HomeMy WebLinkAboutOLCO/ENG/CO2/Main Street PathContract No:R -36869 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Contract Information Change Order No.: 002 Page: 1 Contract No.: R -36869 Letting Date:08/06/2014 District:GREENFIELD DISTRICT AE:Nierman, Chad Change Order Information Change Order No.: 002 Date Generated: 02/02/2015 Date Approved: 00 /00 /0000 Reason Code: CHANGED COND, Materials Related Description: REVISED TREE SIZES Original Contract Amount $ 821,339.94 Current Change Order Amount $ 0.00 Total Previous Approved Changes $ 0.00 Total Change To -Date $ 0.00 Modified Contract Amount $ 821,339.94 Time Extension Information Date Initiated 00/00 /0000 Original Contract Time Time Element Description: Current Time Extension Previous Time Approved Revised Contract Time Date Completed 00 /00 /0000 PE /S:Gregg, Michael Status:Draft EWA: Y or Force Acct: N Percent: 0.000 % Percent: 0.000 % Percent: 0.000 % SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SP Date 00/00 /0000 or SP Days (SS = Standard Specification, SP = Special Provision) SS Days 0 SP Days 0 SP Days Value $ 0.00 SS Days by AE: DCE: ._ - SCE: DDCM: SS Days SP Days Value $ SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00 /00 /0000 or SP Days 0 Contract No:R -36869 Change Order No.: 002 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Page: 2 Review and Approval Information Required Approval Authority AE: DCE: SCE: * DDCM: ($ per Change Order) (- LE $ 250K -) (- LE $ 750K -) ( -- LE $ 2 M - -) ( -- GT $ 2 M -- ) (Days per Contract) (50 SS days) ( 100 SS days) ( 200 SS Days) (GT 200 SS days) Verbal Approval Required? Y / N If Y, by Date Issued Total Change To- Date >5 %? Y / N If Y , Copy to Program Budget Manager Scope /Design Recommendation Y / N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y / N If Y, Date to LPA Date Returned FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -36869 Change Order No:002 INDIANA. Department of Transportation Date :02/03/2015 Pager 3 Contract: R -36869 Project: 1383166 - State:138316600LC3 Change Order Nbr: 002 Change Order Description: REVISED TREE SIZES Reason Code: CHANGED COND, Materials Related CLN • PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change 0044 1383166 0044 622 -05649 EACH 307.000 - 68.000 C Amount:$ - 20,876.00 Item Description: PLANT, DECIDUOUS TREE, SINGLE STEM, 1.25 TO 2 IN Supplemental Descriptionl: Supplemental Description2: 0074 1383166 0073 622 -05650 EACH 614.000 34.000 Item Description: PLANT DECID TREE SINGLE STEM 2 -2.5 IN Supplemental Descriptionl: Supplemental Description2: C Amount:$ 20,876.00 Total Value for Change Order 002 = $ 0.00 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation THE CONTRACT HAD ORIGINAL BID ITEM NO. 44 - PLANT, DECIDUOUS TREE, SINGLE STEM, 1.25 TO 2.0 IN., WITH A QUANTITY OF 68.0 EACH AT 307.00 DOLLARS. THE CITY OF CARMEL'S FORESTER STATED THAT THEIR STANDARD IS NORMALLY A 2. 5 IN. CALIPER TREE. HE ALSO DID NOT SEE TOO MANY PLACES TO PLANT THE ORIGINAL PLANNED 68.0 TREES ON THE JOBSITE. AT A REQUEST FROM THE CITY FORESTER, IT WAS DECIDED TO INCREASE THE CALIPER OF TREES AND PLANT FEWER TREES FOR THE SAME MONEY. THIS IS A ZERO DOLLAR CHANGE, ONLY A CHANGE IN MATERIAL. ITEM NO 72 PLANT DECIDUOUS TREE, SINGLE STEM, 2.0 TO 2.5 IN, IS BEING CREATED WITH A QUANTITY OF 32:0 EACH AT 614.00 DOLLARS TO REPLACE THE PLANNED ITEM NO. 44. l{ Change Order Explanation for Specific Line Item 9,ie. It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. L Contractor.. U L_ ( f Date: ol/ C , Jib I S / Signed By: NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Board of Public Works and Safety: 3- -`f -/5 Mayor James Brainard Date Member OP atson Attest: Date Date 3 /445- Diana L. Cordray, Clerk Treasurer Date Contract No:R -36869 INDIANA Change Order No:002 Department of Transportation (SIGNATURE) APPROVED FOR LOCAL PUBLIC AGENCY ec (TITLE) (DATE) Date:02/03/2015 Page: 4 (TITLE) (DATE) **.kIrker***IrJr*******-■,.t**ir*****,rk-*********************Ir*IF****Irk*Yr*** .,t*IFIHF.HrIrirOnFInF*11rirkkirlren*rtHefrir****.Yrir*}nt PE/S Approval Level SUBMITTED FOR CONSIDERATION APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Name of Approver Date Status