HomeMy WebLinkAboutE&B Paving/ENG/CO7/ 6,650/illinois street.4; CITY OF CARMEL TO: Lisa Scott Engineering Admininstration City of Carmel Indiana One Civic Square Carmel, IN 46032 I. CONTRACT CHANGE ORDER NO.: 7 DATE: February 6, 2015 PROJECT NAME: Illinois Street Extension CITY REQ. NO.: CITY PO NO.: CITY PO DATE: You are directed to make the following changes in this Contract: Carmel #11 -09 a. Final Balancing Change Order to final project pay item #0086. Additional payment was made for changing a light fixture to LED at 116th and Springrnill and installing the last light pole on the NE corner of 111th and Illinois Street. ITEM AMOUNT ( +) OR ( -) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order Contract Price will be increased/decreased by this Change Order New Contract Price including this Change Order Contract Time prior to this Change Order Days 6/1/2013 Net increased /decreased resulting from this Change Order 0 Current Contract Time including this Change Order Days 6/1/2013 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. $ 3,967,517.24 $ 6,650.00 $ 3,974,167.24 Completion Date Days Completion Date The Above Changes Are Recommended American Structurepoint, Inc. ENGINEER 7260 Shadeland Station Address Indianapolis, IN 46256 City /State /Zip By: Phone: 3/7 z /6.//s- Date: The Above Changes Are Accepted E &B Paving Co., Inc. CONTRACTOR 17042 Middletown Avenue Address Noblesville, IN 46060 City /State /Zip B Phone:3 /7- 771 —YR3 a Z -G --/5. Date: Approved ames Brainard, Mayor eI Airigrn) A b - i urke Lori'Wat AT ember, Member Lana Cordr, Date: / y, C reasurer Contract Modification City of Carmel 2/6/2015 12:38 PM FieldManager 4.5a Contract: _Carmel 11 -09, Illinois Street Extension Cont. Mod. Number 7 Revision Number Cont. Mod. Date 2/6/2015 Net Change $6,650.00 Awarded Contract Amount $3,846,602.01 Route Contract Location Short Description Balancing Change Order Description of Changes Balance of pay item #0086 for additional payment made for decorative lighting work on the SE corner of 116th Street and Spring Mill Road and NE corner of 111th Street and Illinois Street. Increases / Decreases Project: 11 -09, Illinois Street Extension Category: 1, Base Bid CNST Item Description Item Code Prop.Ln. Item Type Unit Quantity Chg. Unit Price Dollar Value Decorative Street Lighting, Wiring and _0372 0086 ORIGINAL EACH 0.700 9,500.00000 $6,650.00 Installation Reason: Payment made for installation of decorative lighting on NE corner of 111th and Illinois and change to LED fixture on SE corner of 116th and Spring Mill. Subtotal for Category 1: Subtotal for Project 11 -09: FEDERAL PARTICIPATION - ACTION BY F.H.W.A. $6,650.00 $6,650.00 Approved Not Eligible _See Letter Dated (Signature) (Date) Contract: _Carmel 11 -09 Cont. Mod.: 7 Page 1 of 1