Loading...
HomeMy WebLinkAboutP430.6.pdfD EX. 10. 1.5.6.7..9.11.12..13.14.15.. E 10 B A B.6 7 8 932 E16 E17E18 E15 A'' 2.3.8.16.17.18..4 20.19. A2 5.2 5.8 F 10.1 D.6 D.3 C.9 C.6 C.4 4 C D 1 9.5 65 10 B.6 7 8 932 A'' 5.2 5.8 A A2 B 9.11.12..13.14.7..6.5..41.E15 15..16.18. 41 4" S 2" V 2" V 4" S2" V 4" S2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V CO CO CO CO CO CO CO CO CO 2" S 4" S 2" S 4" S 4" S 2" S 4" S 4" S 4" S 4" S 4" S 2" S 2" S 2" S 2" S 3" S 2" S 2" S 2" S 2" S 3" S 2" S 4" S4" S 2" S 2" S 2" S 4" S 4" S 4" S 2" S 4" S 2" S 4" S 3" S 2" S 2" S 4" S 4" S 2" S 3" S 2" S 2" S 2 2 4" S 4" S 4" S 2 4 3 2 4 4 3 3 2 2 1 2 2 1 2 2 2 24 3 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 4 2 3 4 4" S 2" S 4" S 2 GENERAL NOTES: 1. NOT ALL PLAN NOTES MAY BE USED ON SHEET. 2. NO PIPING SHALL PASS THROUGH ELECTRICAL ROOMS, ELEVATOR EQUIPMENT ROOMS, STAIR SHAFTS, ELEVATOR SHAFTS OR SIMILAR SPACES UNLESS SYSTEM SERVES SPACE. 3. PROVIDE TYPE "A" WATER HAMMER ARRESTORS ON DOMESTIC HOT AND COLD WATER PIPES SERVING FLUSH VALVES, ELECTRONIC FAUCETS AND ELSEWHERE SHOWN ON PLANS. LOCATE DOWNSTREAM OF SHUT-OFF VALVES SERVING FIXTURE OR GROUPS OF FIXTURES AND SHALL BE INSTALLED ABOVE ACCESSIBLE CEILING. 4. THE CONTRACTOR SHALL PIPE, COMPLETE AND MAKE OPERATIONAL EACH PLUMBING FIXTURE WITH WATER, WASTE AND VENT PIPES ACCORDING TO THE PLUMBING FIXTURE SCHEDULE. 5. IF A FIXTURE IS NOT INDICATED TO HAVE H&CW PIPE, W & V PIPE CONNECTED TO IT, IT SHALL BE PROVIDED AND INSTALLED. THE CONTRACTOR SHALL PROVIDE THE COST OF MATERIAL AND INSTALLATION OF THE PIPING WITHIN THEIR SCOPE OF THIS PROJECT. 6. VALVE TAGS WILL BE PLACED ON GRID FOR LOCATION OF VALVES. 7. PROVIDE THERMOSTATIC MIXING VALVE TO SERVE ANY EMERGENCY EYE WASH, EMERGENCY SHOWER REQUIRED. 9365 Counselors Row Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com CONNECTOR WOMEN'S CENTER KEYPLAN N POB 1 SCALE DATE COORD DRAWN APPROVED FILE NAME CLIENT NO. : PROJECT NO. TM WOMEN'S CENTER CARMEL, IN As indicated 04610082 04610082-MEP_BSALS_CENTRAL_v2012.rvt KPM LAP SAP P430.6 THIRD FLOOR SANITARY PLAN - BP6 0461 BP #6 DESIGN DOCUMENTS OCTOBER 10, 2014 1/8" = 1'-0"1 THIRD FLOOR SANITARY PLAN - BP6 MARKDATEDESCRIPTION #PLAN NOTES 1CONNECT 4" S TO EXISTING S. 22" S UP. 33" S UP. 42" V UP.