HomeMy WebLinkAboutP340.6.pdfC
D
E
10
B
A
B.6
5 6 7 8 94321
E16
E17E18
E15 1.5.6.7..9.11.12..
A''
2.3.8.10.13.14.15.16.17.18..4 20.19.
A2
9.5
F
10.1
C.9
C.6
C.4
D.3
D.6
B.6
A
A2
B
9.11.12..13.14.7..6.5..41.E15 15..16.
F
EXAM 3
4047
EXAM 4
4051
PASSAGE
4052
NURSE
STATION
4050
PATIENT
TOILET
4048
PASSAGE
4049
STAFF WORK
4046
ULTRASOUND
4041PASSAGE
4042
EXAM 2
4045
EXAM 1
4044
STORAGE
4043
ULTRASOUND
4040
LAB
4039
PASSAGE
4061
PATIENT
TOILET
4037
BLOOD DRAW
4038
WAITING
4000
FUTURE
TENANT
4100
STOR.
4053 EXAM 5
4054
EXAM 6
4055
EXAM 8
4057
EXAM 7
4056
PASSAGE
4001
CONSULT.
4036
CONSULT.
4035
COPY / FAX
4002
CHECK IN /
OUT
4003
MANAGER
OFFICE
4004
STAFF WORK
4006
COLPO.
4033
N.S.T.
4034
STAFF WORK
4007
STAFF WORK
4008
STAFF TOILET
4010
STORAGE
4009
I.T.
4011
PASSAGE
4012
STORAGE
4014
SOILED
HOLDING
4013
BREAK ROOM
4015
STORAGE
4020
PHYS. WORK
4021
PASSAGE
4016PHYS. WORK
4017
EXAM 16
4026
EXAM 15
4027
STAFF TOILET
4018
COATS
4019
PHYS. WORK
4022
PHYS. WORK
4023
OFFICE
4024
CONFERENCE
ROOM
4025
EXAM 13
4069
EXAM 14
4070
PASSAGE
4068
EXAM 11
4066
EXAM 12
4067
NURSE
STATION
4030
PATIENT
TOILET
4029
NURSE
STATION
4028
NURSE
STATION
4063
PASSAGE
4065
EXAM 10
4064
EXAM 9
4059
PASSAGE
4058
NURSE
STATION
4060
PATIENT
TOILET
4062
PASSAGE
4032
PASSAGE
4005
1 1/2" DHW 3" DCW2" DHWR
1 1/2" DHW 3" DCW2" DHWR
1 1/2" DHW
2" DHWR3" DCW
3" FP
1/2" DCW
STAFF WORK
4031
STORAGE
4049A
WC-3
WC-3
WC-3
WC-3
WC-3
WC-3
LAV- 3
LAV- 3
LAV- 3
LAV- 3
LAV- 3
SK- 1
SK- 1
SK- 1SK- 1
SK- 1SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1
SK- 1SK- 1
SK- 1
SK- 1
SK- 1
SK- 6
4
4
4 5 4
44
4 4
4
4
4
4
4
5
4 4
54 4
4
4
4
4
4
4
4
5 4
4
4
4
4
4
2
5
3 3
1
2" DCW 1 1/4" DHW
3/4" DHW
3/4" DHWR
1 1/4" DHW
3/4" DHW
2" DCW
1 1/4" DHW
1 1/4" DHW2" DCW
3/
4
"
D
H
W
2" DCW
3/4" DHWR
WB-1
WB-1
SK- 1
LAV- 3
SK- 1
SK- 1
SK- 3
4
EEW-1
1
2" DCW
6
2" DCW
3/4" DCW
2" DCW 4
1 1/4" DCW
1 1/4" DHW
2" DCW
1 1/4" DHW
2" DCW
1" DCW
1" DHW
1"
D
H
W
2" DCW1/2" DCW
1" DHW
1" DHW
FIRE PROTECTION GENERAL NOTES:
1. THE EXISTING BUILDING HAS A SPRINKLER SYSTEM INSTALLED IN ALL AREAS.
MODIFY EXISTING SPRINKLER HEADS, BRANCH MAINS & FEED MAIN PIPING AS
REQUIRED TO ACCOMMODATE THE NEW FLOOR PLAN LAYOUT, REFLECTED CEILING
LAYOUT, CEILING ELEVATION CHANGES, HVAC EQUIPMENT & DUCTWORK, ALL PIPING,
AND ALL ELECTRICAL CONDUIT.
2. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING LAYOUT &
ELEVATIONS.
3. SPRINKLER CONTRACTOR SHALL SCHEDULE SPRINKLER SHUTDOWN WITH OWNER
IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATIONS & NOTIFY LOCAL FIRE
DEPARTMENT OF SYSTEM & AREAS OUT OF SERVICE.
GENERAL NOTES:
1. NOT ALL PLAN NOTES MAY BE USED ON SHEET.
2. NO PIPING SHALL PASS THROUGH ELECTRICAL ROOMS, ELEVATOR EQUIPMENT
ROOMS, STAIR SHAFTS, ELEVATOR SHAFTS OR SIMILAR SPACES UNLESS SYSTEM
SERVES SPACE.
3. PROVIDE TYPE "A" WATER HAMMER ARRESTORS ON DOMESTIC HOT AND COLD
WATER PIPES SERVING FLUSH VALVES, ELECTRONIC FAUCETS AND ELSEWHERE
SHOWN ON PLANS. LOCATE DOWNSTREAM OF SHUT-OFF VALVES SERVING FIXTURE
OR GROUPS OF FIXTURES AND SHALL BE INSTALLED ABOVE ACCESSIBLE CEILING.
4. THE CONTRACTOR SHALL PIPE, COMPLETE AND MAKE OPERATIONAL EACH
PLUMBING FIXTURE WITH WATER, WASTE AND VENT PIPES ACCORDING TO THE
PLUMBING FIXTURE SCHEDULE.
5. IF A FIXTURE IS NOT INDICATED TO HAVE H&CW PIPE, W & V PIPE CONNECTED TO
IT, IT SHALL BE PROVIDED AND INSTALLED. THE CONTRACTOR SHALL PROVIDE THE
COST OF MATERIAL AND INSTALLATION OF THE PIPING WITHIN THEIR SCOPE OF THIS
PROJECT.
6. VALVE TAGS WILL BE PLACED ON GRID FOR LOCATION OF VALVES.
7. PROVIDE THERMOSTATIC MIXING VALVE TO SERVE ANY EMERGENCY EYE WASH,
EMERGENCY SHOWER REQUIRED.
9365 Counselors Row
Indianapolis, IN 46240-1478
ph 317.819.7878 fx 317.819.7288
www.bsalifestructures.com
CONNECTOR
WOMEN'S
CENTER
KEYPLAN
N
POB 1
SCALE
DATE
COORD
DRAWN
APPROVED
FILE NAME
CLIENT NO. :
PROJECT NO.
TM
WOMEN'S CENTER
CARMEL, IN
As indicated
04610082
04610082-MEP_BSALS_CENTRAL_v2012.rvt
KPM
LAP
SAP P340.6
FOURTH FLOOR
PLUMBING PLAN -
BP6
0461
BP #6 DESIGN
DOCUMENTS
OCTOBER 10, 2014
1/8" = 1'-0"1 FOURTH FLOOR PLUMBING PLAN - BP6
MARKDATEDESCRIPTION
#PLAN NOTES
1MODIFY EXISTING FP SYSTEM TO ACCOMMODATE THE NEW
ARCHITECTURAL REFLECTED CEILING PLAN.
2NO PIPING ROUTED THROUGH THIS ROOM.
3CONNECT 2" DCW, 1-1/4" DHW, 3/4" DHWR TO EXISTING.
DISCONNECT AND REMOVE PORTION OF DHW LOOP.
41/2" DHW & DCW DROP.
51-1/4" DCW DROP.
6ANY EXISTING DOMESTIC WATER PIPING OVER THIS ROOM
SHALL BE RELOCATED. PROVIDE DRAIN PAN FOR EXISTING ROOF
DRAINS ABOVE THIS ROOM.