HomeMy WebLinkAbout15050128 Correspondence1
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Thursday, July 30, 2015 3:49 PM
To:'Blake McFarland'; Crediford, Maggie
Cc:Craig Koch; Mishler, Nicholas F; Lux, Pamela K; Blanchard, Jim E
Subject:RE: St. Elizabeth Building Permit
Thank you, Blake -
Those match up with what the BZA approved. Attached are .pdf’s of the stamped/approved site plan and of the exterior
architectural building elevations, for the building addition. Please continue to work with Nick Mishler and the Carmel
Building Permits Dept. for their permits/approvals.
(Maggie – please add these two items to Laser Fiche, to docket no. 15020001 SUA, for the St. Elizabeth Ann Seton
Catholic Church Addition. Thank you.)
Angie Conn, AICP | Planning Administrator
City of Carmel Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com
From: Blake McFarland [mailto:bmcfarland@shielsexton.com]
Sent: Thursday, July 30, 2015 3:22 PM
To: Conn, Angelina V
Cc: Craig Koch; Mishler, Nicholas F
Subject: RE: St. Elizabeth Building Permit
Angie,
I have attached both of those documents for your review. Please let me know if you will need anything else from us.
Thank you,
Blake McFarland
From: Conn, Angelina V [ mailto:Aconn@carmel.in.gov ]
Sent: Thursday, July 30, 2015 3:02 PM
To: Blake McFarland
Cc: Craig Koch; Mishler, Nicholas F
Subject: RE: St. Elizabeth Building Permit
Good afternoon, Blake-
The Planning/Zoning Dept. needs PDF’s from Craig/you, of the site plan and of the exterior architectural building
elevations , for the Building Addition . We need to make sure that what you plan to build is what the Board of Zoning
Appeals approved with Docket No. 15020001 SUA , St. Elizabeth Ann Seton Catholic Church Addition. Then, if all is good,
we can stamp/approve those. And, then you can move forward with Nick and the building permits review/approval
process.
Angie Conn, AICP | Planning Administrator
City of Carmel Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com
2
From: Blake McFarland [ mailto:bmcfarland@shielsexton.com ]
Sent: Thursday, July 30, 2015 2:57 PM
To: Conn, Angelina V
Cc: Craig Koch
Subject: St. Elizabeth Building Permit
Angie,
I tried calling a little earlier and wanted to follow-up with an email regarding the building permit for St. Elizabeth Ann
Seton Catholic Church. We previously only had the foundation release and were waiting on the State Design Release to
get our full building permit.
We received that yesterday and I have already sent it to Nick Mishler, who referred me to you. He wanted me to check
to see if there was anything else your office needed from us(drawings, check, review,etc ). Please let me know at your
earliest convenience. My contact info is below if you need to reach me.
Thank you,
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that
the link points to the correct file and location.
Blake McFarland
Project Engineer , Shiel Sexton Co.
• Phone: 317-430-4471
• Address: 902 N. Capitol Ave. Indianapolis, IN 46204
• Website: www.shielsexton.com
• Email: bmcfarland@shielsexton.com
3
Mishler, Nicholas F
From:Blake McFarland <bmcfarland@shielsexton.com>
Sent:Thursday, July 30, 2015 3:22 PM
To:Conn, Angelina V
Cc:Craig Koch; Mishler, Nicholas F
Subject:RE: St. Elizabeth Building Permit
Angie,
I have attached both of those documents for your review. Please let me know if you will need anything else from us.
Thank you,
Blake McFarland
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Thursday, July 30, 2015 3:02 PM
To: Blake McFarland
Cc: Craig Koch; Mishler, Nicholas F
Subject: RE: St. Elizabeth Building Permit
Good afternoon, Blake-
The Planning/Zoning Dept. needs PDF’s from Craig/you, of the site plan and of the exterior architectural building
elevations , for the Building Addition . We need to make sure that what you plan to build is what the Board of Zoning
Appeals approved with Docket No. 15020001 SUA , St. Elizabeth Ann Seton Catholic Church Addition. Then, if all is good,
we can stamp/approve those. And, then you can move forward with Nick and the building permits review/approval
process.
Angie Conn, AICP | Planning Administrator
City of Carmel Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com
From: Blake McFarland [ mailto:bmcfarland@shielsexton.com ]
Sent: Thursday, July 30, 2015 2:57 PM
To: Conn, Angelina V
Cc: Craig Koch
Subject: St. Elizabeth Building Permit
Angie,
I tried calling a little earlier and wanted to follow-up with an email regarding the building permit for St. Elizabeth Ann
Seton Catholic Church. We previously only had the foundation release and were waiting on the State Design Release to
get our full building permit.
We received that yesterday and I have already sent it to Nick Mishler, who referred me to you. He wanted me to check
to see if there was anything else your office needed from us(drawings, check, review,etc ). Please let me know at your
earliest convenience. My contact info is below if you need to reach me.
Thank you,
4
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that
the link points to the correct file and location.
Blake McFarland
Project Engineer , Shiel Sexton Co.
• Phone: 317-430-4471
• Address: 902 N. Capitol Ave. Indianapolis, IN 46204
• Website: www.shielsexton.com
• Email: bmcfarland@shielsexton.com
5
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Thursday, July 30, 2015 3:02 PM
To:'Blake McFarland'
Cc:Craig Koch; Mishler, Nicholas F
Subject:RE: St. Elizabeth Building Permit
Good afternoon, Blake-
The Planning/Zoning Dept. needs PDF’s from Craig/you, of the site plan and of the exterior architectural building
elevations , for the Building Addition . We need to make sure that what you plan to build is what the Board of Zoning
Appeals approved with Docket No. 15020001 SUA , St. Elizabeth Ann Seton Catholic Church Addition. Then, if all is good,
we can stamp/approve those. And, then you can move forward with Nick and the building permits review/approval
process.
Angie Conn, AICP | Planning Administrator
City of Carmel Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com
From: Blake McFarland [mailto:bmcfarland@shielsexton.com]
Sent: Thursday, July 30, 2015 2:57 PM
To: Conn, Angelina V
Cc: Craig Koch
Subject: St. Elizabeth Building Permit
Angie,
I tried calling a little earlier and wanted to follow-up with an email regarding the building permit for St. Elizabeth Ann
Seton Catholic Church. We previously only had the foundation release and were waiting on the State Design Release to
get our full building permit.
We received that yesterday and I have already sent it to Nick Mishler, who referred me to you. He wanted me to check
to see if there was anything else your office needed from us(drawings, check, review,etc ). Please let me know at your
earliest convenience. My contact info is below if you need to reach me.
Thank you,
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that
the link points to the correct file and location.
Blake McFarland
Project Engineer , Shiel Sexton Co.
• Phone: 317-430-4471
• Address: 902 N. Capitol Ave. Indianapolis, IN 46204
• Website: www.shielsexton.com
• Email: bmcfarland@shielsexton.com
6
Mishler, Nicholas F
From:Blake McFarland <bmcfarland@shielsexton.com>
Sent:Thursday, July 30, 2015 1:31 PM
To:Mishler, Nicholas F
Cc:Craig Koch; Rick Turner; Eriksson, Mark
Subject:St. Elizabeth State Design Release
Nick,
I have attached the state design release for St. Elizabeth. I am getting in contact with Angie with Planning and Zoning to
see what she needs from us and will let you know.
Thank you,
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that
the link points to the correct file and location.
Blake McFarland
Project Engineer , Shiel Sexton Co.
• Phone: 317-430-4471
• Address: 902 N. Capitol Ave. Indianapolis, IN 46204
• Website: www.shielsexton.com
• Email: bmcfarland@shielsexton.com
7
Mishler, Nicholas F
From:Craig Koch <ckoch@shielsexton.com>
Sent:Friday, June 12, 2015 8:24 AM
To:Mishler, Nicholas F; Blake McFarland
Cc:Anderson, Kurt M
Subject:RE: Foundation Permit - St. Elizabeth
Nick,
Shiel Sexton will be meeting with the City of Carmel (Kurt Anderson & the engineering team) today for the Pre
Construction Meeting mentioned below. Will we be able to pick up the St. Elizabeth Foundation Permit right after that
meeting?
Thank you,
Craig Koch
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, June 10, 2015 9:27 AM
To: Blake McFarland
Cc: Craig Koch
Subject: Foundation Permit
Blake-
I just spoke to Alex in the Engineering Department. They have asked that I hold the foundation release until you have had the Pre Con meeting
with them. If you have any questions, you can contact Alex Jordan in Engineering at 571-2305.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
8
Mishler, Nicholas F
From:Jordan, Alex
Sent:Wednesday, June 10, 2015 1:45 PM
To:'Craig Koch'; Thomas, John G; Anderson, Kurt M
Cc:Mishler, Nicholas F
Subject:RE: Carmel Pre-Construction Meeting for St. Elizabeth Social Hall Addition
Mr. Koch,
Please contact Kurt Anderson at 317-571-2308 to schedule your pre-con. He will be the City of Carmel representative at
this meeting. Let me know if you have any other questions.
Sincerely,
Alex Jordan
Plan Review Coordinator
City of Carmel Engineering Department
(317) 571-2305
ajordan@carmel.in.gov
From: Craig Koch [mailto:ckoch@shielsexton.com]
Sent: Wednesday, June 10, 2015 1:42 PM
To: Thomas, John G; Jordan, Alex
Cc: Mishler, Nicholas F
Subject: Carmel Pre-Construction Meeting for St. Elizabeth Social Hall Addition
Hello Thomas & Alex,
I wanted to check with the two of you regarding our necessary Pre-Construction Meeting for the St. Elizabeth Ann Seton
Social Hall Addition. As you know, we have requested a foundation permit from the City of Carmel. Please let me know
your availability to meet to review this project. I have left a voicemail for you both and would like to speak with you
about your expectations for the meeting.
Thank you,
Craig Koch
317-945-5276
9
Mishler, Nicholas F
From:Craig Koch <ckoch@shielsexton.com>
Sent:Wednesday, June 10, 2015 1:42 PM
To:Thomas, John G; Jordan, Alex
Cc:Mishler, Nicholas F
Subject:Carmel Pre-Construction Meeting for St. Elizabeth Social Hall Addition
Hello Thomas & Alex,
I wanted to check with the two of you regarding our necessary Pre-Construction Meeting for the St. Elizabeth Ann Seton
Social Hall Addition. As you know, we have requested a foundation permit from the City of Carmel. Please let me know
your availability to meet to review this project. I have left a voicemail for you both and would like to speak with you
about your expectations for the meeting.
Thank you,
Craig Koch
317-945-5276
10
Mishler, Nicholas F
From:Jordan, Alex
Sent:Wednesday, June 10, 2015 9:21 AM
To:Mishler, Nicholas F; Warner, Caleb; Barnes, David R
Subject:RE: St. Elizabeth Seton
Just talked to Kurt. If you could, hold your permit until they have the pre-con. We’re afraid that once they get the
permit, they will be more likely to start without having the pre-con.
From: Mishler, Nicholas F
Sent: Wednesday, June 10, 2015 8:54 AM
To: Jordan, Alex; Warner, Caleb; Barnes, David R
Subject: RE: St. Elizabeth Seton
So it’s OK to release?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Jordan, Alex
Sent: Wednesday, June 10, 2015 8:54 AM
To: Warner, Caleb; Mishler, Nicholas F; Barnes, David R
Subject: RE: St. Elizabeth Seton
The stormwater permit has been issued. We are just waiting for them to contact Kurt for a pre-construction meeting.
From: Warner, Caleb
Sent: Wednesday, June 10, 2015 8:49 AM
To: Mishler, Nicholas F; Jordan, Alex; Barnes, David R
Subject: RE: St. Elizabeth Seton
I have issued a Right of Way permit for this project.
Caleb Warner
Right-of-Way Inspector
City of Carmel Engineering Dept.
(317) 571-2441
(317) 714-8908 cell
From: Mishler, Nicholas F
Sent: Wednesday, June 10, 2015 8:48 AM
To: Warner, Caleb; Jordan, Alex; Barnes, David R
Subject: St. Elizabeth Seton
11
Do you have what you need for this project to be released?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
12
Mishler, Nicholas F
From:Jordan, Alex
Sent:Wednesday, June 10, 2015 8:54 AM
To:Warner, Caleb; Mishler, Nicholas F; Barnes, David R
Subject:RE: St. Elizabeth Seton
The stormwater permit has been issued. We are just waiting for them to contact Kurt for a pre-construction meeting.
From: Warner, Caleb
Sent: Wednesday, June 10, 2015 8:49 AM
To: Mishler, Nicholas F; Jordan, Alex; Barnes, David R
Subject: RE: St. Elizabeth Seton
I have issued a Right of Way permit for this project.
Caleb Warner
Right-of-Way Inspector
City of Carmel Engineering Dept.
(317) 571-2441
(317) 714-8908 cell
From: Mishler, Nicholas F
Sent: Wednesday, June 10, 2015 8:48 AM
To: Warner, Caleb; Jordan, Alex; Barnes, David R
Subject: St. Elizabeth Seton
Do you have what you need for this project to be released?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
13
Mishler, Nicholas F
From:Warner, Caleb
Sent:Wednesday, June 10, 2015 8:49 AM
To:Mishler, Nicholas F; Jordan, Alex; Barnes, David R
Subject:RE: St. Elizabeth Seton
I have issued a Right of Way permit for this project.
Caleb Warner
Right-of-Way Inspector
City of Carmel Engineering Dept.
(317) 571-2441
(317) 714-8908 cell
From: Mishler, Nicholas F
Sent: Wednesday, June 10, 2015 8:48 AM
To: Warner, Caleb; Jordan, Alex; Barnes, David R
Subject: St. Elizabeth Seton
Do you have what you need for this project to be released?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
14
Mishler, Nicholas F
From:Thomas, John G
Sent:Tuesday, June 02, 2015 4:15 PM
To:Janet Sterling (jsterling@af-eng.com); 'aguljas@dol-in.org'; Craig Koch
(ckoch@shielsexton.com)
Cc:Jordan, Alex; Boone, Tiffany; Greskamp, Dan; Barnes, David R; Anderson, Kurt M; Hoover,
Aaron; Warner, Caleb; Kashman, Jeremy M; Duffy, John M; Mishler, Nicholas F; Conn,
Angelina V; Mindham, Daren; Greg Hoyes (Greg.Hoyes@hamiltoncounty.in.gov); Greg
Ilko (gilko@crossroadengineers.com)
Subject:Approved Storm Water Permit - City of Carmel Docket #15020001 SUA Saint Elizabeth
Seton Catholic Church Addition
Good afternoon,
The approved storm water permit for the St. Elizabeth Seton Catholic Church Addition is attached. Please contact Kurt
Anderson at 317-571-2308 to schedule the pre-construction meeting which must be held before starting construction
activities. Please also make sure a right of way permit has been obtained from Caleb Warner in our office before getting
started.
Please let me know if you have any questions and best of luck with the project.
Sincerely,
John Thomas, CPESC, CMS4S
Storm Water Administrator
City of Carmel Engineering Department
(p) 317-571-2314
(f) 317-571-2439
15
Mishler, Nicholas F
From:Thomas, John G
Sent:Tuesday, June 02, 2015 10:00 AM
To:'Craig Koch'; Janet Sterling
Cc:Warner, Caleb; Mishler, Nicholas F; Barnes, David R
Subject:RE: St. Elizabeth Church Addition BMP Estimates
Hi Craig,
The amount below is acceptable. Please submit the performance bond for $56,000 to Dave Barnes in our office. I can
issue the permit after the bond is received.
Sincerely,
John Thomas, CPESC, CMS4S
Storm Water Administrator
City of Carmel Engineering Department
(p) 317-571-2314
(f) 317-571-2439
From: Craig Koch [mailto:ckoch@shielsexton.com]
Sent: Tuesday, June 02, 2015 8:29 AM
To: Janet Sterling
Cc: Thomas, John G; Warner, Caleb; Mishler, Nicholas F
Subject: RE: St. Elizabeth Church Addition BMP Estimates
All,
I apologies for the delay in getting this information to you. I had spoken with someone at the city and thought I only
lacked adding the aqua swirl value to our previous estimate. Janet was kind enough to forward over an itemized
breakdown of Construction Phase SWPPP BMP’s and Post Construction BMP’s. Reviewing this detailed list, I now see
where our estimate fell short. Please see below breakdown that adds up to approximately $56,000. If this seems un-
ordinarily hi or low, please feel free to give me a call and we can discuss.
Construction Phase SWPPP BMP’s
Silt fencing
Inlet Protection
Coir log check dams
Temporary construction entrances
Temporary seeding
$14,000 approximately
Concrete Washout
Portable toilets
Waste receptacles
$15,000 approximately
Post Construction BMP’s
Do not Mow Signs
Detention outlet with trash rack
16
Rip Rap
Native Seed for inadvertent disturbed areas in detention bottom
Aqua-Swirl
Lawn Seeding
Erosion Control Blanket
Seeding Mulch
$27,000 approximately
Thank you for your help with this.
Craig Koch
Shiel Sexton
317-945-5276
From: Janet Sterling [ mailto:jsterling@af-eng.com ]
Sent: Monday, June 01, 2015 4:16 PM
To: Craig Koch
Subject: FW: St. Elizabeth Church Addition
Craig,
The City is being very insistent about the itemized cost opinion they are asking for. Is that still in the works?
Janet
From: Thomas, John G [ mailto:jthomas@carmel.in.gov ]
Sent: Monday, June 01, 2015 4:12 PM
To: Janet Sterling
Subject: St. Elizabeth Church Addition
Hi Janet,
Just got a hand written note from the contractor on this that the new bond amount is for $32,000. I did not receive an
line item estimate to back this up. Can you send one over or let them know they need to provide an estimate? Thanks!
Sincerely,
John Thomas, CPESC, CMS4S
Storm Water Administrator
City of Carmel Engineering Department
(p) 317-571-2314
(f) 317-571-2439
17
Mishler, Nicholas F
From:Craig Koch <ckoch@shielsexton.com>
Sent:Tuesday, June 02, 2015 8:29 AM
To:Janet Sterling
Cc:Thomas, John G; Warner, Caleb; Mishler, Nicholas F
Subject:RE: St. Elizabeth Church Addition BMP Estimates
All,
I apologies for the delay in getting this information to you. I had spoken with someone at the city and thought I only
lacked adding the aqua swirl value to our previous estimate. Janet was kind enough to forward over an itemized
breakdown of Construction Phase SWPPP BMP’s and Post Construction BMP’s. Reviewing this detailed list, I now see
where our estimate fell short. Please see below breakdown that adds up to approximately $56,000. If this seems un-
ordinarily hi or low, please feel free to give me a call and we can discuss.
Construction Phase SWPPP BMP’s
Silt fencing
Inlet Protection
Coir log check dams
Temporary construction entrances
Temporary seeding
$14,000 approximately
Concrete Washout
Portable toilets
Waste receptacles
$15,000 approximately
Post Construction BMP’s
Do not Mow Signs
Detention outlet with trash rack
Rip Rap
Native Seed for inadvertent disturbed areas in detention bottom
Aqua-Swirl
Lawn Seeding
Erosion Control Blanket
Seeding Mulch
$27,000 approximately
Thank you for your help with this.
Craig Koch
Shiel Sexton
317-945-5276
From: Janet Sterling [mailto:jsterling@af-eng.com]
Sent: Monday, June 01, 2015 4:16 PM
To: Craig Koch
Subject: FW: St. Elizabeth Church Addition
18
Craig,
The City is being very insistent about the itemized cost opinion they are asking for. Is that still in the works?
