CARMEL UTILITIES
130 1st Avenue S.W. WATER DISTRIBUTION
CARMEL, INDIANA 46032 SEWER COLLECTION
November 29, 1994
Memo To: Jim Dougherty
From: John Duffy
RE: Construction Permit for Hamilton Western Utilities - Springdale Farms- Section 1
I have attached a copy of a construction permit for Hamilton Western for sanitary sewer and lift
station construction. As you are aware, Hamilton Western flows to the South Plant are an ongoing
concern. This development will add 13,330 average gallons per day and 53,320 gallons during
peak times. The development will also have a new lift station constructed with 2415 ft. of 4"
force main.
NOTICE OF APPEAL RIGHTS
The Indiana Department of Environmental Management is
notifying you of the Commissioner's decision regarding the issuance
of the attached construction permit. This is being done because
the applicant for the permit listed you as a person or party who
may be potentially affected by the issuance of the permit.
Indiana law gives potentially affected persons or parties
certain appeal rights. These appeal rights, including the required
time limitations and procedures for exercising them, are set out
in more detail in the cover letter and Part III of the permit.
Please read the foregoing information carefully so that you
may become aware of your rights in this matter.
Carme! l't!lities
w NOV 1 8 1994
Jim Dougrerty
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
We make Indiana a cleaner, healthier place to live
Evan Bayh
Governor
Kathy Prosser
Commissioner
November 15, 1994
VIA CERTIFIED MAIL z 339 825 102
Davis Development L.P.
3755 East 82nd Street
Indianapolis, Indiana 46240
Dear Applicant:
100 North Senate Avenue
P.O. Box 6015
Indianapolis, Indiana 46206-6015
Telephone 317-232-8603
Environmental Helpline 1-800-451-6027
Re: 327 IAC Article 3 Construction
Permit Application
Plans and Specifications for
Sanitary Sewer
Springdale Farms, Section -1
Permit Approval No. 8172
Hamilton Western Utilities, Inc.
The application, plans and specifications, and supporting documents for the
above -referenced project have been reviewed and processed in accordance with rules
adopted under 327 IAC Article 3. Enclosed is the Construction Permit (Approval
No. 8172), which applies to the construction of the above -referenced proposed sanitary
sewer system to be located at 156th and Springmill Road.
Please review the enclosed permit carefully and become familiar with its terms
and conditions. In addition, it is imperative that the applicant, consulting
architect/engineer (A/E), inspector, and contractor are aware of these terms,
conditions, and reporting and testing requirements.
It should be noted that any person affected or aggrieved by the agency's
decision in authorizing the construction of the above -referenced facility may, within
fifteen (15) days from date of mailing, appeal by filing a request with the Technical
Secretary of the Water Board for an adjudicatory hearing in accordance with IC 4-
21.5-3-7 and IC 13-7-10-2.5. The procedure for appeal is outlined in more detail in
Part III of the attached construction permit.
Plans and specifications were prepared by Davis Development L.P., certified by
Mr. Christopher R. White, P.E., and submitted for review on August 30, 1994, with
additional information submitted on September 21, 1994 and October 13, 1994.
An Equal Opportunity Employer
Printed on Recycled Paper
ti
Page 2 of 5
Permit Approval No. 8172
SANITARY SEWER SYSTEM DESCRIPTION
The proposed project shall consist of approximately 2,549 feet of 8 -inch
diameter (PVC, SDR 35) sanitary sewer, 2,415 feet of 4 -inch diameter (PVC, SDR
21) force main and a lift station to provide service for 43 single-family homes to be
located in the Springdale Farms, Section -1, with an expected average flow of 13,330
GPD. The lift station will consist of two submersible -type grinder pumps each with a
capacity of 130 GPM at 21 feet TDH. The new force main will be connected to an
existing 15 -inch diameter sanitary sewer at the northeast corner of 156th and
Springmill Road.
Inspection during construction of the new sanitary sewer and maintenance after
completion will be provided by Hamilton Western Utilities. The wastewater treatment
will be provided by the City of Carmel.
CONDITIONS AND LIMITATIONS TO THE AUTHORIZATION FOR
CONSTRUCTION OF SANITARY SEWERS
During the period beginning on the effective date of this permit and extending
until the expiration date, the permittee is authorized to construct the above described
sanitary sewer system. Such construction shall conform to all provisions of State Rule
327 IAC Article 3 and the following specific provisions:
PART I
SPECIFIC CONDITIONS AND LIMITATIONS TO THE CONSTRUCTION PERMIT
Unless specific authorization is otherwise provided under the permit, the
permittee shall comply with the following conditions:
1. Ali local permits shall be obtained before construction is begun on this
project.
2. If pollution or nuisance conditions are created, immediate corrective
action will be taken by the permittee.
3. Sewer to water main separation distances must comply with Section 38
of the Recommended Standards for Wastewater Facilities, 1990 Edition.
4. The infiltration/exfiltration for the subject sewer system shall not exceed
200 gallons per inch of the diameter per mile of sewer in a 24-hour
period.
5. The results of the infiltration/exfiltration test and/or force main leakage
Page 3 of 5
Permit Approval No. 8172
test on the completed sewer shall be submitted to this office within
three months of completion of construction.
6. Plans for construction in a floodway must be submitted to the
Department of Natural Resources for consideration of approval prior to
the start of construction.
7. An audio-visual alarm shall be installed for the proposed lift station.
8. Air relief valves shall be installed at high points in the force main.
9. A drop pipe must be provided for all sewers entering a manhole at an
elevation of 24 inches or more above the manhole invert.
10. All force main must be tested (two hour minimum) at 150% of design
working pressure for leakage. Leakage (gallons per hour) shall be less
than ((# of joints) (d in inches) (psi) /2)/3700. Test procedures from
the appropriate AWWA specifications for pressure pipe may be used as
an alternate.
11. Deflection tests must be performed on all flexible* pipe after the final
backfill has been in place at least 30 days. No pipe shall exceed a
vertical deflection of 5%. Deflection test results shall be submitted with
the infiltration/exfiltration test results. (*The following are considered
nonflexible pipes: vitrified clay pipe, concrete pipe, ductile iron pipe,
cast iron pipe, asbestos cement pipe.)
Failure to submit test results within the allotted time period or failure to meet
guidelines as set forth in the above conditions could be subject to enforcement
proceedings as provided by 327 IAC 3-5-3.
Page 5 of 5
Permit Approval No. 8172
PART III
APPEALS PROCEDURE
Anyone wishing to challenge this agency's decision for authorizing the
construction of this facility may do so, provided that a petition for administrative
review is filed as required by IC 4-21.5-3-7. The petition must be submitted within
fifteen (15) days of the date of mailing of this permit notification. The petition must
include facts demonstrating that you are either the applicant, a person aggrieved or
adversely affected by this decision, or otherwise entitled to review by law.
Additionally, IC 13-7-10-2.5 requires that your petition include:
1. The name and address of the person making the request;
2. The interest of the person making the request;
3. Identification of any persons represented by the person making the
request;
4. The reasons, with particularity, for the request;
5. The issues, with particularity, proposed for consideration at the hearing;
and
6. Identification of the permit terms and conditions which, in the judgement
of the person making the request, would be appropriate in the case in
question to satisfy the requirements of the law governing permits of the
type granted or denied by the Assistant Commissioner's action.
7. Pursuant to IC 4-21.5-3-1(f), any document serving as a petition for
review or review and stay must be filed with Kathy Prosser, Technical
Secretary of the Water Pollution Control Board. Filing of such a
document is complete on the earliest of the following dates:
a. The date on which the petition is delivered to the Office of the
Technical Secretary of the Water Pollution Control Board, located
at 100 North Senate Avenue, P.O. Box 6015, Indianapolis,
Indiana 46206-6015;
b. The date of the postmark on the envelope containing the petition,
if the petition is mailed by United States mail; or
c. The date on which the petition is deposited with a private carrier,
as shown by a receipt issued by the carrier, if the petition is sent
by private carrier.