Loading...
HomeMy WebLinkAboutP310.5.pdfD EX. 1. 5. 6. 7.. 9. 11. 12.. E B A B.6 732 E16 E17 E18 E15 A'' 2. 3. 8. .4 A2 5.2 5.8 F G D.6 D.3 C.9 C.6 C.4 4 C D 1 9.6 C D E B A B.6 E16 E17 E18 E15 1. 5. 6. 7.. 9. 11. 12.. A'' 2. 3. 8. 10. .4 A2 5.2 5.8 F G C.9 C.6 C.4 D.3 D.6 E B.6 732 A'' 5.2 5.8 A A2 B 9. 11. 12.. 7.. 6. 5. .4 1. E15 G F 41 FUTURE CAFE 1400 SHELL SPACE 1600 FITTING 1505 STORAGE 1506 FITTING 1507 BUS. OFFICE 1504 CASHIER 1503 SHELL SPACE 1800 COMMUNITY/ CONFERENCE ROOM 1700 DISPLAY AREA 1501 STORAGE 1508 WAITING 1200 OFFICE 1202 CONSULTATION 1201 FUTURE PHARMACY 1300 1 1/2" DHW 1" DHWR 3" DCW 1 1/2" DHW 1" DHWR 3" DCW 2" D H W 4" D C W 1 1 / 2 " D H W R SK- 2 WB-1 SK- 1 3/4" DCW 5 4 SK- 5 FWG-1 5 7 1" DHW 1" D H W 1" DHW 1" DHW 1" DHW 4 6 4 8 1" D C W 3/4" DHWR 9 9 1" DCW 2" DCW 2" V P310.5 A Sim 2" S 2" V 2" V 4" S 4" S 4" S 4" S 4" S 4" S 4" S 2" S 3" ST 2" S 4" S 4" S 4" S 2" S 3" S 4" S 2" S 6" ST 6" ST 6" ST 1 4" S 3 3 2 2" V 2" V 10 3/ 4 " D C W 1" DHW 1/2" DHWR 1" D H W 1" D H W 2" D C W 10 GENERAL NOTES: 1. NOT ALL PLAN NOTES MAY BE USED ON SHEET. 2. NO PIPING SHALL PASS THROUGH ELECTRICAL ROOMS, ELEVATOR EQUIPMENT ROOMS, STAIR SHAFTS, ELEVATOR SHAFTS OR SIMILAR SPACES UNLESS SYSTEM SERVES SPACE. 3. THE CONTRACTOR SHALL PIPE, COMPLETE AND MAKE OPERATIONAL EACH PLUMBING FIXTURE WITH WATER, WASTE AND VENT PIPES ACCORDING TO THE PLUMBING FIXTURE SCHEDULE. 4. IF A FIXTURE IS NOT INDICATED TO HAVE H&CW PIPE, W & V PIPE CONNECTED TO IT, IT SHALL BE PROVIDED AND INSTALLED. THE CONTRACTOR SHALL PROVIDE THE COST OF MATERIAL AND INSTALLATION OF THE PIPING WITHIN THEIR SCOPE OF THIS PROJECT. 5. VALVE TAGS WILL BE PLACED ON GRID FOR LOCATION OF VALVES. 6. PROVIDE THERMOSTATIC MIXING VALVE TO SERVE ANY EMERGENCY EYE WASH, EMERGENCY SHOWER REQUIRED. WALL OUTLET POWER MODULE DISPOSER PUSH BUTTON FAUCET COUNTER FIRE PROTECTION GENERAL NOTES: 1. THE EXISTING BUILDING HAS A SPRINKLER SYSTEM INSTALLED IN ALL AREAS. MODIFY EXISTING SPRINKLER HEADS, BRANCH MAINS & FEED MAIN PIPING AS REQUIRED TO ACCOMMODATE THE NEW FLOOR PLAN LAYOUT, REFLECTED CEILING LAYOUT, CEILING ELEVATION CHANGES, HVAC EQUIPMENT & DUCTWORK, ALL PIPING, AND ALL ELECTRICAL CONDUIT. 2. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING LAYOUT & ELEVATIONS. 3. SPRINKLER CONTRACTOR SHALL SCHEDULE SPRINKLER SHUTDOWN WITH OWNER IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATIONS & NOTIFY LOCAL FIRE DEPARTMENT OF SYSTEM & AREAS OUT OF SERVICE. FLOOR LOOP VENT ABOVE FLOOD RIM OF FIXTURE(6" MIN) PIPE SLEEVE; REFER TO PIPE PENETRATION DETAIL FOR SEALING REQUIREMENTS (DETAIL "E" ON SHEET P800.3) P-TRAP WASTE LINE WASTE LINE ROUTE VENT TO LOCATION SHOWN ON PLAN SK-1 4" S 4" V 4" S 2" V 2" V 2" V 2" S 4" S 4" S SK-5 SK-2 2" V 2" V 2" V 2" V 2" S 2" S 4" S 4" S 4" S CO 2" V 2" V FWG-1 2" S 2" V 9365 Counselors Row Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com CONNECTOR WOMEN'S CENTER KEYPLAN N POB 1 SCALE DATE COORD DRAWN APPROVED FILE NAME CLIENT NO. : PROJECT NO. TM WOMEN'S CENTER CARMEL, IN As indicated 04610082 04610082-MEP_BSALS_CENTRAL_v2012.rvt KPM SAP SAP P310.5 FIRST FLOOR PLUMBING PLAN - BP5 0461 BP #5 DESIGN DOCUMENTS SEPTEMBER 12, 2014 1/8" = 1'-0" 1 FIRST FLOOR PLUMBING PLAN - BP5 # PLAN NOTES 1 CONNECT 2" DCW, 1" DHW, 1/2" DHWR TO EXISTING DCW, DHW, DHWR. 2 CONNECT 2" DCW, 1" DHW, 3/4" DHWR TO EXISTING DCW, DHW, DHWR. 3 CONNECT 2" V TO EXISTING V. 4 MODIFY EXISTING FP SYSTEM TO ACCOMMODATE THE NEW ARCHITECTURAL REFLECTED CEILING PLAN. 5 1/2" DHW & DCW DROP. 6 1/2" DCW, DWH DN. PROVIDE POINT OF USE GREASE INTERCEPTOR SIMILAR TO JAY R SMITH MODEL 8007. PLACE UNIT UNDER COUNTER AND CONNECT COMPLETE. 7 1/2" DCW, DHW UP TO ISLAND SINK. 8 PROVIDE SINK TOP SWITCH FOR ISLAND SINK. REFER TO DETAIL "A". 9 2" V DN. 10 2" DCW CAPPED FOR FUTURE CONNECTION. NO SCALE A PUSH BUTTON GARBAGE DISPOSAL DETAIL NO SCALE B ISLAND VENT PIPING DETAIL .Sanitary Riser Diagram BP5 (Boutique) .. Sanitary Riser Diagram BP5 (Community Room) MARK DATE DESCRIPTION