Loading...
HomeMy WebLinkAbout003_C100_Site Preparation Plan.PDF(c ��.) i ----- ----- --------�- _------�� � � � �X ��� �.�o� 3 w ��,o� � � � �� � � ' #� � �, I � I � i�l � �� � � I� 1 p � � �v�i�� ,h'`•�^� �� �, ���� ,�� , � , � �� ,�. � x� i �� � (Asphalt) ���� � � �� X � �� � � � �� �� �o. � � �� ��• � �� � �,,� � � I ��,�sl c� �O i� � � X SITE PREPARATION PLAN SCALE: 1 " = 3 0 ' 0' 15' 30' 60' SCALE: 1 " = 3 0' NORTH 6' temporary chain link fence � �6' temporary chain link fence I I � , J �0 PREPARATION PLAN NOTES CO CONSTRUCTION LIMIT LINE LO LIMIT OF PROPOSED THEATER BUILDING. OP PROTECT EXISTING CONSTRUCTION OR UTILIN TO REMAIN. SO TIE BACK RETAINING WALL SHORING. ALTERNATE BID N0. 1. PREPARATION GENERAL NOTES 1. ALL MATERIAL EXCEPT THAT BELONGING TO A PUBUC OR PRNATE UTILITY COMPANY SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL NOTIFY THE OWNERS OF WATER, ELECTRIC, OR GAS MEfERS (UNLESS OTHERWISE NOTED) WHEN THE METERS ARE READY FOR REMOVAL, AND SHALL BE RESPONSIBLE FOR DISCONNECTING ALL UTIUTIES IN COMPLIANCE WITH LOCAL REQUIREMENTS. 2. THE EXISTING UTILIIY LOCATIONS ARE APPROXIMATE AND BASED ON THE BEST AVAILABLE INFORMATION. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING THESE LOCATIONS AND ANY DAMAGE WHICH IS DONE TO SAID UTILITIES. 3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO STUDY THE PLANS AND VISIT THE SITE TO DEfERMINE THE ITEMS THAT MUST BE REMOVED TO COMPLY WITH THE SITE DEVELOPMENT PLANS. NO EXTRA FEE WILL BE PAID FOR THE REMOVAL OR RELOCATION OF ANY ITEM NOT LISTED THAT IS VISIBLE UPON A SITE VISIT. THE DEMOLITION LEGEND AND NOTES ARE INTENDED TO SIMPLIFY THE DRAWINGS, AND DOES NOT GUARANTEE THAT ALL ITEMS ARE ADDRESSED. 4. REMOVE FROM SITE DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS IN A LEGAL MANNER. 5. NO BURNING OF ANY MATERIAL, DEBRIS, OR TRASH ONSITE WILL BE ALLOWED, D(CEPT WHEN ALLOWED BY APPROPRIATE GOVERNING AUTHORITY AND OWNER. IF ALLOWED AS STATED ABOVE, BURNING SHALL BE PERFORMED IN A MANNER PRESCRIBED BY GOVERNING AUTHORITY. ATfEND BURNING MATERIALS UNTIL FlRES HAVE BURNED OUT AND HAVE BEEN COMPLEfELY EXTINGUISHED. 6. TRANSPORT MATERIALS REMOVED FROM DEMOUSHED STRUCTURES WITH APPROPRIATE VEHICLES AND DISPOSE OF OFFSITE TO AREAS APPROVED FOR DISPOSAL BY GOVERNING AUTHORITIES AND APPROPRIATE PROPERTY OWNERS. 7. CONTRACTOR IS RESPONSIBLE TO OBTAIN ALL DEMOLITION PERMITS. 8. STRIP TOPSOIL FROM ALL AREAS TO BE DISTURBED BY CONSTRUCTION OPERATIONS OR MATERIAL STORAGE. 9. ALL D(ISTING SITE IMPROVEMENTS MUST BE REMOVED FROM THE SITE. PRIOR TO CONSTRUCTION THE DEMOLITION CONTRACTOR IS TO NOTIFY THE ENGINEER WHO PREPARED DEMOUTION DOCUMENT IF THERE ARE ANY DISCREPANCIES. 10. THE CONTRACTOR SHALL TAKE EXTREME CARE TO AVOID DISRUPTING THE EXISTING BUILDINGS AND RELATED BUSINESSES ADJACENT TO THE SITE. 11. THE CONTRACTOR SHALL CONFIRM THE EXTENTS OF EXISTING UTILITIES ON THE SITE AND ENSURE THAT THE WORK SHOWN ON THESE PLANS WILL NOT ADVERSELY AFFECT UTILITIES AND DRAINAGE PIPES SERVING OTHER BUILDINGS IN THE VICINITY OF THIS SITE. 12. REMOVAL OF THE EXISTING ASPHALT PAVEMENT INDICATED IN THE PROPOSED PAVED AREAS SHALL INCLUDE ALL AGGREGATE BASE MATERIALS. SAW CUT AREAS CLEAN, NEAT, AND TRUE TO LINE SO NO CHIPPING OR BREAKING OF THE D(ISTING PAVEMENT OCCURS. LEGEND ___________�___ �,---------- _ PROPERTY LINE CONSTRUCTION LIMIT LINE EXISTING MINOR CONTOUR LINE TO CHANGE EXISTING MAJOR CONTOUR LINE TO CHANGE EXISTING MINOR CONTOUR LINE (UNCHANGED) EXISTING MAJOR CONTOUR LINE (UNCHANGED) EXISTING SPOT ELEVATION TO CHANGE EXISTING SPOT ELEVATION (UNCHANGED) EXISTING STORM SEWER ____ -______= s� _____ _____ _____ EXISTING SANITARY SEWER W/STRUCTURE - - - - - - �E - - - - - - uE - EXISTING BURIED ELECTRIC - - - - - - oET - - - - - - oET - EXISTING OVERHEAD ELECTRIC�TELEPHONE - - - - - - uT - - - - - - uT - EXISTING BURIED TELEPHONE ------�------�— EXISTING GAS MAIN -----� EXISTING WATER MAIN -- EXISTING STORM PIPING TO BE REMOVED ������������ (Asphalt) �� EXISTING PAVING TO BE REMOVED AS NOTED �������� ��` \ HOLEY MOLEY SAYS, "DON'T DIG BLIND" _ � 1-800-382-5544 CALL TOLL FREE 1-800-428-5200 FOR CALLS OUTSIDE OF INDIANA Owner: CARMEL THEATER DEVELOPMENT COMPANY 11711 North Pennsylvania Street, Suite 200 Carmel, Indiana 46032 317.573-6050 Architect: � ��; � PEDGOR DESIGN GROUP Architecture / Project Management: 355 City Center Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) Engineer: CS� Architects ARCHITECTURE • INTERIOR DESIGN 280 East 96th Street, Suite 100 • Indianapolis, Indiana 46240 Main 317.848.7800 • Fax 317.574.0957 • csoinc.net OFFICE BLDG.7-C-2 PARKING GARAGE 7-C-3 7-C-4 E.C. 7-C-11 � ♦ �-� ! i�, A / \ � �I �l ��I� Pro�ect. COPYRIGHT & OWNERSHIP OF DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTIDN TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATIDN IN DER�GATI�N OF COMMON LAW COPYRIGHT,INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS, ALL INFORMATIDN CONTAINED HEREIN CONSTITUTES THE �RIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. ND PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING �R BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED,COPIED, EXHIBITED,PHOTOGRAPHED,PUBLISHED,MODIFIED OR OTHERWISE DISTRIBUTEDIN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GRDUP, LLC, c COPYRIGHT 2006, 2007, 2008, 2009 JAMES R. STUTZMAN, AIA, INDIANAPOLIS. BID SET rin a e Sheet Issue Date 12/22/09 Drawn By Checked By KIRT GSS Last Revision Date: O O O O O O Project Number: Parcel 7C-1 Sheet Title: SITE PREPARATION PLAN Sheet Number: