Loading...
HomeMy WebLinkAbout146_E302-0002 (Const Issue 7-22-2010).PDFGENERAL NOTES A. DIVISION 26 CONTRACTOR IS REQUIRED TO REVIEW, COMMENT AND COORDINATE ALL WORK PRIOR TO ROUGH—IN WITH PLANS PREPARED BY ARTEC, ARCHITECTURAL PLANS/SECTIONS/DETAILS. FAILURE TO FULLY COORDINATE MAY RESULT IN REWORK AT DIVISION 26 CONTRACTOR'S EXPENSE. O SH EET KEYNOTES 1. PROVIDE LIGHTING FIXTURE WITH AUTOMATIC EMERGENCY GENERATOR TRANSFER DEVICE (GTD). SEE DETAIL ON SHEET E-501. 2. LUTRON N1500 WALL DIMMERS. 3. SEE THIRD FLOOR LIGHTING PLAN FOR ADDITIONAL OVERHEAD LIGHTING IN THIS ROOM. 4. PROVIDE LIGHTING FIXTURES BENEATH THE MECHANICAL CATWALK. 5. LIGHT SWITCHES CONTROL ALL LIGHTING FIXTURES IN THIS ROOM. SEE ELECTRICAL THIRD FLOOR LIGHTING PLAN FOR ADDITIONAL OVERHEAD LIGHTING FIXTURES. 6. CONNECT LIGHTING FIXTURES IN THIS ROOM TO RELAY PANEL IN DIMMER ROOM 310, UNLESS OTHERWISE NOTED. 7• 1 2"C, 28—#10 AND 1—#10 GRD TO STAGE DIMMER BOARD IN DIMMER ROOM 310. EQUIPMENT/DEVICE PROVIDED BY THEATRICAL EQUIPMENT CONTRACTOR (TEC) AND THE APPROPRIATE JUNCTION BOXES, CONDUIT AND WIRE ROUTED FROM EQUIIPMENT/DEVICES TO THE STAGE DIMMER BOARD (SDB) AND ALL FINAL CONNECTIONS PROVIDED BY DIVISION 26. COORDINATE AND VERIFY THE EXACT LOCATIONS AND ELECTRICAL REQUIREMENT WITH THEATRICAL EQUIPMENT CONTRACTOR (TEC). 8. CONNECT LIGHTING FIXTURES IN THIS ROOM TO LOW VOLTAGE LIGHT SWITCHES LOCATED BELOW AND TO RELAY PANEL IN DIMMER ROOM 310 UNLESS OTHER WISE NOTED. SEE SHEET E301 FOR LOCATION OF LIGHT SWITCHES BELOW. 9• 1 1/2"C, FOURTEEN (14) CATEGORY 6 CABLES AND 1—#12 GRD TO ETHERNET PROCESSOR IN STAGE DIMMER BOARD (SDB) FOR LIGHTING CONTROL. 10. 1 3/4"C, 2—#10 AND 1—#10 GRD TO STAGE DIMMER BOARD IN DIMMER ROOM 310. EQUIPMENT/DEVICE PROVIDED BY THEATRICAL EQUIPMENT CONTRACTOR (TEC) AND THE APPROPRIATE JUNCTION BOXES, CONDUIT AND WIRE ROUTED FROM EQUIIPMENT/DEVICES TO THE STAGE DIMMER BOARD (SDB) AND ALL FINAL CONNECTIONS PROVIDED BY DIVISION 26. COORDINATE AND VERIFY THE EXACT LOCATIONS AND ELECTRICAL REQUIREMENT WITH THEATRICAL EQUIPMENT CONTRACTOR (TEC). � 1• (1) 1"C, ONE (1) CATEGORY 6 CABLE AND 1—#12 GRD TO ETHERNET PROCESSOR IN STAGE DIMMER BOARD (SDB) FOR LIGHTING CONTROL. ROOM LEG EN D Owner: CARMEL THEATER DEVELOPMENT COMPANY 117ll North Pennsylvania Street, Suite 200 Carmel, Indiana 46032 317.573-6050 Architect: PEDCOR DESIGN GROUP Architecture / Project Management: 355 City Center Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) Engineer: L'AC UI S CONSULTING ENGINEERS 9229 DELEGATES ROW, SUITE 550 INDIANAPOLIS, IN 46240 317.706.2075 WWW.LACQUIS.COM �� -°{�r��a+ ' ' � �. 7-C-4 E.C. OFFICE BLDG.7-C-2 PARKING 7- -9 GARAGE 7-C-3 — — — — 7-C-11 KEY PLAN �� �� Project: COPYRIGHT & OWNERSHIP OF DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL, ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATIDN IN DEROGATION OF COMMON LAW COPYRIGHT,INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS, ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R, STUTZMAN, AND PEDCOR DESIGN GRDUP, LLC, NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED,PHOTOGRAPHED,PUBLISHED,MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R, STUTZMAN AND PEDCOR DESIGN GROUP, LLC, c COPYRIGHT 2006, 2007, 2008, 2009 JAMES R, STUTZMAN, AIA, INDIANAPOLIS, BID PACKAGE N0. 3 CONSTRUCTION ISSUE SET Print Date Sheet Issue Date 07/22/10 04/01 /10 Drawn By Checked By MAR PCB Last Revision Date: O0 . O O O O O Project Number: Parcel 7C-1 Sheet Title: ELECTRICAL SECOND FL�OR CONTROL LEVEL Sheet Number: