HomeMy WebLinkAbout246262 06/17/15 r.G�q
�(" MF. CITY OF CARMEL, INDIANA VENDOR: 068025
® ONE CIVIC SQUARE CROSSROAD ENGINEERS, PC CHECK AMOUNT: $"'101,733.97"
r. �; CARMEL, INDIANA 46032 3417 S SHERMAN DR CHECK NUMBER: 246262
v,�.` BEECH GROVE IN 46107 CHECK DATE: 06/17/15
k ETON�
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
202 4340100 32636 4,405.96 2015 PLAN REVIEW
912 R4462300 31844 15417 16.80 EMERSON DRIVE DRAINAG
912 R4462300 32638 15417 6,098.20 EMERSON DR STORM SEWE
2200 R4350900 32629 15419 360.00 ON CALL ENGINEERING
106 5023990 38526 15437 7,500.00 LAND TITLE SURVEY
211 R4340100 31903 15438 656.25 MAIN ST PATH KEYSTONE
212 R4462865 25294 15475 74,411.76 ILL ST EXT PHASE 2
211 R4340100 25293 15477 3,415.00 ASA#4-116TH & GRAY RA
1192 4350900 15480 800.00 OTHER CONT SERVICES
202 4340100 32631 15504 4,070.00 GUILFORD-CITY CNTR/MA
��CEIVED
CrossRoad Engineers, PC M 2Q13
3417 Sherman Drive �U AaMEL em
Beech317-780,IN 6107
15 5
. 32c�31
City of Carmel Pc� Invoice number 15504
Jeremy Kashman 'a o 2-4'34 0 10 0 Date 06/04/2015
1 Civic Square
Carmel, IN 46032 Project GUILFORD RD.-CITY CENTER DR.TO
MAIN ST. (DES#1383180)
For services performed April 25,2015 through May 29,2015.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract dated May 1,2013 and amended with ASA#17
dated March 18,2015.
P.O.#32631 &P.O.#31905
Amount
Supplemental Topographic Survey&Route Survey
Contract Amount 28,700.00
Percent Complete 10.00
Total Billed 2,870.00
Current Billed 2,870.00
Environmental Document Preparation-CE
Contract Amount 28,800.00
Percent Complete 0.00
Total Billed 0.00
Current Billed 0.00
Road Design and Plan Preparation
Contract Amount 103,440.00
Percent Complete 0.00
Total Billed 0.00
Current Billed 0.00
Geotechnical Evaluation&Pavement Design
Contract Amount 15,500.00
Percent Complete 0.00
Total Billed 0.00
Current Billed 0.00
Utility Coordination
Contract Amount 12,000.00
Percent Complete 10.00
Total Billed 1,200.00
Current Billed 1,200.00
City of Carmel Invoice number 15504 Invoice date 06/04/2015
Page 1 of 2
City of Carmel Invoice number 15504
Project GUILFORD RD.-CITY CENTER DR.TO MAIN ST.(DES#1383180) Date 06/04/2015
Amount
Public Hearing/Public Information Meetings
Contract Amount 8,400.00
Percent Complete 0.00
Total Billed 0.00_
Current Billed 0.00
Right of Way Engineering
Contract Amount 17,500.00
Percent Complete 0.00
Total Billed 0.00
Current Billed 0.00
Total 4,070.00
Invoice total 4,070.00
City of Carmel Invoice number 15504 Invoice date 06/04/2015
Page 2 of 2.
P
I�
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107 d 3 2(a3 (o
317-780-1555
2 02 — L43 +O 10 O
City of Carmel Invoice number 15485
Jeremy Kashman Date 06/04/2015
1 Civic Square
Carmel, IN 46032 Project CITY OF CARMEL-2014 ON-CALL PLAN
REVIEW
For services performed April 25,2015 through May 29,2015.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract dated May 1,2013 and ASA#7 dated February
14,2014 and ASA#9 dated May 21,2014.
ASA#18 PO#32636
Professional Fees
General Plan Review
Billed
Hours Rate Amount
Senior Project Manager
Billable Time 6.00 125.00 750.00
Project Manager
Billable Time 0.50 110.00 55.00
Coordination with Roger Ward
Project Engineer
Billable Time 5.50 95.00 522.50
Phase subtotal 12.00 1,327.50
Bonbar at Monon Lake-14110005 SP
Billed
Hours Rate Amount
Project Engineer
Billable Time 3.50 95.00 332.50
Boone Creek Farm -15050003 SUA
Billed
Hours Rate Amount
Project Engineer
Billable Time 1.00 95.00 95.00
Carmel Clay Fire Department Station#44 Rebuild-15020018 TAC
Billed
Hours Rate Amount
Project Engineer
Billable Time 0.50 95.00 47.50
City of Carmel Invoice number 15485 Invoice date 06/04/2015
Page 1 of 3
City of Carmel Invoice number 15485
Project_ CITY OF CARMEL-2014 ON-CALL PLAN REVIEW Date 06/04/2015
Professional Fees
Carmel Clay Fire Department Station#44 Rebuild-15020018 TAC
Billed
Hours Rate Amount
Assistant Project Engineer
Billable Time 4.00 80.00 320.00
Phase subtotal 4.50 367.50
Carmel Corporate Center-14120002 ADLS Amend
Billed
Hours Rate Amount
Project Engineer
Billable Time 0.50 95.00 47.50
Children's Learning Adventure-14100017 DP
Billed
Hours Rate Amount
Project Engineer
Billable Time 4.00 95.00 380.00
Delta Faucet Headquarters Expansion-
Billed
Hours Rate Amount
Project Engineer
Billable Time 1.50 95.00 142.50
Indiana Spine Group Building Addition-15040008 DP/ADLS
Billed
Hours Rate Amount
Project Engineer
Billable Time 2.50 95.00 237.50
Sanctuary at 116th,Sec 4B-15010001 SP
Billed
Hours Rate Amount
Project Engineer
Billable Time 1.00 95.00 95.00
The Preserve at Bear Creek,Section 2-14120013 DP
Billed
Hours Rate Amount
Project Engineer
Billable Time 13.00 95.00 1,235.00
Tom Wood Management-14120011 DP Amend
Billed
Hours Rate Amount
Project Engineer
Billable Time 1.00 95.00 95.00
Professional Fees subtotal 44.50 4,355.00
Reimbursables
General Plan Review
Billed
Units Rate Amount
Miles 48.00 0.52 24.96
The Preserve at Bear Creek,Section 2-14120013 DP
Billed
Units Rate Amount
Miles 50.00 0.52 26.00
City of Carmel Invoice number 15485 Invoice date 06/04/2015
Page 2 of 3
1,
City of Carmel Invoice number 15485
Project 7 CITY OF CARMEL-2014 ON-CALL PLAN REVIEW Date 06/04/2015
_
+Reimbursables
The Preserve at Bear Creek,Section 2-14120013 DP
Billed
Units Rate Amount
from 105321 to 105371
Reimbursables subtotal 50.96
Invoice total 4,405.96
Thank u!
r �
Chip Cha P. E.
President
City of Carmel Invoice number 15485 Invoice date 06/04/2015
Page 3 of 3
CrossRoad Engineers, PC DECEIVED
3417 Sherman Drive
Beech Grove, IN 46107 JUN 2013
317-780-1555 CARMEL
CITY ENGINEER
�a s
C,V;,-
9 O. 2 929 3 �'eu"zu
City of Carmel Invoice number 154
Jeremy Kashman Z — R�{3`"f O I Op Date 06/04/2015
1 Civic Square
Carmel, IN 46032 Project 116TH&GRAY ROAD RAB
For services performed April 25,2015 through May 29,2015.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our proposal dated October 31,2013,and Additional Services
Agreement#4 approved December 4,2013.
PO#25293
Units Amount
R/W Engineering
Contract Amount 7.00 10,500.00
Percent Complete 100.00
Total 7.00 10,500.00
Billed
Current Billed 0.00 0.00
R/W Legal Descriptions
Contract Amount 15.00 7,500.00
Percent Complete 100.00
Total 15.00 7,500.00
Billed
Current Billed 0.00 0.00
R/W Staking
ContractAmount 7.00 2,800.00
Percent Complete 0.00
Total 0.00 0.00
Billed
Current Billed 0.00 0.00
Payment Processing &Document Recording
Contract Amount 7.00 700.00
Percent Complete 0.00
Total 0.00 0.00
Billed
Current Billed 0.00 0.00
City of Carmel Invoice number 15477 Invoice date 06/04/2015
Page 1 of 2
City of Carmel Invoice number 15477
Project 116TH&GRAY ROAD RAB Date 06/04/2015
Units Amount
R/W Management
Contract Amount 7.00 7,000.00
Percent Complete 0.00
Total 0.00 0.00
Billed
Current Billed 0.00 0.00
Total 0.00 0.00
Professional Fees
R/W Engineering Revisions
Billed
Hours Rate Amount
Director
Billable Time 6.00 140.00 840.00
RAN Manager
Billable Time 7.50 90.00 675.00
CADD Technician
Billable Time 10.00 80.00 800.00
Phase subtotal 23.50 2,315.00
Professional Fees subtotal 23.50 2,315.00
Consultant
Appraisal Problem Analysis
Billed
Units Rate Amount
Traynor&Associates, Inc. 5.00 220.00 1,100.00
Parcels 1, 2, 3, 4&5
Invoice total 3,415.00
Tha ul
r
� 1
Chip Char
President
City of Carmel Invoice number 15477 Invoice date 06/04/2015
Page 2 of 2
"ravnor & Associates, Inc. Invoice
APPRAISAL DIVISION DATE INVOICE#
5/28/2015 15281
6750 East 75th Street
Indianapolis, IN 46250
BILL TO
Crossroad Engineers
3417 South Sherman Drive
Beech Grove,Indiana 46107
DESCRIPTION AMOUNT
116th&Gray Road APA's,Carmel,IN 1,000.00
Parcels 1,2,3,4,and 5
Total $1,000.00
FEDERAL TAX ID 35-2099023
o- [�qll
vaC
-/AA;
�a
c� P2 CEIVEO
CrossRoad Engineers, PCUl
n;
3417 Sherman Drive JUN 2013 ,
Beech Grove, IN 46107 , CMMEL
317-780-1555 CITYENGINEEp 'c
�e
City of Carmel '2-12 —R 4410 2 t'd,S Invoice number 15475
Jeremy Kashman Date 06/04/2015
1 Civic Square
Carmel, IN 46032 Project ILLINOIS STREET PROJECT 10-10
For services performed April 25,2015 through May 29,2015.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our proposal dated September 16,2013 and our Agreement
for Professional Services dated November 20,2013:
PO#25294
Professional Fees
Inspection
Billed
Hours Rate Amount
Director
Billable Time 35.00 140.00 4,900.00
Project Inspector
Billable Time 383.00 90.00 34,470.00
Assistant Project Inspector
Billable Time 137.50 70.00 9,625.00
Resident Project Representative
Billable Time 189.00 110.00 20,790.00
Phase subtotal 744.50 69,785.00
Professional Fees subtotal 744.50 69,785.00
Reimbursables
Inspection
Billed
Units Rate Amount
Miles 5,138.00 0.52 2,671.76
Consultant .
Inspection
Billed
Units Rate Amount
Atlas Appraisals, LLC 1.00 1,955.00 1,955.00
Parcel 7 2nd appraisal
Invoice total 74,411.76
City of Carmel Invoice number 15475 Invoice date 06/04/2015
Page 1 of 2
City of Carmel Invoice number 15475
Project ILLINOIS STREET PROJECT 10-10 Date 06/04/2015
Thank uu!
l �
Chip Charl P. E.
President
City of Carmel Invoice number 15475 Invoice date 06/04/2015
Page 2 of 2
Illinois Street Project 10-10
Inspection
Date Range from:4/25/2015 to 5/29/2015 Work In Progress
Employee/Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeoffi
Dane Snyder 203.50 203.50
Billable Time 203.50 203.50
Date Total Billed WIPTotal Billable Deferred Hold Non Billable Writeoff
4/27/2015 9.00 9.00
4/28/2015 10.50 10.50
4/29/2015 9.50 9.50
4/30/2015 10.00 10.00
5/1/2015 1.00 1.00
5/1/2015 9.00 9.00
5/4/2015 7.00 7.00
5/5/2015 9.00 9.00
5/6/2015 10.00 10.00
5/7/2015 9.50 9.50
5/8/2015 4.50 4.50
5/8/2015 3.50 3.50
5/11/2015 9.00 9.00
5/12/2015 10.00 10.00
5/13/2015 7.00 7.00
5/14/2015 8.00 8.00
5/15/2015 6.00 6.00
5/15/2015 3.00 3.00
5/18/2015 10.50 10.50
5/19/2015 9.50 9.50
5/20/2015 10.00 10.00
5/21/2015 10.00 10.00
5/21/2015 0.50 0.50
5/22/2015 8.00 8.00
5/27/2015 9.50 9.50
5/28/2015 10.00 10.00
Justen J.Hochstetler 137.50 137.50
Billable Time 137.50 137.50
Date Total Billed WIPTotal Billable Deferred Hold Non Billable Writeoff
5/11/2015 8.50 8.50
5/12/2015 8.50 8.50
Illinois Street Project 10-10
Inspection
Date Range from:4/25/2015 to 5/29/2015 Work In Progress
Employee/Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
5/13/2015 11.00 11.00
5/14/2015 9.50 9.50
5/15/2015 2.50 2.50
5/15/2015 7.00 7.00
5/16/2015 8.00 8.00
5/18/2015 10.00 10.00
5/19/2015 10.00 10.00
5/20/2015 10.00 10.00
5/21/2015 2.00 2.00
5/21/2015 8.50 8.50
5/22/2015 7.00 7.00
5/26/2015 8.00 8.00
5/27/2015 8.00 8.00
5/28/2015 8.50 8.50
5/29/2015 10.50 10.50
Justin M.Schneck 179.50 179.50
Billable Time 179.50 179.50
Date Total Billed WIPTotal Billable Deferred Hold Non Billable Writeoff
4/27/2015 7.00 7.00
4/28/2015 5.00 5.00
4/29/2015 8.00 8.00
4/30/2015 5.00 5.00
5/1/2015 7.50 7.50
5/2/2015 8.00 8.00
5/4/2015 8.00 8.00
5/5/2015 5.00 5.00
5/6/2015 9.00 9.00
5/7/2015 9.00 9.00
5/8/2015 7.00 7.00
5/11/2015 6.00 6.00
5/12/2015 7.00 7.00
5/13/2015 6.00 6.00
5/14/2015 7.00 7.00
5/15/2015 7.00 7.00
Illinois lStreet+Protect 110=10
Inspection
Date Range from:4/25/2015 to 5/29/2015 Work In Progress
Employee/Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
5/16/2015 8.00 8.00
5/18/2015 8.00 8.00
5/19/2015 4.50 4.50
5/20/2015 10.00 10.00
5/21/2015 5.50 5.50
5/22/2015 6.00 6.00
5/26/2015 10.00 10.00
5/27/2015 5.50 5.50
5/29/2015 10.50 10.50
Lance A.Stahley 189.00 189.00
Billable Time 189.00 189.00
Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
4/27/2015 5.00 5.00
4/27/2015 1.00 1.00
4/28/2015 5.00 5.00
4/28/2015 1.00 1.00
4/29/2015 7.00 7.00
4/29/2015 2.00 2.00
4/30/2015 2.00 2.00
4/30/2015 2.00 2.00
5/1/2015 6.00 6.00
5/1/2015 1.00 1.00
5/4/2015 7.00 7.00
5/4/2015 2.00 2.00
5/5/2015 6.00 6.00
5/5/2015 2.00 2.00
5/6/2015 8.00 8.00
5/6/2015 2.00 2.00 _ -
5/7/2015 6.00 6.00
5/7/2015 1.00 1.00
5/8/2015 8.00 8.00
5/8/2015 1.00 1.00
5/11/2015 8.00 8.00
5/11/2015 1.00 1.00
IlllinoisStreet Project 10-10
Inspection ,
±Date Range from:4/25/2015 to 5/29/2015 Work In Progress
�IEmployee/Activity Total Billed WIP Total Billable Deferred Hold Non'Billable Writeoff.
5/12/2015 8.00 8.00
5/12/2015 1.00 1.00
5/13/2015 8.00 8.00
5/13/2015 3.00 3.00
5/14/2015 6.00 6.00
5/14/2015 1.00 1.00
5/15/2015 7.00 7.00
5/15/2015 2.00 2.00
5/18/2015 9.00 9.00
5/19/2015 10.00 10.00
5/20/2015 9.00 9.00
5/21/2015 6.00 6.00
5/26/2015 9.00 9.00
5/27/2015 9.00 9.00
5/28/2015 8.00 8.00
5/29/2015 9.00 9.00
Trent E.Newport 35.00 35.00
Billable Time 35.00 35.00
Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
4/27/2015 1.00 1.00
4/28/2015 2.00 2.00
4/29/2015 1.00 1.00
4/30/2015 2.00 2.00
5/1/2015 3.00 3.00
5/4/2015 1.00 1.00
5/5/2015 2.00 2.00
5/6/2015 1.00 1.00
5/7/2015 1.00 1.00
5/8/2015 2.00 2.00
5/11/2015 1.00 1.00
5/12/2015 1.00 1.00
5/13/2015 1.00 1.00
5/14/2015 • 1.00 1.00
5/15/2015 3.00 3.00
Illinois Street Project 10-10
Inspection
Date Range from:4/25/2015 to 5/29/2015 Work In Progress
Employee/Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
5/18/2015 1.00 1.00
5/19/2015 1.00 1.00
5/20/2015 1.00 1.00
5/21/2015 1.00 1.00
5/22/2015 2.00 2.00
5/26/2015 1.00 1.00
5/27/2015 1.00 1.00
5/28/2015 1.00 1.00
5/29/2015 3.00 3.00
Total 744.50 744.50
Illinois St. Inspection Phase Mileage
Inspection 5,138.00 2,671.76
_ ___..____.._ __v _-._,._._.__ _______. -___. ._ - _._.__ ____ ._.. ___.______ ---------
04/27/15
._-_04/27/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 66.00 34.32 ✓
04/27/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 56.00 29.12 ✓
04/27/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
04/28/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
04/28/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 53.00 27.56 ✓
04/28/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 69.00 35.88 ✓
-- -._----------
04/29/15
___.__04/29/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 54.00 28.08 ✓
04/29/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 63.00 32.76 ✓
04/29/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 43.00 22.36 ✓
_____ ��. _..... ..,w__. _._�
04/30/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 48.00 24.96 ✓
04/30/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 67.00 34.84-------------
✓
04/30/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
05/01/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 70.00 36.40 ✓
05/01/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
05/01/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 42.00 21.84 ✓
05/01/15 Illinois Street Project 10-10 Inspection Mileage 67.00 34.84 ✓
05/02/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
05/04/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage
Milea a 63.00 32.76
______-_ _ --------
05/04/15
_.__05/04/15 .....__.__✓_._
_.._..._.._-_.
