Loading...
HomeMy WebLinkAboutE310.5.pdf.. J J J J J J J J J J J J J J J J J GENERAL NOTES: A. REFER TO BP5 SHEET E001.5 FOR ELECTRICAL SYMBOLS AND ADDITIONAL GENERAL NOTES. B. REFER TO HPE, H, AND P SERIES DRAWINGS FOR ADDITIONAL INFORMATION AND ELECTRICAL SCOPE. E B.6 732 A'' 5.2 5.8 A A2 B 9. 11. 12.. 7.. 6. 5. .4 1. E15 E14 41 SHELL COFFEE 1LN4 DISPLAY AREA 1501 FITTING 1505 STORAGE 1506 FITTING 1507 STORAGE 1508 BOUTIQUE 1500 CASHIER 1503 BUS. OFFICE 1504 STORAGE 1502 COMMUNITY/ CONFERENCE ROOM 1700 SHELL SPACE 1600 SHELL SPACE 1800 MSWB1 REF +44" GFCI +36" +36" +28" REF +44" GFCI +24" MICRO GFCI 1 PRINT 2 2 2 16 6 6 6 6 14 14 14 12 12 12 12 12 8 8 8 +30" +30" +30" 10 10 4 10 10 2 22 22 20 28 28 28 28 28 8 6 4 DW GD 4 10 GFCI +46" 24 5 7 28 26 8 3 OFFICE 1202 CONSULTATION 1201 WAITING 1200 13 36 18 30 18 18 36 36 36 36 30 30 30 11 20 11 12 +24"+30" +24" 10 14 TYP. +18" GFCI GB 6 TB-1-114 7.5KW 9 24 24 24 24 28 28 9365 Counselors Row Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com CONNECTOR WOMEN'S CENTER KEYPLAN N SCALE DATE COORD DRAWN APPROVED FILE NAME CLIENT NO. : PROJECT NO. TM WOMEN'S CENTER CARMEL, IN As indicated 04610082 04610082-MEP_BSALS_CENTRAL_v2012.rvt BDH TMH JCP E310.5 FIRST FLOOR POWER PLAN 0461 BP #5 DESIGN DOCUMENTS SEPTEMBER 12, 2014 PLAN NOTES 1 CONNECT RECEPTACLES IN THIS AREA TO 20A, 1P, 120 VAC CIRCUIT SHOWN FROM PANEL "1LN3." 2 CONNECT RECEPTACLES IN THIS AREA TO 20A, 1P, 120 VAC CIRCUIT SHOWN FROM PANEL "1LN2." 3 MOTORIZED PROJECTION SCREEN RECESSED ON CEILING. CONNECT COMPLETE TO 20A, 1P, 120 VAC CIRCUIT BREAKER "1LN2-2" WITH THREE BUTTON (UP/DOWN/STOP) CONTROLLER MOUNTED ON WALL. MOUNT CONTROLLER AT +46" A.F.F. 4 CONNECT GARBAGE DISPOSAL TO 20A, 1P, 120 VAC CIRCUIT SHOWN THROUGH WALL MOUNTED CONTROL SWITCH. MOUNT CONTROL SWITCH AT +46" A.F.F ABOVE COUNTER. LABEL CONTROL SWITCH "GARBAGE DISPOSAL." COORDINATE EXACT LOCATION OF ROUGH-IN WITH PLUMBING TRADE. ROUTE CONDUIT FROM NEAREST WALL TO UNDER FLOOR SLAB TO DEVICE LOCATION. SAW CUT FLOOR AS REQUIRED. 5 CONNECT COOK-TOP-OVEN TO 50A, 2P, 208 VAC CIRCUIT "1LN2-10,12" WITH FEEDER SIZE 3/4"C, 2#6 + 1#10 GROUND. ALSO PROVIDE 50A, 2P, 208 VAC SHUNT TRIP BREAKER MATCHING TO EXISTING IN SPACE MADE AVAILABLE IN PANEL "1LN2." REMOVE 20A, 1P, 120 VAC BREAKERS FROM PANEL "1LN2" TO ACCOMMODATE TWO POLE SHUNT TRIP BREAKER. ROUTE CONDUIT FROM NEAREST WALL TO UNDER FLOOR SLAB TO DEVICE LOCATION. SAW CUT FLOOR AS REQUIRED. SHUNT TRIP BREAKER SHALL BE ACTIVATED BY HEAT DETECTOR IN THE HOOD. USE CIRCUIT "1LN2-34" FOR POWER TO SHUNT TRIP. 6 CONNECT DISH WASHER TO 20A, 1P, 120 VAV CIRCUIT "1LN2-16." 7 CONNECT SELF CONTAINED HOOD TO 20A, 1P, 120 VAC CIRCUIT "1LN2-18." COORDINATE EXACT LOCATION OF ROUGH-IN IN FIELD. 8 PROVIDE DUPLEX RECERPTACLE RECESSED IN CEILING FOR VIDEO PROJECTOR AND CONNECT COMPLETE TO CIRCUIT SHOWN. COORDINATE EXACT LOCATION OF RECEPTACLE WITH ARCHITECURAL CEILING GRID. 9 TERMINAL BOX. PROVIDE CONNECTION OF 480V, 3PH, 3W CIRCUIT INDICATED TO 30A, 3P CB IN PANEL 1HN2- 8,10,12 WITH FEEDER SIZE F30. REFER TO H SERIES DRAWINGS FOR TERMINAL BOX LOCATIONS AND QUANTITIES. ALSO REFER TO DETAIL ON E800. 10 CONNECT GARBAGE DISPOSAL TO 20A, 1P, 120 VAC CIRCUIT SHOWN THROUGH PUSH BUTTON CONTROL SWITCH MOUNTED ON THE COUNTER. LABEL CONTROL SWITCH "GARBAGE DISPOSAL." COORDINATE EXACT LOCATION OF PUSH BUTTON CONTROL SWITCH WITH PLUMBING TRADE. ALSO PROVIDE GFCI DUPLEX RECEPTACLE BELOW SINK FOR POWER TO GARBAGE DISPOSAL THROUGH POWER MODULE. REFER TO DETAIL A ON SHEET P310.5 FOR ADDITIONAL SCOPE OF WORK. 11 PROVIDE TWO GANG BOX AND 1"C WITH INSULATED BUSHING AND PULL STRING FROM WALL BOX TO ABOVE CEILING JUNCTION BOX LOCATED NEAR VIDEO PROJECTOR FOR DATA REQUIREMENTS. 12 BUILT-IN CONVECTION WALL OVEN MOUNTED UNDER COOK TOP OVEN. CONNECT COMPLETE TO 30A, 2P, 208 VAC CIRCUIT "1LN2-(30,32) WITH FEEDER SIZE 3/4"C, 2 # 10 + 1 # 12 GROUND. ALSO PROVIDE 30A, 2P, 208 VAC BREAKER MATCHING TO EXISTING IN SPACE MADE AVAILABLE IN PANEL "1LN2". REMOVE EXISTING 20A, 1P, 120 VAC BREAKER FROM PANEL TO ACCOMMODATE NEW BREAKER. COORDINATE LOCATION OF ROUGH-IN IN FIELD. ROUTE CONDUIT FROM NEAREST WALL TO UNDER FLOOR SLAB TO DEVICE LOCATION. SAW CUT FLOOR AS REQUIRED. 13 CONNECT RECEPTACLES IN THIS AREA TO CIRCUIT SHOWN FROM PANEL "1LN4." 14 ROUTE CONDUIT FROM NEAREST WALL TO UNDER FLOOR SLAB TO DEVICE LOCATION. SAW CUT FLOOR AS REQUIRED. 1/8" = 1'-0" 1 FIRST FLOOR POWER PLAN MARK DATE DESCRIPTION