Loading...
HomeMy WebLinkAbout121_P200 (Const Issue 7-22-2010).PDFPLUMBING LOWER LEVEL & FIRST FLOOR FOUNDATION PLAN SCALE: 1 /8" = 1'-0" NOTE: FINISHED FIRST FLOOR ELEVATION AT +0'-0" = ELEVATION AT 833.50' 0 4' 8' 16' 3', 13 GENERAL NOTES A. REFER TO DRAWING M001 FOR MECHANICAL, FIRE PROTECTION AND PLUMBING SYMBOLS AND ABBREVIATIONS. O SH EET KEYNOTES � • 2" WASTE UP. 2• 3" WASTE UP. 3• 4" WASTE UP. 4• 2" WASTE TO FLOOR DRAIN WITH P—TRAP. 5• 3" WASTE TO FLOOR DRAIN WITH P—TRAP. 6• 4" WASTE TO FLOOR DRAIN WITH P—TRAP. 7• 3" WASTE WITH P—TRAP UP TO MOP BASIN. $• 2" VENT UP. 9• 4" STORM DRAIN UP. 10. 10" STORM DRAIN UP. 11. 3" DOMESTIC COLD WATER SERVICE ENTRANCE UP. 12• 6" FIRE SERVICE ENTRANCE UP. 13. PIPE SLEEVE WAS PART OF FOUNDATION BID PACKAGE. 14. 10" HWS SLEEVE CENTERLINE AT 828.65' (58.25" BELOW FINISH FLOOR ELEV.). 12" CWS SLEEVE CENTERLINE AT 828.75' (57" BELOW FINISH FLOOR ELEV.). 10" HWR SLEEVE CENTERLINE AT 828.65' (58.25" BELOW FINISH FLOOR ELEV.). 12" CWR SLEEVE CENTERLINE AT 828.75' (57" BELOW FINISH FLOOR ELEV.). 15. SEE CIVIL DRAWINGS FOR CONTINUATION. Owner: CARMEL THEATER DEVELOPMENT COMPANY 11711 North Pennsylvania Street, Suite 200 Carmel, Indiana 46032 317.573-6050 Architect: . . � . � �, 4 , PEDCOR DESIGN GROUP Architecture / Project Management: 355 City Center Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) Engineer: L'AC UIS CONSULTING ENGINEERS 9229 DELEGATES ROW, SUTTE 550 INDIANAPOLIS, IN 46240 317.706.2075 WWW.LACQUIS.COM �. � OFFICE BLDG.7-C-2 PARKING GARAGE 7-C-3 7-C-4 E.C. ---- 7-C-11 � ♦ �� If ►. �I��I - �- Project: r 1 U � ti J M W � U Z � � �� Q c� � N � � � M � C� � O z � � � � � � W c� .. W � — Z ._ � m � — o � � �� J � U W w '— � � � � _ -- � �C � � � Q m o z � U O � U � w `� a� C� � Q � J J � COPYRIGHT & OWNERSHIP OF DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL, ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATIDN IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS, ALL INFORMATIDN CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R, STUTZMAN, AND PEDCOR DESIGN GRDUP, LLC, NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED,PHOTOGRAPHED,PUBLISHED,MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R, STUTZMAN AND PEDCOR DESIGN GROUP, LLC, c COPYRIGHT 2006, 2007, 2008, 2009 JAMES R, STUTZMAN, AIA, INDIANAPOLIS, BID PACKAGE N0. 3 CONSTRUCTION ISSUE SET rin a e Sheet Issue Date 07/22/10 04/01 /10 Drawn By Checked By GMR AJM Last Revision Date: O O O O O O Project Number: Parcel 7C-1 Sheet Title: PLUMBING LOWER LEVEL & FIRST FLOOR FOUNDATION PLAN Sheet Number: