Loading...
HomeMy WebLinkAbout240268 12/16/14 a"!,cagy �i \. CITY OF CARMEL, INDIANA VENDOR: 068025 4i; ONE CIVIC SQUARE CROSSROAD ENGINEERS, PC CHECK AMOUNT: $**"61,866.00* a' 3417 S SHERMAN DR CHECK NUMBER: 240268 s.� ,?, CARMEL, INDIANA 46032 9M��TpN��` BEECH GROVE IN 46107 CHECK DATE: 12/16/14 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 1192 4350900 14883 3,050.00 OTHER CONT SERVICES 212 R4462865 25294 14894 46,787.00 ILL ST EXT PHASE 2 2200 R4340100 31850 14896 1,020.00 ON CALL ENGINEER 912 4462300 31844 14897 7,859.00 EMERSON DRIVE DRAINAG 211 R4462300 31845 14907 3,043.39 2014 DRAINAGE PLAN 2200 R4462000 31845 14907 106.61 2014 DRAINAGE PLAN i loll 727 02 - � • N ���� Cross Road Engineers, PC G 2� 3417 Sherman Drive o- Beech Grove, IN 46107 317-780-1555 P.O. 3185 U City of Carmel Invoice number 14896 Jeremy Kashman 2200 — R43L}ol oo Date 12/03/2014 1 Civic Square Carmel, IN 46032 Project CITY OF CARMEL-ON CALL ENGINEERING AND INSPECTION SERVICES For services performed November 1,2014 through November 28,2014. PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with Agreement for Professional Services dated March 27,2013 and approved May 1,2013. Appropriation#202-4340100 ASA#10 PO 31850 106th St Trail-Jumper Lane Parcel Professional Fees Billed Hours Rate Amount Director Billable Time 1.00 135.00 135.00 106th St Trail-CTRWD parcel Professional Fees Billed Hours Rate Amount CADD Technician Billable Time 6.00 80.00 480.00 General Misc.Management Professional Fees Billed Hours Rate Amount Project Engineer Billable Time 4.50 y 90.00 405.00 meeting to discuss Windemere and other projects Invoice total 1,020.00 City of Carmel Invoice number 14896 Invoice date 12/03/2014 Page 1 of 2 City of Carmel Invoice number 14896 Project CITY OF CARMEL-ON CALL ENGINEERING AND INSPECTION SERVICES Date 12/03/2014 Than Y' u! c r r Chip Charl P. E. President I� City of Carmel Invoice number 14896 Invoice date 12/03/2014 Page 2 of 2 lr JLA @J 10(1972737 00 CrossRoad Engineers, PC ` �G 2 49 3417 Sherman Drive Beech Grove, IN 46107 317-780-1555 City of Carmel F 31 8 4-4 Invoice number 14897 Jeremy Kashman Date 12/03/2014 1 Civic Square °+12 o u (0 2- Carmel, Carmel, IN 46032 Project LITTLE COOL CREEK DRAINAGE IMPRVMTS.&EMERSON DR .NEIGHBORHOOD DRAINAGE STUDY For services performed November 1,2014 through November 28,2014. PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract dated May 1,2013 and ASA#11 approved August 6,2014. PO#31844 Topographic Survey Professional Fees Billed Hours Rate Amount Survey Manager 5.00 110.00 550.00 Crew Chief 37.50 80.00 3,000.00 Field Man 56.50 60.00 3,390.00 Assistant Survey Manager 4.50 80.00 360.00 Professional Fees subtotal 103.50 7,300.00 Reimbursables Billed Units Rate Amount Miles 282.00 0.50 141.00 Phase subtotal 7,441.00 Drainage Analysis and Report Professional Fees Billed Hours Rate Amount Director 3.00 135.00 405.00 Reimbursables Billed Units Rate Amount Miles 26.00 0.50 13.00 Phase subtotal 418.00 Invoice total 7,859.00 City of Carmel Invoice number 14897 Invoice date 12/03/2014 Page 1 of 2 City of Carmel Invoice number 14897 - Project_ LITTLE COOL CREEK DRAINAGE IMPRVMTS.&EMERSON DR.NEIGHBORHOOD DRAINAGE STUDY Date 12/03/2014 Tha Y u! Chip Char President i City of Carmel Invoice number 14897 Invoice date 12/03/2014 Page 2 of 2 eV d INA 1% rav CrossRoad Engineers, PC ®E`v 3417 Sherman Drive Beech Grove, IN 46107 317-780-1555 P.O, 3►g tF S City of Carmel Invoice number 14907 Jeremy Kashman 211�R HH 102 3 00 3 ,n t+3. 39 Date 12/03/2014 1 Civic Square 220 o-R L4 H 62-00 1 0 to. Co 1 Carmel, IN 46032 Project CITY OF CARMEL-2014 ON-CALL PLAN REVIEW For services performed November 1,2014 through November 28,2014. PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract dated May 1,2013 and ASA#7 dated February 14,2014 and ASA#9 dated May 21,2014. ASA#7 PO#31902 ASA#9 PO#31836 ASA#12 PO#31845 General Plan Review Professional Fees Billed Hours Rate Amount Senior Project Manager Billable Time 6.50 120.00 780.00 Project Engineer Billable Time 4.00 90.00 360.00 Inglenook, Section 1C Phase subtotal 1,140.00 1800 106th Street Professional Fees Billed Hours Rate Amount Project Engineer Billable Time 2.50 90.00 225.00 Ashmoor-14060014 SP Professional Fees Billed Hours Rate Amount Project Engineer Billable Time 1.00 90.00 90.00 City of Carmel Invoice number 14907 Invoice date 12/03/2014 Page 1 of 2 City of Carmel Invoice number 14907 Project CITY OF CARMEL-2014 ON-CALL PLAN REVIEW Date 12/03/2014 Children's Learning Adventure-14100017 DP Professional Fees Billed Hours Rate Amount Project Engineer Billable Time 6.50 90.00 585.00 Kroger J959 Carmel Expansion Concept Professional Fees Billed Hours Rate Amount Senior Project Manager Billable Time 1.00 120.00 120.00 Project Engineer Billable Time 3.50 90.00 315.00 Phase subtotal 435.00 Lakeside Apartments-14040026 TAC Professional Fees Billed Hours Rate Amount Project Engineer Billable Time 1.50 90.00 135.00 Mayflower Park DC-14100016 DP Professional Fees Billed Hours Rate Amount Project Engineer Billable Time 3.00 90.00 270.00 Silvara,Section 1 B Professional Fees Billed Hours Rate Amount Project Engineer Billable Time 1.50 90.00 135.00 Tallyn's Ridge Primary Plat-14050019 PP Professional Fees Billed Hours Rate Amount Project Engineer Billable Time 1.50 90.00 135.00 Invoice total 3,150.00 Thank Y 1 Chip Charle P. ( r President City of Carmel Invoice number 14907 Invoice date 12/03/2014 Page 2 of 2 • IZP Na CrossRoad Engineers, PCS 3417 Sherman Drive Beech Grove, IN 46107 317-780-1555 `eLz9LC,'J City of Carmel Invoice number 14894 Jeremy Kashman P O 2`'2q`F Date 12/03/2014 1 Civic Square 2 12-RN L4 Carmel, IN 46032 Project ILLINOIS STREET PROJECT 10-10 For services performed November 1, 2014 through November 28,2014. PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our proposal dated September 16,2013 and our Agreement for Professional Services dated November 20,2013: PO#25294 Inspection Professional Fees Billed Hours Rate Amount Director 34.00 135.00 4,590.00 CADD Manager 5.00 90.00 450.00 Project Inspector 302.00 85.00 25,670.00 Resident Project Representative 139.00 105.00 14,595.00 Reimbursables Billed Units Rate Amount Miles 2,964.00 0.50 1,482.00 Phase subtotal 46,787.00 Invoice total 46,787.00 Than] ou! J Chip Chari P. E. President City of Carmel Invoice number 14894 Invoice date 12/03/2014 Pagel 4 Illinois Street Protect 10-10 Inspection Date Range from:11/1/2014 to 11/28/2014 Work In Progress p Employee/Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeofff Dane Snyder 146.00 146.00 Billable Time 146.00 146.00 Date Total Billed WIPTotal Billable Deferred Hold Non Billable Writeoff 11/3/2014 9.50 9.50 11/4/2014 7.00 7.00 11/5/2014 10.00 10.00 11/6/2014 10.00 10.00 11/7/2014 3.50 3.50 11/7/2014 4.00 4.00 11/11/2014 9.00 9.00 11/12/2014 10.00 10.00 11/13/2014 