Illinois Street Project 10-10 Inspection Lance Stahley Mileage 46.00 23.92 ✓
05/04/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20
05/05/_15 Illinois Street Project 10-10 Inspection Lance Stahley_ Mileage 37.0_0_ 19.24 ✓
05/05/15 Illinois Street Project 10-10 Inspection Justin Schneck v ^-Yry LLM�Mileage 57.00 29.64 ✓ .___.__
05/05/15 Illinois Street Pro'ect__._.____.._.__--.________._______...._._-____..___._.._..__._._._..__._.-_,..�.__..__--_--__.._._.__.___.,_.._________._._.-___..�.-_---.-__..__.,__________.._.___._._.__.._._,-_..__......,..____._..
10-10 Inspection Dane Snyder Mileage 69.00 35.88 ✓
------ ___.._..
05/06/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 68.00 35.36 ✓
05/06/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 63.00 32.76 ✓
05/06/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 48.00 24.96 ✓
05/07/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 56.00 29.12 ✓
05/07/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 66.00 34.32 ✓
_,........._._.._....
05/07/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
05/08/15 Illinois Street Project 10-10 Inspection. Justin Schneck Mileage 60.00 31.20 ✓
_.. .__....._ _.
05/08/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 68.00 35.36 ✓
05/08/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 45.00 23.40 ✓
05/11/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
011
05/11/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 51.00 26.52 ✓
05/11/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 47.00 24.44 ✓
05/11/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 65.00 33.80 ✓
05/12/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 48.00 24.96 ✓
05/12/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 69.00 35.88 ✓
_._..__._.._.,-._. ........ .._._..
05/12/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 45.00 23.40 ✓
05/12/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
_..�.__ __.___--------------
05/13/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 63.00 32.76 ✓
05/13/15 Illinois Street Project 10-10 InspectionJusten Hochstetler Mileage 55.00 28.60 ✓
05/13/15 Illinois Street Project 10-10 Inspecoon Dane Snyder Mileage 72.00 37.44 ✓
05/13/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 54.00 28.08 ✓
05/14/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 50.00 26.00 ✓
05/14/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 68.00 35.36 ✓
05/14/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 57.00 29.64 ✓
05/14/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 69.00 35.88 ✓
05/15/15 Illinois Street Project 10-10 Inspection Mileage 68.00 35.36 ✓
05/15/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 66.00 34.32 ✓
05/15/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
---------- ____._....... _,._____ _ u------ __ _,_.___.____._ _. ...,__.. ..____.........___._..
05/15/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 54.00 28.08 ✓
05/15/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 46.00 23.92 ✓
05/16/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 54.00 28.08 ✓
05/16/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
05/18/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 52.00 27.04
05/18/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 71.00 36.92 ✓
-.-_- -___________,._ �.
05/18/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage _54.00 28.08 ✓
05/18/15^m 14.Illinois Street Project 10-10 Inspection Justin Schneck ..J��..V Mileage �_...,_._..___,.._.60.00V 31.20,....__.__..........,✓_..-....._.,.__...
05/19/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 63.00 32.76 ✓
05/19/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 60.00 31.20 ✓
05/19/15 Illinois Street Project 10-10 Inspection Dane Snyder - Mileage 69.00 35.88 ✓
._- ... ___..�..,....,____._...,_-.,. ______...___.__._._...___.�., M,.__._.__. .._...-._ . ....,__. .__.....__....._..__..
