HomeMy WebLinkAbout4110S404.pdf41
1
0
S
4
0
4
.
d
w
g
MA
R
C
H
2
,
2
0
1
5
4110
ISSUED FOR 50 %
ISSUED FOR REDLINE REVIEW
RECORD DRAWINGS
ISSUED FOR PERMIT
KICK OFF MEETING
FINAL APPROVED PLAN
ISSUED FOR BID
GETGO, LLC.
--
KAB
3550
THE BRIDGES
CARMEL, INDIANA
03/03/15
02/25/15
03/03/15
--
01/23/15
--
03/03/15
TFB
S404
S404
20
3/4" = 1'-0"
SECTION
3/3/15
S404
21
3/4" = 1'-0"
SECTION
4'-0"
3'
-
6
"
M
I
N
.
ELEV. FIN. GRADE
(SEE ARCH. DWGS.)
EXTERIOR PAVEMENT
(SEE ARCH. DWGS.)
1/2" ISOLATION JOINT
CONC. SLAB-ON-GRADE
HSS COLUMN
1/2" ISOLATION JOINT
(SEE SCHEDULE)
(ALL AROUND)
CONC. SPREAD FTG.
(SEE SCHEDULE)
20"x20" CONC. PIER
REINF. W/ (4) #5 DOWELS
& #3 CLOSED TIES @ 8" O.C.
FOOTING REINF.
(SEE SCHEDULE)
ELEV. T/FTG
(SEE PLAN)
ELEV. T/PIER
(SEE SCHEDULE)
CONCRETE FILL
SE
E
SC
H
E
D
U
L
E
4" MASONRY VENEER
(SEE ARCH. DWGS.)
1'-2"OUT FACE
OF VENEER
1'-8"2'-4"
10"
ELEV. T/ MASONRY
(SEE ARCH. DWGS.)
STONE SILL
(SEE ARCH. DWGS.)
2x4 WOOD STUDS
(SEE ARCH. DWGS.)
WALL CLADDING
(SEE ARCH. DWGS.)
SEE SCHEDULE
3'
-
6
"
M
I
N
.
ELEV. FIN. GRADE
(SEE ARCH. DWGS.)
EXTERIOR PAVEMENT
(SEE ARCH. DWGS.)
1/2" ISOLATION JOINT
CONC. SLAB-ON-GRADE
HSS COLUMN
1/2" ISOLATION JOINT
(SEE SCHEDULE)
(ALL AROUND)
CONC. SPREAD FTG.
(SEE SCHEDULE)
20"x20" CONC. PIER
REINF. W/ (4) #5 DOWELS
& #3 CLOSED TIES @ 8" O.C.
FOOTING REINF.
(SEE SCHEDULE)
ELEV. T/FTG
(SEE PLAN)
ELEV. T/PIER
(SEE SCHEDULE)
CONCRETE FILL
SE
E
SC
H
E
D
U
L
E
4" MASONRY VENEER
(SEE ARCH. DWGS.)
1'-10"OUT FACE
OF VENEER
6"
10"
ELEV. T/ MASONRY
(SEE ARCH. DWGS.)
STONE SILL
(SEE ARCH. DWGS.)
2x4 WOOD STUDS
(SEE ARCH. DWGS.)
WALL CLADDING
(SEE ARCH. DWGS.)
4" SOLID CMU
3
12" CMU
(GROUT SOLID)
#5 DOWELS
@ 48" O.C.
PIER PLAN
VERT. DOWELS
20"x20"
CONC. PIER
CLOSED TIES
PIER PLAN
VERT. DOWELS
20"x20"
CONC. PIER
CLOSED TIES