11.00 11.00 11/14/2014 8.00 8.00 11/17/2014 8.00 8.00 11/18/2014 8.00 8.00 11/19/2014 6.50 6.50 11/20/2014 9.50 9.50 11/21/2014 8.00 8.00 11/24/2014 9.00 9.00 11/25/2014 8.00 8.00 11/26/2014 7.00 7.00 Justin M.Schneck 156.00 156.00 Billable Time 156.00 156.00 Date Total Billed WIP Total Billable Deferred . Hold Non Billable Writeoff 11/3/2014 9.00 9.00 11/4/2014 10.00 10.00 11/512014 10.50 10.50 11/6/2014 9.00 9.00 11/7/2014 8.00 8.00 11/10/2014 8.00 8.00 11/11/2014 8.00 8.00 11/12/2014 10.00 10.00 11/13/2014 10.00 10.00 11/14/2014 10.00 10.00 �Illinois Street Project 10-10�Y�^ Inspection Date'Range from:11/1/2014 to.11/28/2014 Work In Progress Employee/Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff 11/17/2014 8.00 8.00 11/18/2014 8.50 8.50 11/19/2014 7.00 7.00 11/20/2014 5.50 5.50 11/21/2014 10.50 10.50 11/24/2014 8.00 8.00 11/25/2014 8.00 8.00 11/26/2014 8.00 8.00 Lance A.Stahley 139.00 139.00 Billable Time 139.00 139.00 Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff 11/3/2014 8.00 8.00 11/3/2014 1.00 1.00 11/4/2014 8.00 8.00 11/4/2014 1.00 1.00 11/5/2014 8.00 8.00 11/5/2014 2.00 2.00 11/6/2014 8.00 8.00 11/6/2014 2.00 2.00 11/7/2014 8.00 8.00 11/7/2014 1.00 1.00 11/11/2014 9.00 9.00 11/12/2014 9.00 9.00 11/13/2014 10.00 10.00 11/14/2014 9.00 9.00 11/19/2014 9.00 9.00 11/20/2014 10.00 10.00 11/21/2014 11.00 11.00 11/22/2014 8.00 8.00 11/24/2014 8.00 8.00 11/25/2014 9.00 9.00 Robert A.Percifield 5.00 5.00 Billable Time 5.00 5.00 Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff jlllinoisStreet Project 10-10 Inspection i i } j Date Range from:11/1/2014 to 11/28/2014 Work In Progress !Employee/Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff 11/14/2014 2.00 2.00 11/17/2014 1.00 1.00 11/18/2014 2.00 2.00 Trent E.Newport 34.00 34.00 Billable Time 34.00 34.00 Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff 11/3/2014 2.00 2.00 11/4/2014 2.00 2.00 11/5/2014 2.00 2.00 11/6/2014 2.00 2.00 11/7/2014 2.00 2.00 11/10/2014 1.00 1.00 11/11/2014 2.00 2.00 11/12/2014 1.00 1.00 11/13/2014 2.00 2.00 11/14/2014 4.00 4.00 11/17/2014 2.00 2.00 11/18/2014 2.00 2.00 11/19/2014 2.00 2.00 11/20/2014 2.00 2.00 11/21/2014 2.00 2.00 11/24/2014 2.00 2.00 11/25/2014 2.00 2.00 Total _ 480.00 480.00 Illinois St. Inspection Phase Mileage ® . . o s Inspection 2,964.00 1,482.00 11/03/14 Illinois Street Project 10-10 Inspection Dane Snyder _ Mileage 64.00 32.00 ✓ 11/03/14 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 47.00 23.50 ✓ 11/03/14_ _Illinois Street Project 10-10 Inspection Justin Schneck Mileage 61.00 30.50 ✓_ 11/04/14 _ Illinois Street Project 10-10 Inspection Lance Stahley Mileage 46.00 23.00 ✓ __ + 11/04/14 Illinois Street Project 10-10 Inspection Mileage 60.00 30.00 ✓ _ 11/04/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 28.00 14.00 ✓ 11/04/14 Illinois Street Project 10-10 Inspection _Dane Snyder_ Mileage _ 73._00 36.50 �✓ 11/05/14 Illinois Street Project 10-10 Inspection _ Justin Schneck Mileage 28.00 14.00 ✓_ 11/05/14 Illinois Street Project 1040 Inspection - Dane Snyder_ Mileage 62.00 _ 31.00 ✓ 11/05/14 Illinois Street Project.10-10 Inspection Lance Stahley Mileage 56.00 28.00 ✓ 11/06/14 Illinois Street Project 10-10 Inspection Lance Stahley Mileage _37.00 18.50 ✓ 11/06/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage _ 61.00 _ 30.50 _ ✓�� 11/06/14 Illinois Street Project 10-10 Inspection Dane Snyder - Mileage 66.00 33.00 ✓ - 11/07/14 