Loading...
HomeMy WebLinkAbout140_E202 (Const Issue 7-22-2010).PDFG EN ERAL NOTES A. DIVISION 26 CONTRACTOR IS REQUIRED TO REVIEW, COMMENT AND COORDINATE ALL WORK PRIOR TO ROUGH—IN WITH PLANS PREPARED BY ARTEC, ARCHITECTURAL PLANS/SECTIONS/DETAILS. FAILURE TO FULLY COORDINATE MAY RESULT IN REWORK AT DIVISION 26 CONTRACTOR'S EXPENSE. O SH EET KEYNOTES �• 3/4"C, 2—#10 AND 1—#10 GRD. 2. VARIABLE FREQUENCY DRIVE CONTROLLER FURNISHED BY DIVISION 20 AND INSTALLED COMPLETE BY DIVISION 26. 3• PROVIDE THE APPROPRIATE STRUCTURAL STEEL CHANNEL SUPPORTS FOR PANELS "2H1" AND "2L2" ALLOWING ROOM FOR THE CONSTRUCTION OF THE FUTURE PEDESTRIAN WALKWAY. VERIFY EXACT LOCATION WITH THE ARCHITECT PRIOR TO ROUGHING—IN. 4. PROVIDE 50 AMP ENCLOSED CIRCUIT BREAKER BENEATH SINK FOR INSTANTANEOUS WATER HEATER CONNECTED TO CIRCUIT INDICATED. CONNECT CIRCUIT BREAKER TO WATER HEATER WITH CIRCUIT INDICATED. 5. PROVIDE JUNCTION BOX ABOVE CEILING WITH CIRCUITS INDICATED FOR FUTURE USE. 6• INSTALL RECEPTACLE(S) BELOW S&C PANEL. ROOM LEGEND Owner: CARMEL THEATER DEVELOPMENT COMPANY 117ll North Pennsylvania Street, Suite 200 Carmel, Indiana 46032 317.573-6050 Architect: . . � � ; �, 4 PEDCOR DESIGN GROUP Architecture / Project Management: 355 City Center Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) Engineer: L'AC UI S CONSULTING ENGINEERS 9229 DELEGATES ROW, SUITE 550 INDIANAPOLIS, IN 46240 317.706.2075 WWW.LACQUIS.COM �� -°{�r��a+ ' ' � � 7-C-4 E.C. OFFICE BLDG.7-C-2 PARKING 7- -9 GARAGE 7-C-3 — — — — 7-C-11 KEY PLAN �� �� Project: COPYRIGHT & OWNERSHIP OF DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP. ALL INFORMATION CONTAINED HEREINIS CONFIDENTIAL, ITS SUBMISSIDN AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATIDN IN DEROGATION OF COMMON LAW COPYRIGHT,INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS, ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R, STUTZMAN, AND PEDCOR DESIGN GRDUP, LLC, NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED,PHOTOGRAPHED,PUBLISHED,MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R, STUTZMAN AND PEDCOR DESIGN GROUP, LLC, c COPYRIGHT 2006, 2007, 2008, 2009 JAMES R, STUTZMAN, AIA, INDIANAPOLIS, BID PACKAGE N0. 3 CONSTRUCTION ISSUE SET Print Date Sheet Issue Date 07/22/10 04/01 /10 Drawn By Checked By MAR PCB Last Revision Date: O O O O O O Project Number: Parcel 7C-1 Sheet Title: ELECTRICAL SECOND FL�OR POWER PLAN Sheet Number: