Loading...
HomeMy WebLinkAboutP340.6.pdfC D E 10 B A B.6 5 6 7 8 94321 E16 E17E18 E15 1.5.6.7..9.11.12.. A'' 2.3.8.10.13.14.15.16.17.18..4 20.19. A2 9.5 F 10.1 C.9 C.6 C.4 D.3 D.6 B.6 A A2 B 9.11.12..13.14.7..6.5..41.E15 15..16. F EXAM 3 4047 EXAM 4 4051 PASSAGE 4052 NURSE STATION 4050 PATIENT TOILET 4048 PASSAGE 4049 STAFF WORK 4046 ULTRASOUND 4041PASSAGE 4042 EXAM 2 4045 EXAM 1 4044 STORAGE 4043 ULTRASOUND 4040 LAB 4039 PASSAGE 4061 PATIENT TOILET 4037 BLOOD DRAW 4038 WAITING 4000 FUTURE TENANT 4100 STOR. 4053 EXAM 5 4054 EXAM 6 4055 EXAM 8 4057 EXAM 7 4056 PASSAGE 4001 CONSULT. 4036 CONSULT. 4035 COPY / FAX 4002 CHECK IN / OUT 4003 MANAGER OFFICE 4004 STAFF WORK 4006 COLPO. 4033 N.S.T. 4034 STAFF WORK 4007 STAFF WORK 4008 STAFF TOILET 4010 STORAGE 4009 I.T. 4011 PASSAGE 4012 STORAGE 4014 SOILED HOLDING 4013 BREAK ROOM 4015 STORAGE 4020 PHYS. WORK 4021 PASSAGE 4016PHYS. WORK 4017 EXAM 16 4026 EXAM 15 4027 STAFF TOILET 4018 COATS 4019 PHYS. WORK 4022 PHYS. WORK 4023 OFFICE 4024 CONFERENCE ROOM 4025 EXAM 13 4069 EXAM 14 4070 PASSAGE 4068 EXAM 11 4066 EXAM 12 4067 NURSE STATION 4030 PATIENT TOILET 4029 NURSE STATION 4028 NURSE STATION 4063 PASSAGE 4065 EXAM 10 4064 EXAM 9 4059 PASSAGE 4058 NURSE STATION 4060 PATIENT TOILET 4062 PASSAGE 4032 PASSAGE 4005 1 1/2" DHW 3" DCW2" DHWR 1 1/2" DHW 3" DCW2" DHWR 1 1/2" DHW 2" DHWR3" DCW 3" FP 1/2" DCW STAFF WORK 4031 STORAGE 4049A WC-3 WC-3 WC-3 WC-3 WC-3 WC-3 LAV- 3 LAV- 3 LAV- 3 LAV- 3 LAV- 3 SK- 1 SK- 1 SK- 1SK- 1 SK- 1SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1 SK- 1SK- 1 SK- 1 SK- 1 SK- 1 SK- 6 4 4 4 5 4 44 4 4 4 4 4 4 4 5 4 4 54 4 4 4 4 4 4 4 4 5 4 4 4 4 4 4 2 5 3 3 1 2" DCW 1 1/4" DHW 3/4" DHW 3/4" DHWR 1 1/4" DHW 3/4" DHW 2" DCW 1 1/4" DHW 1 1/4" DHW2" DCW 3/ 4 " D H W 2" DCW 3/4" DHWR WB-1 WB-1 SK- 1 LAV- 3 SK- 1 SK- 1 SK- 3 4 EEW-1 1 2" DCW 6 2" DCW 3/4" DCW 2" DCW 4 1 1/4" DCW 1 1/4" DHW 2" DCW 1 1/4" DHW 2" DCW 1" DCW 1" DHW 1" D H W 2" DCW1/2" DCW 1" DHW 1" DHW FIRE PROTECTION GENERAL NOTES: 1. THE EXISTING BUILDING HAS A SPRINKLER SYSTEM INSTALLED IN ALL AREAS. MODIFY EXISTING SPRINKLER HEADS, BRANCH MAINS & FEED MAIN PIPING AS REQUIRED TO ACCOMMODATE THE NEW FLOOR PLAN LAYOUT, REFLECTED CEILING LAYOUT, CEILING ELEVATION CHANGES, HVAC EQUIPMENT & DUCTWORK, ALL PIPING, AND ALL ELECTRICAL CONDUIT. 2. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING LAYOUT & ELEVATIONS. 3. SPRINKLER CONTRACTOR SHALL SCHEDULE SPRINKLER SHUTDOWN WITH OWNER IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATIONS & NOTIFY LOCAL FIRE DEPARTMENT OF SYSTEM & AREAS OUT OF SERVICE. GENERAL NOTES: 1. NOT ALL PLAN NOTES MAY BE USED ON SHEET. 2. NO PIPING SHALL PASS THROUGH ELECTRICAL ROOMS, ELEVATOR EQUIPMENT ROOMS, STAIR SHAFTS, ELEVATOR SHAFTS OR SIMILAR SPACES UNLESS SYSTEM SERVES SPACE. 3. PROVIDE TYPE "A" WATER HAMMER ARRESTORS ON DOMESTIC HOT AND COLD WATER PIPES SERVING FLUSH VALVES, ELECTRONIC FAUCETS AND ELSEWHERE SHOWN ON PLANS. LOCATE DOWNSTREAM OF SHUT-OFF VALVES SERVING FIXTURE OR GROUPS OF FIXTURES AND SHALL BE INSTALLED ABOVE ACCESSIBLE CEILING. 4. THE CONTRACTOR SHALL PIPE, COMPLETE AND MAKE OPERATIONAL EACH PLUMBING FIXTURE WITH WATER, WASTE AND VENT PIPES ACCORDING TO THE PLUMBING FIXTURE SCHEDULE. 5. IF A FIXTURE IS NOT INDICATED TO HAVE H&CW PIPE, W & V PIPE CONNECTED TO IT, IT SHALL BE PROVIDED AND INSTALLED. THE CONTRACTOR SHALL PROVIDE THE COST OF MATERIAL AND INSTALLATION OF THE PIPING WITHIN THEIR SCOPE OF THIS PROJECT. 6. VALVE TAGS WILL BE PLACED ON GRID FOR LOCATION OF VALVES. 7. PROVIDE THERMOSTATIC MIXING VALVE TO SERVE ANY EMERGENCY EYE WASH, EMERGENCY SHOWER REQUIRED. 9365 Counselors Row Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com CONNECTOR WOMEN'S CENTER KEYPLAN N POB 1 SCALE DATE COORD DRAWN APPROVED FILE NAME CLIENT NO. : PROJECT NO. TM WOMEN'S CENTER CARMEL, IN As indicated 04610082 04610082-MEP_BSALS_CENTRAL_v2012.rvt KPM LAP SAP P340.6 FOURTH FLOOR PLUMBING PLAN - BP6 0461 BP #6 DESIGN DOCUMENTS OCTOBER 10, 2014 1/8" = 1'-0"1 FOURTH FLOOR PLUMBING PLAN - BP6 MARKDATEDESCRIPTION #PLAN NOTES 1MODIFY EXISTING FP SYSTEM TO ACCOMMODATE THE NEW ARCHITECTURAL REFLECTED CEILING PLAN. 2NO PIPING ROUTED THROUGH THIS ROOM. 3CONNECT 2" DCW, 1-1/4" DHW, 3/4" DHWR TO EXISTING. DISCONNECT AND REMOVE PORTION OF DHW LOOP. 41/2" DHW & DCW DROP. 51-1/4" DCW DROP. 6ANY EXISTING DOMESTIC WATER PIPING OVER THIS ROOM SHALL BE RELOCATED. PROVIDE DRAIN PAN FOR EXISTING ROOF DRAINS ABOVE THIS ROOM.