Loading...
HomeMy WebLinkAboutLS.1 Life Safety Plan.PDFProject Number: Revisions: Drawn By Checked ByIssue Date James Robert Stutzman, AIA, NCARB Architecture / Project Management: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: Sheet Title: Project: Developer: By: UN I T E D F I D E L I T Y B A N K Ca r m e l , In d i a n a 4 6 0 3 2 Ca r m e l C i t y C e n t e r - B l d g A 72 0 S . R a n g e L i n e R o a d , S u i t e 1 4 0 COPYRIGHT & OWNERSHIP OF DOCUMENTS N D N M M M M M M M M MM M M M M M M M M M M M M M M M M M M TRASH DISP.DA3 Mtr R m 1A - 2 ( A 1 4 8 ) StairSA4 ElevEA12 StairSA3 ElevEA6 StairSA5 StairSA1 ElevEA9 ElevEA8 ElevEA1 StairSA2 StairSA6 ElevEA11 ELEVEA4ELEVEA5 ElevEA3 ElevEA2 ElevEA7 ElevEA10 THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPY RIGHT 2015 JAMES R. STUTZMAN, AIA, Carmel, Indiana. KEY PLAN PEDCOR DESIGN GROUP LS.1 Life Safety Plan AJR MC2/11/2015 STATE RELEASE SET: 02/11/2015 SUITE 140 N R.6 Plaza P111 Color Concrete Paving.bpn PLAZA RA N G E L I N E R O A D BE BE BE PE BE BE PE & BE PE BE PLAZA BUILDING A BUILDING B BE SCALE: 1" = 20' 2 PHASE I LIFE SAFETY PLAN LS.1 WALL TYPES-FIRE RATINGS 1 HOUR RATED 2 HOUR RATED 3 HOUR RATED EGRESS PATH EXITS AND LOCATIONS BE PE PARKING EXIT BUILDING EXIT OP ORIGINATION POINT CARMEL CITY CENTER -PHASE 1 BUILDINGS 2. HORIZONTAL FIRE SEPARATIONS: ! ASSEMBLIES SEPARATING THE GARAGE PARKING LEVEL AND FIRST FLOOR OF BUILDINGS ABOVE IS THREE HOURS(3HRS.) ! ASSEMBLIES SEPARATING THE GARAGE PARKING LEVEL AND PLAZA ABOVE IS ONE AND ONE HALF HOUR (1 1/2 HR.) ! ASSEMBLIES SEPARATING THE FIRST FLOOR OF BUILDINGS AND SECOND FLOOR ABOVE IS TWO HOURS (2 HRS). CONSTRUCTION DESIGN RELEASE SHELL & CORE PROJECT NUMBER: 317796 RELEASE DATE: 06.19.07 2 HR. RATED. 2 HR. RATED. UNITED FIDELITY BANK BLDG A 1ST FLR ATM LOCATION