Illinois Street Project 10-.10 Inspection Dane Snyder Mileage 61.00__ 30.50 ✓ 11/07/14 r Illinois Street Project 10-10 Inspection _ Justin Schneck _ Mileage _ 61.00 30.50 ✓ 11/07/14 Illinois Street Project 10-10 Inspection Lance Stahley _ Mileage 46.00 23.00 ✓M 11/10/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage .67.00 33.50 ✓�__ 11/11/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 64.00 32.00 ✓ �- 11/11/14 Illinois Street Project 10-10 Inspection Lance Stahley Mileage47.00 23.50 _ �✓ 11/11/14 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 65.00 32.50 ___ ✓ 11/12/14 Illinois Street Project 10-10 Inspection, Dane Snyder Mileage 63.00 31,50 ✓ _ _ 11/12/14 Illinois Street Project 10-10 Inspection _ Lance Stahley Mileage 39.00 19.50 ✓ 11/12/14 Illinois Street Project 10-10 Inspection Justin Schneck _Mileage 61.00 30.50 _ _ ✓ 11/13/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 61.00 30.50 ✓ ��� 11/13/14 Illinois Street Project 10.10 Inspection Lance Stahley Mileage 48.00 24.00 ✓ _ 11/13/14 Illinois Street Project 10-10 Inspection Dane Snyder Mileage62.00 31.0_0 ✓ 11/14/14 �Illinois_Street_Project 10-10 Inspection Mileage - 67.00 33.50 ✓ -- y�11/_p14/14 Illinois Street Project 10-10 Inspection Y ection Snyder g� Milea e 68.00 0 34.0 _ ProJ _ _ _ _ Dane Sn_ _ ✓ __ _ 11/14/14 Illinois Street Project 10-10 _ Inspection Lance Stahley - Mileage 39.00 m19.50 ✓ 11/14/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 61:00 30.50 ✓ 11/17/14 Illinois Street Project 10-10 Inspection_ Justin Schneck Mileage 61.00 30:50 ✓ ..._.___..... 11/17/14 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 63.00 31.50 ✓ 11/18/14 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 60.00 30.00 ✓ • 0 ' 8 i B Owl e • e 8 8 8 8 w 11/18/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 28.00 14.00 ✓ 11/19/14 _ Illinois Street Project 10-10Inspectionµ Justin Schneck M � Mileage 61.00 30.50 ✓��~ 11/19/14 _ Illinois Street Project 10-10 Inspection � Dane Snyder � �Mileage58.00 29.00 µ ✓ 11/19/14 _ Illinois Street Project 10-10 Inspection N �Lance Stahley Mileage _ X43.00 21.50 ✓ 11/20/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage _ 61.00 30.50 ✓ 11/20/14_ Illinois Street Project 10-10 Inspection Lance Stahley Mileage_ 56.00 28.00 v ✓ 11/20/14 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 67.00 33.50 ✓ 11/21/14 Illinois Street Project 10.-10 Inspection '. Dane Snyder Mileage 68.00 34.00 11/21/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage_ 61.00 30.50 ✓ 11/21/14 Illinois Street Project 10-10 Inspection Lance Stahley_ Mileage 54.00 27.00 ✓ 11/21/14 Illinois Street Project 10-10 Inspection _ Mileage ~ 66.00 33.00 _ ✓_ ~ 11/22/14 Illinois-Street Project 10-10 Inspection Lance Stahley Mileage 43.00 21.50 11/24/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 6_1.00 30.50 ✓ 11/24/14 Illinois Street Project 10-10 Inspection Lance Stahley Mileage _ 46.00 23.00 m✓ ____ 11/24/14 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 62.00 31.00 ✓�� �� 11/25/14 Illinois Street Project 10-10 Inspection. Dane Snyder Mileage 60.00 30.00_ ✓ 11/25/14 Illinois Street Project 10-10 Inspection Lance Stahley Mileage _ 29.00 14.50 ✓ , 11/25/14 Illinois Street Project 10-10 Inspection Justin Schneck w� Mileage 61.00 30.50 ✓ 11/26/14 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 67.00 _33.50 ✓ _ 11/26/14 Illinois Street Project.10-10 Inspection Dane Snyder Mileage 59.00 29.50 ✓ __ 2,964.00 1,482.00 1 Prescribed by State Board of Accounts City Form No.201(Rev.1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Crossroad Engineers Purchase Order No. 3417 Sherman Drive Terms Beech Grove, IN 46107 Date Due Invoice Invoice Description Date Number (or note attached invoice(s)or bill(s) Amount 12/3/2014 14896 On-call engineering and inspection $ 1,020.00 12/3/2014 14897 Little Cool Creek Drain. Imp.&Emerson Dr.Study $ 7,859.00 12/3/2014 14907 2014 On-call plan review $ 3,043.39 12/3/2014 14907 2014 On-call plan review $ 106.61 12/3/2014 14894 Project 10-10 Illinois Street $ 46,787.00 Total $ 58,816.00 1 hereby certify that the attached invoice(s), or bill(s), is (are)true and correct and I have audited same in accordance with IC 5-11-10-1.6. ,20 Clerk-Treasurer VOUCHER NO WARRANT NO. Crossroad Engineers ALLOWED 20 3417 Sherman Drive IN SUM OF$ Beech Grove, IN 46107 $ 58,816.00 ON ACCOUNT OF APPROPRIATION FOR Board Members PO#or INVOICE NO. ACCT#/TITLE AMOUNT DEPT# I hereby certify that the attached invoice(s), or 31850 14896 - 2200-R4340100 $ 1,020.00 bill(s) is (are)true and correct and that the materials or services itemized thereon for 31844 14897 912-4462300 $ 7,859.00 which charge is made were ordered and 31845 14907 211-R446230 $ 3,043.39 received except 31845 14907" 2200-R44620 $ 106.61 25294 14894 212-R4462865 $ 46,787.00 12/13/2014 Signature City Engineer Cost Distribution ledger classification if Title claim paid motor vehicle highway fund 6- IALA 6.15L 4 Cross Road Engineers, PC ,s— 3417 Sherman Drive Beech Grove, IN 46107 317-780-1555 City of Carmel Department of Community Services Invoice number 14883 David Littlejohn Date 12/03/2014 One Civic Square Carmel, IN 46032 Project MONON DETOUR 96TH AND COLLEGE For services performed November 1,2014 through November 28,2014. PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our email proposal dated September 28,2014 and approved September 30,2014. Amount Survey Contract Amount 2,250.00 Percent Complete 100.00 Total Billed 2,250.00 Current Billed 2,250.00 Sidewalk Easement plat and description Contract Amount 1.00 800.00 Percent Complete 100.00 Total Billed 1.00 800.00 Current Billed 1.00 . 800.00 Total 3,050.00 Invoice total 3,050.00 Aging Summary Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120 14883 12/03/2014 3,050.00 3,050.00 Total 3,050.00 3,050.00 0.00 0.00 0.00 0.00 City of Carmel Department of Community Services Invoice number 14883 Invoice date 12/03/2014 Pagel VOUCHER NO. WARRANT NO. ALLOWED 20 Cross Road Engineers, P.C. IN SUM OF$ 3417 Sherman Drive Beech Grove, IN 46107 $3,050.00 ON ACCOUNT OF APPROPRIATION FOR ; Carmel DOCS PO#/Dept. INVOICE NO. ACCT#/TITLE AMOUNT Board Members 1192 I 14883 I 43-509.00 I $3,050.00 1 hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except Friday, December 12, 2014 zcv Director Title Cost distribution ledger classification if claim paid motor vehicle highway fund Prescribed by State Board of Accounts City Form No.201(Rev.1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service,where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Purchase Order No. Terms Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 12/03/14 14883 Sidewalk easement $3,050.00 I hereby certify that the attached invoice(s), or bill(s), is(are)true and correct and I have audited same in accordance with IC 5-11-10-1.6 20 Clerk-Treasurer