05/19/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 54.00 28.08 ✓
05/20/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 62.00 32.24 ✓
05/20/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 72.00 37.44 ✓
05/20/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 39.00 20.28 ✓
__.,.__. . .,__. .._ ......___...__..__ _.. .._._...__ _,._._.___..__._.._ ..__ __.........___.__.. _,,...__..
05/20/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 63.00 32.76 ✓
05/21/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
05/21/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 54.00 28,08 ✓
® �PrOfect ® ® - e ®n IS Aftm"OtHICISOiiltdd
05/21/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 49.00 25.48 ✓
__......._.._-_._._.__ _.._._.._..... ____._..
05/21/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 70.00 36.40 ✓
05/22/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.00 31.20 ✓
05/22/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 54.00 28.08 ✓
05/22/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 62.00 32.24 ✓
05/26/15�W Y Illinois Street Project 10-10 ._.._Inspection~ W_f Lance Stahley- _____._.._._.,_..__.._.... 9_..__ ._.____._..._.__....___-_.__-...___-._
Milea a 46.00 23.92 ✓
05/26/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 66.00 34.32 ✓
05/26/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 54.00 28.08 ✓
05/27/15 _ Illinois Street Project 10-10 Inspection Justin Schneck Mileage 60.0031.20 ✓
05/27/15 Illinois Street Project 10-10InspectionDane Snyder
._._._....._�.._....._____.__.__..- _._.._. ..._..__..._.._.____.....__ __.____-___..__...._....._._Mileage_..._.____.._..._......._..._..__........___....__m-.._.._.____..�_.____.._._.,..._..._..__..___
71.00 36.92 ✓
__....-.._.._---......._ ._... .__ _..__....
05/27/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 45.00 23.40 ✓
05/27/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 54.00 28.08 ✓
05/28/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 51.00 26.52 ✓
05/28/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 58.00 30.16 ✓
05/28/15 Illinois Street Project 10-10 Inspection Dane Snyder Mileage 69.00 35.88 ✓
05/28/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 63.00 32.76 ✓
05/29/15 Illinois Street Project 10-10 Inspection Justen Hochstetler Mileage 56.00 29.12
05/29/15 Illinois Street Project 10-10 Inspection Justin Schneck Mileage 63.00 32.76 ✓
05/29/15 Illinois Street Project 10-10 Inspection Lance Stahley Mileage 49.00 25.48 ✓
5,138.00 2,671.76
ATLAS APPRAISALS, LLC
11495 N Pennsylvania Suite 200, Carmel, IN 46032 Phone: 317-358-7293
email: atlasappraisalsllc@gmail.com
May 19, 2015
CrossRoad Engineers,PC
3417 Sherman Drive
Beech Grove,IN 46107
Re: City of Carmel Project 10-10
Illinois St. Extension
Appraising
STATEMENT OR INVOICE
Enclosed please find our invoice for the completion of appraisal on the above referenced project.
5/19/2015 Appraising
Road Des. # Parcel# Owner Report Type INVOICE
Illinois St Ext City of Carmel 10-10 7 CIHS Newco, LLC Short Form $1,500
Correction $200
TOTAL $1,700
Respectfully Submitted.
Monica A. Alexander
Indiana Certified General Appraiser License#CG40700683
t7g70���
~: t RECEIVED
Cross Road Engineers, PC CO JUN 2013
3417 Sherman Drive A CARMEL �
Beech Grove, IN 46107 CITY ENGINEER
317-780-1555 � �
9.c:). gz(.02.9
City of Carmel 220d — R4 3 g 5 p p Invoice number 15419
Jeremy Kashman Date 06/04/2015
1 Civic Square
Carmel, IN 46032 Project CITY OF CARMEL-ON CALL
ENGINEERING AND INSPECTION
SERVICES
For services performed April 25,2015 through May 29,2015.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with Agreement for Professional Services dated March 27,2013
and approved May 1,2013.
ASA#16
PO 32629
Professional Fees
River Road inspection
Billed
Hours Rate Amount
Director
Billable Time 1.00 140.00 140.00
Resident Project Representative
Billable Time 2.00 110.00 220.00
pre-con then site meeting
Phase subtotal 3.00 360.00
Professional Fees subtotal 3.00 360.00
Invoice total 360.00
Thank ou!
NCh
s, P. EP
City of Carmel Invoice number 15419 Invoice date 06/04/2015
Page 1
CrossRoad Engineers, PC
3417 Sherman Drive �i�,
Beech Grove, IN 46107 �' �A
317-780-1555 61
City of Carmel 3 t 9 3 Invoice number 15438
Jeremy Kashman 2 1 1 — R y 3LI O l o cb Date 06/04/2015
1 Civic Square
Carmel, IN 46032 Project MAIN STREET PATH FROM KEYSTONE
TO GRAY-ROAD
For services performed April 25,2015 through May 29,2015.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our LPA-Consulting Contract dated November 20,2013. '
ASA#8
PO#31903
Consultant
Geotech Soil Borings and Report(PO#31903)
Billed
Units Rate Amount
Earth Exploration, Inc. 1.00 656.25 656.25
Invoice total 656.25
Tha k ou!
C Charl P. E.
President
City of Carmel Invoice number 15438 Invoice date 06/04/2015
Page 1
7l
�PLOR,471ON
im�m.T-�
7770 West New York Street
Indianapolis,IN 46214-2988
317-273-1690
3.17-273-2250(FAX)
INVOICE
DATE: May 18, 2015 INVOICE NO.: . 11506004
TO: CrossRoad Engineers, PC PROJECT: Main St. Path Project &
3417 Sherman Dr. 136th St. Path Project
Beech Grove, IN 46107 Des No.: 1383166& 1383165
Attm Mr. Mark A. Beck, P.E.
ti AUTHORIZATION: Electronic Mail EEI PROJECT NO.: 1-14-054
BILLED THROUGH DATE: May 24, 2015 TERMS: Net 30 days .
Description Quantity Unit Price Extension Total
Geotechnical Evaluation
Geotechnical engineer(32) 6.3 hr 105.00 656.25
TOTAL $656.25
P1 4.
CEVEi
1 s'� JUN 2
CrossRoad Engineers, PC CARMEL
Sherman Drive =._
Beech Grove, IN 46107 CI7YENGINE,_„
?
0.q i 46`+1{- 317-780-1555
CJ12 — %Z'4H623o0 �t(o• $O
City of Carmel ,p 0 32(0.,y sY Invoice number 15417
Jeremy Kashman Date 06/04/2015
1 Civic Square CI t? -eL4L4 23 00 to ocl g.2 0
Carmel, IN 46032 Project LITTLE COOL CREEK DRAINAGE
IMPRVMTS. & EMERSON
DR .NEIGHBORHOOD DRAINAGE
STUDY
For services performed April 25,2015 through May 29,2015.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract dated May 1, 2013:
PO#31844($35,000)ASA#11
PO#32648($30,000)ASA#15
PO#32638($23,000)ASA#19
Units Amount
Plats&Descriptions
Contract Amount 3.00 3,600.00
Percent Complete 100.00
Total Billed 3.00 3,600.00
Current Billed 0.00 0.00
Acquisition
Contract Amount 3.00 4,500.00
Percent Complete 100.00
Total Billed 3.00 4,500.00
Current Billed 2.00 3,000.00
Right of Way Management
Contract Amount 3.00 3,000.00
Percent Complete 100.00
Total Billed 3.00 3,000.00
Current Billed 2.00 2,000.00
Total 4.00 5,000.00
Drainage Analysis and Report
Professional Fees
Billed
Hours Rate Amount
Director 0.50 140.00 70.00
Project Manager 9.50 110.00 1,045.00
Phase subtotal 1,115.00
City of Carmel Invoice number 15417 Invoice date 06/04/2015
Page 1 of 2
City of Carmel Invoice number 15417
„Project LITTLE COOL CREEK DRAINAGE IMPRVMTS.&EMERSON DR.NEIGHBORHOOD DRAINAGE.STUDY Date 06/04/2015
Invoice total 6,115.00
City of Carmel Invoice number 15417 Invoice date 06/04/2015
Page 2 of 2
Prescribed by State Board of Accounts City Form No.201(Rev.1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom,
rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Crossroad Engineers Purchase Order No.
3417 Sherman Drive Terms
Beech Grove, IN 46107 Date Due
Invoice Invoice Description
Date Number (or note attached invoice(s)or bill(s) Amount
6/4/2015 15504 Guilford Road-City Center Drive to Main St $ 4,070.00
6/4/2015 15485 2015 On-Call Plan Review $ 4,405.96
6/4/2015 15477 116th and Gray Road RAB , $ 3,415.00
6/4/2015 15475 Project 10-10; Illinois Street. - $ 74,411.76
6/4/2015 15419 On-Call Engineering and Inspection $ 360.00
6/4/2015 15438 Main Street Path -,Keystone to Gray $ 656.25
6/4/2015 15417 Little Cool Creek Drainage Improve. Study $ 16.80
6/4/2015 15417 Little Cool Creek Drainage Improve. Study $ 6,098.20
Total $ 93,433.97
hereby certify that the attached invoice(s), or bill(s), is (are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6.
,20
Clerk-Treasurer
VOUCHER NO WARRANT NO.
Crossroad Engineers ALLOWED 20
3417 Sherman Drive IN SUM OF $
Beech Grove, IN 46107
$ 93,433.97
ON ACCOUNT OF APPROPRIATION FOR
Board Members
PO#or INVOICE NO. ACCT#/TITLE AMOUNT
DEPT# I hereby certify that the attached invoice(s), or
32631 15504 202-4340100 $ 4,070.00 bill(s) is (are)true and correct and that the
materials or services itemized thereon for
32636 15485 202-4340100 $ 4,405.96 which charge is made were ordered and
25293 15477 211-R434010 $ 3,415.00 received except
25294 15475 212-R446286 $ 74,411.76
32629 15419 2200-R4350900 $ 360.00
31903 15438 211-R4340100 $ 656.25
31844 15417 912-R44623( s 16.80
32638 15417 912-R44623( $ 6,098.20
6/15/2015
Signa ure
City Engineer
Cost Distribution ledger classification if Title
claim paid motor vehicle highway fund
J
+ - Cross Road Engineers, PC
3417 Sherman Drive
2015 , Beech Grove, IN 46107
z - LIOcL� 317-780-1555
City of Carmel Department of Community Services Invoice number 15480
David Littlejohn Date 06/04/2015
One Civic Square
Carmel, IN 46032 Project GUILFORD RD. PATH EXTENSION
-PROJECT
For services performed April 25,2015 through May 29,2015. j
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract dated May 1,2013,as amended by Additional
Services Agreement No. 13 approved December 17,2014.
PO#31920
Amount
Topographic Survey&Research
Contract Amount 1,500.00
Percent Complete 100.00
Total Billed 1,500.00
Current Billed 0.00
Design&Construction Drawings
Contract Amount 3,500.00
Percent Complete 100.00
Total Billed 3,500.00
Current Billed 0.00
Easement/Right of Way Documents
Contract Amount 800.00
Percent Complete 100.00
Total Billed 800.00
Current Billed 800.00
Total 800.00
Invoice total 800.00
Invoice Summary
Prior
Description Billed
TOPOGRAPHIC SURVEY&RESEARCH 1,500.00
DESIGN&CONSTRUCTION DRAWINGS 3,500.00
EASEMENT/RIGHT OF WAY DOCUMENTS 0.00
Total 5,000.00
City of Carmel Department of Community Services Invoice number 15480 Invoice date 06/04/2015
Page 1 of 2
VOUCHER NO. WARRANT NO.
ALLOWED 20
Cross Road Engineers, P.C.
IN SUM OF$
3417 Sherman Drive
Beech Grove, IN 46107
$800.00
ON ACCOUNT OF APPROPRIATION FOR
Carmel DOCS
PO#/Dept. INVOICE NO. I ACCT#/TITLE AMOUNT Board Members
31919 I 15480 I 43-509.00 I $800.00 1 hereby certify that the attached invoice(s), or
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Monday, June 15, 2015
Dire4r
Title
Cost distribution ledger classification if
claim paid motor vehicle highway fund
Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
I
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service,where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No.
Terms
Date Due
III Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
06/04/15 15480 $800.00
I hereby certify that the attached invoice(s), or bill(s), is(are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6
20
Clerk-Treasurer
7JI
CrossRoad Engineers, PCd �II3417 Sherman Drive
Beech Grove, IN 46107
Ley
317-780-1555 —
Carmel/Clay Board of Parks and Recreation Invoice number 15437
1411 E. 116th Street Date 06/04/2015
Carmel, IN 46032
Project RIVER ROAD TYNER PROPERTY
For services.performed April"25,"2015 through.May 29,2015.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with your Engagement Letter dated May 5,2015.
Amount
ALTA/ACSM 5.16 Ac.Tract
Contract Amount 7,500.00
Percent Complete 100.00
Total Billed 7,500.00
Current Billed 7,500.00
Total 7,500.00
Invoice total 7,500.00
Carmel/Clay Board of Parks and Recreation Invoice number 15437 Invoice date 06/04/2015
Page 1
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice of bill to be properly itemized must show; kind of service,where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No.
CrossRoad Engineers, PC Date Due
3417 Sherman Drive
Beech Grove, IN 46107
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) PO# Amount
6/4/15 15437 ALTA/ACSM Land title survey 38526 $ 7,500.00
Total $ 7,500.00
1 hereby certify that the attached invoice(s),or bill(s)is(are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6
20—
Clerk-Treasurer
Voucher No. Warrant No.
Allowed 20
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107 In Sum of$
I
$ 7,500.00
i
ON ACCOUNT OF APPROPRIATION FOR
106 Park Impact Fee
PO#or INVOICE NO. kCCT#MTLI AMOUNT Board Members
Dept#
38526 15437 5023990 $ 7,500.00 1 hereby certify that the attached invoice(s), or
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
1
f
June 11, 2015
$ 7,500.00 Accounts Payable Coordinator
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund