Loading...
HomeMy WebLinkAbout101_M202 (Const Issue 7-22-2010).PDFO SHEET KEYNOTES 1• 68/24 SA DUCT FROM ABOVE DROP IN 48/36 HORIZONTAL. 2• 60/24 RA DUCT DROP IN BULKHEAD. 3• 48/24 RA DUCT FROM BELOW. 4• 30/24 RA DUCT FROM BELOW. 5. 46/36 RA DUCT FROM LEVEL ABOVE, CONTINUE DOWN. 6. 40/24 RA DUCT DOWN. CAP DUCT TOP. 7• 48/16 SA DUCT FROM ABOVE DROP IN 48/36 HORIZONTAL. 8. 24/24 SA DUCT FROM ABOVE TRANSIT TO 36/24 AND DROP IN 48/36 HORIZONTAL. 9• 16/10 SA DUCT DOWN. 10. 16/60 SA DUCT UP. 11. 12/10 SA DUCT DOWN. 12• 12/12 SA DUCT DOWN. 13. 14/16 SA DUCT UP & DOWN. 14. 14/14 SA DUCT UP & DOWN. 15. 18/10 RA DUCT FROM BELOW. 16. 32/16 SA DUCT DOWN. 17• 16/16 SA DUCT DOWN. 18• INSTALL 68' LONG SLOT DIFFUSER FOR RETURN AIR INTO THE ACOUSTICAL LEDGE PLENUM. 19. OPEN TO BELOW. 20. TROLLEY BEAM ABOVE. 21. MOUNT VFD ON AHU. 22• PROVIDE FLEX CONNECTION BETWEEN PLENUM BOX AND BRANCHES (TYP.). 23• INSTALL 40/24 DUCT AS HIGH AS POSSIBLE ABOVE CEILING. 24• COVER DUCT OPENING PER DETAIL 9/M501. 25. TC PANEL FOR AHU—A. 26. TC PANEL FOR AHU—B. 27. TC PANEL FOR AHU—C. HVAC SECON D FLOOR - C4NTROL LEVEL PLAN SCALE: 1 /8" = 1'-0" 0 4' 8' 16' ��� � a v'������� , �� � � ����������r�m*�� � � �� � �`� � � �: ��� , � �.� � � � � Owner: CARMEL THEATER DEVELOPMENT COMPANY 11711 North Pennsylvania Street, Suite 200 Carmel, Indiana 46032 317.573-6050 Architect: � � � : �.� ; � PEDCOR DESIGN GROUP Architecture / Project Management: 355 City Center Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) Engineer: L'AC UIS CONSULTING ENGINEERS 9229 DELEGATES ROW, SUITE 550 INDIANAPOLIS, IN 46240 317.706.2075 WWW.LACQUIS.COM OFFICE BLDG.7-C-2 PARKING GARAGE 7-C-3 7-C-4 E.C. ---- 7-C-11 KEY PLAN �� �� Project: r 1 V � ti J M W � U Z � � �� Q c� � N � � � M � C� � O z � � � � � � W v� .. W � — Z ._ � m � — o � � �� J � c� W w '— � � � � _ -- � �C � � � Q m o z � U O � U � w `� a� C� � Q� J J � COPYRIGHT & OWNERSHIP OF DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL, ITS SUBMISSION AND DISTRIBUTIDN TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATIDN IN DEROGATIDN OF COMMON LAW COPYRIGHT,INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS, ALL INFORMATIDN CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC, NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED,COPIED, EXHIBITED,PHOTOGRAPHED,PUBLISHED,MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R, STUTZMAN AND PEDCOR DESIGN GRDUP, LLC, c COPYRIGHT 2006, 2007, 2008, 2009 JAMES R, STUTZMAN, AIA, INDIANAPOLIS, BID PACKAGE N0. 3 CONSTRUCTION ISSUE SET rin a e Sheet Issue Date 07/22/10 04/01 /10 Drawn By Checked By OSO AJ M Last Revision Date: O O O O O O Project Number: Parcel 7C-1 Sheet Title: HVAC SECOND FLOOR CONTROL LEVEL Sheet Number: