HomeMy WebLinkAbout105_M302 (Const Issue 7-22-2010).PDFO S H E ET KEYN OTES
1. MOUNT VFD ON STAND ALONE RACK. COORDINATE RACK LOCATION WITH FUTURE
"BRIDGE" CONSTRUCTION.
2. 6� CHWR, 4� HWR, 4� HWS AND 6� CHWS FROM BELOW.
3. PIPING SUPPORT.
4• KEEP THIS AREA CLEAR FOR COIL MAINTENANCE/REMOVAL.
5• 1-1 /2� HWS/R UP.
6• 1-1 /2� HWS/R DOWN.
7• 1 � HWS/R DOWN.
:
INSTALL 3—WAY VALVE.
INSTALL AIR VENTS.
PIPING SECOND FLOOR - CONTROL LEVEL PLAN
SCALE: 1 /8" = 1'-0"
0 4' 8' 16'
Owner:
CARMEL THEATER
DEVELOPMENT COMPANY
11711 North Pennsylvania Street, Suite 200
Carmel, Indiana 46032
317.573-6050
Architect:
. . � : � �, 4 ,'
PEDCOR DESIGN GROUP
Architecture / Project Management:
355 City Center Drive
Carmel, Indiana 46032
317.705.7979 (phone)
317.705.7980 (fax)
Engineer:
L'AC UIS
CONSULTING ENGINEERS
9229 DELEGATES ROW, SUTTE 550
INDIANAPOLIS, IN 46240
317.706.2075
WWW.LACQUIS.COM
7-C-4
E.C.
OFFICE
BLDG.7-C-2
PARKING
GARAGE
7-C-3
— — — —
7-C-11
KEY PLAN
��
��
Project:
r
1
U
�
ti
J M
W �
U
Z
� �
��
Q c� � N
� � � M
� C� � O
z � � �
� � �
W c� ..
W � — Z
._
� m � —
o �
� �� J
� U W
w '— � �
_ � �
._ � pC
� � � Q
m o
z � U
O �
U
�
w `�
a�
C� �
Q �
J
J
�
COPYRIGHT & OWNERSHIP OF DOCUMENTS
THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE
SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP.
ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL, ITS
SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE
CONSTRUED AS PUBLICATIDN IN DEROGATION OF COMMON LAW
COPYRIGHT,INTELLECTUAL PROPERTY RIGHTS OR OTHER
RESERVED RIGHTS, ALL INFORMATIDN CONTAINED HEREIN
CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE
ARCHITECT, JAMES R, STUTZMAN, AND PEDCOR DESIGN GRDUP, LLC,
NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE
RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE
RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED,
EXHIBITED,PHOTOGRAPHED,PUBLISHED,MODIFIED OR OTHERWISE
DISTRIBUTEDIN ANY WAY WITHOUT THE SPECIFIC AND PRIOR
WRITTEN CONSENT OF THE ARCHITECT, JAMES R, STUTZMAN AND
PEDCOR DESIGN GROUP, LLC, c COPYRIGHT 2006, 2007, 2008,
2009 JAMES R, STUTZMAN, AIA, INDIANAPOLIS,
BID PACKAGE N0. 3
CONSTRUCTION ISSUE SET
rin a e Sheet Issue Date
07/22/10 04/01 /10
Drawn By Checked By
OSO AJM
Last Revision Date:
O
O
O
O
O
O
Project Number:
Parcel 7C-1
Sheet Title:
PIPING
SECOND FLOOR
CONTROL LEVEL
Sheet Number: