Loading...
HomeMy WebLinkAboutVS Engineering/DOCS/Addl Serv 1/7000/W Carmel Drive Path{ 1 . VS Engineering, lnc1. DOCS - 2014 Appropriation, #43- 509.00; P.O. #32179 Contract. Not To Exceed $7, 000.00 ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PURCHASE OF GOODS AND SERVICES THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT ( "Agreement ") entered into by and between the City of Carmel and VS Engineering, Incl. (the "Vendor"), as City Contract dated December 19, 2013 shall amend the terms of the Agreement by adding the additional services to be provided by Vendor consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". Furthermore, the terms of the Agreerrment shall be amended to include the E- verify requirement as stated in Indiana Code §.22 -5 -1.7 etseq., which is attached hereto and incorporated herein as Exhibit "B ", as well as the required E- verify Affidavit, attached hereto and incorporated herein as Exhibit "G ". Also, pursuant to I.C. § 5 -22 -16.5, Vendor shall certify that in signing this document, it does not engage in investment activities within the Country of Iran. The terms and conditions of the Agreement,shall not otherwise be affected by this Additional Services Amendment and shall remain' ih full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA by and through its Board of Public Works and Safety VS Engineering, Incl. By: By: 3ames Brainard, Presidi g Officer nate: /Z 3 Mari M ry Ann Date: Lori S. Watsor 7Memmber Date: /` -]c3 /lV ' ATTEST: Diana Cordray, IAM%, /Date: i-)73// IS16a:pe[u'enot Svcs k cna. S,c IXJ SV014AVS 2 ring ,w,fl \n, Amme wfw Ii Vmrylatg en asp Bhagwan C. Patel, PE Printed Name Chairman Title FID/TIN: 35- 1494479 Last Four of SSN if. Sole Proprietor: Date: /O /23 /2 O /9- May-23, 2014 VS ENGINEERING, INC. Civil Structural • Transportation • Environmental Mr. Mike Hollibaugh Carmel, Indiana City Hall, One Civil Square Carmel, Indiana 46032 Re.: West Carmel Drive Path Project Additional Design Services Dear Mr. Hollibaugh: VS Engineering, Inc. is delighted to respond to your request for proposal for additional services for the West Carmel Drive Path Construction project. Please find enclosed for your review and consideration our design fee proposal for the project. I appreciate the opportunity extended by you and your staff in submitting this proposal and look forward to providing the highest caliber of professional services tothe City of Carmel. Respectfully Submitted, VS ENGINEERING, INC. 7 Brad S. Faris, P.E., L.S. Project Manager Enclosures 4275 North High School Road Indianapolis, Indiana 46254 (317) 293 -3542 Tel (317).293 -4737 Fax www.vsengineering.com Wt.) VS ENGINEERING, INC. •} I Civil • Structural • Transportation • Environmental Date of Proposal: Project Description: SCOPE OF SERVICES May 20, 2014 West Carmel Drive Path — Additional-Suniey Carrnel, Indiana VS ENGINEERING, INC. (VSEI) shall provide field surveying services for the above referenced project. VSEI shall furnish all labor, materials, and equipment to perform the surveying services described below for the fee identified below. Field Surveying Services BASIC SERVICES 1. VSE -shall survey the project location within the defined project limits to satisfactorily - complete the basic field survey.services described herein. VSE shall also provide one set of original field notes, all field survey data collected via electronic media, and one set of master drawings: VSE's work, shall be in accordance with Indiana Code (I.C. 25- 21.5); and Indiana. Administrative Code (865 I.A.C. 1 -12) 2. This Survey Scope does not include the preparation of a Location Control Route Survey (LCRS). In the event that right -of -way or easements will be purchased to sufficiently complete the project, a LCRS may be required to fully conform to 865 I.A.C. 1 -12. A. Supply electronic files including the following as directed by client: 1. Finished plan view of topographic survey in AutoCAD .dwg format 2. 1 -foot contours in either AutoCAD .dwg or format 3. TIN used to create contours as derived from Civil 3D 4. Electronic points, file in .txt coordinate format. 5. .Survey Book in .pdf format including: a. Horizontal and Vertical: Datum definition b. Level Notes and TBM descriptions c. Control Exhibit d. Utility Contact Information 4275 North High School Road Indianapolis, Indiana 46254 (317) 293 -3542 Tel (317) 293 -4737 Fax www.vsengi neering.corn EXHIBIT A t;,1 B: The signature, seal, and registration number of the land surveyor, registered in the State of Indiana, who was in responsible.charge of the survey, shall be affixed :to.thesurvey book submitted`(if necessary)'. 'In addition, VSEI shall complete the field survey as summarized below and as directed by the Client. The project area to be feld' surveyed is described as follows: Additional'Survey Limits.— See Attachment No. 1 Beginning approximately360 feet west of the centerline of 31:° Avenue SW, survey west approximately 670 feet. The width ofthe' survey will be "25 feet south of the south edge -of pavement of Carmel Drive. Total Survey'. includes-approximately 670 feet by ; approximately -25 •feet'wide adjacent to the' roadway. C. Obtain last deed of record, subdivision plats, and section or auditor plats for all properties within the project limits "from local and state agencies.. The property information shall include parcel number„ property owner's name, mailing address and property location. VS shall provide a listing of all property information, deeds, plats, and maps, D. Send out survey notices together with questionnaires (ifapplicable)`to all property owners within the project area All survey notices and questionnaires shall be approvedby'Client prior to distribution. E. Establish. PrimaryHorizontal Control within the project limits such that the survey base lines) can, be re-established during construction. A local ground coordinate system, will be established and tied to!the,East Zone of the Indiana State Plane Coordinate System, NAD83(2011) per the INDOT Survey Manual. F. Locate NGS, IDNR, Hamilton.County, or INDOT benchmarks and transfer elevation'.toihe site. Set temporary bench marks within the project limits suchthat elevatiohdatum can be re- established during construction. G. 'Tie in-the survey base lines to available USPLSS section corners and /or existing property /right- of- way monumentation. All necessary section corners will be located or re- established to adequately define property lines along the limits of the project. H. Re- establish existing roadway alignments from plans for previous projects: I. Plot right -of -way and property lines based on observed physical evidence and record documents acquired from local government agencies. Coordinate with all utility companiesto locate:and mark their utilities in field VS shall notify the utilities via the call before you dig notification system (Indiana Underground Plant Protection Service (I.U.P.P.S.)). VS shall verify that each utility has field located their facilities during the-course of the design survey. The existing facilities located, at the time of the field survey, shall be incorporated into the design survey. In addition, VS shall provide listing of all utilities and all information available for that utility including address, and telephone number. EXHFB,s-- 4 L_ � Ye )'•1- i r 202i K. Perform design survey in sufficient detail.to obtain topographic data, utilities, buildings, walls, walks, signs, vaults; and natural and man made features, as-evidenced by facilities at the,ground surface and Marks by others, necessary ` for the development of project plans,'including all potentially-affected trees, 6 inches in diameter and greater, identified by size. L. Take cross sections approximately every 50 feet across the right -of -way of public roadways and or the project limits (as described above) whichever is further out Additional cross sections shall be taken at intersection of streets, roads, railroads, driveways, etc. Obtain elevations of all existing structures such as drainage culverts, utilities and other structures. M. Indicate:spotelevations atall finish floors, at each threshold, building edges, insets and projections; exterior platforms, steps (top and bottom treads), corners building entrances, break in grade, ramps, area ways, tree grates, etc. within the project limits, and at top and bottom of curb. N. Provide a,listing of all symbols, notations and legends used in the field survey. VS shall furnish a hard copy together with all field survey information . collected on electronic media. VS -shall also prepare master drawings (1 -foot contours) from data collected in topographic survey using AutoCAD -Civil, 3D and.shall submit a hard copy together with electronic format. VS shall delineate and label the location of all buildings, structures, fences, railings, signs, walls, walks, paved areas, curbs and other permanent structures and existing improvements. VS shall outline allbuildirig edges; insets and projections, and belowgrade structures such as vaults, basements, and areaways' where applicable, as evidenced by facillties'at the ground surface and marks by others. 0. Prepare survey book with control information (datum definition, control point &:temporary benchmark locations,-etc.), utility contacts and other pertinent project survey information. J: \Survey\Proposals12013\VSE \Carmel Drive Path\Add'I Survey\Carmel Drive Path Add'l Survey.- :Survey.Scope.doc 3 0+ 7 Attachment No. 1 Add'I Survey Limits — Carmel Drive Page 1 of 1 Additional Survey Limits Original Survey Limits U t-Li\ It 'I of U= VS ENGINEERING, INC. 1 Date of Proposal: Civil • Structural • Transportation • Environmental SCOPE OF SERVICES May 22, 2014 Project Description: West Carmel Drive Path Carmel, Indiana Additional Services: VS Engineering has been asked to provide additional services as a part of the Carmel Drive Path Project. The additional services include path design,along the south side of Carmel drive from approximately 225 feet west of the intersection of Gradle Road eastward to approximately 380 feet west of the intersection of 3" Avenue SW. Total length of path is approximately 600 feet. The intent of this additional path design is to provide connectivity between the existing trail at each end of the design area. This segment of trail design will be incorporated into the trail plans for the proposed trail along the north side of Carmel Drive from Old Meridian to the Monon Trail. The project will utilize 100 %.Local funds. The intent of this trail project is to design and construct the proposed trail within the existing Right -of -Way. Design Services BASIC SERVICES Path Design A. Key elements to the design phase include the following: 1. Develop'Construction Plans 2. Design of new ADA compliant curb ramps; where required. 3. New 8 -10' path where sidewalk does not currently exist. 4. Design and construct the proposed trail within the existing right -of -way.. 5. Drainage design as required to perpetuate drainage. 6. Prepare with the necessary specifications and Quantity calculations and cost estimate will be'provided. B. Design Plans 1. The following design plan submissions will be made as part of this project: a. Preliminary Plans.(60 %) submittal to.the City of Carmel b. Final :Plars (95 %) submittal to the City of Carmel c. Tracings submittal to City of Carmel 4275 North High School Road Indianapolis, Indiana 46254 (317) 293- 3542 'Tel (317) 293 -4737 Fax www.vso-nginooring.com EXHIBIT A c,f-7 VS ENGINEERING MAN -HOUR FEE JUSTIFICATION BY CLASSIFICATION PROJECT: West Carmel Drive Path - Additional Survey Carmel, Indiana ATTACHMENT NO. 2 PAGE 1 OF 1 5/20/2014 tt _,. •ESTIMATED TIME _ Project - SurSeyorIL Party, • Survey •.;'Chief+ I- `' Tech II' . ,.. Totals Engineering: Survey -t'' i 590/person 1' I . Research t ... a,. . -. _ - - .. ,: i • C.;: _ :.I ` -: . , Auditor / Assessor Maps 2 N/A Subdivision Plats Owners Names and GIS Info Mailings 1 Deeds 2 Section Comer Ties N/A Plans Surveys ;3UtIlity;Coordination. ..., .. ,' ^r ... '::- ' 4 -1 ......, Locate Tickets 1 Follow - Up Verification 1 Vertical':Control * : =T ?n • &?s: . tr': ._. ...:d: ,,;+',•! s � . '.,n, Bench Level Circuit N/A N/A N/A N/A MHorizentel'Cootroh. ' -.. - T tit . — - - ..... ••• Main Line Traverse NIA Section (Grant) Comer Tie-In 8 Reference Property Comer Reconnaissance Y„' T opographyaElevations.'.:.ra,;.- ., .,,,, ^d,_y - Main Line .. .. .::: -,: .:.. ,. -,-1 r -r '... 6 6 Structure Details 3 3 tr:,Roete'. Survey :8'•Fleid!Book'P.reparation .'S:;7' ' -- ` . -.;;,:..; -• ,... xe -: ; t.• -; -: Alignment Calculation NIA Property Line Determination Topography (CAD Drawing) 2 5 1 Control Point References 8•TBM Descriptions N/A Route Survey N/A Field Book 2 4 a,Traveil e c .,. < " . .. r., - -`) r , '' ". e: ` .. -iS4 Travel Time 1 1 1 1 Total Hours 7 I 10 I 23 40 Average Weighted Hourly Rate 9 93:02 11 84,96 $ 59.20 Total Salary Cost S 651:140 849.60 $ 1,361.60 $ 2,862.34 Direct Cost (See below) $ 27.80 Total 5 2,89014 ErVgine'erinwSurvey Fee J. + >, .. ,. 1,:a.. , _� .. „_ ..` $i. `..- 2;800.00' DIRECT COSTS I UNIT COST I QUANTITY I COST Travel Mileage $0.445 mile 40 $ 17.80 Lodging (Per Person / Day) 590/person 5'' - i Per Diem (Per Person / Day) 526 /person 5 - Reproductions/Copies/Materials /Postage 1 LS 1 1 1 $ 10.00 TOTAL 15 27.80 EXHIBIT A G of-7 J: \SurveyProposals \20131VSE \Carmel Drive Path \Add'I Survey \Carmel Drive Path Add'i survey - Survey Fee.xls U VS ENGINEERING,, INC. -I- [ 11 Civil • Structural • Transportation • Environmental ADDITIONAL DESIGN SERVICES MANHOURS AND FEE JUSTIFICATION WEST CARMEL DRIVE - Old Meridian Street to Monon Trail CITY OF CARMEL, INDIANA Direct Labor TASK PROJECT MANAGER II ENGINEER III ENGINEER I CADD ':TECH II CADD . TECH I ' TOTAL Preliminary Design Plans 1 4 4 4 4 17 Preliminary Contract Documents Provided for in Original; Fee Proposal 0 Quantity Calculations and Preliminary Cost Estimate 1 2 2 5 Final Design Plans 1 2 2 2 4 11 Final Contract Documents Provided for in Original Fee Proposal 0 Rule 5'Erosion Control Plans & SWPPP 1 2 4 4 4 15 Meetings, Provided for in Original Fee Proposal 0 Bidding Phase Services Provided for in Original Fee Proposal 0 TOTAL LABOR HOURS 4 10 12 10 12 48 HOURLY BILLING. RATE $158.02 $110.77 $73.35 $72.60 $55.69 TOTAL $632.08 $1,107.70 $880.20 $726.00 '5668:28 DIRECT LABOR SUBTOTAL $4,014.26 Other Direct Costs a) Transportation: 1 Trips @ 40 miles @.$0.585 /mile b). Equipment Rental, Reproduction, Misc. Expense $23,40 $100.00 OTHER DIRECT COSTS SUBTOTAL TOTAL COST $123.40 $4,137.66 PROPOSED DESIGN SERVICES FEE $4,200.00 EXHIBIT