Janet
From: Thomas, John G [ mailto:jthomas@carmel.in.gov ]
Sent: Monday, June 01, 2015 4:12 PM
To: Janet Sterling
Subject: St. Elizabeth Church Addition
Hi Janet,
Just got a hand written note from the contractor on this that the new bond amount is for $32,000. I did not receive an
line item estimate to back this up. Can you send one over or let them know they need to provide an estimate? Thanks!
Sincerely,
John Thomas, CPESC, CMS4S
Storm Water Administrator
City of Carmel Engineering Department
(p) 317-571-2314
(f) 317-571-2439
19
Mishler, Nicholas F
From:Greg R. Hoyes <Greg.Hoyes@hamiltoncounty.in.gov>
Sent:Tuesday, June 02, 2015 8:08 AM
To:Mishler, Nicholas F; Thomas, John G; Barnes, David R; Jordan, Alex
Cc:'Craig Koch'
Subject:RE: St. Elizabeth Ann Seton addition
Nick
We have no issues with a foundation or full release of this project. Thanks.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, May 28, 2015 9:34 AM
To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M;
Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex;
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Warner,
Caleb; David E. Lucas; Keesling, Rachel M
Cc: 'Craig Koch'
Subject: St. Elizabeth Ann Seton addition
Good morning-
I have received plans for an addition to the St. Elizabeth Ann Seton church located at 10655 Haverstick Rd. The builder is seeking a FOUNDATION
ONLY release at this time, pending the full state release . Please see attached plans and let me know if your office will need additional information
before the project is released for foundation construction.
Also, please copy Craig Koch with Shiel Sexton on your reply. He is CC’d on this email.
If you need additional information, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
20
Mishler, Nicholas F
From:Craig Koch <ckoch@shielsexton.com>
Sent:Friday, May 29, 2015 1:01 PM
To:Warner, Caleb
Cc:Mishler, Nicholas F
Subject:RE: St. Elizabeth Ann Seton addition
Hi Caleb,
I’ll be bringing the check by this afternoon, but I have a couple of quick questions for you regarding this. Can you give
me a call back at 317-945-5276?
Thank you,
Craig Koch
From: Warner, Caleb [mailto:cwarner@carmel.in.gov]
Sent: Thursday, May 28, 2015 9:37 AM
To: Mishler, Nicholas F
Cc: Craig Koch
Subject: RE: St. Elizabeth Ann Seton addition
I will require a Right of Way permit with a $5000 License and Permit Bond made out to the City of Carmel.
Thanks,
Caleb Warner
Right-of-Way Inspector
City of Carmel Engineering Dept.
(317) 571-2441
(317) 714-8908 cell
From: Mishler, Nicholas F
Sent: Thursday, May 28, 2015 9:34 AM
To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M;
Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex;
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Warner,
Caleb; 'David Lucas'; Keesling, Rachel M
Cc: 'Craig Koch'
Subject: St. Elizabeth Ann Seton addition
Good morning-
I have received plans for an addition to the St. Elizabeth Ann Seton church located at 10655 Haverstick Rd. The builder is seeking a FOUNDATION
ONLY release at this time, pending the full state release . Please see attached plans and let me know if your office will need additional information
before the project is released for foundation construction.
Also, please copy Craig Koch with Shiel Sexton on your reply. He is CC’d on this email.
If you need additional information, let me know.
21
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
22
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Friday, May 29, 2015 12:41 PM
To:Mishler, Nicholas F
Cc:'Craig Koch'; Lux, Pamela K; Lopez, Alexia K; Blanchard, Jim E
Subject:RE: St. Elizabeth Ann Seton addition (BZA Docket No. 15020001 SUA)
Hi, Nick –
The Planning/Zoning Dept. is okay with them receiving the ‘Foundation Only’ release.
Please let us know when they want to move forward with the next steps for a building permit. Then, the
Planning/Zoning Dept. will need PDF’s from Craig/them, of the site plan and of the exterior architectural building
elevations , for the Building Addition . We need to make sure that what they plan to build is what the Board of Zoning
Appeals approved with Docket No. 15020001 SUA . Then, if all is good, we can stamp/approve those.
Sincerely,
Angie Conn, AICP | Planning Administrator
City of Carmel Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com
From: Mishler, Nicholas F
Sent: Thursday, May 28, 2015 9:34 AM
To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M;
Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex;
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Warner,
Caleb; 'David Lucas'; Keesling, Rachel M
Cc: 'Craig Koch'
Subject: St. Elizabeth Ann Seton addition (BZA Docket No. 15020001 SUA)
Good morning-
I have received plans for an addition to the St. Elizabeth Ann Seton church located at 10655 Haverstick Rd. The builder is seeking a FOUNDATION
ONLY release at this time, pending the full state release . Please see attached plans and let me know if your office will need additional information
before the project is released for foundation construction.
Also, please copy Craig Koch with Shiel Sexton on your reply. He is CC’d on this email.
If you need additional information, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
23
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Friday, May 29, 2015 10:00 AM
To:Mishler, Nicholas F
Subject:RE: St. Elizabeth Ann Seton addition
Carmel Utilities is ok
Lisa Kempa
Carmel Utilities
30 West Main St., Ste 220
317/571-2443
From: Mishler, Nicholas F
Sent: Thursday, May 28, 2015 9:34 AM
To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M;
Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex;
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Warner,
Caleb; 'David Lucas'; Keesling, Rachel M
Cc: 'Craig Koch'
Subject: St. Elizabeth Ann Seton addition
Good morning-
I have received plans for an addition to the St. Elizabeth Ann Seton church located at 10655 Haverstick Rd. The builder is seeking a FOUNDATION
ONLY release at this time, pending the full state release . Please see attached plans and let me know if your office will need additional information
before the project is released for foundation construction.
Also, please copy Craig Koch with Shiel Sexton on your reply. He is CC’d on this email.
If you need additional information, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
24
Mishler, Nicholas F
From:David E. Lucas <David.Lucas@hamiltoncounty.in.gov>
Sent:Friday, May 29, 2015 9:45 AM
To:Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham,
Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes,
David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov';
'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Warner, Caleb;
Keesling, Rachel M
Cc:'Craig Koch'
Subject:RE: St. Elizabeth Ann Seton addition
Nick,
This is outside of Highway jurisdiction. We have no comments or concerns.
Sincerely,
David E. Lucas
HCHD Project Coordinator
1700 South 10 th Street
Noblesville, IN 46060
Phone: 317-773-7770
Direct: 317-770-4474
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, May 28, 2015 9:34 AM
To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M;
Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex;
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Warner,
Caleb; David E. Lucas; Keesling, Rachel M
Cc: 'Craig Koch'
Subject: St. Elizabeth Ann Seton addition
Good morning-
I have received plans for an addition to the St. Elizabeth Ann Seton church located at 10655 Haverstick Rd. The builder is seeking a FOUNDATION
ONLY release at this time, pending the full state release . Please see attached plans and let me know if your office will need additional information
before the project is released for foundation construction.
Also, please copy Craig Koch with Shiel Sexton on your reply. He is CC’d on this email.
If you need additional information, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
25
Please consider the environment before printing this email
26
Mishler, Nicholas F
From:Clark, Joanne L. <jlclark@Vectren.com>
Sent:Friday, May 29, 2015 6:02 AM
To:Mishler, Nicholas F
Cc:'Craig Koch'
Subject:RE: St. Elizabeth Ann Seton addition
Good Morning Nick,
Building addition does not appear to include mechanical room where gas meter/service is located on the church, so
Vectren does not have any issues with you releasing the foundation permit.
Thank you,
Joanie Clark
Vectren Energy Delivery
317-776-5532
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, May 28, 2015 9:34 AM
To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M;
Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex;
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Warner,
Caleb; 'David Lucas'; Keesling, Rachel M
Cc: 'Craig Koch'
Subject: St. Elizabeth Ann Seton addition
This EXTERNAL email contains an attachment. Do not open attachments or click on links in emails unle ss you
are certain the source AND content of the email are credible.
Good morning-
I have received plans for an addition to the St. Elizabeth Ann Seton church located at 10655 Haverstick Rd. The builder is seeking a FOUNDATION
ONLY release at this time, pending the full state release . Please see attached plans and let me know if your office will need additional information
before the project is released for foundation construction.
Also, please copy Craig Koch with Shiel Sexton on your reply. He is CC’d on this email.
If you need additional information, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
This message (including any attachments) is intended only for the use of the individual or entity to which it is
addressed and may contain information that is non-public, proprietary, privileged, confidential, and exempt
27
from disclosure under applicable law or may constitute as attorney work product. If you are not the intended
recipient, you are hereby notified that any use, dissemination, distribution, or copying of this communication is
strictly prohibited. If you have received this communication in error, notify us immediately by telephone and (i)
destroy this message if a facsimile or (ii) delete this message immediately if this is an electronic
communication. Thank you.
28
Mishler, Nicholas F
From:Godsey, Trent N <Trent.Godsey@duke-energy.com>
Sent:Thursday, May 28, 2015 9:44 AM
To:Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham,
Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes,
David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov';
'Hartman-ryan.hartman@ctrwd.org'; Warner, Caleb; 'David Lucas'; Keesling, Rachel M
Cc:'Craig Koch'
Subject:RE: St. Elizabeth Ann Seton addition
Duke Energy will not be affected by the expansion! Thanks!
Trent G.
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, May 28, 2015 9:34 AM
To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M;
Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex;
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; Godsey, Trent N; Warner, Caleb; 'David
Lucas'; Keesling, Rachel M
Cc: 'Craig Koch'
Subject: St. Elizabeth Ann Seton addition
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from
unknown senders or unexpected email. ***
Good morning-
I have received plans for an addition to the St. Elizabeth Ann Seton church located at 10655 Haverstick Rd. The builder is seeking a FOUNDATION
ONLY release at this time, pending the full state release . Please see attached plans and let me know if your office will need additional information
before the project is released for foundation construction.
Also, please copy Craig Koch with Shiel Sexton on your reply. He is CC’d on this email.
If you need additional information, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
29
Mishler, Nicholas F
From:Warner, Caleb
Sent:Thursday, May 28, 2015 9:37 AM
To:Mishler, Nicholas F
Cc:'Craig Koch'
Subject:RE: St. Elizabeth Ann Seton addition
I will require a Right of Way permit with a $5000 License and Permit Bond made out to the City of Carmel.
Thanks,
Caleb Warner
Right-of-Way Inspector
City of Carmel Engineering Dept.
(317) 571-2441
(317) 714-8908 cell
From: Mishler, Nicholas F
Sent: Thursday, May 28, 2015 9:34 AM
To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M;
Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex;
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Warner,
Caleb; 'David Lucas'; Keesling, Rachel M
Cc: 'Craig Koch'
Subject: St. Elizabeth Ann Seton addition
Good morning-
I have received plans for an addition to the St. Elizabeth Ann Seton church located at 10655 Haverstick Rd. The builder is seeking a FOUNDATION
ONLY release at this time, pending the full state release. Please see attached plans and let me know if your office will need additional information
before the project is released for foundation construction.
Also, please copy Craig Koch with Shiel Sexton on your reply. He is CC’d on this email.
If you need additional information, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
30
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Thursday, May 28, 2015 9:35 AM
To:Mishler, Nicholas F
Subject:Automatic reply: St. Elizabeth Ann Seton addition
I will be out of the office until Friday , May 29, 2015. I will be checking emails. If you need immediate assistance please contact Ted
Spearman at 571-2452.
31
Mishler, Nicholas F
From:Barnes, David R
Sent:Thursday, May 28, 2015 9:35 AM
To:Mishler, Nicholas F
Subject:Automatic reply: St. Elizabeth Ann Seton addition
I'm out till 6/2 - cALL KATE/LISA FOR UP TO MINUTE INFO .
32
Mishler, Nicholas F
From:Mindham, Daren
Sent:Thursday, May 28, 2015 9:35 AM
To:Mishler, Nicholas F
Subject:Automatic reply: St. Elizabeth Ann Seton addition
I am out of the office until 5/29. I will reply to emails after my return. Please call 571-2417, if you need
immediate assistance.