HomeMy WebLinkAboutP310.5.pdfD EX.
1. 5. 6. 7.. 9. 11. 12..
E
B
A
B.6
732
E16
E17 E18
E15
A''
2. 3. 8. .4
A2
5.2 5.8
F
G
D.6
D.3
C.9
C.6
C.4
4
C
D
1
9.6
C
D
E
B
A
B.6
E16
E17 E18
E15 1. 5. 6. 7.. 9. 11. 12..
A''
2. 3. 8. 10. .4
A2
5.2 5.8
F
G
C.9
C.6
C.4
D.3
D.6
E
B.6
732
A''
5.2 5.8
A
A2
B
9. 11. 12.. 7.. 6. 5. .4 1. E15
G
F
41
FUTURE CAFE
1400 SHELL SPACE
1600
FITTING
1505
STORAGE
1506
FITTING
1507
BUS. OFFICE
1504
CASHIER
1503
SHELL SPACE
1800
COMMUNITY/
CONFERENCE
ROOM
1700
DISPLAY AREA
1501
STORAGE
1508
WAITING
1200
OFFICE
1202
CONSULTATION
1201
FUTURE
PHARMACY
1300
1 1/2" DHW
1" DHWR 3" DCW 1 1/2" DHW
1" DHWR 3" DCW
2"
D
H
W
4"
D
C
W
1
1
/
2
"
D
H
W
R
SK- 2
WB-1
SK- 1
3/4" DCW 5
4
SK- 5
FWG-1
5
7
1" DHW
1"
D
H
W
1" DHW
1" DHW
1" DHW
4
6
4
8
1"
D
C
W
3/4" DHWR
9
9
1" DCW
2" DCW
2"
V
P310.5
A Sim
2"
S
2" V
2"
V
4" S
4"
S
4" S
4" S 4" S
4"
S
4"
S
2"
S
3" ST
2" S
4"
S
4" S
4"
S
2" S
3" S
4"
S
2" S
6" ST 6" ST 6" ST
1
4" S
3
3
2
2" V
2" V
10
3/
4
"
D
C
W
1" DHW
1/2" DHWR
1"
D
H
W
1"
D
H
W
2"
D
C
W
10
GENERAL NOTES:
1. NOT ALL PLAN NOTES MAY BE USED ON SHEET.
2. NO PIPING SHALL PASS THROUGH ELECTRICAL ROOMS, ELEVATOR EQUIPMENT
ROOMS, STAIR SHAFTS, ELEVATOR SHAFTS OR SIMILAR SPACES UNLESS SYSTEM
SERVES SPACE.
3. THE CONTRACTOR SHALL PIPE, COMPLETE AND MAKE OPERATIONAL EACH
PLUMBING FIXTURE WITH WATER, WASTE AND VENT PIPES ACCORDING TO THE
PLUMBING FIXTURE SCHEDULE.
4. IF A FIXTURE IS NOT INDICATED TO HAVE H&CW PIPE, W & V PIPE CONNECTED TO IT,
IT SHALL BE PROVIDED AND INSTALLED. THE CONTRACTOR SHALL PROVIDE THE
COST OF MATERIAL AND INSTALLATION OF THE PIPING WITHIN THEIR SCOPE OF THIS
PROJECT.
5. VALVE TAGS WILL BE PLACED ON GRID FOR LOCATION OF VALVES.
6. PROVIDE THERMOSTATIC MIXING VALVE TO SERVE ANY EMERGENCY EYE WASH,
EMERGENCY SHOWER REQUIRED.
WALL OUTLET
POWER
MODULE
DISPOSER
PUSH BUTTON
FAUCET
COUNTER
FIRE PROTECTION GENERAL NOTES:
1. THE EXISTING BUILDING HAS A SPRINKLER SYSTEM INSTALLED IN ALL AREAS.
MODIFY EXISTING SPRINKLER HEADS, BRANCH MAINS & FEED MAIN PIPING AS
REQUIRED TO ACCOMMODATE THE NEW FLOOR PLAN LAYOUT, REFLECTED CEILING
LAYOUT, CEILING ELEVATION CHANGES, HVAC EQUIPMENT & DUCTWORK, ALL PIPING,
AND ALL ELECTRICAL CONDUIT.
2. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING LAYOUT &
ELEVATIONS.
3. SPRINKLER CONTRACTOR SHALL SCHEDULE SPRINKLER SHUTDOWN WITH OWNER
IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATIONS & NOTIFY LOCAL FIRE
DEPARTMENT OF SYSTEM & AREAS OUT OF SERVICE.
FLOOR
LOOP VENT ABOVE FLOOD RIM
OF FIXTURE(6" MIN)
PIPE SLEEVE; REFER TO PIPE PENETRATION
DETAIL FOR SEALING REQUIREMENTS
(DETAIL "E" ON SHEET P800.3)
P-TRAP
WASTE LINE
WASTE LINE
ROUTE VENT TO
LOCATION SHOWN ON PLAN
SK-1
4" S
4" V
4" S
2" V
2" V
2" V
2" S
4" S
4" S
SK-5
SK-2
2" V
2" V
2" V 2" V
2" S
2" S
4" S 4" S
4" S
CO
2" V
2" V
FWG-1 2" S
2" V
9365 Counselors Row
Indianapolis, IN 46240-1478
ph 317.819.7878 fx 317.819.7288
www.bsalifestructures.com
CONNECTOR
WOMEN'S
CENTER
KEYPLAN
N
POB 1
SCALE
DATE
COORD
DRAWN
APPROVED
FILE NAME
CLIENT NO. :
PROJECT NO.
TM
WOMEN'S CENTER
CARMEL, IN
As indicated
04610082
04610082-MEP_BSALS_CENTRAL_v2012.rvt
KPM
SAP
SAP P310.5
FIRST FLOOR
PLUMBING PLAN -
BP5
0461
BP #5 DESIGN
DOCUMENTS
SEPTEMBER 12, 2014
1/8" = 1'-0" 1 FIRST FLOOR PLUMBING PLAN - BP5
# PLAN NOTES
1 CONNECT 2" DCW, 1" DHW, 1/2" DHWR TO EXISTING DCW, DHW, DHWR.
2 CONNECT 2" DCW, 1" DHW, 3/4" DHWR TO EXISTING DCW, DHW, DHWR.
3 CONNECT 2" V TO EXISTING V.
4 MODIFY EXISTING FP SYSTEM TO ACCOMMODATE THE NEW
ARCHITECTURAL REFLECTED CEILING PLAN.
5 1/2" DHW & DCW DROP.
6 1/2" DCW, DWH DN. PROVIDE POINT OF USE GREASE INTERCEPTOR SIMILAR
TO JAY R SMITH MODEL 8007. PLACE UNIT UNDER COUNTER AND CONNECT
COMPLETE.
7 1/2" DCW, DHW UP TO ISLAND SINK.
8 PROVIDE SINK TOP SWITCH FOR ISLAND SINK. REFER TO DETAIL "A".
9 2" V DN.
10 2" DCW CAPPED FOR FUTURE CONNECTION.
NO SCALE A PUSH BUTTON GARBAGE DISPOSAL DETAIL
NO SCALE B ISLAND VENT PIPING DETAIL
.Sanitary Riser Diagram BP5 (Boutique)
.. Sanitary Riser Diagram BP5 (Community Room)
MARK DATE DESCRIPTION