 CPT2T RB1T P2T PASSAGE 4012 CPT2T RB1T P2T2 PASSAGE 4016 CPT2T RB1T P2T2 PHYS. WORK 4017 CPT2T RB1T P8T PHYS. WORK 4021 CPT2T RB1T P2T PHYS. WORK 4022 CPT2T RB1T P2T PHYS. WORK 4023 CPT2T RB1T P2T NURSE STATION 4028 CPT2T RB1T P10T NURSE STATION 4030 CPT2T RB1T P10T PASSAGE 4032 CPT2T RB1T P2T2 PASSAGE 4005 CPT2T RB1T P2T PASSAGE 4058 CPT2T RB1T P2T2 NURSE STATION 4060 CPT2T RB1T P10T2 NURSE STATION 4063 CPT2T RB1T P10T2 PASSAGE 4065 CPT2T RB1T P2T2 PASSAGE 4068 CPT2T RB1T P2T2 EXAM 4 4051 LVP3T RB1T P2T2 EXAM 3 4047 LVP3T RB1T P2T2 EXAM 2 4045 LVP3T RB1T P2T2 ULTRASOUND 4041 LVP3T RB1T P2T2 EXAM 1 4044 LVP3T RB1T P2T2 ULTRASOUND 4040 LVP3T RB1T P2T2 EXAM 6 4055 LVP3T RB1T P2T2 PATIENT TOILET 4048 LVP3T RB2T EP2T2 STOR. 4053 VCT1T RB1T P2T STAFF WORK 4046 CPT2T RB1T P8T NURSE STATION 4050 CPT2T RB1T P8T BLOOD DRAW 4038 LVP3T RB1T P2T WAITING 4000 CPT2T RB1T P2T COPY / FAX 4002 CPT2T RB1T P2T STORAGE 4043 VCT1T RB1T P2T PASSAGE 4042 CPT2T RB1T P2T2 PASSAGE 4052 CPT2T RB1T P2T2 PASSAGE 4061 CPT2T RB1T P2T2 PASSAGE 4049 CPT2T RB1T P2T2 PASSAGE 4001 CPT2T RB1T P2T2 FUTURE TENANT 4100 -- -- -- CG1T CG1TCG1T CG1T CG1T CG1TCG1T CG1T CG1TCG1T CG1T CG1T CG1T CG1TCG1T CG1T CG1T CG1TCG1TCG1TCG1TCG1T CG1TCG1TCG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T CG1T10 11 810 10 10 10 10 10 8 8 8 8 8 8 8 8 8 8 8 65 9 999 99 9 9 10101010 10 10 10 111111 11 11 11 11 12 12 12 12 12 12 10 10 IF141.6 2 11 STORAGE 4049A VCT1T RB1T P2T STAFF WORK 4031 CPT2T RB1T P10T CG1TCG1T 13 1313 131313 13 1313 13 13 13 13 13 13 13 13 13 13 13 13 13 CG1T CG1T CG1T FINISH LEGEND BLOCK FINISH ABBREVIATIONS ACT ACOUSTICAL CEILING TILE CPT CARPET CG CORNER GUARD CC CUBICLE CURTAIN DG DECORATIVE GLASS EP EPOXY PAINT ETR EXISTING TO REMAIN F FABRIC GB GYPSUM BOARD LVP LUXURY VINYL PLANK P PAINT ROOM NAME ROOM NUMBER REMARKS COLUMN FLOOR BASE WALL NOTE: FINISHES INDICATED IN FINISH LEGEND BLOCKS ARE GENERAL OVERALL FINISHES FOR ROOM UNLESS OTHERWISE NOTED BY NOTE, REMARK, DETAIL, AND/OR ELEVATION. PL PLASTIC LAMINATE PMC PRE-MANUFACTURED WOOD CABINETRY PME PATCH AND MATCH EXISTING RB RESILIENT BASE SC SEALED CONCRETE (SPEC 03300) SS SOLID SURFACE SSK SOLID SURFACE SINK SV SHEET VINYL VCT VINYL COMPOSITION TILE WP WALL PROTECTION FINISH REMARKS 1.REFER TO FINISH PLANS FOR FLOOR PATTERN, TRANSITIONS AND/OR ACCENT LOCATIONS. 2.REFER TO FINISH PLANS FOR ACCENT WALL LOCATIONS. FINISH PLAN NOTES 10 B.6 9 10.1 C 9.5 VCT5T VCT5T VCT5T VCT6T VCT6T VCT6T VCT7T VCT7T VCT7T 4' - 0"3' - 0"5' - 0"5' - 0"3' - 0"6' - 0"2' - 0"1' - 0"1' - 0"4' - 6" 2' - 0"1' - 0"6' - 0"4' - 0"3' - 0"5' - 0"7' - 0"2' - 6"4' - 0" 2' - 2 " 2' - 0 " 5' - 0 " 1' - 0 " 1' - 0 " 3' - 1 0 " 3' - 2 " 4' - 0 " 3' - 1 0 " 2' - 2 " 2' - 0 " 4' - 0 " 1' - 0 " 2' - 0 " 3' - 1 0 " 9365 Counselors Row Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com CONNECTOR WOMEN'S CENTER KEYPLAN N SCALE DATE COORD DRAWN APPROVED FILE NAME CLIENT NO. : PROJECT NO. TM P R E L I M I N A R Y D R A W I N G N O T F O R C O N S T R U C T I O N WOMEN'S CENTER CARMEL, IN As indicated 04610082 IF141.6 FOURTH FLOOR FINISH PLAN 0461 BP #6 DESIGN DOCUMENTS OCT. 10, 2014 1/8" = 1'-0"1 FOURTH FLOOR ARCHITECTURAL PLAN 8WALL TO RECEIVE P8T. 9WALL TO RECEIVE P9T. 10WALL TO RECEIVE P10T. 11WALL TO RECEIVE P11T. 12WALL TO RECEIVE EP8T. 13PROVIDE 5" HIGH WP1T RUBRAIL BEHIND CHAIRS. CONFIRM FINAL HEIGHT AND LOCATION WITHIN ROOM WITH TENANT. 1/4" = 1'-0"2 BREAK ROOM 4015 ENLARGED FINISH PLAN MARKDATEDESCRIPTION